Interrogatory responses
Answers to questions 792, 801, 805, 806
Files11
OCC-792_Final.pdf
PDF · 130 KB · 3 pagesText searchable
Download OCC-792_Final.pdfRead the text of OCC-792_Final.pdf
OCC-792 Attachment 1 REDACTED.pdf
PDF · 696 KB · 3 pagesText searchable
Download OCC-792 Attachment 1 REDACTED.pdfRead the text of OCC-792 Attachment 1 REDACTED.pdf
OCC-792 Attachment 2 REDACTED.pdf
PDF · 694 KB · 3 pagesText searchable
Download OCC-792 Attachment 2 REDACTED.pdfRead the text of OCC-792 Attachment 2 REDACTED.pdf
OCC-792 Attachment 3 REDACTED.pdf
PDF · 726 KB · 8 pagesText searchable
Download OCC-792 Attachment 3 REDACTED.pdfRead the text of OCC-792 Attachment 3 REDACTED.pdf
OCC-792 Attachment 4 REDACTED.pdf
PDF · 183 KB · 1 pageNo text in this file
OCC-792 Attachment 5 REDACTED.pdf
PDF · 69 KB · 1 pageNo text in this file
OCC-801_Final.pdf
PDF · 92 KB · 2 pagesText searchable
Download OCC-801_Final.pdfRead the text of OCC-801_Final.pdf
OCC-805_Final.pdf
PDF · 91 KB · 1 pageText searchable
Download OCC-805_Final.pdfRead the text of OCC-805_Final.pdf
OCC-805 Attachment 1.pdf
PDF · 165 KB · 13 pagesText searchable
Download OCC-805 Attachment 1.pdfRead the text of OCC-805 Attachment 1.pdf
OCC-805 Attachment 1.xlsx
Excel · 44 KBText searchable
Download OCC-805 Attachment 1.xlsxRead the text of OCC-805 Attachment 1.xlsx
OCC-806_Final.pdf
PDF · 124 KB · 2 pagesText searchable
Download OCC-806_Final.pdfRead the text of OCC-806_Final.pdf
Text of OCC-792 Attachment 3 REDACTED.pdf
Extracted from the file · 8 pages · 9,251 characters
Text of OCC-801_Final.pdf
Extracted from the file · 2 pages · 3,664 characters
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-805 Page 1 of 1 Date Filed: October 05, 2026 Witness: Lavelle A. Freeman, Gerhard Walker, Juan F. Martinez, Steven C. Osuch, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ADDITIONS-12, p. 145. Company attributes the 2024 decrease in Peak Load/Capacity to “large Substation capacity projects (6 in 2023 versus 3 in 2024).” Identify each substation capacity project undertaken during 2017 through 2025, with the load forecast and planning criterion relied upon at authorization, the measured peak load in the five years after inservice, the total cost, and any non-wires alternative evaluation. Response: Please refer to OCC-80,5 Attachment 1. This Excel workbook contains a list of substation transformer projects driven by capacity needs that were installed and in service between 2017 through 2025. The Company has also added capacity projects to the list that had significant capital spend within the same timeframe but are not yet in service. All historical load forecasts available for these substations at the time of authorization are provided in the separate worksheets within the attachment. Please note that some projects are not listed with a standardized 10-year forecast because they were developed prior to 2017. However, The Company has provided the 2017 (earliest available) forecast for these projects. Columns I through M of the table identify the recorded peak load value for the following 5 years after in service date, if available. For projects initiated and developed prior to 2017, the Company relied on a different application for forecasting substation loads. The historical load forecasts and values are not maintained in this application as the values become overwritten by, non-weather normalized, actual peak loads once they occur and are recorded.
Text of OCC-805 Attachment 1.pdf
Extracted from the file · 13 pages · 7,185 characters
Text of OCC-805 Attachment 1.xlsx
Extracted from the file
Text of OCC-806_Final.pdf
Extracted from the file · 2 pages · 4,078 characters
As listed on the current system
Question(s) Answered 792, 801, 805, 806 (The Connecticut Light and Power Company) Date Filed: 10/05/2026