  1. Page 31 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 31 of 46 614 615 To calculate the cost of the total Energy Efficiency program, the savings over a ten (10) year time span are considered in the NWA Framework, resulting in an Energy Efficiency program cost of 616 EEcost = εEE ∗ 10a ∗ ∫0 617 Where the savings are calculated over all days of the year using the Energy Efficiency Profiles. 618 619 All Energy Efficiency cost is incurred at the year on inception with no running cost. In addition, a Utility Earnings Factor, see Chapter 9.D. is applied to the cost. 620 EERevReq = EEcost ∗ (1 + εEarning ) 621 There is no inflation assumed for the cost of Energy Efficiency programs 365 622 EEkWh dd 9.G.02 9.G.03 H. DEMAND RESONSE 623 624 625 Demand Response Programs are, as part of the NWA Framework, modeled with a cost per kW. In reality, there is a performance factor applied, with some assets no performing at all events, or not to full specification. However, for the NWA Framework, some assumptions have been made to simplify the modeling 626 627 628 629 630 631 632 a. 633 COMMERICAL 634 For commercial DR, the capacity payments are set at 635 a. b. c. d. The assumption is that the assets are fully able to perform. As a result, the cost for DR programs can be reduced to an annual capacity payment without a performance component. Unlike Energy Efficiency, DR costs are annual costs that continue to present over the course of the financial planning horizon. Demand Response program costs are excluded from an inflation rate in the NWA Framework Programs working with storage do not account for replacement of cells or batteries. That cost is covered by the owner and accounted for in the annual payments. CapEx Cost $0.00⁄ MW. $0.00⁄ MW 636 • Equipment Cost: 637 • Interconnection Equipment: 638 • Replacement Cost: The default labor rate factor is at 639 • Engineering, Installation, and Commissioning: 640 641 b. • Overhead: OpEx Cost 642 • Fixed O&M: Fixed O&M cost is defaulted at 643 • Variable O&M: 644 645 646 647 c. d. $0.00⁄ a ∗ MW $0.00⁄ MWh • Full Load Hours: Real-Estate Cost: Program Costs • N/A $0.00⁄ MW 0% N/A $0.00 $0⁄ MW One Time Program Cost 25
  2. Page 32 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 32 of 46 • 648 $50,000⁄ a ∗ MW Reoccurring Program Cost 649 650 651 652 Commercial DR contracts are limited to eight (8) events a year and can be expanded at a cost rate of 50%. E.g., in the NWA Framework a commercial DR contract is required that can supply 16 events a year. The cost of that contract would then calculate as follows 653 Total Events − Maximum Contract Events ≥ 0 654 εDRCom ∗ (1 + ∗ 655 Resulting in a cost of 656 50,000 657 The program is scaled to the year with the largest number of events in the forecasting horizon 658 RESIDENTIAL 659 For residential DR, the capacity payments are set at 660 a. $ kW 1 Total Events−Maximum Contract Events 2 Maximum Contract Events 1 16−8 2 8 ∗ (1 + ∗ ) = 75,000 9.H.01 ) 9.H.02 $ 9.H.03 kW CapEx Cost: $0.00⁄ MW. $0.00⁄ MW 661 • Equipment Cost: 662 • Interconnection Equipment: 663 • Replacement Cost: The default labor rate factor is at 664 • Engineering, Installation, and Commissioning: 665 666 b. • Overhead: OpEx Cost: 667 • Fixed O&M: Fixed O&M cost is defaulted at 668 • Variable O&M: 669 670 671 c. d. $0.00⁄ a ∗ MW $0.00⁄ MWh • Full Load Hours: Real-Estate Cost: Program Costs: 672 • One Time Program Cost 673 • Reoccurring Program Cost N/A $0.00⁄ MW 0% N/A $0.00 $0⁄ MW $120,000⁄ a ∗ MW 674 675 Residential DR contracts are limited to 16 events a year and can be expanded at a cost rate of 50% using the same methodology as the commercial DR contracts, see Equation 9.H.03 676 The program is scaled to the year with the largest number of events in the forecasting horizon 677 STORAGE 678 For storage DR, the capacity payments are set at 26
  3. Page 33 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 33 of 46 679 a. CapEx Cost: $0.00⁄ MW $0.00⁄ MW 680 • Equipment Cost: 681 • Interconnection Equipment: 682 • Replacement Cost: The default labor rate factor is at 683 • Engineering, Installation, and Commissioning: 684 685 b. • Overhead: OpEx Cost: 686 • Fixed O&M: Fixed O&M cost is defaulted at 687 • Variable O&M: 688 689 690 c. d. $0.00⁄ a ∗ MW $0.00⁄ MWh • Full Load Hours: Real-Estate Cost: Program Costs: 691 • One Time Program Cost 692 • Reoccurring Program Cost N/A $0.00⁄ MW 0% N/A $0.00 $0⁄ MW $250,000⁄ a ∗ MW 693 694 Battery DR contracts are limited to 60 events a year and can be expanded at a cost rate of 50% using the same methodology as the commercial DR contracts, see Equation 9.H.03 695 The program is scaled to the year with the largest number of events in the forecasting horizon 696 I. CONSERVATION VOLTAGE REDUCTION 697 698 CVR programs provide for a slightly altered cost structure. Based on the Company’s experience, the cost to implement a CVR program at a Substation is highly variable based on present equipment, but is defaulted to 699 εCVRInstall = 2,500,000 700 And takes an average of 12-man hours a week to operate, which results in an annual cost of 701 εCVRO&M = 78,000 702 J. $ 9.I.01 Substation $ 9.I.02 Substation∗a BATTERY STORAGE 703 For battery storage solutions, the cost assumptions are based on NREL publications14. 704 705 a. CapEx Cost: ▪ Equipment Cost: The default value Battery Storage is at 706 i. Battery Cells 707 ii. Battery Inverter (4 Quadrant) 14 $209,000⁄ MWh $70,000⁄ MW https://atb.nrel.gov/electricity/2019/index.html?t=st based on 2-hour storage systems 27
  4. Page 34 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 34 of 46 708 ▪ Interconnection Equipment: 709 ▪ Replacement Cost: The default labor rate factor is at 710 ▪ Engineering, Installation, and Commissioning: 711 712 713 714 715 716 b. ▪ Overhead: OpEx Cost: c. d. ▪ Fixed O&M: Fixed O&M cost is defaulted at ▪ Full Load Cycles Real-Estate Cost: Program Costs: 717 ▪ One Time Program Cost 718 ▪ Reoccurring Program Cost 719 $100,000⁄ MW εReplace = 20% $62,500⁄ MW 50% $50,000⁄ a N/A $0.00 $0⁄ MW $0⁄ a ∗ MWh Note: Variable O&M for BESS is based on energy losses and cost of energy 720 K. FUEL CELL 721 722 723 Fuel Cells are modeled as Commercial Fuel Cells with the following cost components in the NWA Framework. For the NWA Framework, they will be considered as part of the Energy Efficiency portfolio and funded by Eversource. The following outlines the default values assumed in the cost model. 724 a. CapEx Cost 725 • Equipment Cost: $0.00⁄ MW. 726 • Interconnection Equipment: 727 • Replacement Cost: The default labor rate factor is at 728 • Engineering, Installation, and Commissioning: $0.00⁄ MW N/A $0.00⁄ MW N/A 729 730 b. • Overhead: OpEx Cost 731 • Fixed O&M: Fixed O&M cost is defaulted at 732 • Variable O&M: 733 734 735 c. d. 6000h⁄ a $0.00 • Full Load Hours: Real-Estate Cost: Program Costs 736 • One Time Program Cost 737 • Reoccurring Program Cost 738 $0.00⁄ a ∗ MW $0.00⁄ MWh L. $700 000⁄ MW $0⁄ a ∗ MW COMBINED HEAT AND POWER 739 740 CHPs are modeled as Commercial – Natural Gas Microturbines with the following cost components in the NWA Framework. They are deployed through incentive programs managed under the Energy Efficiency Umbrella 741 e. CapEx Cost 28
  5. Page 35 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 35 of 46 $0.00⁄ MW. $0.00⁄ MW 742 • Equipment Cost: 743 • Interconnection Equipment: 744 • Replacement Cost: The default labor rate factor is at 745 • Engineering, Installation, and Commissioning: 746 747 f. • Overhead: OpEx Cost 748 • Fixed O&M: Fixed O&M cost is defaulted at 749 • Variable O&M: 750 751 752 g. h. • One Time Program Cost 754 • Reoccurring Program Cost 755 $0.00⁄ a ∗ MW $0.00⁄ MWh 6000h⁄ a $0.00 • Full Load Hours: Real-Estate Cost: Program Costs 753 N/A $0.00⁄ MW N/A $1 000 000⁄ MW $0⁄ a ∗ MW M. EMERGENCY GENERATION 756 757 758 Emergency Generation typically represents 3rd party owned and operated Diesel or Natural Gas Generators which an EDC secures under contractual obligation. These contracts include annual capacity payments as well as variable payments depending on the rate of utilization. 759 a. CapEx Cost: 760 ▪ Equipment Cost: The default value for Fuel Cells is at 761 ▪ Interconnection Equipment: 762 ▪ Replacement Cost: The default labor rate factor is at 763 ▪ Engineering, Installation, and Commissioning: 764 765 b. ▪ Overhead: OpEx Cost: 766 ▪ Fixed O&M: Fixed O&M cost is defaulted at 767 ▪ Variable O&M: 768 769 770 c. d. ▪ One Time Program Cost 772 ▪ Reoccurring Program Cost N/A $0⁄ MW N/A $270,000⁄ a ∗ MW $400⁄ MWh ▪ Full Load Hours Real-Estate Cost: Program Costs: 771 $0⁄ MW $0⁄ MW N/A $0.00 $0⁄ MW $0⁄ a ∗ MWh 773 29
  6. Page 36 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 36 of 46 10. REVENUE REQUIREMENTS 774 775 The following chapter outlines all the assumptions and calculations conducted for the calculations of the revenue requirements. 776 A. GENERAL ASSUMPTIONS 777 778 For the NWA Framework, a simplified approach was chosen to evaluate the revenue requirements stemming from certain investments. 779 ACCOUNTS 780 The following accounts and Modified Accelerated Cost Recovery System (MACRS) depreciations are considered: 781 782 783 784 a. b. c. d. 785 For the book depreciation, the following equipment lifespans are considered 786 787 788 a. b. c. 789 The resulting combinations for assets are 790 791 792 a. b. c. 793 DEPRECIATION ACCRUAL RATE 794 The Framework provisions the accrual rate as 795 345 Inverters 344 Solar Panels/Generators 362 Distribution Station Equipment 363 Storage Battery Equipment 5 Years 5 Years 20 Years 7 Years Battery Cells Solar Panels, Inverters, Generators, Fuel Cells, CHP All traditional hardware 7/12 5/20 20/40 12 Years 20 Years 40 Years Battery Cells Solar Panels, Inverters, Generators, Fuel Cells, CHP All traditional hardware 1 10.A.01 Asset Useful Life (years) 796 PRE-TAX WACC 797 The Pre-Tax Weighted Average Cost of Capital (WACC) are calculated as follows 798 799 800 801 802 803 804 805 a. b. c. Using a Federal Tax Rate of 21% and a state rate per selected state the effective state rate is calculated as State Rate ∗ (1 − Federal Rate) The Effective State and Federal Tax Rate is the calculated by Federal Rate + Effective State Rate The Net Income After Taxes on Income is 1 − Effective State and Federal Tax Rate 30 10.A.02 10.A.03 10.A.04
  7. Page 37 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 37 of 46 806 807 d. And the Pre-Tax WACC results in a. For MA and CT Weighted Cost of Long Term Debt + 808 809 b. Net Income After Taxes 10.A.05 For NH Weighted Cost of Short Term Debt + 810 Weighted Cost of Preferred Stock+Weighted Cost of Common Equity Weighted Cost of Long Term Debt+Weighted Cost of Common Equity Net Income After Taxes 10.A.06 811 PROPERTY PURCHASES 812 Any property purchases are reflected in the revenue requirements on a yearly basis with 813 Cost of Property ∗ WACC 814 and are not inflation adjusted over time 815 PROGRAM COST 816 817 Program costs (yearly and one-time) are added to the revenue requirements of the year they are incurred in with the addition of a levelized earnings rate applied. 818 Yearly Program Cost ∗ (1 + State Specific Earnings Rate) 819 Program costs are not inflation adjusted over time 820 O&M COST 821 822 O&M (or OpEx) costs to the company are a direct pass through to the revenue requirements, they do however increase by the inflation rate on a yearly basis. 823 ASSET REVENUE 824 825 If the NWA solution provides a revenue stream that can be set against its cost, the annual revenue will be subtracted from the annual O&M cost. 826 10.A.07 10.A.08 B. MACRS 827 MACRS 7 YEARS (363 - STORAGE BATTERY EQUIPMENT) 828 Table 6: 7 Year MARCS Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 14.29% 24.49% 17.49% 12.49% 8.93% 8.92% 8.93% 4.46% 829 830 831 31
  8. Page 38 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 38 of 46 832 MACRS 5 YEARS (344/345 - SOLAR PANELS, INVERTERS, GENERATORS) 833 Table 7: 5 Year MARCS 32.00% 19.20% 11.52% 11.52% 5.76% 836 837 4.46% Year 12 4.46% Year 17 Year 11 4.46% 4.46% Year 10 4.46% Year 16 Year 9 4.46% 4.46% Year 8 4.52% Year 15 Year 7 4.89% 4.46% Year 6 5.29% Year 14 Year 5 5.71% 4.46% Year 4 6.18% Year 13 Year 3 6.68% 4.46% Year 2 Table 8: 20 Year MARCS 7.22% 835 Year 1 MACRS 20 YEARS (344/345 - SOLAR PANELS, INVERTERS, GENERATORS) 3.75% 834 Year 21 20.00% 2.23% Year 6 Year 20 Year 5 4.46% Year 4 Year 19 Year 3 4.46% Year 2 Year 18 Year 1 C. STATE SPECIFIC RATES Table 9: State Specific Rates Massachusetts Connecticut New Hampshire Property Tax Rates 2.56% 2.59% 2.18% State Rate 8.00% 8.25% 7.70% Share of Long-Term Debt 45.67% 45.38% 43.15% Share of Preferred Stock 0.74% 1.62% N/A Share of Common Equity 53.59% 53.00% 54.41% Share of Short-Term Debt N/A N/A 2.44% Cost of Long-Term Debt 4.21% 4.64% 4.08% Cost of Preferred Stock 4.56% 4.75% N/A Cost of Common Equity 10.00% 9.25% 9.30% Cost of Short-Term Debt N/A N/A 2.07% EE/DR Program Earnings 5.00% 5.00% 5.00% 838 839 32
  9. Page 39 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 39 of 46 11. REVENUE ESTIMATION MODEL 840 841 As part of the NWA Framework, potential revenue streams which can be generated through DER resources can be considered. A. REGIONAL NETWORK SERVICE ( RNS) AND LOCAL NETWORK SERVICE (LNS) 15: 842 843 844 The RNS Rate is the rate applicable to Regional Network Service to affect a delivery to load in a particular Local Network, as determined in accordance with Schedule 9 to the OATT. 845 846 LNS is the network service provided under Schedule 21 and the Local Service Schedules to permit the Transmission Customer to efficiently and economically utilize its resources to serve its load. 847 848 As part of the NWA Framework and Tool, the RNS and LNS values will not be considered as an input when evaluating NWAs only, due to the following considerations: 849 850 851 852 853 854 855 856 857 858 859 860 a. b. c. d. The total volume of RNS and LNS cost on the transmission system remains the same, any reduction of those costs at one specific utility will result in an uptake of cost with all other utilities. From a regulatory standpoint, this favoring of one customer base over another is in the eyes of the EDCs not conducive to achieving the most cost-effective solution for all ratepayers The Framework and Tool base their cost benefit analysis on the impact on Revenue Requirements, both the LNS and RNS values cannot be realized as an impact on the Revenue Requirements for a specific solution, therefore should not be considered. In the medium and long term, Eversource expects a large-scale uptake of storage on the ISO-NE System. With large quantities of flexible resources, it is to be expected that most, if not all utilities will optimize dispatch against LNS/RNS cost, effectively flattening peak loads. As a result, any benefit that might have been had in the early days will disappear overtime. For BESS, dispatch is solely reserved for managing distribution grid constraints, as such resources need to be held at ready state and can therefore not be used to address these value streams. B. ISO REGISTRATION MODEL 161718 861 862 863 DERs have several options for registering with the ISO New England. However, not all options are acceptable/feasible for DERs listed as NWAs as it significantly limits their ability to act on distribution grid needs. The following options are available. 864 865 866 867 868 a. SOG: A generating unit may register and participate in the wholesale market as a Settlement Only Generator if it has capability of less than five MW connected below transmission per OP-14. A SOG does not participate in the day ahead energy market, participated in the real time energy market but without submitting priced energy offers, thus not dispatched by operations and is not monitored in real time. An SOG can participate in the capacity market, in the regulation market as an alternative technology regulation resource, ATRR, and not in the reserve market. 15 https://www.iso-ne.com/static-assets/documents/2019/10/transmission_planning_improvements.pdf 16 https://www.iso-ne.com/static-assets/documents/rules_proceds/operating/isone/op14/op14_rto_final.pdf 17 https://www.iso-ne.com/static-assets/documents/rules_proceds/operating/isone/op18/op18_rto_final.pdf 18 https://www.iso-ne.com/participate/support/glossary-acronyms/ 33
  10. Page 40 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 40 of 46 869 870 871 872 873 874 875 876 b. 877 878 Note: For a DER to be considered as an NWA, the EDC’s NWA dispatch always takes precedent over the ISO’s dispatch for two reasons: 879 880 881 882 883 a. 884 The NWA Framework therefore applies the following considerations 885 886 887 888 889 890 891 892 893 894 a. 895 Note: This limits the asset size to 5MW as any assets above this threshold are required to be a MG c. b. b. MG: Modelled Generation is any generating unit participating in the wholesale market whose capability is greater than 5 MW connected at any voltage level or below 5 MW connected to transmission must register as a Modeled Generation. A MG may participate in the day ahead energy market (must if it has a capacity supply obligation from the capacity market), must make priced energy offers in the real time energy market, and have appropriate telemetry per OP-18 so operations can dispatch and monitor output. A MG can participate in the capacity, reserve and regulation markets provided the unit meets applicable technical requirements. LR: A Load Reducer is any operating generating unit not registered as a generating unit to participate in the wholesale energy, reserves or regulation markets. A load reducer may participate in the regulation market as an ATRR. The ISO has a larger pool of resources to draw upon with a statistical assumption of compliance allowing it to address issues with a level of non-response from assets whereas the EDC with its limited NWA resources behind a single constraint relies on the asset’s participation. Failure to comply with the EDC’s NWA dispatch can result in a localized power system failure resulting in customer outages and the DER being offline for either one purpose. In general, for all NWA assets, the preferred mode to register with the ISO is SOG or LR. While registration as MG provides more access to market value streams, it requires strict dispatch schedules and steep penalties for non-compliance of those schedules. With the primary objective of the asset being distribution system reliability and ISO and distribution system needs not always aligning, this would cause a conflict of interest with potentially critical amounts of penalties incurred as the distribution system dispatch would always take precedence. The associated risk with such a participation cannot be modeled precisely and therefore does not lend itself as a reliable revenue stream. In the event that storage is used as a grid resource and while owned by an EDC cannot participate in energy markets, it could be treated as a load reducer. In this case, the Framework looks only at the energy losses in the charging and discharging cycle as the battery would charge at retail and discharge at retail, not being allowed to make any revenue. (all SOG registered storage assets charge and discharge at wholesale cost) 34

As listed on the current system

Question(s) Answered 566, 569, 570, 575, 578 (The Connecticut Light and Power Company) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)