Text of OCC-590 Attachment 2.pdf

Extracted from the file · 1 page · 7,906 characters

Text of OCC-590 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

3 pages match
  1. Page 5 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 OCC-590 Attachment 3 Page 5 of 14 This option presents a significant improvement over the current ROW construction, but at a significant expense. This option was not selected as the preferred because, despite being incredibly robust, the design does not offer enough benefit over the distribution style construction proposed in option 1 for the cost. Option 5 suggests a Non-Wires Solution via installation of a 22.5MWh Battery. To eliminate the overload condition under contingency between the 14R31 when supporting the 11M62 & 11M3 load, a minimum of 6.25MVA is required. Assuming a 4hour outage, a 10-year growth rate of ~1.43%, and a power factor of 0.9, a 22.5MWh battery would be needed. Based on this, the total cost for the battery would be $54.450 Million. NWA estimate was calculated at $2M per MWh based on the two lowest of three contractor bids received in Connecticut. This option is not preferred because it does not address the 1/0 ACSR limitation or the aging infrastructure throughout the ROW. It does solve the contingent overload but would only be able to support this condition for 4 hours. The preferred option addresses both concerns and does so for a significantly lower cost. 3. Project Relationships (if applicable):
  2. Page 6 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 OCC-590 Attachment 3 Page 6 of 14 Project Title : 15L68 15L69 WPC Reliability Improvement Project ID#: CD0 2208 Approval Status: Partial Funding Estimated Project Cost : $ 1,725 K Estimated Start Year (Construction) : 2026 Regulatory Category : Infrastructure Replacement Estimated In Service Year (Energized): 2026 1. Executive Summary: As part of Eversource’s plan to address some of the worst performing circuits (WPC), project CD02208 was created to address the high impact zones on the 15L68 circuit. To ensure only the most cost-effective solutions were utilized, a benefit cost analysis (BCA) was performed to identify recommended solutions. As a result of the BCA, the solutions were determined based on the number of outages experienced within the past four years. The BCA recommends improved sectionalization for the high impact zones on the now 15L69 circuit. This project proposes installing new sectionalizing devices on the backbone to reduce customer zones and increase reliability in the area for the first two zones. The third zone on Hamburg Rd is to be reconductored. 2. Alternative Summary/Project Options Comparison: Option 1 – Original Scope 2 – Descope Required to meet project need Increase reliability of the 15L69-82M zone X X Increase reliability of the 130-customer radial tap on Lynn Rd X X Increase reliability of the 15L68-4000 zone X X Resolves the existing contingency overload in the 15L68-4000 X X zone Additional Benefits (not required to meet scope of project) Reduces customer zones X Total reconductoring 13,770’ 7,120’ Coverts 4.8 kV to 23 kV X No automatic circuit ties with circuits emanating from the same X X bus Authorization Type Partial Partial Capital Cost $3,220.8k $1,725.4k Expense Cost $182.9k $97.9k Total Cost $3,403.7k $1,823.3k Design Criteria Total Cost / CM Saved $74.49 /CMS $53.31 /CMS Total Cost / CI Saved $20,621 /CIS $11,375 /CIS Preferred option 3. Project Relationships (if applicable): X 3 – NWS X X X X N/A X Partial $20.06M $1.14M $21.2M $686.07 /CMS $113,067 /CIS
  3. Page 7 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 OCC-590 Attachment 3 Page 7 of 14 Project Title : We stb ro o k 20 S Co nve rs io n Estimated Project Cost : $1,306K Project ID#: CS00703 Estimated Start Year (Construction) : 2026 Regulatory Category : Capacity Estimated In Service Year (Energized): 2026 Approval Status: Initial Funding 1. Executive Summary: The Westbrook 20S non-bulk substation is fed by the 15L46 feeder which is the source of the 27.6kV feed originating from the Bokum 15L substation, located in Old Saybrook, CT. Project CS00365 - Bokum 15L Distribution Transformer Replacement/Addition and Station Reconfiguration was approved for full funding on April 27, 2023, and has a current in-service date (ISD) of August 2026. The scope of that project is to increase the substation capacity of Bokum 15L and convert the distribution voltage from 27.6kV to 23kV to improve reliability. The 15L46 feeder leaves Bokum 15L substation and then runs express (no taps or customers directly fed at 27.6kV) approximately five (5) miles southwest to Westbrook 20S substation. The distribution line work to convert the 15L46 feeder will be done under project CD02381 – Convert 15L46 to 23kV. To support the conversion of the 15L46 feeder, the 20S-1X transformer at Westbrook will need to have the primary taps changed from 27.6kV to 23kV. In addition, lightning arrestors on the 20S-1X will be replaced. A mobile transformer will be on standby during construction to mitigate any single contingency load loss scenarios. All construction efforts on this project will be coordinated with the conversion of the 15L46 feeder in project CS00365 and CD02381. 2. Alternative Summary/Project Options Comparison: There is currently a distribution line project being developed to eliminate/ retire the Westbrook 20S non-bulk substation by the end of 2027. This project contains four separate alternatives to how the substation can be eliminated. Due to the May 2026 need to convert the 15L46 distribution line to 23kV, making use of the existing transformer by changing its internal taps was the only viable alternative. The only other alternative to be considered for this project to support the conversion work of 15L46 would be to replace the existing transformer. This would be a much more expensive and timely solution for an interim project.
  4. Page 8 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 OCC-590 Attachment 3 Page 8 of 14 3. Project Relationships (if applicable): This project’s need is driven by two other distribution related projects. Substation project CS00365 – “Bokum 15L Distribution Transformer Replacement/ Addition and Station Reconfiguration” will increase capacity of the substation and convert the operating voltage from 27.6kV to 23kV. Distribution line project CD02381 – “Convert 15L46 to 23kV” will construct all line work outside the substation to enable the voltage conversion of the 15L46 feeder from 27.6kV to 23kV out to the Westbrook 20S non-bulk substation.
  5. Page 9 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 OCC-590 Attachment 3 Page 9 of 14 Project Title : Switch Gear Automation -21P1 Kirkland Pl Estimated Project Cost : $683.1 K Project ID#: CD02107 Estimated Start Year (Construction) : 2027 Regulatory Category : Infrastructure Replacement Estimated In Service Year (Energized) : 2027 Approval Status: Full Funding 1. Executive Summary: The existing PMH switch gear is live front and does not switch automatically leaving 121 customers out with the loss of the source feeder until the switchgear can be manually operated. The existing switch gear was installed in 1988. An additional padmount transformer will be installed to improve secondary voltage for customers supplied from the street secondary. This project replaces a manual PMH switch gear, located on Kirtland Place, Meriden, with an automatic PME 5 pair. PMH gear is live front while PME switch gear is dead front and is DSCADA capable offering both safety and operational flexibility. The switch gear is fed by the East Meriden 21P1, and the backup is the 21P4. 121 customers are fed from this switch gear. There was one outage, non-storm tree related, affecting 754 customers including this switch gear. 2. Alternative Summary/Project Options Comparison: Design Criteria Option 1 – Repl PMH switch gear with PME 5 auto 2 – Repl PMH switch gear with PME 5 auto & add additional padmount Yes Yes Voltage Improvement No Yes Authorization Type Partial Full Capital Cost $730K $683K Expense Cost $29K $27K Total Cost $759K $710K Cost / MVA added $/MVA $/MVA Cost / CM Saved $536/CM $576/CM Cost / CI Saved $14,476/CI $15,574/CI Automatic restoration to 121 customers for loos of source Preferred option X Option 2 was chosen to add a second transformer pad to improve secondary voltage to customers which is currently at 115 volts and could drop below the allowable threshold. Doing nothing would put customers at risk of a long duration outage and potentially cause low voltage. 3. Project Relationships (if applicable):
  6. Page 10 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 OCC-590 Attachment 3 Page 10 of 14 Project Title : 11C14 WPC Reliability Improvement Estimated Project Cost : $ 563 K Project ID#: CD0 2207 Estimated Start Year (Construction) : 2026 Regulatory Category : Infrastructure Replacement Estimated In Service Year (Energized) : 2026 Approval Status: Partial Funding 1. Executive Summary: Benefit Cost Analysis initiative: In 2025 Distribution Design Engineering updated its design policy and adopted a systematic process and decision-making tool that quantifies outages and compare them against the financial benefits to determine the cost-effectiveness of projects. This new process is referred as the “Benefit Cost Analysis” or BCA. The 11C14 circuit, a 23 kV line serving 3,052 customers across Chester, Haddam, Higganum, Killingworth, and Middletown, ranked #1 on Connecticut’s worst-performing circuits list in 2022. CD02207 will address one of two high-impact zones where seven outages occurred in the past four years, replacing aging infrastructure and adding automation. The remaining zone was addressed under Project CD01956 and was completed in August 2025. This project includes replacing three single-phase reclosers with a triple-single recloser at the top of Candlewood Hill Road and reconductoring approximately half a mile south to the highway underpass using 477 spacer cable. This approach balances cost with significant reliability improvements and positions the circuit for long-term resilience. 2. Alternative Summary/Project Options Comparison: Option Design Criteria Improve Resiliency Improve automation and visibility 1 – Rescope (Replace 3 singlephase reclosers with SCADA TripleSingle) Total Cost / CM Saved Total Cost / CI Saved Preferred option 3 – NWS Required to meet project need X X Eliminate 39 splices Improve tree clearance from primary conductor Higher breaking strength of primary conductor Authorization Type Capital Cost Expense Cost Total Cost 2– Originally proposed X X 4 – Replace 3 singlephase reclosers with Triple-Single SCADA recloser and Reconductor w/ 477 tree wire 5 – Replace 3 singlephase reclosers with Triple-Single SCADA recloser and Reconductor w/ 477 spacer cable X X X X X X X X Partial $118.3K $6.7K $125.0K Partial $5.4M $169K $5.6M Partial $31M $970K $32.0M Partial $455.8K $25.8K $481.6K Partial $563.3K $29.0K $592.3K $12.83/CMS $3.1K/CIS $47.95/CMS $11.7K/CIS $328.77/CMS $80.5K/CIS $6.18/CMS $1.5K/CIS $5.07/CMS $1.2K/CIS X
  7. Page 11 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 OCC-590 Attachment 3 Page 11 of 14 3. Project Relationships (if applicable):
  8. Page 12 of 14Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 OCC-590 Attachment 3 Page 12 of 14 Project Title : 15L69/11C12 Contingency Overload Estimated Project Cost : $ 594.3 K Project ID#: CD02618 Estimated Start Year (Construction) : 2026 Regulatory Category : Capacity Estimated In Service Year (Energized): 2027 Approval Status: Partial Funding 1. Executive Summary: This project proposes to solve a contingent overload on the Bokum 15L69 ROW when picking up the Haddam 11C12 circuit. A load study showed that under contingency when the 15L69 is picking up the 11C12-70S and 11C12-71S zone, this will add 277 amps and will cause the Bokum 15L69 to experience a 120% overload of the normal limit and 100% of the emergency limit. The scope of the project is to modify the 11C12 loop scheme and have the 11C14 pick up more of the 11C12 load. This will cause the 11C14 to experience a 115% overload at normal and would require reconductoring of 2,580 feet of 2/0 Cu and 336 AL TW with 477 AL TW beyond the 11C14-71S. 2. Alternative Summary/Project Options Comparison: Design Criteria Contingent loads < 100% of OH rating Increases capacity on 11C14 circuit Reduce Load on the 15L69 ROW Increases capacity on Bokum 15L69 ROW Keeps existing Bokum 15L69 ROW infrastructure Improves Bokum 15L69 ROW infrastructure Authorization Type Capital Cost Expense Cost *Total Cost Option 1 – 11C12 Loop Scheme 2 – Reconductor Bokum 15L69 3 – NWS for Change & Reconductor ROW with Necessary Pole Bokum 15L69 11C14 Replacement Required to meet project need X X X Additional Benefits (not required to meet scope of project) X X X Total Cost / MVA added Preferred option X X X X Partial $594.3K $18.5K $612.8K Partial $2.95M $0.09M $3.04M Partial $23.6M $0.75M $24.35M $83.1K/MVA X $254.3K/MVA $8.03M/MVA Do ing no thing wo uld vio la te the Eve rso urc e p la nning c rite ria b y e xc e e d ing no rmal rating s und e r c o nting e nc y. 3. Project Relationships (if applicable):
  9. Page 13 of 14Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 OCC-590 Attachment 3 Page 13 of 14 Project Title : 11Y2 Contingency Overload Estimated Project Cost : $ 696 K Project ID#: CD0 2654 Estimated Start Year (Construction) : 2028 Regulatory Category : Capacity Estimated In Service Year (Energized) : 2028 Approval Status: Partial Funding 1. Executive Summary: The Flanders 11Y2 has a contingent overload while carrying the 11Y8-71S zone. The 11Y2 also has a contingent overload during a #2 Bus fault within the Flanders 11Y substation while picking up the 11Y8-71S and 11Y7-70S zones. This project addresses both contingent overloads. The scope of the project consists of reconductoring the 11Y2 backbone along Flanders Rd to resolve the overload. 2. Alternative Summary/Project Options Comparison: Option Design Criteria 4 – NWS for #2 Bus Fault Contingency 5 - Reconductor from 11Y2 riser to Society Rd (Segments 1 and 2) + NWS for #2 Bus Fault Contingency X X X X X X Additional Benefits (not required to meet scope of project) X X 0 0 0 0 X X X X X 0 X 1 – Reconductor from 11Y2 riser to Society Rd (Segments 1 and 2) Normal loads < 80% of UG rating Normal loads < 90% of OH rating X X Contingent loads < 100% of rating X Solves Bus fault contingency Additional ties created Increases capacity on the circuit No automatic circuit ties with circuits emanating from the same bus Authorization Type Capital Cost Expense Cost Total Cost Total Cost / MVA added Preferred option 2 – NWS for 11Y8 Contingency 2 – Reconductor from 11Y2 riser to Roxbury Rd (All 3 Segments) Required to meet project need X X X X X X X N/A X N/A N/A Partial $695.7k $21.7k Partial $17.5M $0.5M $18M Partial $1,520.9k $47.4k Partial $43.1M $1.3M Partial $12.3M $0.4M $1,568.3k $348.5k/MVA $44.4M $12M/MVA $12.7M $3.4M/MVA $717.4k $159.4k/MVA X $12M/MVA Option 1 of reconductoring only up to Society Rd, solving the 11Y8 contingency, is preferred due to its lower cost, and that it reduces the severity of the #2 Bus fault contingency overload. The #2 Bus fault contingency overload will be reviewed under a separate project. The other options are cost prohibitive and thus were not chosen. If this project does not move forward and nothing is done, the overload violates the planning criteria, could damage equipment potentially failing and causing long duration outages to customers.
  10. Page 14 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 OCC-590 Attachment 3 Page 14 of 14 3. Project Relationships (if applicable):

Text of OCC-594_Final.pdf

Extracted from the file · 4 pages · 7,909 characters

Text of OCC-594 Attachment 1.pdf

Extracted from the file · 1 page · 3,879 characters

Text of OCC-594 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Scanned pages of OCC-594 Attachment 2 REDACTED.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers