Interrogatory responses

Answers to questions 590, 594

Files10

Search terms highlighted
Eversource rate increase is on 7 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
Words on different pages

Text of OCC-590 Attachment 2.pdf

Extracted from the file · 1 page · 7,906 characters

Text of OCC-590 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of OCC-590 Attachment 3.pdf

Extracted from the file · 14 pages · 27,306 characters

Text of OCC-594_Final.pdf

Extracted from the file · 4 pages · 7,909 characters

Text of OCC-594 Attachment 1.pdf

Extracted from the file · 1 page · 3,879 characters

Words on different pages

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: Feeder Capacity Projects] PROJECT_NUMBER | PROJECT_DESCRIPTION | Substation | Circuit | DIVISION | DISTRICT | Scope | Total Cost ($k) | Labor Cost ($k) | Outside Services Cost ($k) | Material Cost ($k) | Removals Cost ($k) | Other Cost ($k) | Indirect subtotal ($k) | Contingency ($k) | Study Year | ISD | Maximum Capacity MVA Exceedance | Maximum Capacity AMPS Exceedance | Normal Rating AMPS CD01543 | 3R04 Contingency Overload | Rocky Hill 3R | 3R04 | CENTRAL | HARTFORD | Reconductor CD02199 | Oxford 26N7 Contingency Overload | Oxford 26N | 26N7 | WESTERN | NEWTOWN | Reconductor & Reconfiguration CD02587 | 15U2 Contingency Overload | Chippen Hill 15U | 15U2 | CENTRAL | CHESHIRE | Reconductor & Reconfiguration CD02591 | Middle River 28M11 Contingency Overload | Middle River 28M | 28M11 | WESTERN | NEWTOWN | Reconfiguration CD02660 | 35A8 Contingency Overload | Wilton 35A | 35A8 | WESTERN | NORWALK | Reconfiguration CD02651 | 12N15 Contingency Overload | Ridgefield 22N | 22N15 | WESTERN | NORWALK | Reconfiguration CD02654 | 11Y2 Contingency Overload | Flanders 11Y | 11Y2 | EASTERN | NEW LONDON | Reconductor CD02687 | 1Q6 Contingency Overload | Uncasville 1Q | 1Q6 | EASTERN | NEW LONDON | Reconfiguration CD02023 | West Brookfield 14H1 Overload | West Brookfield 14H | 14H1 | WESTERN | NEWTOWN | Reconductor CD02087 | Noera 13H S/S LCC Load Relief | Noera 13H Todd 30L | 30L29 | CENTRAL | CHESHIRE | New Feeder CD02396 | West Brookfield 14H S-S Expansion | West Brookfield 14H | 14H1 | WESTERN | NEWTOWN | Reconfiguration CD02570 | 14W12 Contingency Overload | Rockville 14W | 14W12 | CENTRAL | TOLLAND | Reconfiguration CD02489 | 24A17 Normal Overload | Flax Hill 24A | 24A17 | WESTERN | NORWALK | Reconfiguration CD02469 | 28F2 Overload | Greenwich 28F | 28F2 | WESTERN | STAMFORD | Reconductor CD02471 | 11R3 Circuit Overload | Cos Cob 11R | 11R3 | WESTERN | STAMFORD | Reconfiguration CD02617 | 28F3 Contingency Overload | Greenwich 28F | 28F3 | WESTERN | STAMFORD | Reconfiguration CD02739 | 13S6 Circuit Overload | Darien 13S | 13S6 | WESTERN | STAMFORD | Reconfiguration CD02903 | 14M7 Normal Overload | Tracy 14M | 14M7 | EASTERN | DANIELSON | Reconductor CD02957 | Network Unit 354 - Feeder 134 XFMR Replacement | South Meadow 1A | 1A134 | CENTRAL | HARTFORD | Equipment Replacement CD02958 | Network Unit 355 - Feeder 135 XFMR Replacement | South Meadow 1A | 1A135 | CENTRAL | HARTFORD | Equipment Replacement CD02172 | Farmington 1C19 Contingency Overload | Farmington | 1C19 | CENTRAL | CHESHIRE | Reconductor & Reconfiguration

Scanned pages of OCC-594 Attachment 2 REDACTED.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

As listed on the current system

Question(s) Answered 590, 594 (The Connecticut Light and Power Company) Date Filed: 09/28/2026