Interrogatory responses
Answers to questions 566, 569, 570, 575, 578
Files6
OCC-566_Final.pdf
PDF · 154 KB · 3 pagesText searchable
Download OCC-566_Final.pdfRead the text of OCC-566_Final.pdf
OCC-569_Final.pdf
PDF · 115 KB · 3 pagesText searchable
Download OCC-569_Final.pdfRead the text of OCC-569_Final.pdf
OCC-570_Final.pdf
PDF · 87 KB · 2 pagesText searchable
Download OCC-570_Final.pdfRead the text of OCC-570_Final.pdf
OCC-575_Final.pdf
PDF · 121 KB · 2 pagesText searchable
Download OCC-575_Final.pdfRead the text of OCC-575_Final.pdf
OCC-578_Final.pdf
PDF · 116 KB · 1 pageText searchable
Download OCC-578_Final.pdfRead the text of OCC-578_Final.pdf
OCC-578 Attachment 1.pdf
PDF · 1.5 MB · 46 pagesText searchable
Download OCC-578 Attachment 1.pdfRead the text of OCC-578 Attachment 1.pdf
Text of OCC-575_Final.pdf
Extracted from the file · 2 pages · 3,973 characters
Text of OCC-578_Final.pdf
Extracted from the file · 1 page · 1,564 characters
Page 21 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 21 of 46 350 351 Both DR resource types are modeled with pre-conditioning (e.g. through precooling before an event) and a snap back (e.g. through re-cooling after an event). 352 353 354 a. b. 355 356 Figure 7 shows a modeled DR event with 2 MW of commercial, and 0.5 MW of residential DR capacity. Clearly visible, the preconditioning and snap back, before and after the event respectively. Pre-Cooling lasts 30 min and is defaulted to 60% of the total DR impact and is user adjustable depending on local conditions Snap Back lasts for 2 hours after the event and is defaulted to 60% of the total DR impact and is user adjustable depending on local conditions 357 1.00 5.00 0.90 0.00 0.80 -10.00 0.60 -15.00 0.50 -20.00 0.40 -25.00 0.30 -30.00 0.20 -35.00 0.10 -40.00 358 0.70 MWH BATTERY CHARGE MW -5.00 12:00:00 AM 12:30:00 AM 1:00:00 AM 1:30:00 AM 2:00:00 AM 2:30:00 AM 3:00:00 AM 3:30:00 AM 4:00:00 AM 4:30:00 AM 5:00:00 AM 5:30:00 AM 6:00:00 AM 6:30:00 AM 7:00:00 AM 7:30:00 AM 8:00:00 AM 8:30:00 AM 9:00:00 AM 9:30:00 AM 10:00:00 AM 10:30:00 AM 11:00:00 AM 11:30:00 AM 12:00:00 PM 12:30:00 PM 1:00:00 PM 1:30:00 PM 2:00:00 PM 2:30:00 PM 3:00:00 PM 3:30:00 PM 4:00:00 PM 4:30:00 PM 5:00:00 PM 5:30:00 PM 6:00:00 PM 6:30:00 PM 7:00:00 PM 7:30:00 PM 8:00:00 PM 8:30:00 PM 9:00:00 PM 9:30:00 PM 10:00:00 PM 10:30:00 PM 11:00:00 PM 11:30:00 PM 10.00 0.00 Fuel Cell CHP Solar EE CVR Battery Total Emergancy Gen Capacity Delta Headroom Battery Charge DR Total 359 Figure 7: Example DR Event with Pre-Conditioning and Snap Back 360 AVAILABILITY OF DR RESOURCES 361 362 363 364 365 DR resources, much like EE, are only available if the underlying load is actually being used. For EE, the Framework models this approach with a seasonal and intra-day dependency. For commercial and residential DR, the NWA Framework provides a similar approach. As both forms of DR (excluding BTM storage) are typically based on HVAC applications, their highest impact will be achieved during peak summer month during afternoon hours. Figure 8 highlights the peak availability of DR resources throughout the year assumed in the NWA Framework. 15Page 22 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 22 of 46 366 367 Figure 8: Annual DR Capacity Availability Profile 368 369 370 371 For each individual day, the Annual DR Capacity Availability Profile provides the peak DR response that can be expected based on the contracted volume. All contracted volume is given at 100% Annual DR Capacity. For each individual day, the value is then scaled to a daily profile to match actual resource usage. Figure 9 shows the Framework’s availability profile for commercial and residential DR resources. 372 373 Figure 9: Available DR Capacity Profile 374 16Page 23 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 23 of 46 375 376 377 378 379 380 381 E. CONSERVATION VOLTAGE REDUCTION Conservation Voltage Reduction (CVR) is given as a percentage of feeder load and as such varies over time. During a low load situation CVR will consequently reduce the load less in absolute numbers, than it does during a high load situation. The default assumed maximum reduction value is 1.8%, which is lower than the 2.345 reported by EPRI (only report with more constant impedance loads), but the number can be changed depending on the feeder topology and load constellation. The 1.8% represents values evaluated by the Company on its own circuits and requires a high-level evaluation for each region to ensure that such targets can be reached. 382 F. BATTERY STORAGE 383 384 385 For the purpose of technical evaluation all available battery resources are dispatched in the same manner. Hereby no distinction is made between grid scale battery systems and BTM solutions. Further, only battery resources that are under direct control of the utility are considered as NWA options, both utility scale and behind the meter. 386 Battery dispatch is constrained by: 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 a. b. c. d. e. f. Maximum Charging/Discharging Power: It is assumed that a battery has a symmetric dispatch and can achieve its full rated power both when charging or discharging and is limited only by the inverter capabilities. No reactive power dispatch will be taken into consideration. Available Headroom: The battery will not (dis)charge in a fashion that introduces new capacity violations, therefore, recharge limitations are in place and a battery might find itself in a situation where it cannot recharge fast enough to support a new capacity constraint. It will take into consideration any additional capacity from Permanently Altering and Continuously Running Assets (See Section 8.A.) Capacity Deficit: The battery will not (dis)charge more than is required to eliminate a capacity deficit. This means, only the absolute required minimum usage of the battery is assumed, which would equal ideal conditions. State of Charge: The battery cannot charge, or discharge more than its state of charge allows. Batteries are assumed to be able to charge between 0% and 100% of their nameplate capacity. All the batteries are given an initial state of charge for the peak day simulation. That initial state of charge can be freely chosen 6 by the user. The dispatch simulation requires the batteries to return to the same SOC at the end of the simulated day, to ensure same initial condition should the following day also require battery dispatch for NWA purpose. The default setting here is 50%, stating that the battery starts, and ends, each day at 50% state of charge. a. IMPORTANT: If the battery is unable to attain at least the same SOC at the end of the peak day that it started the day with, it is at high risk of not being able to perform two consecutive event days. This means that the station does not have enough headroom to allow adequate recharging of the BESS. Degradation: No degradation of storage capacity is applied in the NWA Framework Round Trip Efficiency: A round trip efficiency is defined in the NWA Framework, which is applied equally to the charging and discharging cycles with 2 √%roundtrip 409 8.F.01 410 5 https://www.epri.com/research/products/1024482 17Page 24 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 24 of 46 411 412 The charge and discharge efficiency are taken into consideration for SOC modeling, energy loss calculations, and when determining the ideal system size. 413 414 If any capacity deficit cannot be met by the battery, either because it does not have sufficient power, or because it has run empty, this will be highlighted. 415 416 417 418 419 420 421 422 423 424 425 426 427 G. FUEL CELL Fuel Cell units are assumed to be must run assets and are modeled as continuously running. See Chapter 6.A and 9.K. The NWA Framework assumes that, outside of reliability considerations, any downtime for Fuel Cells will be maintenance-related and scheduled outside of possible event days. H. COMBINED HEAT AND POWER Combined Heat and Power (CHP) units are assumed to be must run assets and are modeled as continuously running. The NWA Framework assumes that, outside or reliability considerations, any downtime for CHPs will be maintenance-related and scheduled outside of possible event days. I. EMERGANCY GENERATION Emergency Generation units are dispatched to compensate any capacity deficits. Their dispatched is modeled as binary, either on or off. They are not modeled to require warm up or spool down times as the resolution of the NWA Framework is 15 min, which provides adequate time for a generator to reach operational output. Aside from N-1 considerations, Emergency Generators are modeled at name plate rating. 428 18Page 25 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 25 of 46 9. COST MODEL 429 430 431 432 For the NWA Framework, the Cost Model describes how costs of all types of solutions, NWA and traditional are modeled. For all NWA solutions, the same cost model is applied (with the exception of CVR). Where an NWA solution does not have a cost factor, the values are considered null. 433 A. TRADITIONAL SOLUTION 434 Traditional Solution cost is provided in the NWA Framework in three categories 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 a. b. c. CapEx: Capital Expenses for traditional solutions are provided for a single year of expense; the NWA Framework assumes for simplicity reasons that all cost can be allocated to a single year. The Framework provides for entries in the following fields, which are all summed up to be included in the total CapEx of the project: a. Labor and Equipment b. Engineering c. Material d. PM Support / Permitting e. Removal f. Contingency g. Escalation h. Indirects i. AFUDC OpEx: Operational Expenses are provided starting the year of the project and represent any increase or decrease in OpEx due to the new solution. A decrease in OpEx due to a new traditional solution can also be included as a negative value. Any change in OpEx will be extrapolated forward over the full financial planning horizon. Real-Estate Cost: Any property purchases required are recorded separately. An annual addition to the revenue requirements is made through multiplication of the sum of all property purchases made to that point in time, multiplied by the WACC WACC ∗ ∑t1 $PropertyPurchase (t) 455 9.A.01 B. NWA COST TYPES 456 The NWA Framework accounts for four (4) types of cost when it comes to DERs under consideration for NWA opportunities. 457 458 459 460 461 462 463 464 465 a. CapEx Cost: Capital Expenses (CapEx) are treated as expensed in a single year for any DER project. E.g., the installation of a battery system carries $5.5 Million CapEx cost. Even if the project to build said battery system might, in reality take more than a year, the Framework assumes those costs occur in the year the solution is deployed. ▪ CapEx costs are increased on a yearly basis using a general inflation rate ▪ CapEx costs have a book depreciation over the asset’s life span (12, 20, or 40 years) ▪ CapEx costs have a tax depreciation over either 5, 7, or 20 years ▪ CapEx costs for specific asset types have a technology cost reduction, such as solar panels CapEx Cost includes the following line items in the cost model for each type of NWA 19Page 26 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 26 of 46 ▪ 466 467 468 469 470 471 472 473 ▪ 474 ▪ 475 476 477 478 479 480 481 482 ▪ 483 ▪ 484 485 486 ∑ (Pinst ∗ x 487 488 489 490 491 492 493 494 495 496 497 498 b. $ MW ) 9.B.01 OpEx Cost: Operational Expenses (OpEx) are treated as expenses reoccurring every year. Reoccurring cost, program or OpEx, are calculated on a yearly basis. ▪ OpEx costs are increased on a yearly basis using a general inflation rate ▪ OpEx costs are treated as a direct passthrough to revenue requirements without additional earnings add on OpEx Cost include the following line items in the cost model for each type of NWA ▪ Fixed O&M: Includes all maintenance and minor replacement activities, in addition to any running cost that are not dependent on utilization. ▪ Variable O&M: Includes all fuel and other variable cost that is dependent on either the energy produced or the Full Load Hours of operation per year. ▪ 499 500 501 502 503 504 505 506 507 508 Equipment Cost: Includes all NWA asset equipment, such as generators, panels, or inverters. Reappears for an asset replacement. Given in $⁄MW. For accounting purposes (see Chapter 10.A. Accounts), these costs are split between the following positions where applicable o Distribution Hardware o Inverters o Generators/Motors/CHP/Fuel Cells o Battery Cells Interconnection Equipment: Includes all equipment required to interconnect the asset. Does not re-appear for an asset replacement. Given in $⁄MW Replacement Cost: For NWA solutions with a lower life span than financial planning horizon, a replacement of the Equipment cost is considered in addition to a labor factor. Given in $⁄MW o Battery Cells are replaced after 12 years o Inverters are replaced after 20 years o Solar Panels are replaced after 20 years o Generators, CHP, and Fuel Cells are replaced after 20 years o All Other Hardware is replaced after 40 years Engineering, Installation, and Commissioning: All labor associated with the installation of the Equipment and the Interconnection. This includes labor, EPC overhead, and any interconnection costs with the utility. Given in $⁄MW Overhead: Project management and internal overhead for projects. Given in % of other CapEx cost where x represents the respective CapEx cost components as (for battery systems, the includes the battery cell component cost) Full Load Hours: For variable O&M this represents the assume ratio of Energy Year Pinst c. Real-estate Cost: Real-estate cost can come into consideration for traditional solutions, grid scale solar DG and storage systems. Investments into properties cannot be depreciated, but will be accounted for with WACC ▪ Real-estate costs are increased with the yearly inflation rate d. Program Costs: There are two types of Program Costs, reoccurring, such as costs created through Demand Response Programs, and one-time program costs, such as for the deployment of energy efficiency measures ▪ One Time Program Cost: Added to the OpEx costs the year they are incurred with an earnings multiplier ▪ Reoccurring Program Cost: Added to the OpEx cost every year they are incurred with an earning multiplier ▪ Program Costs are not increased on a yearly basis using a general inflation rate 20Page 27 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 27 of 46 509 C. ANNUAL RATES OF CHANGE 510 511 All values in the NWA Framework are provided in nominal values. To account for inflation, and the reduction in cost for certain technologies, the NWA Framework provisions for annual rates of change for the following 512 513 a. Inflation Rate: The inflation rate is defaulted to 2% an applies to all hardware, labor, real estate and O&M costs. Program costs are excluded from inflation 514 515 516 517 518 519 520 521 522 523 524 525 526 527 b. Discount Rate: The discount rate is given as a nominal discount rate and defaulted to −3.37%7. The effective discount rate is calculated, depending on the year the expense happens as (100% + εDiscount Rate + εInflation Rate )t−Base Year 9.C.01 Cost Rate PV Panels8: The cost rate for PV Panels provides a projection of cost development of PV Panels instead of the inflation rate. PV Panels are not subject to the inflation rate but adhere to changes based on the Cost Rate for PV Panels. The NWA Framework defaults this value at −4.0% Cost Rate Battery Cells9: The cost rate for Battery Cells provides a projection of cost development of Battery Cells instead of the inflation rate. Battery Cells are not subject to the inflation rate but adhere to changes based on the Cost Rate for Battery Cells. The NWA Framework defaults this value at −5.0% Cost Rate Inverters10: The cost rate for Inverters provides a projection of cost development of Inverters instead of the inflation rate. Inverters are not subject to the inflation rate but adhere to changes based on the Cost Rate for Inverters. The NWA Framework defaults this value at 6%. This value applies to both Battery and Solar inverters. While the NREL report highlights a 2019 price increase of 20% for utility scale central inverters, that number will most likely not be sustainable. 528 Table 3: Application of Annual Change Rates Based on Cost Component c. d. e. Component Inflation Rate Discount Rate Real Estate X X Traditional X X Int. Hardware X X Any O&M X X Inverters X X Battery Cells X X Solar Panels X X Gen., FCs, CHP X X Program Costs Electricity Cost Cost Rate Panels Cost Rate Cells X X X X X X 7 https://www.synapse-energy.com/sites/default/files/AESC-2018-17-080-Oct-ReRelease.pdf 8 NREL Q4 2019/Q1 2020 Solar Industry Update Page 39 9 NREL Cost Projections for Utility-Scale 10 Cost Rate Invert. NREL Q4 2019/Q1 2020 Solar Industry Update Page 64 21Page 28 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 28 of 46 529 530 Note: All technology rates of change can be edited within the NWA Screening Tool to adjust to the ever-changing landscape. To provide a unified source of information, the NWA Framework uses NREL’s publications11 531 D. EARNING FACTORS UTILITY PROGRAMS 532 533 534 On all program costs, the EDC is entitled to make a percentage earning. Those earnings are accounted for in the overall NWA solution cost as they appear in the rate base. For the NWA Framework, the following values for the Earning Factor εEarning are assumed. 535 Note: Historic assumption is based on the level of generated benefits as a percentage of spend and depending on jurisdiction. 536 Table 4: Program Earning Rates State MA CT NH Assumed Earnings Rate 5.0% 5.0% 5.0% 537 These values are applied to: 538 539 540 541 542 543 a. b. c. 544 Demand Response Programs, annually a. Commercial b. Residential c. Battery Storage Energy Efficiency Programs, once Behind the Meter Solar Programs, annually E. LIFE CYCLE ASSUMPTIONS 545 546 For the cost calculation, the NWA Framework makes assumptions on the useful life of an asset. This is achieved within the NWA Framework by clustering assets into three (3) expected useful life spans 547 Table 5: Life Cycle Assumptions by Asset Type Asset Type 12-Year Assets 20-Year Assets Traditional Solution X Interconnection Hardware X Inverters Battery Cells 548 549 40-Year Assets X X Solar Panels X Generators, FCs, CHP X The Life Cycle Assumptions will inform the calculation of the Revenue Requirements through the tax and book depreciation, as well as MACRS values. 11 NREL Annual Technology Baseline 22Page 29 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 29 of 46 550 551 552 If, within the financial planning horizon selected, an asset reaches the end of its useful lifespan, it is assumed replaced by the NWA Framework with an addition investment happening in the last year of its expected lifespan. This process can, depending on the asset and the Financial Planning Horizon, happen more than once. 553 F. SOLAR GENERATION 554 For the NWA Framework, cost assumptions have been made for the cost of solar systems to supply default values. 555 UTILITY SCALE SOLAR GENERATION 1213 556 557 a. CapEx Cost ▪ Equipment Cost: 558 i. Panels 559 ii. Solar Inverter (2 Quadrant) $340,000⁄ MW $62,000⁄ MW. 560 ▪ Interconnection Equipment: 561 ▪ Replacement Cost: The default labor rate factor is at 562 ▪ Engineering, Installation, and Commissioning: 563 564 b. ▪ Overhead: OpEx Cost 565 ▪ Fixed O&M: Fixed O&M cost is defaulted at 566 ▪ Variable O&M: 567 568 569 c. d. $50,000⁄ a $0.00⁄ MWh 1400h⁄ a $0.00 ▪ Full Load Hours: Real-Estate Cost: Program Costs 570 ▪ One Time Program Cost 571 ▪ Reoccurring Program Cost $330,000⁄ MW εReplace = 20% $240,000⁄ MW 50% $0⁄ MW $0⁄ a ∗ MW 572 With different sizes between inverters and panels, the cost model accounts for the Equipment Cost as follows 573 $470,000⁄ $50,000⁄ MW ∗ PinstDC + MW ∗ PinstAC 574 Where. For the NWA Framework, a default overclocking rate εOC is assumed for all solar generation, this value is defaulted to 575 εOC = 1.2 576 BEHIND THE METER SOLAR GENERATION: 577 578 Behind the meter solar generation is modeled in the NWA Framework as a Utility program, with the EDC providing an incentive above and beyond state and federal incentives to direct investments into a certain region. There is no comparative model in 9.F.01 9.F.02 12 https://atb.nrel.gov/electricity/2019/index.html?t=su 13 Solar Energy Industries Association, US Solar Market Insight, Full Report, Q4 2020 23Page 30 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 30 of 46 579 580 the ES territory that would provide indication pricing and a closer evaluation would be required if such a solution ends up being viable. 581 a. CapEx Cost $0.00⁄ MW. $0.00⁄ MW 582 • Equipment Cost: 583 • Interconnection Equipment: 584 • Replacement Cost: The default labor rate factor is at 585 • Engineering, Installation, and Commissioning: 586 587 b. • Overhead: OpEx Cost 588 • Fixed O&M: Fixed O&M cost is defaulted at 589 • Variable O&M: 590 591 592 c. d. • One Time Program Cost 594 • Reoccurring Program Cost 595 $0.00⁄ a ∗ MW $0.00⁄ MWh 1400h⁄ a $0.00 • Full Load Hours: Real-Estate Cost: Program Costs 593 N/A $0.00⁄ MW N/A $0⁄ MW $35⁄ a ∗ MW G. ENERGY EFFICIENCY 596 597 Energy Efficiency is conducted as a utility program with the assumption that all expenses happen in a single year, and that no continuous expenses are required. 598 a. CapEx Cost $0.00⁄ MW. $0.00⁄ MW 599 • Equipment Cost: 600 • Interconnection Equipment: 601 • Replacement Cost: The default labor rate factor is at 602 • Engineering, Installation, and Commissioning: 603 604 b. • Overhead: OpEx Cost 605 • Fixed O&M: Fixed O&M cost is defaulted at 606 • Variable O&M: 607 608 609 c. d. $0.00⁄ a ∗ MW $0.00⁄ MWh • Full Load Hours: Real-Estate Cost: Program Costs 610 • One Time Program Cost 611 • Reoccurring Program Cost N/A $0.00⁄ MW N/A N/A $0.00 $50⁄ 10a ∗ MWh $0⁄ a ∗ MW 612 The cost of energy efficiency programs is determined by through a $/kWh saved metric εEE , with 613 εEE = 50 $ 9.G.01 MWh∗10a 24
As listed on the current system
Question(s) Answered 566, 569, 570, 575, 578 (The Connecticut Light and Power Company) Date Filed: 09/22/2026