Interrogatory responses

Answers to questions 590, 594

Files10

Search terms highlighted
Eversource rate increase is on 7 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
Words on different pages

Text of OCC-590 Attachment 2.pdf

Extracted from the file · 1 page · 7,906 characters

Text of OCC-590 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of OCC-590 Attachment 3.pdf

Extracted from the file · 14 pages · 27,306 characters

Text of OCC-594_Final.pdf

Extracted from the file · 4 pages · 7,909 characters

Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 OCC-594 Attachment 1 Page 1 of 1 PROJECT_NU MBER PROJECT_DESCRIPTION CD01543 CD02199 CD02587 CD02591 CD02660 CD02651 CD02654 CD02687 CD02023 3R04 Contingency Overload Oxford 26N7 Contingency Overload 15U2 Contingency Overload Middle River 28M11 Contingency Overload 35A8 Contingency Overload 12N15 Contingency Overload 11Y2 Contingency Overload 1Q6 Contingency Overload West Brookfield 14H1 Overload CD02087 Noera 13H S/S LCC Load Relief CD02396 CD02570 CD02489 CD02469 CD02471 CD02617 CD02739 CD02903 CD02957 CD02958 CD02172 West Brookfield 14H S-S Expansion 14W12 Contingency Overload 24A17 Normal Overload 28F2 Overload 11R3 Circuit Overload 28F3 Contingency Overload 13S6 Circuit Overload 14M7 Normal Overload Network Unit 354 - Feeder 134 XFMR Replacement Network Unit 355 - Feeder 135 XFMR Replacement Farmington 1C19 Contingency Overload Substation Rocky Hill 3R Oxford 26N Chippen Hill 15U Middle River 28M Wilton 35A Ridgefield 22N Flanders 11Y Uncasville 1Q West Brookfield 14H Noera 13H Todd 30L West Brookfield 14H Rockville 14W Flax Hill 24A Greenwich 28F Cos Cob 11R Greenwich 28F Darien 13S Tracy 14M South Meadow 1A South Meadow 1A Farmington Circuit DIVISION DISTRICT Scope Indirect Outside Total Labor Cost Material Removals Other subtotal Services Cost ($k) Cost ($k) Cost ($k) Cost ($k) ($k) ($k) Cost ($k) Contingency ($k) Study Year ISD 3R04 26N7 15U2 28M11 35A8 22N15 11Y2 1Q6 14H1 CENTRAL WESTERN CENTRAL WESTERN WESTERN WESTERN EASTERN EASTERN WESTERN HARTFORD NEWTOWN CHESHIRE NEWTOWN NORWALK NORWALK NEW LONDON NEW LONDON NEWTOWN Reconductor Reconductor & Reconfiguration Reconductor & Reconfiguration Reconfiguration Reconfiguration Reconfiguration Reconductor Reconfiguration Reconductor 278.4 1,594.0 1,450.8 455.4 280.2 352.1 695.7 146.3 1,064.0 11.7 66.7 60.7 19.1 11.7 14.7 29.1 6.1 91.2 94.8 542.4 493.8 155.0 95.4 119.8 236.8 49.8 120.3 47.5 272.1 247.7 77.8 47.8 60.1 118.8 25.0 384.0 21.0 120.4 109.6 34.4 21.2 26.6 52.6 11.1 25.0 1.8 0.0 0.0 0.0 1.9 0.0 4.6 1.0 0.0 101.6 545.2 529.3 166.1 102.2 128.5 253.8 53.4 440.0 0.0 10.6 9.6 3.0 0.0 2.3 0.0 0.0 3.6 2025 2023 2024 2025 2025 2025 2025 2025 2023 6/1/2028 6/1/2028 6/1/2028 6/1/2028 6/1/2028 6/1/2028 6/1/2028 6/1/2028 6/1/2027 30L29 CENTRAL CHESHIRE New Feeder 2,952.7 123.6 1,005.0 504.2 223.2 0.0 1,077.2 19.6 2024 14H1 14W12 24A17 28F2 11R3 28F3 13S6 14M7 1A134 1A135 1C19 WESTERN CENTRAL WESTERN WESTERN WESTERN WESTERN WESTERN EASTERN CENTRAL CENTRAL CENTRAL NEWTOWN TOLLAND NORWALK STAMFORD STAMFORD STAMFORD STAMFORD DANIELSON HARTFORD HARTFORD CHESHIRE Reconfiguration Reconfiguration Reconfiguration Reconductor Reconfiguration Reconfiguration Reconfiguration Reconductor Equipment Replacement Equipment Replacement Reconductor & Reconfiguration 1,000.0 129.6 544.9 1,594.2 301.3 400.3 236.0 630.2 450.9 498.4 4,405.1 41.9 5.4 22.8 285.6 12.6 16.8 9.9 45.3 76.4 84.5 570.2 340.4 44.1 185.5 45.6 102.5 136.2 80.3 139.3 56.0 61.9 390.8 170.7 22.1 93.0 201.8 51.4 68.3 40.3 160.1 47.8 52.9 904.0 75.6 9.8 41.2 38.0 22.8 30.3 17.8 50.9 63.3 70.0 118.7 0.0 0.9 0.0 0.0 2.0 2.7 0.0 0.0 0.0 0.0 27.1 364.8 47.3 198.8 878.2 109.9 146.0 86.1 234.6 205.9 227.6 2,394.4 0.0 0.0 3.6 0.0 0.0 0.0 1.6 0.0 1.4 1.5 0.0 2024 2024 2024 2026 2024 2026 2025 2026 2026 2026 2023 Maximum Maximum Capacity Capacity AMPS MVA Exceedanc Exceedance e Normal Rating AMPS 0.08 1.10 0.96 1.80 0.22 0.41 3.70 0.87 2.10 2 45 40 74 9 17 93 38 86 375 460 421 511 580 235 490 395 440 6/1/2027 2.00 84 2092 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 2.89 0.38 1.46 1.14 0.20 1.10 0.32 1.12 1.67 3.19 121 16 64 50 8 47 8 28 42 80 440 440 440 480 373 604 460 130 450 450 490

Text of OCC-594 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Scanned pages of OCC-594 Attachment 2 REDACTED.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

As listed on the current system

Question(s) Answered 590, 594 (The Connecticut Light and Power Company) Date Filed: 09/28/2026