    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 17 of 46 257 258 259 solar. Solar generation potential is defined through clear sky irradiance profiles3. These clear sky irradiance profiles represent ideal weather conditions and change with the day of the year. The following simplified equation is used to determine the PDC panel output over time. 260 PDC (t) = 261 262 263 264 265 266 267 268 269 270 271 272 The Framework does not consider losses or orientation of the solar array and rather assumes ideal conditions for both. b. IClearSky (t) W 1000 2 m ∗ PDCRated 8.B.01 Minimal Weather Adjusted Output (MWAC): In order to account for weather conditions and the chance of non-ideal conditions for solar generation, a Minimal Weather Adjusted Relative Irradiance εIrrMWAC has been evaluated through data analytics on historic irradiance data sets. A Minimal Weather Adjusted Relative Irradiance shall be used for all three seasons using the 10th percentile on the event distribution. • Summer: Jun, Jul, Aug 16.6% • Transition: Mar, Apr, May, Sept, Oct, Nov 18.1% • Winter: Dec, Jan, Feb 24.1% The resulting Minimal Weather Adjusted Clear Sky Irradiance Profile can therefore be determined by IClearSkyMWAC (t) = IClearSky (t) ∗ εIrrMWAC 8.B.02 273 274 Resulting in a Minimal Weather Adjusted DC Capacity of 275 PDCMWAC (t) = 276 277 278 No conversion losses are modeled for solar distributed generation, and the PDCMWAC (t) results can be directly converted to the resulting PACMWAC (t) values as follows. If PDCMWAC > PACRated , PACMWAC is capped at PACRated . 279 PACMWAC (t) = max PDCMWAC (t) IClearSky MWAC W 1000 2 m PAC (t) ∗ PDCRated 8.B.03 8.B.04 Rated 280 281 282 c. 283 Note: The NWA Framework defaults the PDC to PAC ration as 1.2.4 284 285 286 287 288 289 290 291 292 293 Degradation: The NWA Framework does not account for panel degradation over time but assumes a replacement of panels every 20 years. Figure 2 shows an application of solar distributed generation to reduce a capacity deficit. Using the evaluation framework for solar distributed generation, this capacity curve was calculated as follows: a. The plan calls for four (4) systems at PACRated = 2 MW each; no other DERs are considered b. The systems are defined as having an c. d. PDC PAC Rated = 1.5 ratio Rated The reliability framework accounts for only three (3) of the four (4) systems at 2 MW each, assuming the loss of the largest asset The clear sky irradiance profile is converted to the Minimal Weather Adjusted clear sky irradiance profile and applied to PDCMWAC to calculate PDCMWAC (t) using summer profiles 3 The NWA Framework bases its Clear Sky Irradiance data off Clean Power Research’s SolarAnywhere® Datasets 4 Data based on historic trend analysis of large-scale solar system installations in CT 11
  2. Page 18 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 18 of 46 294 e. In no instance does PDCMWAC (t) exceed PACRated , therefore there is no capping of the expected output 295 f. The resulting Minimal Weather Adjusted capacity curve peaks at 3.15 MW, or 39.3% of PACRated , or 26.3% of PDCRated 296 g. Due to the time of peak, very little contribution is made by solar to the capacity deficit shown in the example below. 297 1.00 5.00 0.90 0.00 0.80 -10.00 0.60 -15.00 0.50 -20.00 0.40 -25.00 0.30 -30.00 0.20 -35.00 0.10 -40.00 298 299 0.70 MWH BATTERY CHARGE MW -5.00 12:00:00 AM 12:30:00 AM 1:00:00 AM 1:30:00 AM 2:00:00 AM 2:30:00 AM 3:00:00 AM 3:30:00 AM 4:00:00 AM 4:30:00 AM 5:00:00 AM 5:30:00 AM 6:00:00 AM 6:30:00 AM 7:00:00 AM 7:30:00 AM 8:00:00 AM 8:30:00 AM 9:00:00 AM 9:30:00 AM 10:00:00 AM 10:30:00 AM 11:00:00 AM 11:30:00 AM 12:00:00 PM 12:30:00 PM 1:00:00 PM 1:30:00 PM 2:00:00 PM 2:30:00 PM 3:00:00 PM 3:30:00 PM 4:00:00 PM 4:30:00 PM 5:00:00 PM 5:30:00 PM 6:00:00 PM 6:30:00 PM 7:00:00 PM 7:30:00 PM 8:00:00 PM 8:30:00 PM 9:00:00 PM 9:30:00 PM 10:00:00 PM 10:30:00 PM 11:00:00 PM 11:30:00 PM 10.00 0.00 Fuel Cell CHP Solar EE CVR Battery Total Emergancy Gen Capacity Delta Headroom Battery Charge DR Total Figure 2: Application of Minimal Weather Adjusted Solar Generation Capacity to a Capacity Deficit 300 C. ENERGY EFFICIENCY 301 302 303 304 305 Energy Efficiency is modeled as a permanent dispatch from the year of installation. This means, that the Energy Efficiency impacts will be modeled as continuously on, regardless of whether there is a capacity deficit or not. Energy Efficiency is modeled for four (4) distinct applications as well as a generic application, each with different profiles. Energy Efficiency is calculated as follows over the course of a day, with εType (t) the Energy Efficiency specific profile type. The Energy Efficiency profiles listed below are based on internal experience of the EE-Team. 306 PEE = ∑Type (PEEType ∗ εType (t)) 307 308 309 310 a. 8.C.01 Lighting: Lighting Energy Efficiency is assumed to mostly target commercial and industrial lighting, as a result, Energy Efficiency savings will manifest themselves during working hours. Commercial and industrial lighting-based Energy Efficiency will take effect starting at 7am and stop at after 6pm. No seasonal dependency is assumed for Lighting Energy Efficiency measures. 12
  3. Page 19 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 19 of 46 Commercial Lighting EE Profile 120% EE Profile 100% 80% 60% 40% 20% 0:00 0:45 1:30 2:15 3:00 3:45 4:30 5:15 6:00 6:45 7:30 8:15 9:00 9:45 10:30 11:15 12:00 12:45 13:30 14:15 15:00 15:45 16:30 17:15 18:00 18:45 19:30 20:15 21:00 21:45 22:30 23:15 0% 311 312 Figure 3: Daily Lighting EE Profile 313 314 315 316 317 318 b. c. 319 320 321 322 Residential Lighting: Residential Lighting is assumed to provide the most impact in the evening hours after 7pm. HVAC Commercial: Commercial HVAC is assumed to mostly be active during the day, with minimal activity at night. It is also dependent on the time of year. The underlying assumption is that HVAC load will be the highest during summer months, the lowest during spring and fall, with a minor peak during winter. To determine the day of year dependency of potential commercial HVAC savings, the following equation applied in the NWA Framework: εHVACCommYearly (t) = 1 + cos ( 15 min Interval of the Year Total number of15 min Intervals per Year 1 15 min Interval of the Year 3 Total number of15 min Intervals per Year ∗ 4π) + sin ( ∗ π) 8.C.02 which results in the annual curve for HVAC below. 323 324 Figure 4: Annual Commercial HVAC EE Profile 325 For daily profile of commercial HVAC Energy Efficiency, 326 εHVACCommDaily (t) = (1 + sin (π ∗ 1 15 min Interal of the Day−10 2 Total number of15 min Intervals per Day 327 328 329 330 13 )) ∗ εHVACCommYearly (t) 8.C.03
  4. Page 20 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 20 of 46 331 332 Figure 5: Daily Profile for Commercial HVAC EE 333 334 335 d. HVAC Residential: The HVAC residential follows the same yearly distribution as the HVAC commercial application, see above Equation 8.C.02. εHVACResYearly (t) = εHVACComYearly (t) 8.C.04 336 337 338 339 However, given that residential HVAC applications typically have a higher yield in the evening hours and at night as opposed to the commercial HVAC which typically operates during the day, the profile has been adjusted. For the daily profile of residential HVAC, the following profile function is applied. 340 εHVACResDaily (t) = (0.7 + 3 10 sin (2π ∗ 15 min Interval of the Day+30 otal number of15 min Intervals per Day )) ∗ εHVACResYearly (t) 8.C.05 341 342 343 Figure 6: HVAC Residential HVAC EE Profile 344 D. DEMAND RESPONSE 345 346 Demand Response (DR) is classified into two types, commercial and residential DR. Both types of DR will dispatch automatically if there is a modeled capacity delta. The dispatch is modeled as a binary function, activating all of the resources or none. 347 348 DR contracts provide for a 3-hour dispatch minimum window. Longer dispatch windows can be simulated, but an adjustment to the overall DR volume needs to be made, as the EDC would then stagger the DR resources to achieve such an effect. 349 SNAP BACK AND PRE-CONDITIONING 14
  5. Page 21 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 21 of 46 350 351 Both DR resource types are modeled with pre-conditioning (e.g. through precooling before an event) and a snap back (e.g. through re-cooling after an event). 352 353 354 a. b. 355 356 Figure 7 shows a modeled DR event with 2 MW of commercial, and 0.5 MW of residential DR capacity. Clearly visible, the preconditioning and snap back, before and after the event respectively. Pre-Cooling lasts 30 min and is defaulted to 60% of the total DR impact and is user adjustable depending on local conditions Snap Back lasts for 2 hours after the event and is defaulted to 60% of the total DR impact and is user adjustable depending on local conditions 357 1.00 5.00 0.90 0.00 0.80 -10.00 0.60 -15.00 0.50 -20.00 0.40 -25.00 0.30 -30.00 0.20 -35.00 0.10 -40.00 358 0.70 MWH BATTERY CHARGE MW -5.00 12:00:00 AM 12:30:00 AM 1:00:00 AM 1:30:00 AM 2:00:00 AM 2:30:00 AM 3:00:00 AM 3:30:00 AM 4:00:00 AM 4:30:00 AM 5:00:00 AM 5:30:00 AM 6:00:00 AM 6:30:00 AM 7:00:00 AM 7:30:00 AM 8:00:00 AM 8:30:00 AM 9:00:00 AM 9:30:00 AM 10:00:00 AM 10:30:00 AM 11:00:00 AM 11:30:00 AM 12:00:00 PM 12:30:00 PM 1:00:00 PM 1:30:00 PM 2:00:00 PM 2:30:00 PM 3:00:00 PM 3:30:00 PM 4:00:00 PM 4:30:00 PM 5:00:00 PM 5:30:00 PM 6:00:00 PM 6:30:00 PM 7:00:00 PM 7:30:00 PM 8:00:00 PM 8:30:00 PM 9:00:00 PM 9:30:00 PM 10:00:00 PM 10:30:00 PM 11:00:00 PM 11:30:00 PM 10.00 0.00 Fuel Cell CHP Solar EE CVR Battery Total Emergancy Gen Capacity Delta Headroom Battery Charge DR Total 359 Figure 7: Example DR Event with Pre-Conditioning and Snap Back 360 AVAILABILITY OF DR RESOURCES 361 362 363 364 365 DR resources, much like EE, are only available if the underlying load is actually being used. For EE, the Framework models this approach with a seasonal and intra-day dependency. For commercial and residential DR, the NWA Framework provides a similar approach. As both forms of DR (excluding BTM storage) are typically based on HVAC applications, their highest impact will be achieved during peak summer month during afternoon hours. Figure 8 highlights the peak availability of DR resources throughout the year assumed in the NWA Framework. 15
  6. Page 22 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 22 of 46 366 367 Figure 8: Annual DR Capacity Availability Profile 368 369 370 371 For each individual day, the Annual DR Capacity Availability Profile provides the peak DR response that can be expected based on the contracted volume. All contracted volume is given at 100% Annual DR Capacity. For each individual day, the value is then scaled to a daily profile to match actual resource usage. Figure 9 shows the Framework’s availability profile for commercial and residential DR resources. 372 373 Figure 9: Available DR Capacity Profile 374 16
  7. Page 23 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 23 of 46 375 376 377 378 379 380 381 E. CONSERVATION VOLTAGE REDUCTION Conservation Voltage Reduction (CVR) is given as a percentage of feeder load and as such varies over time. During a low load situation CVR will consequently reduce the load less in absolute numbers, than it does during a high load situation. The default assumed maximum reduction value is 1.8%, which is lower than the 2.345 reported by EPRI (only report with more constant impedance loads), but the number can be changed depending on the feeder topology and load constellation. The 1.8% represents values evaluated by the Company on its own circuits and requires a high-level evaluation for each region to ensure that such targets can be reached. 382 F. BATTERY STORAGE 383 384 385 For the purpose of technical evaluation all available battery resources are dispatched in the same manner. Hereby no distinction is made between grid scale battery systems and BTM solutions. Further, only battery resources that are under direct control of the utility are considered as NWA options, both utility scale and behind the meter. 386 Battery dispatch is constrained by: 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 a. b. c. d. e. f. Maximum Charging/Discharging Power: It is assumed that a battery has a symmetric dispatch and can achieve its full rated power both when charging or discharging and is limited only by the inverter capabilities. No reactive power dispatch will be taken into consideration. Available Headroom: The battery will not (dis)charge in a fashion that introduces new capacity violations, therefore, recharge limitations are in place and a battery might find itself in a situation where it cannot recharge fast enough to support a new capacity constraint. It will take into consideration any additional capacity from Permanently Altering and Continuously Running Assets (See Section 8.A.) Capacity Deficit: The battery will not (dis)charge more than is required to eliminate a capacity deficit. This means, only the absolute required minimum usage of the battery is assumed, which would equal ideal conditions. State of Charge: The battery cannot charge, or discharge more than its state of charge allows. Batteries are assumed to be able to charge between 0% and 100% of their nameplate capacity. All the batteries are given an initial state of charge for the peak day simulation. That initial state of charge can be freely chosen 6 by the user. The dispatch simulation requires the batteries to return to the same SOC at the end of the simulated day, to ensure same initial condition should the following day also require battery dispatch for NWA purpose. The default setting here is 50%, stating that the battery starts, and ends, each day at 50% state of charge. a. IMPORTANT: If the battery is unable to attain at least the same SOC at the end of the peak day that it started the day with, it is at high risk of not being able to perform two consecutive event days. This means that the station does not have enough headroom to allow adequate recharging of the BESS. Degradation: No degradation of storage capacity is applied in the NWA Framework Round Trip Efficiency: A round trip efficiency is defined in the NWA Framework, which is applied equally to the charging and discharging cycles with 2 √%roundtrip 409 8.F.01 410 5 https://www.epri.com/research/products/1024482 17
  8. Page 24 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 24 of 46 411 412 The charge and discharge efficiency are taken into consideration for SOC modeling, energy loss calculations, and when determining the ideal system size. 413 414 If any capacity deficit cannot be met by the battery, either because it does not have sufficient power, or because it has run empty, this will be highlighted. 415 416 417 418 419 420 421 422 423 424 425 426 427 G. FUEL CELL Fuel Cell units are assumed to be must run assets and are modeled as continuously running. See Chapter 6.A and 9.K. The NWA Framework assumes that, outside of reliability considerations, any downtime for Fuel Cells will be maintenance-related and scheduled outside of possible event days. H. COMBINED HEAT AND POWER Combined Heat and Power (CHP) units are assumed to be must run assets and are modeled as continuously running. The NWA Framework assumes that, outside or reliability considerations, any downtime for CHPs will be maintenance-related and scheduled outside of possible event days. I. EMERGANCY GENERATION Emergency Generation units are dispatched to compensate any capacity deficits. Their dispatched is modeled as binary, either on or off. They are not modeled to require warm up or spool down times as the resolution of the NWA Framework is 15 min, which provides adequate time for a generator to reach operational output. Aside from N-1 considerations, Emergency Generators are modeled at name plate rating. 428 18
  9. Page 25 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 25 of 46 9. COST MODEL 429 430 431 432 For the NWA Framework, the Cost Model describes how costs of all types of solutions, NWA and traditional are modeled. For all NWA solutions, the same cost model is applied (with the exception of CVR). Where an NWA solution does not have a cost factor, the values are considered null. 433 A. TRADITIONAL SOLUTION 434 Traditional Solution cost is provided in the NWA Framework in three categories 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 a. b. c. CapEx: Capital Expenses for traditional solutions are provided for a single year of expense; the NWA Framework assumes for simplicity reasons that all cost can be allocated to a single year. The Framework provides for entries in the following fields, which are all summed up to be included in the total CapEx of the project: a. Labor and Equipment b. Engineering c. Material d. PM Support / Permitting e. Removal f. Contingency g. Escalation h. Indirects i. AFUDC OpEx: Operational Expenses are provided starting the year of the project and represent any increase or decrease in OpEx due to the new solution. A decrease in OpEx due to a new traditional solution can also be included as a negative value. Any change in OpEx will be extrapolated forward over the full financial planning horizon. Real-Estate Cost: Any property purchases required are recorded separately. An annual addition to the revenue requirements is made through multiplication of the sum of all property purchases made to that point in time, multiplied by the WACC WACC ∗ ∑t1 $PropertyPurchase (t) 455 9.A.01 B. NWA COST TYPES 456 The NWA Framework accounts for four (4) types of cost when it comes to DERs under consideration for NWA opportunities. 457 458 459 460 461 462 463 464 465 a. CapEx Cost: Capital Expenses (CapEx) are treated as expensed in a single year for any DER project. E.g., the installation of a battery system carries $5.5 Million CapEx cost. Even if the project to build said battery system might, in reality take more than a year, the Framework assumes those costs occur in the year the solution is deployed. ▪ CapEx costs are increased on a yearly basis using a general inflation rate ▪ CapEx costs have a book depreciation over the asset’s life span (12, 20, or 40 years) ▪ CapEx costs have a tax depreciation over either 5, 7, or 20 years ▪ CapEx costs for specific asset types have a technology cost reduction, such as solar panels CapEx Cost includes the following line items in the cost model for each type of NWA 19
  10. Page 26 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 26 of 46 ▪ 466 467 468 469 470 471 472 473 ▪ 474 ▪ 475 476 477 478 479 480 481 482 ▪ 483 ▪ 484 485 486 ∑ (Pinst ∗ x 487 488 489 490 491 492 493 494 495 496 497 498 b. $ MW ) 9.B.01 OpEx Cost: Operational Expenses (OpEx) are treated as expenses reoccurring every year. Reoccurring cost, program or OpEx, are calculated on a yearly basis. ▪ OpEx costs are increased on a yearly basis using a general inflation rate ▪ OpEx costs are treated as a direct passthrough to revenue requirements without additional earnings add on OpEx Cost include the following line items in the cost model for each type of NWA ▪ Fixed O&M: Includes all maintenance and minor replacement activities, in addition to any running cost that are not dependent on utilization. ▪ Variable O&M: Includes all fuel and other variable cost that is dependent on either the energy produced or the Full Load Hours of operation per year. ▪ 499 500 501 502 503 504 505 506 507 508 Equipment Cost: Includes all NWA asset equipment, such as generators, panels, or inverters. Reappears for an asset replacement. Given in $⁄MW. For accounting purposes (see Chapter 10.A. Accounts), these costs are split between the following positions where applicable o Distribution Hardware o Inverters o Generators/Motors/CHP/Fuel Cells o Battery Cells Interconnection Equipment: Includes all equipment required to interconnect the asset. Does not re-appear for an asset replacement. Given in $⁄MW Replacement Cost: For NWA solutions with a lower life span than financial planning horizon, a replacement of the Equipment cost is considered in addition to a labor factor. Given in $⁄MW o Battery Cells are replaced after 12 years o Inverters are replaced after 20 years o Solar Panels are replaced after 20 years o Generators, CHP, and Fuel Cells are replaced after 20 years o All Other Hardware is replaced after 40 years Engineering, Installation, and Commissioning: All labor associated with the installation of the Equipment and the Interconnection. This includes labor, EPC overhead, and any interconnection costs with the utility. Given in $⁄MW Overhead: Project management and internal overhead for projects. Given in % of other CapEx cost where x represents the respective CapEx cost components as (for battery systems, the includes the battery cell component cost) Full Load Hours: For variable O&M this represents the assume ratio of Energy Year Pinst c. Real-estate Cost: Real-estate cost can come into consideration for traditional solutions, grid scale solar DG and storage systems. Investments into properties cannot be depreciated, but will be accounted for with WACC ▪ Real-estate costs are increased with the yearly inflation rate d. Program Costs: There are two types of Program Costs, reoccurring, such as costs created through Demand Response Programs, and one-time program costs, such as for the deployment of energy efficiency measures ▪ One Time Program Cost: Added to the OpEx costs the year they are incurred with an earnings multiplier ▪ Reoccurring Program Cost: Added to the OpEx cost every year they are incurred with an earning multiplier ▪ Program Costs are not increased on a yearly basis using a general inflation rate 20

As listed on the current system

Question(s) Answered 566, 569, 570, 575, 578 (The Connecticut Light and Power Company) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)