Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 591, 593

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy5 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files5

Text of OCC-591 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-593 Page 1 of 1 Date Filed: September 23, 2026 Witness: Lavelle A. Freeman and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at 49. For each proposed capacity project, provide the annual load forecast at the affected substation and feeder level through 2040. Identify the forecast peak, applicable equipment rating, percentage of rating, forecast year of first exceedance, and all newcustomer or DER projects included in the forecast. Provide the data in native, unlocked Excel format. Response: The Company creates a 10-year peak load forecast which, based on the most current vintage from March 2026, extends to 2035. The peak load forecast does not extend to 2040. For the annual load forecast for each capacity project, please refer to the OCC-591, Attachment 1 CONFIDENTIAL.

As listed on the current system

Question(s) Answered 591, 593 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026

This filing on the current system (opens in a new tab)