Utility Dockets and Filings

Interrogatory responses

Answers to questions 590, 594

Files10

Search terms highlighted
Eversource rate increase is on 7 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
  1. Page 1Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 OCC-590 Attachment 1 Page 1 of 2 Project # Name of Project Projected Date of Estimated Distribution Need/Timeline of Investment Cost Improvement Project Justification EDC Proposed NWS Proposed Preliminary Solicitation? RFI? Notes West Brookfield 14H Xfmr and PASS-MO Replacements 2028 $16.9M Capacity Increase NO NO SDC and partial funding approval. CD01505 Man to Auto - 63 Grand St (Buckingham Square) & 188 Bank St & 135 Grand St 2027 $2.1M Enhancement Programs NO NO Partial CPAC CD02015 14W9/14W12 Reliability Improvements 2026 $1.3M Infrastructure Replacement NO NO Partial CPAC CD02023 West Brookfield 14H1 Overload 2026 $1.1M Capacity NO NO Partial CPAC CD02033 TDRP 11C13 WPC 2026 $5.7M Infrastructure Replacement NO NO Partial CPAC CD02087 Noera 13H S/S LCC Load Relief 2026 $3.M Capacity NO NO Partial CPAC CD02156 Eliminate Lakeview 31A Triple Circuit Polelines 2026 $3.9M Infrastructure Replacement NO NO Partial CPAC CD02160 48C7 & 48C8 Smart Switch Project RWO.9 2026 $1.1M Enhancement Programs NO NO Partial CPAC CD02190 Middle River 28M3 Load Relief via 28M7 2025 $3.7M Capacity NO NO Partial CPAC CD02193 12J4 WPC Reliability Improvement CD02199 Oxford 26N7 Contingency Overload CD02213 12Y9 WPC Reliability Improvement 2027 2027 2026 2026 $3.9M $3.9M $1.6M $5.M Identification of project risks (e.g., potential for delays or cost overruns) Likely NWS Solicitation Opportunities (Over $1 Million, and Eligible Project Justification) CS00604 CD02192 12J5 WPC Reliability Improvement Project scope and key materials (e.g., transformer, etc.) Infrastructure Replacement Infrastructure Replacement Capacity Infrastructure Replacement NO NO NO NO NO NO NO NO Partial CPAC Partial CPAC Partial CPAC Partial CPAC CD02214 30R8 WPC Reliability Improvement 2026 $5.9M Infrastructure Replacement NO NO Partial CPAC CD02215 35L9 WPC Reliability Improvement 2028 $3.8M Infrastructure Replacement NO NO Partial CPAC Replace two 25 MVA transformers for two 62.5 MVA transformers with new high side switches and neutral reactors. •Customer Permission / Siting Council / Addresses the manual switchgear serving the Buckingham Municipal approvals Square load loop and the load loop fed from the Post Office / •Internal construction resources not available to Ramp Garage wall mounted manual switchgear. perform the work Addresses a double circuit pole line where the two circuits •Customer Permission / Siting Council / back each other up via automatic loops. Municipal approvals Major Materials: •Internal construction resources not available to • 12,200 ft. of 556 Spacer Cable perform the work • 1,400 ft. of 556 TW • (2) Rreclosers •Customer Permission / Siting Council / Addresses the contingency overload on the West Brookfield Municipal approvals 14H1 circuit. •Internal construction resources not available to perform the work Address a radial zone of 850 customers on the 11C13-62R •Customer Permission / Siting Council / with poor reliability by installing an automatic tie with the Municipal approvals Judd Brook 32R1 circuit. •Internal construction resources not available to Major Materials: perform the work • (4) Smart Switches • (1) Tie Reclosers • (1) Midpoint Recloser • (126) Poles • 8,600 ft. 556 1Ø tree wire • 13,000 ft. 556 tree wire • 2,000 ft. 1/0 neutral • (22) 1-Phase transformers •Customer Permission / Siting Council / Municipal approvals Provide load relief to the Noera 13H substation. •Internal construction resources not available to perform the work Address the two triple circuit pole lines at Lakeview 31A •Customer Permission / Siting Council / Substation. Municipal approvals Major Materials: •Internal construction resources not available to • 4,900 ft. 1000 CU EPR 15KV Cable perform the work • 1,600 ft. 12-6’ conduit1 • (3) Manholes • (2) GOAB Switches • (2) Three Phase Risers Installing new sectionalizing reclosers and tie reclosers to •Customer Permission / Siting Council / reduce customer and load zones. Municipal approvals Major Materials: •Internal construction resources not available to • (3) Sectionalizing Reclosers perform the work • (3) Tie Reclosers • (2) Midpoint Reclosers • (1) Radial Recloser •Customer Permission / Siting Council / Proposed to resolve normal and contingency overloads on Municipal approvals 28M3 & 28M13 feeders, improve low voltage issues and •Internal construction resources not available to provide capacity around load growth areas via a new feeder, perform the work 28M7. Furthermore, transfer 1,986 customers (~207 Amps) •Contingent upon CS00571 from 28M3 to the new feeder, 28M7. Major Materials: •(2) Cooper Nova Form 6 •(2) 900A In-line Disc Switch •(1) 900A GOAB •5,000 ft. 1000 Cu EPR (3Ø) •15,000 ft. 556 AL TW (1Ø) •(3) Manhole 6’x14’x7’ – 9-ton SC 566644 •1,000 ft. 12-6 ft. Duck bank •(1) 3Ø Riser Pole Infrastructure replacement to improve the reliability of the 12J5 circuit. Major Materials: • 2,600 ft. Three phase 556 Tree Wire • 3,400 ft. Single phase 336 Tree Wire • (22) Wood Poles • 9,400 ft. Single phase 336 Tree Wire • 9,400 ft. 750 AL Aerial Cable • (2) 13.8kV Reclosers/Scada Switches • (60) Wood Poles Aaddresses the five high impact zones on the 12J4 where Eversource has experienced outages within the past four years. Major Materials: • 6,400 ft. Three phase 556 Tree Wire • 1,900 ft. Three phase 556 Spacer Cable • (1) 23kV Reclosers/Scada Switches • (68) Wood Poles • 8,100 ft. Single phase 336 Tree Wire • (5) 4.8kV Reclosers • (3) 13.8kV to 4.8kV 500kVA Step Down Transformer • (3) 13.8kV to 4.8kV 167 kVA Step Down Transformer – (for bank) • (1) 13.8kV to 4.8kV 167 kVA Step Down Transformer – (single phase) • (36) Wood Poles Resolve the contingency overload on the Oxford 26N7 Substation feeder. Major Materials: • 6500 ft. of 556.5 AAC 175 MIL Covered Wire • (2) 25KV Class 3 Phase Reclosers • 42 x 45 ft. Class 1 Poles Infrastructure replacement to improve the reliability of the 12Y9 circuit. Major Materials: • 26,000 ft. Three phase 556 Tree Wire • (1) 1254kVA Autotransformer • (7) Reclosers Addresses four high impact zones on the 30R8 where Eversource has experienced outages within the past four years. Major Materials: • (1) Recloser • (556) SC – 13,700 ft. • 1,000 Cu EPR – 1,500 ft. • (1) Recloser • 750Al AC – 12,600 ft. • 4/0 EPR – 3,700 ft. • (4) 600A switches • (1) G.O.A.B switch This project addresses the aging infrastructure and reliability performance in two high impact zones Major Materials: • (2) Reclosers • (556) SC – 20,000 ft. CD02294 Sharon Hospital Reliability 2026 $2.3M Infrastructure Replacement NO NO Partial CPAC Provide greater reliability to the 21J4 circuit and the 4L06 tie zone by address aging infrastructure in the area. Major Materials: • 3,025 ft. 477 TW 3ph (Originally bare 4/0 AAC) • (25) 3ph Poles (frontier) • 7,350 ft. 477 TW 3ph (Originally bare 336 AAC) • (44) 3ph Poles (frontier) CD02303 22M9 (88%) 2026 $1.2M Capacity NO NO Partial CPAC Address concerns with the 22M9 feeder that relate to the cable’s UG rating. Major Materials: • 7,100 ft. of 500 Kcmil Cu EPR cable CD02318 2025 Large Customer Zones > 1000 - RWO Western - 8Z - 15R 2026 $1.5M Enhancement Programs NO NO Partial CPAC CD02320 2025 Large Customer Zones > 1000 - RWO Central - 10 - 15 2026 $2.M Enhancement Programs NO NO Partial CPAC CD02340 Trip Savers - 2024 2026 $2.M Enhancement Programs NO NO Partial CPAC CD02381 15L46 convert to 23kv Getaway work a 2026 $1.4M Capacity NO NO Partial CPAC CD02387 Trip Saver - 2025 2026 $10.M Enhancement Programs NO NO Partial CPAC Also tied to an asset condition project (CS06007) installing new double bus switchgear to replace oil filled breakers and reclosers. •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Installation of multiple smart switches will reduce the Municipal approvals customers affected on a circuit in the event of future outages. •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Addresses 10 large customer zones in the Central Division Municipal approvals with the installation of 15 viper reclosers. •Internal construction resources not available to perform the work •Customer Permission / Siting Council / install Trip Savers at 1155 fused lateral locations in Municipal approvals Connecticut to reduce the number of outages caused by •Internal construction resources not available to transient type events perform the work Convert Bokum 15L46 from 27.6 kV to 23 kV. •Customer Permission / Siting Council / Major Materials: Municipal approvals • (3) 25 kV Reclosers •Internal construction resources not available to • (2) 1,200 kVAR Capacitors perform the work • (3) 1,254 kVA auto transformers 23kV -13.8kV •Contingent upon CS00365, CS00636 •Customer Permission / Siting Council / Install Trip Savers at 959 fused lateral locations in Connecticut Municipal approvals to reduce the number of outages caused by transient type •Internal construction resources not available to events. perform the work
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 OCC-590 Attachment 1 Page 2 of 2 Project # Name of Project Projected Date of Estimated Distribution Need/Timeline of Investment Cost Improvement Project Justification EDC Proposed NWS Proposed Preliminary Solicitation? RFI? Notes Project scope and key materials (e.g., transformer, etc.) Likely NWS Solicitation Opportunities (Over $1 Million, and Eligible Project Justification) CD02405 Equip. Replacement & Conversion on 12C4 2026 $1.4M Infrastructure Replacement NO NO Partial CPAC Addresses deficiencies on the Enfield 12C4 circuit. Major Materials: • 3,200 ft. of #477 TW • 1,200 ft. of 556 SC • (39) Single-phase transformers • (8) Three-phase transformers • (21) Single-phase poles • (6) Three-phase poles • (3) Junction poles CD02474 2025 Eastern 900-999 Custs RWO SS Project 2026 $1.2M Enhancement Programs NO NO Partial CPAC Addresses zones impacting 900 – 999 customers within the Eastern division to minimize the impact of future outage events. 2026 $1.7M Enhancement Programs NO NO Partial CPAC Addresses 6 large customer zones in the Western Division with the installation of 13 viper reclosers. CD02476 Central 900-999 Custs RW SS Project 2026 $3.8M Enhancement Programs NO NO Partial CPAC Addresses zones impacting 900 – 999 customers within the Central division to minimize the impact of future outage events. CD02479 2026 Cheshire 800-899 Custs RWO SS Poject 2026 $1.9M Enhancement Programs NO NO Partial SDC Addresses zones impacting 800 – 900 customers within the Cheshire Area Work Center to minimize the impact of future outage events. CD02534 2026 Hartford 800-899 Custs SS 2026 $3.8M Enhancement Programs NO NO Partial SDC Addresses 13 large customer zones impacting 800 – 899 customers within the Hartford Area Work Center – Central Division - to minimize the impact of future outage events. CD02535 2026 Tolland 800 - 899 Custs SS Project 2026 $1.5M Enhancement Programs NO NO Partial SDC This 2026 Tolland Smart Switch project addresses circuit zones that serves between 800 and 900 customers. CD02543 Chelsea Piers Switchgear Upgrade 2026 $1.2M Infrastructure Replacement NO NO Partial CPAC Addresses single point failures on Glenbrook (1K08 & 1K18) feeders that feed NBC facility via Maher Rd, Stamford, CT. Major Materials: • (1) S&C Vista Green 422 (pair) • 700ft. 500 Cu EPR Cable CD02549 2026 Newtown 800-899 Custs SS Proj 2026 $2.3M Enhancement Programs NO NO Partial CPAC CD02575 2026 E Hampton 800-899 SS Project 2026 $1.4M Enhancement Programs NO NO Partial CPAC CD02587 15U2 Contingency Overload 2026 $1.5M Capacity NO NO Partial CPAC CD02475 2025 Large Customer Zones 900-999 RWO Western Potential NWS Solicitation Opportunities ($500,000 – $1 Million) CD02552 2026 Torrington 800-899 SS Project 2026 $.5M Enhancement Programs NO NO Partial CPAC CD02489 24A17 Normal Overload 2026 $.5M Capacity NO NO Partial CPAC 2026 $.6M Infrastructure Replacement NO NO Partial CPAC CD02576 2026 Danielson 800-899 Custs SS Project 2026 $.6M Enhancement Programs NO NO Partial CPAC CD02223 Man-to-auto Enfield Industrial Park 2028 $.6M Enhancement Programs NO NO Partial CPAC CD02446 Reconductor Jones Hill East Haddam 2025 $.6M Infrastructure Replacement NO NO Partial CPAC CD02607 2026 Hartford SS CI Rank 101-200 2026 $.6M Enhancement Programs NO NO Partial SDC CD02519 2025 Hartford AWC SS 1-100 CI 5Z 5R 2025 $.6M Enhancement Programs NO NO Partial CPAC CD02533 2025 Torrington SS Rank 1-100 CI 2026 $.7M Enhancement Programs NO NO Partial CPAC CD02477 2026 Madison 800-899 Csts RWO SS Project 2026 $.7M Enhancement Programs NO NO Partial CPAC 2028 $.8M Infrastructure Replacement NO NO Partial CPAC CD02469 28F2 Overload 2026 $.9M Capacity NO NO Partial CPAC CD02553 2026 Waterbury 800-899 Custs Project 2026 $.9M Enhancement Programs NO NO Partial CPAC CD02542 2025 Cheshire AWC SS 1-100 CI 4Z 7R 2026 $.9M Enhancement Programs NO NO Partial CPAC CD01276 St. Mary's Hospital - Adding Swgear 2027 $.9M Enhancement Programs NO NO Partial CPAC CD01946 12J5-1600F, Wormwood, Mansfield - LR 2025 $.9M Infrastructure Replacement NO NO Partial CPAC CD02594 2025 East Hampton CI Rank 1 - 100 2025 $1.M Enhancement Programs NO NO Partial CPAC CD02532 2025 Newtown SS Rank 1-100 CI 2026 $1.M Enhancement Programs NO NO Partial CPAC CD02396 West Brookfield 14H S-S Expansion 2027 $1.M Capacity NO NO Partial CPAC CD01278 SSRK301.23-12C-60R->1494COND.6 2026 $1.M Enhancement Programs NO NO Partial CPAC CD02551 2026 Stamford 800-899 Custs 2026 $1.M Enhancement Programs NO NO Partial CPAC CD02299 2025 Central Smart Switch (CI) RWO – 6Z – 8R 2025 $1.M Enhancement Programs NO NO Partial CPAC CD02480 CD02510 Replace ringed spacer cable on railroad ave. madison Replace Cable & Manual Switch Gear Industrial Rd Bristol Identification of project risks (e.g., potential for delays or cost overruns) •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Addresses zones impacting 800 – 899 customers within the Municipal approvals Newtown Area Work Center to minimize the impact of future •Internal construction resources not available to outage events. perform the work •Customer Permission / Siting Council / Addresses zones impacting 800 – 899 customers within the Municipal approvals East Hampton Area Work Center to minimize the impact of •Internal construction resources not available to future outage events. perform the work •Customer Permission / Siting Council / Provide for load relief to the Chippen Hill 15U2-70S zone. Municipal approvals Serves to break up the large customer zone 15U4-73S, which •Internal construction resources not available to has 1,009 customers affected. perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work Addresses the normal and contingency overloads in the first •Customer Permission / Siting Council / Municipal approvals zone of the 24A17 circuit. •Internal construction resources not available to Major Materials: perform the work • (3) 15KV Viper switch with form 6 control •Customer Permission / Siting Council / Replaces the ringed spacer cable on Horse Pond Rd and Municipal approvals Railroad Ave, Madison, CT. Remove five spans of out of •Internal construction resources not available to service primary conductor perform the work •Customer Permission / Siting Council / Addresses zones impacting 800 – 899 customers within the Municipal approvals Danielson Area Work Center to minimize the impact of future •Internal construction resources not available to outage events. perform the work •Customer Permission / Siting Council / Replace the manual switchgear on the 12C7 feeding the Municipal approvals Enfield Industrial Park on Phoenix St. in Enfield, CT. •Internal construction resources not available to Major Materials: perform the work • (2) S&C PME-9 Switchgear stock code 603870 • (2) Pad tops • (2) Pad bottoms • 200 ft. of 500 AL EPR • 200 ft. of #1 Al EPR (as needed) Addresses zones impacting 800 – 899 customers within the Torrington Area Work Center to minimize the impact of future outage events. •Customer Permission / Siting Council / Reconductor 4700 feet with 447 tree wire single phase to Municipal approvals improve reliability for customers on Jones Hill Road, East •Internal construction resources not available to Haddam. Replace aging infrastructure including 27 poles that perform the work have been in service since 1948. •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / The Smart Switch Program includes the installation of Municipal approvals additional smart switch devices (reclosers) on circuits with •Internal construction resources not available to zones impacting 500 or more customers. perform the work •Customer Permission / Siting Council / Addresses zones with a large number of customers Municipal approvals interrupted over a four-year period within the Torrington •Internal construction resources not available to district. perform the work •Customer Permission / Siting Council / Addresses zones impacting 800 – 899 customers within the Municipal approvals Madison Area Work Center to minimize the impact of future •Internal construction resources not available to outage events. perform the work •Customer Permission / Siting Council / Upgrade the existing manual switchgear in Enterprise Dr from Municipal approvals S&C PMH-9 pair with live front in south Bristol to PME-9 •Internal construction resources not available to switchgear with a dead front. perform the work Addresses an overload on the 28F2 circuit. •Customer Permission / Siting Council / Major Materials: Municipal approvals • 3,000 ft. of 500 Cu Ug Cable •Internal construction resources not available to • 2,200 of 477 AAC TW perform the work • 100 ft. of 1000 Cu Ug Cable •Customer Permission / Siting Council / Addresses zones impacting 800 – 899 customers within the Municipal approvals Waterbury Area Work Center to minimize the impact of •Internal construction resources not available to future outage events. perform the work •Customer Permission / Siting Council / 4 large customer zones in the Cheshire AWC with the Municipal approvals installation of 7 Viper reclosers. •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Installation of a set of 4-way solid dielectric switchgear on the Municipal approvals line side of the existing feed to the existing switchgear at St •Internal construction resources not available to Mary's Hospital 201B. perform the work Address the recurring outages on Wormwood Rd in •Customer Permission / Siting Council / Mansfield. Municipal approvals Major Materials: •Internal construction resources not available to •11,050 ft. of Single Phase 336 Tree Wire perform the work •(52) Poles •(3) Single Phase Radial Reclosers •Customer Permission / Siting Council / The Smart Switch Program includes the installation of Municipal approvals additional smart switch devices (reclosers) on circuits with •Internal construction resources not available to zones impacting 500 or more customers. perform the work •Customer Permission / Siting Council / Address zones with a large number of customers interrupted Municipal approvals over a four-year period within the Newtown district. •Internal construction resources not available to perform the work To support the expansion of the West Brookfield 14H S/S in •Customer Permission / Siting Council / Brookfield, CT. Municipal approvals Major Materials: •Internal construction resources not available to • (1) Sectionalizing Recloser perform the work • (2) Pre-cast Manholes Address a large customer zone on the 12C4 circuit in Enfield, •Customer Permission / Siting Council / CT. Municipal approvals Major Materials: •Internal construction resources not available to • (6) Reclosers and controls perform the work • (6) sets of Disconnect Switches • 800 ft. of 500 AL Aerial Cable •Customer Permission / Siting Council / Addresses zones impacting 800 – 899 customers within the Municipal approvals Stamford Area Work Center to minimize the impact of future •Internal construction resources not available to outage events. perform the work •Customer Permission / Siting Council / This 2025 Smart Switch project addresses circuit zones that Municipal approvals have between 500 and 1000 customers and have experienced •Internal construction resources not available to multiple outages over the past 4 years. perform the work Addresses zones with a large number of customers interrupted over a four-year period within the Hartford district. Installation of six (6) new reclosers
Words on different pages
Words on different pages

Text of OCC-590 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of OCC-590 Attachment 3.pdf

Extracted from the file · 14 pages · 27,306 characters

Text of OCC-594_Final.pdf

Extracted from the file · 4 pages · 7,909 characters

Text of OCC-594 Attachment 1.pdf

Extracted from the file · 1 page · 3,879 characters

Text of OCC-594 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Scanned pages of OCC-594 Attachment 2 REDACTED.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

As listed on the current system

Question(s) Answered 590, 594 (The Connecticut Light and Power Company) Date Filed: 09/28/2026

This filing on the current system (opens in a new tab)