Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 590, 594

Files10

Search terms highlighted
Eversource rate increase is on 7 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
Words on different pages
Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 OCC-590 Attachment 2 Page 1 of 1 Project # Name of Project Projected Date of Estimated Distribution Need/Timeline of Investment Cost Improvement Project Justification EDC Proposed NWS Solicitation? Proposed Preliminary RFI? Notes Project Scope and Key materials (e.g., transformer, etc.) Identification of project risks (e.g., potential for delays or cost overruns) Likely NWS Solicitation Opportunities (Over $1 Million, and Eligible Project Justification) CD02723 CD02701 CD02440 Town Scorecard Improvements - Eastern BCA Western Backbone Sectionalizing 14R31 ROW Rebuild 2026 2027 2026 $1.5M $2.2M $19.8M Enhancement Programs Enhancement Programs Infrastructure Replacement NO NO NO NO NO Partial CPAC Approved Wires & Poles SDC Approved Wires & Poles NO Full CPAC Approved Wires & Poles This project addresses the Town Scorecard Initiative which identifies •Customer Permission / Siting Council / the top 10 worst performing towns in Eversource, CT for SAIDI and Municipal approvals SAIFI. Project CD02723 addresses the worst performing SAIDI and SAIFI •Internal construction resources not towns in the Eastern Region. Reliability initiatives to install reclosers available to perform the work will improve circuit performance by reducing the number of customers •Materials Shortage or long lead times interrupted. The Smart Switch program now analyzes circuit zones throughout Eversource and ranks them based on their impact on SAIDA and SAIFI across the company. The Smart Switch Program is a continuation of an Eversource initiative of a multi-year program to improve circuit reliability by adding automatic or SCADA sectionalizing devices on overhead distribution circuits. The Smart Switch Program focuses on breaking up customer zones and lowering the average number of customers impacted by a backbone interruption. Under this project, 18 circuit zones will be addressed with the installation of 19 reclosers in the Western region of Connecticut. CD02440 seeks to address contingent loading limitations and aging infrastructure on the 14R31 ROW near Goshen, CT. The 14R31 is a 27.6kV sub-transmission line which originates at the Campville 14R substation in Harwinton CT. This circuit is responsible for feeding three smaller distribution substations: West Goshen 33M, Cornwall 37J1, & North Litchfield 42J1 circuits. In total, over 3,100 customers and 11 critical facilities are supplied from this normal feed. The identified portion of the 14R31 is comprised of roughly 39,000’ of 3-ph 1/0 ACSR conductor. The identified segment includes 152 poles with an average age of 45 years. The 14R31 ROW has experienced 8 reliability related outages in the last 15 years and has seen 3 instances where the segment of 1/0 ACSR was burnt down due to overload under contingency due to switching. To prevent future asset damage due to switching and to address the aging infrastructure within this ROW, this ROW will be rebuilt to modern distribution standards, and the entirety of the existing 1/0 ACSR backbone be reconductored. This would result in the reconductoring of 39,000’ of 1/0 ACSR backbone, the installation of 99 new steel/composite distribution poles within the ROW, and 80 new wood poles along roadside segments •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Materials Shortage or long lead times •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Materials Shortage or long lead times This project address the three high impact zones on the 15L68 circuit. This project proposes installing new sectionalizing devices on the backbone to •Customer Permission / Siting Council / reduce customer zones and increase reliability in the area for the first two Municipal approvals zones. The third zone on Hamburg Rd is to be reconductored, 7,120. Main •Internal construction resources not driver is to reconductor 15L68, Hamburg Rd. Two additional segments to available to perform the work improve reliability which include installing a new Smart Switch on •Materials Shortage or long lead times Dennison Rd, Westbrook, and filling in the gap 150 feet on E. Pond Meadow Rd to refeed a lateral. CD02208 15L68 15L69 WPC Reliability Improvement 2026 $1.7M Infrastructure Replacement NO NO Partial CPAC Approved Wires & Poles CS00703 Westbrook 20S Conversion 2026 $1.3M Capacity NO NO Initial Funding Approved - Full Funding scheduled for 2/5/26 NO Full CPAC Approved Wires & Poles This project replaces a manual PMH switch gear, located on Kirtland Place, Meriden, with an automatic PME 5 pair. PMH gear is live front while PME switch gear is dead front and is DSCADA capable offering both safety and operational flexibility. The switch gear is fed by the East Meriden 21P1, and the backup is the 21P4. 121 customers are fed from this switch gear. There was one outage, non-storm tree related, affecting 754 customers including this switch gear. This project addresses the 11C14-161R zone by replacing primary conductor that has 39 splices, and also prioritizes automation to reduce •Customer Permission / Siting Council / outage frequency and duration, improve service reliability, and Municipal approvals enhance the overall customer experience. •Internal construction resources not Major Material: available to perform the work • (3) 25kV SCADA recloser and control • 0.5 miles 477 AL spacer cable Potential NWS Solicitation Opportunities ($500,000 – $1 Million) CD02107 Man to Auto - East Main Street 2027 $.7M Infrastructure Replacement NO CD02207 11C14 WPC Reliability Improvement 2026 $.6M Infrastructure Replacement NO NO Partial CPAC Approved Wires & Poles CD02618 Contingency Overload 15L69/11C12 2026 $.6M Capacity NO NO Partial CPAC Approved Wires & Poles CD02654 11Y2 Contingency Overload 2028 $.7M Capacity NO NO Partial CPAC Approved Wires & Poles The scope of the project is to support the conversion of the 15L46 feeder from Bokum 15L substation under projects CS00365 and CD02381. This will require the de-energization of the 20S-1X transformer at Westbrook 20S distribution substation so the oil can be drained, taps adjusted from 27.6kV to 23kV, and refill the oil. Key materials will be three high side lightning arresters and a mobile transformer on standby during the outage. This work is scheduled to take place in May 2026. Construction delays due to recloser inventory under project CD02381. Transformer oil processing time. Exposing transformer core to environment. •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Materials Shortage or long lead times The scope of the project is to modify the 11C12 loop scheme and have •Customer Permission / Siting Council / the 11C14 pick up more of the 11C12 load to relieve the contingent Municipal approvals overload on the 15L69 which violates the planning criteria. The 11C14 •Internal construction resources not will require reconductoring to increase its capacity to accommodate available to perform the work this reconfiguration. The Flanders 11Y2 has a contingent overload while carrying the 11Y871S zone and the 11Y2 also has a contingent overload during a #2 Bus •Customer Permission / Siting Council / fault within the Flanders 11Y substation while picking up the 11Y8-71S Municipal approvals and 11Y7-70S zones which violates the planning criteria. This project •Internal construction resources not addresses both contingent overloads. The scope of the project consists available to perform the work of reconductoring the 11Y2 backbone along Flanders Rd to resolve the overload.

Text of OCC-590 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of OCC-590 Attachment 3.pdf

Extracted from the file · 14 pages · 27,306 characters

Text of OCC-594_Final.pdf

Extracted from the file · 4 pages · 7,909 characters

Text of OCC-594 Attachment 1.pdf

Extracted from the file · 1 page · 3,879 characters

Text of OCC-594 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Scanned pages of OCC-594 Attachment 2 REDACTED.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

As listed on the current system

Question(s) Answered 590, 594 (The Connecticut Light and Power Company) Date Filed: 09/28/2026

This filing on the current system (opens in a new tab)