Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 606, 607, 613, 614, 615, 616, 618, 619, 621, 622

Files12

Text of OCC-614_Final.pdf

Extracted from the file · 1 page · 476 characters

Text of OCC-614 Attachment 1.pdf

Extracted from the file · 1 page · 2,882 characters

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: Voluntary Only] The Connecticut Light and Power Company d/b/a Eversource Energy Docket No 26-05-10 Date Issued September 10, 2026 OCC-614 Attachment 1 Page 1 of 1 The Connecticut Light and Power Company 2025 Voluntary Terminations Line ID | Position | Termination Reason Admin Support A | Retirement Area Stockhandler | Retirement Auto Body Mechanic | Retirement Building Maint Mechanic (Dual License) | Retirement Cable Worker | Retirement Chief Electrician | Retirement Chief Meter-Service Mechanic Electric | Retirement Chief Meter-Service Mechanic Electric (Incumbent Only) | Retirement Chief Splicer/Chief Cable Splicer | Retirement Chief Stockhandler | Retirement Chief Utility Worker | Retirement Chief/Top Line Mechanic | Retirement Construction Equipment Operator | Retirement Distribution Coordinator | Retirement Electrician | Retirement Equipment Tester | Retirement Field Engineering Designer I | Retirement Field Engineering Designer II | Retirement Field Training Leader | Retirement Garage Mechanic | Retirement Lead Electrician | Retirement Lead Equipment Tester | Retirement LEAD LINE MECHANIC | Retirement Meter Service Installer | Retirement Meter-Service Mechanic-Electric | Retirement Senior Division Administration Representative (Sw) | Retirement Senior Representative, Construction | Retirement Senior Specialist, Emergency Preparedness | Retirement Senior Supervisor, Electric Field Operations | Retirement Senior Supervisor, Field Engineering Design | Retirement Stockhandler | Retirement Supervisor, Electric Field Operations | Retirement Supervisor, Technical Training | Retirement Chief/Top Line Mechanic | Relocation Garage Mechanic | Relocation Lead Splicer/Lead Cable Splicer | Relocation Response Specialist- Line | Relocation Supervisor, Electric Field Operations | Relocation Associate Engineer | Personal Line Helper | Personal Manager, Electric Operations | Personal Response Specialist- Line | Personal Supervisor, Electric Field Operations | Personal Supervisor, Substation Operations | Personal Supervisor, System Operations Center | Personal Tractor-Trailer Driver | Job Betterment Meter and Service Dispatch | Dissatisfied

Text of OCC-615_Final.pdf

Extracted from the file · 3 pages · 6,240 characters

Text of OCC-616_Final.pdf

Extracted from the file · 1 page · 1,256 characters

Text of OCC-618_Final.pdf

Extracted from the file · 1 page · 1,156 characters

Text of OCC-619_Final.pdf

Extracted from the file · 1 page · 1,572 characters

Text of OCC-621_Final.pdf

Extracted from the file · 1 page · 949 characters

Text of OCC-622_Final.pdf

Extracted from the file · 1 page · 1,569 characters

As listed on the current system

Question(s) Answered 606, 607, 613, 614, 615, 616, 618, 619, 621, 622 (The Connecticut Light and Power Company) Date Filed: 09/24/2026

This filing on the current system (opens in a new tab)