Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 742, 745, 746, 747, 748, 749

Files6

Text of OCC-747_Final.pdf

Extracted from the file · 2 pages · 3,110 characters

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-18 Date Issued September 14, 2026 OCC-748 Page 1 of 1 Date Filed: September 28, 2026 Witness: Jared A. Lawrence Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-AMI-2 at 49 “The Company also plans to run a high impedance detection for distribution intelligence pilot, which will leverage grid-edge data from AMI to identify potential high impedance fault conditions or abnormal system behavior”. a. Please describe what other distributed intelligence capabilities the Company intends to pilot and leverage for planning and operations. Response: Eversource has identified several distributed intelligence capabilities for evaluation which includes load disaggregation, and transformer monitoring. Eversource is currently conducting pilot programs within the Massachusetts program deployment. Load disaggregation provides EV awareness, which monitors consumption, and solar awareness, which monitors generation, in the form of pilot programs. These programs will enable the capability to identify behind the meter EV or solar, and can subsequently provide session data such as power generation, power consumption, peak power, and total power. Transformer monitoring enables real time voltage and load characteristics of distribution transformers. This is calculated instantly by the meters and electrically connected to the same transformer. These applications provide Eversource with granular data that can better understand how behind the meter solar and EV devices affect grid performance. Pending PURA approval, the technology that is currently available in Massachusetts would be available to benefit Connecticut customers.

Text of OCC-749_Final.pdf

Extracted from the file

As listed on the current system

Question(s) Answered 742, 745, 746, 747, 748, 749 (The Connecticut Light and Power Company) Date Filed: 09/28/2026

This filing on the current system (opens in a new tab)