Interrogatory responses
Answers to questions 590, 594
Files10
OCC-590_Final.pdf
PDF · 137 KB · 2 pagesText searchable
Download OCC-590_Final.pdfRead the text of OCC-590_Final.pdf
OCC-590 Attachment 1.pdf
PDF · 220 KB · 2 pagesText searchable
Download OCC-590 Attachment 1.pdfRead the text of OCC-590 Attachment 1.pdf
OCC-590 Attachment 1.xlsx
Excel · 32 KBText searchable
Download OCC-590 Attachment 1.xlsxRead the text of OCC-590 Attachment 1.xlsx
OCC-590 Attachment 2.pdf
PDF · 194 KB · 1 pageText searchable
Download OCC-590 Attachment 2.pdfRead the text of OCC-590 Attachment 2.pdf
OCC-590 Attachment 2.xlsx
Excel · 28 KBText searchable
Download OCC-590 Attachment 2.xlsxRead the text of OCC-590 Attachment 2.xlsx
OCC-590 Attachment 3.pdf
PDF · 1.1 MB · 14 pagesText searchable
Download OCC-590 Attachment 3.pdfRead the text of OCC-590 Attachment 3.pdf
OCC-594_Final.pdf
PDF · 156 KB · 4 pagesText searchable
Download OCC-594_Final.pdfRead the text of OCC-594_Final.pdf
OCC-594 Attachment 1.pdf
PDF · 99 KB · 1 pageText searchable
Download OCC-594 Attachment 1.pdfRead the text of OCC-594 Attachment 1.pdf
OCC-594 Attachment 1.xlsx
Excel · 29 KBText searchable
Download OCC-594 Attachment 1.xlsxRead the text of OCC-594 Attachment 1.xlsx
OCC-594 Attachment 2 REDACTED.pdf
PDF · 291 KB · 1 pageText read by machine from a scan; may contain errors, especially in numbers
Download OCC-594 Attachment 2 REDACTED.pdfScanned pages and text of OCC-594 Attachment 2 REDACTED.pdf
The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.
Part 1
[Sheet: Sheet 1] Project # | Name of Project | Projected Date of Need/Timeline of Improvement | Estimated Distribution Investment Cost | Project Justification | EDC Proposed NWS Solicitation? | Proposed Preliminary RFI? | Notes | Project scope and key materials (e.g., transformer, etc.) | Identification of project risks (e.g., potential for delays or cost overruns) Likely NWS Solicitation Opportunities (Over $1 Million, and Eligible Project Justification) CS00604 | West Brookfield 14H Xfmr and PASS-MO Replacements | $16.9M | Capacity Increase | NO | NO | SDC and partial funding approval. | Replace two 25 MVA transformers for two 62.5 MVA transformers with new high side switches and neutral reactors. | Also tied to an asset condition project (CS06007) installing new double bus switchgear to replace oil filled breakers and reclosers. CD01505 | Man to Auto - 63 Grand St (Buckingham Square) & 188 Bank St & 135 Grand St | $2.1M | Enhancement Programs | NO | NO | Partial CPAC | Addresses the manual switchgear serving the Buckingham Square load loop and the load loop fed from the Post Office / Ramp Garage wall mounted manual switchgear. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02015 | 14W9/14W12 Reliability Improvements | $1.3M | Infrastructure Replacement | NO | NO | Partial CPAC | Addresses a double circuit pole line where the two circuits back each other up via automatic loops. Major Materials: • 12,200 ft. of 556 Spacer Cable • 1,400 ft. of 556 TW • (2) Rreclosers | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02023 | West Brookfield 14H1 Overload | $1.1M | Capacity | NO | NO | Partial CPAC | Addresses the contingency overload on the West Brookfield 14H1 circuit. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02033 | TDRP 11C13 WPC | $5.7M | Infrastructure Replacement | NO | NO | Partial CPAC | Address a radial zone of 850 customers on the 11C13-62R with poor reliability by installing an automatic tie with the Judd Brook 32R1 circuit. Major Materials: • (4) Smart Switches • (1) Tie Reclosers • (1) Midpoint Recloser • (126) Poles • 8,600 ft. 556 1Ø tree wire • 13,000 ft. 556 tree wire • 2,000 ft. 1/0 neutral • (22) 1-Phase transformers | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02087 | Noera 13H S/S LCC Load Relief | $3.M | Capacity | NO | NO | Partial CPAC | Provide load relief to the Noera 13H substation. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02156 | Eliminate Lakeview 31A Triple Circuit Polelines | $3.9M | Infrastructure Replacement | NO | NO | Partial CPAC | Address the two triple circuit pole lines at Lakeview 31A Substation. Major Materials: • 4,900 ft. 1000 CU EPR 15KV Cable • 1,600 ft. 12-6’ conduit1 • (3) Manholes • (2) GOAB Switches • (2) Three Phase Risers | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02160 | 48C7 & 48C8 Smart Switch Project RWO.9 | $1.1M | Enhancement Programs | NO | NO | Partial CPAC | Installing new sectionalizing reclosers and tie reclosers to reduce customer and load zones. Major Materials: • (3) Sectionalizing Reclosers • (3) Tie Reclosers • (2) Midpoint Reclosers • (1) Radial Recloser | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the workPart 2
CD02190 | Middle River 28M3 Load Relief via 28M7 | $3.7M | Capacity | NO | NO | Partial CPAC | Proposed to resolve normal and contingency overloads on 28M3 & 28M13 feeders, improve low voltage issues and provide capacity around load growth areas via a new feeder, 28M7. Furthermore, transfer 1,986 customers (~207 Amps) from 28M3 to the new feeder, 28M7. Major Materials: •(2) Cooper Nova Form 6 •(2) 900A In-line Disc Switch •(1) 900A GOAB •5,000 ft. 1000 Cu EPR (3Ø) •15,000 ft. 556 AL TW (1Ø) •(3) Manhole 6’x14’x7’ – 9-ton SC 566644 •1,000 ft. 12-6 ft. Duck bank •(1) 3Ø Riser Pole | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Contingent upon CS00571 CD02192 | 12J5 WPC Reliability Improvement | $3.9M | Infrastructure Replacement | NO | NO | Partial CPAC | Infrastructure replacement to improve the reliability of the 12J5 circuit. Major Materials: • 2,600 ft. Three phase 556 Tree Wire • 3,400 ft. Single phase 336 Tree Wire • (22) Wood Poles • 9,400 ft. Single phase 336 Tree Wire • 9,400 ft. 750 AL Aerial Cable • (2) 13.8kV Reclosers/Scada Switches • (60) Wood Poles | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02193 | 12J4 WPC Reliability Improvement | $3.9M | Infrastructure Replacement | NO | NO | Partial CPAC | Aaddresses the five high impact zones on the 12J4 where Eversource has experienced outages within the past four years. Major Materials: • 6,400 ft. Three phase 556 Tree Wire • 1,900 ft. Three phase 556 Spacer Cable • (1) 23kV Reclosers/Scada Switches • (68) Wood Poles • 8,100 ft. Single phase 336 Tree Wire • (5) 4.8kV Reclosers • (3) 13.8kV to 4.8kV 500kVA Step Down Transformer • (3) 13.8kV to 4.8kV 167 kVA Step Down Transformer – (for bank) • (1) 13.8kV to 4.8kV 167 kVA Step Down Transformer – (single phase) • (36) Wood Poles | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02199 | Oxford 26N7 Contingency Overload | $1.6M | Capacity | NO | NO | Partial CPAC | Resolve the contingency overload on the Oxford 26N7 Substation feeder. Major Materials: • 6500 ft. of 556.5 AAC 175 MIL Covered Wire • (2) 25KV Class 3 Phase Reclosers • 42 x 45 ft. Class 1 Poles | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02213 | 12Y9 WPC Reliability Improvement | $5.M | Infrastructure Replacement | NO | NO | Partial CPAC | Infrastructure replacement to improve the reliability of the 12Y9 circuit. Major Materials: • 26,000 ft. Three phase 556 Tree Wire • (1) 1254kVA Autotransformer • (7) Reclosers | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02214 | 30R8 WPC Reliability Improvement | $5.9M | Infrastructure Replacement | NO | NO | Partial CPAC | Addresses four high impact zones on the 30R8 where Eversource has experienced outages within the past four years. Major Materials: • (1) Recloser • (556) SC – 13,700 ft. • 1,000 Cu EPR – 1,500 ft. • (1) Recloser • 750Al AC – 12,600 ft. • 4/0 EPR – 3,700 ft. • (4) 600A switches • (1) G.O.A.B switch | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02215 | 35L9 WPC Reliability Improvement | $3.8M | Infrastructure Replacement | NO | NO | Partial CPAC | This project addresses the aging infrastructure and reliability performance in two high impact zones Major Materials: • (2) Reclosers • (556) SC – 20,000 ft. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the workPart 3
CD02294 | Sharon Hospital Reliability | $2.3M | Infrastructure Replacement | NO | NO | Partial CPAC | Provide greater reliability to the 21J4 circuit and the 4L06 tie zone by address aging infrastructure in the area. Major Materials: • 3,025 ft. 477 TW 3ph (Originally bare 4/0 AAC) • (25) 3ph Poles (frontier) • 7,350 ft. 477 TW 3ph (Originally bare 336 AAC) • (44) 3ph Poles (frontier) | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02303 | 22M9 (88%) | $1.2M | Capacity | NO | NO | Partial CPAC | Address concerns with the 22M9 feeder that relate to the cable’s UG rating. Major Materials: • 7,100 ft. of 500 Kcmil Cu EPR cable | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02318 | 2025 Large Customer Zones > 1000 - RWO - Western - 8Z - 15R | $1.5M | Enhancement Programs | NO | NO | Partial CPAC | Installation of multiple smart switches will reduce the customers affected on a circuit in the event of future outages. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02320 | 2025 Large Customer Zones > 1000 - RWO - Central - 10 - 15 | $2.M | Enhancement Programs | NO | NO | Partial CPAC | Addresses 10 large customer zones in the Central Division with the installation of 15 viper reclosers. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02340 | Trip Savers - 2024 | $2.M | Enhancement Programs | NO | NO | Partial CPAC | install Trip Savers at 1155 fused lateral locations in Connecticut to reduce the number of outages caused by transient type events | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02381 | 15L46 convert to 23kv Getaway work a | $1.4M | Capacity | NO | NO | Partial CPAC | Convert Bokum 15L46 from 27.6 kV to 23 kV. Major Materials: • (3) 25 kV Reclosers • (2) 1,200 kVAR Capacitors • (3) 1,254 kVA auto transformers 23kV -13.8kV | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Contingent upon CS00365, CS00636 CD02387 | Trip Saver - 2025 | $10.M | Enhancement Programs | NO | NO | Partial CPAC | Install Trip Savers at 959 fused lateral locations in Connecticut to reduce the number of outages caused by transient type events. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02405 | Equip. Replacement & Conversion on 12C4 | $1.4M | Infrastructure Replacement | NO | NO | Partial CPAC | Addresses deficiencies on the Enfield 12C4 circuit. Major Materials: • 3,200 ft. of #477 TW • 1,200 ft. of 556 SC • (39) Single-phase transformers • (8) Three-phase transformers • (21) Single-phase poles • (6) Three-phase poles • (3) Junction poles | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02474 | 2025 Eastern 900-999 Custs RWO SS Project | $1.2M | Enhancement Programs | NO | NO | Partial CPAC | Addresses zones impacting 900 – 999 customers within the Eastern division to minimize the impact of future outage events. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02475 | 2025 Large Customer Zones 900-999 RWO Western | $1.7M | Enhancement Programs | NO | NO | Partial CPAC | Addresses 6 large customer zones in the Western Division with the installation of 13 viper reclosers. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the workPart 4
CD02476 | Central 900-999 Custs RW SS Project | $3.8M | Enhancement Programs | NO | NO | Partial CPAC | Addresses zones impacting 900 – 999 customers within the Central division to minimize the impact of future outage events. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02479 | 2026 Cheshire 800-899 Custs RWO SS Poject | $1.9M | Enhancement Programs | NO | NO | Partial SDC | Addresses zones impacting 800 – 900 customers within the Cheshire Area Work Center to minimize the impact of future outage events. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02534 | 2026 Hartford 800-899 Custs SS | $3.8M | Enhancement Programs | NO | NO | Partial SDC | Addresses 13 large customer zones impacting 800 – 899 customers within the Hartford Area Work Center – Central Division - to minimize the impact of future outage events. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02535 | 2026 Tolland 800 - 899 Custs SS Project | $1.5M | Enhancement Programs | NO | NO | Partial SDC | This 2026 Tolland Smart Switch project addresses circuit zones that serves between 800 and 900 customers. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02543 | Chelsea Piers Switchgear Upgrade | $1.2M | Infrastructure Replacement | NO | NO | Partial CPAC | Addresses single point failures on Glenbrook (1K08 & 1K18) feeders that feed NBC facility via Maher Rd, Stamford, CT. Major Materials: • (1) S&C Vista Green 422 (pair) • 700ft. 500 Cu EPR Cable | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02549 | 2026 Newtown 800-899 Custs SS Proj | $2.3M | Enhancement Programs | NO | NO | Partial CPAC | Addresses zones impacting 800 – 899 customers within the Newtown Area Work Center to minimize the impact of future outage events. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02575 | 2026 E Hampton 800-899 SS Project | $1.4M | Enhancement Programs | NO | NO | Partial CPAC | Addresses zones impacting 800 – 899 customers within the East Hampton Area Work Center to minimize the impact of future outage events. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02587 | 15U2 Contingency Overload | $1.5M | Capacity | NO | NO | Partial CPAC | Provide for load relief to the Chippen Hill 15U2-70S zone. Serves to break up the large customer zone 15U4-73S, which has 1,009 customers affected. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work Potential NWS Solicitation Opportunities ($500,000 – $1 Million) CD02552 | 2026 Torrington 800-899 SS Project | $.5M | Enhancement Programs | NO | NO | Partial CPAC | Addresses zones impacting 800 – 899 customers within the Torrington Area Work Center to minimize the impact of future outage events. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02489 | 24A17 Normal Overload | $.5M | Capacity | NO | NO | Partial CPAC | Addresses the normal and contingency overloads in the first zone of the 24A17 circuit. Major Materials: • (3) 15KV Viper switch with form 6 control | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the workPart 5
CD02480 | Replace ringed spacer cable on railroad ave. madison | $.6M | Infrastructure Replacement | NO | NO | Partial CPAC | Replaces the ringed spacer cable on Horse Pond Rd and Railroad Ave, Madison, CT. Remove five spans of out of service primary conductor | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02576 | 2026 Danielson 800-899 Custs SS Project | $.6M | Enhancement Programs | NO | NO | Partial CPAC | Addresses zones impacting 800 – 899 customers within the Danielson Area Work Center to minimize the impact of future outage events. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02223 | Man-to-auto Enfield Industrial Park | $.6M | Enhancement Programs | NO | NO | Partial CPAC | Replace the manual switchgear on the 12C7 feeding the Enfield Industrial Park on Phoenix St. in Enfield, CT. Major Materials: • (2) S&C PME-9 Switchgear stock code 603870 • (2) Pad tops • (2) Pad bottoms • 200 ft. of 500 AL EPR • 200 ft. of #1 Al EPR (as needed) | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02446 | Reconductor Jones Hill East Haddam | $.6M | Infrastructure Replacement | NO | NO | Partial CPAC | Reconductor 4700 feet with 447 tree wire single phase to improve reliability for customers on Jones Hill Road, East Haddam. Replace aging infrastructure including 27 poles that have been in service since 1948. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02607 | 2026 Hartford SS CI Rank 101-200 | $.6M | Enhancement Programs | NO | NO | Partial SDC | Addresses zones with a large number of customers interrupted over a four-year period within the Hartford district. Installation of six (6) new reclosers | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02519 | 2025 Hartford AWC SS 1-100 CI 5Z 5R | $.6M | Enhancement Programs | NO | NO | Partial CPAC | The Smart Switch Program includes the installation of additional smart switch devices (reclosers) on circuits with zones impacting 500 or more customers. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02533 | 2025 Torrington SS Rank 1-100 CI | $.7M | Enhancement Programs | NO | NO | Partial CPAC | Addresses zones with a large number of customers interrupted over a four-year period within the Torrington district. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02477 | 2026 Madison 800-899 Csts RWO SS Project | $.7M | Enhancement Programs | NO | NO | Partial CPAC | Addresses zones impacting 800 – 899 customers within the Madison Area Work Center to minimize the impact of future outage events. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02510 | Replace Cable & Manual Switch Gear Industrial Rd Bristol | $.8M | Infrastructure Replacement | NO | NO | Partial CPAC | Upgrade the existing manual switchgear in Enterprise Dr from S&C PMH-9 pair with live front in south Bristol to PME-9 switchgear with a dead front. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02469 | 28F2 Overload | $.9M | Capacity | NO | NO | Partial CPAC | Addresses an overload on the 28F2 circuit. Major Materials: • 3,000 ft. of 500 Cu Ug Cable • 2,200 of 477 AAC TW • 100 ft. of 1000 Cu Ug Cable | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the workPart 6
CD02553 | 2026 Waterbury 800-899 Custs Project | $.9M | Enhancement Programs | NO | NO | Partial CPAC | Addresses zones impacting 800 – 899 customers within the Waterbury Area Work Center to minimize the impact of future outage events. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02542 | 2025 Cheshire AWC SS 1-100 CI 4Z 7R | $.9M | Enhancement Programs | NO | NO | Partial CPAC | 4 large customer zones in the Cheshire AWC with the installation of 7 Viper reclosers. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD01276 | St. Mary's Hospital - Adding Swgear | $.9M | Enhancement Programs | NO | NO | Partial CPAC | Installation of a set of 4-way solid dielectric switchgear on the line side of the existing feed to the existing switchgear at St Mary's Hospital 201B. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD01946 | 12J5-1600F, Wormwood, Mansfield - LR | $.9M | Infrastructure Replacement | NO | NO | Partial CPAC | Address the recurring outages on Wormwood Rd in Mansfield. Major Materials: •11,050 ft. of Single Phase 336 Tree Wire •(52) Poles •(3) Single Phase Radial Reclosers | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02594 | 2025 East Hampton CI Rank 1 - 100 | $1.M | Enhancement Programs | NO | NO | Partial CPAC | The Smart Switch Program includes the installation of additional smart switch devices (reclosers) on circuits with zones impacting 500 or more customers. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02532 | 2025 Newtown SS Rank 1-100 CI | $1.M | Enhancement Programs | NO | NO | Partial CPAC | Address zones with a large number of customers interrupted over a four-year period within the Newtown district. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02396 | West Brookfield 14H S-S Expansion | $1.M | Capacity | NO | NO | Partial CPAC | To support the expansion of the West Brookfield 14H S/S in Brookfield, CT. Major Materials: • (1) Sectionalizing Recloser • (2) Pre-cast Manholes | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD01278 | SSRK301.23-12C-60R->1494COND.6 | $1.M | Enhancement Programs | NO | NO | Partial CPAC | Address a large customer zone on the 12C4 circuit in Enfield, CT. Major Materials: • (6) Reclosers and controls • (6) sets of Disconnect Switches • 800 ft. of 500 AL Aerial Cable | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02551 | 2026 Stamford 800-899 Custs | $1.M | Enhancement Programs | NO | NO | Partial CPAC | Addresses zones impacting 800 – 899 customers within the Stamford Area Work Center to minimize the impact of future outage events. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02299 | 2025 Central Smart Switch (CI) RWO – 6Z – 8R | $1.M | Enhancement Programs | NO | NO | Partial CPAC | This 2025 Smart Switch project addresses circuit zones that have between 500 and 1000 customers and have experienced multiple outages over the past 4 years. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work
Text of OCC-590 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of OCC-590 Attachment 3.pdf
Extracted from the file · 14 pages · 27,306 characters
Text of OCC-594_Final.pdf
Extracted from the file · 4 pages · 7,909 characters
Text of OCC-594 Attachment 1.pdf
Extracted from the file · 1 page · 3,879 characters
Text of OCC-594 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Scanned pages of OCC-594 Attachment 2 REDACTED.pdf
Read by machine from a scan · 1 page · may contain errors, especially in numbers
As listed on the current system
Question(s) Answered 590, 594 (The Connecticut Light and Power Company) Date Filed: 09/28/2026