Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 818, 822, 824

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy5 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files5

Text of OCC-824 Attachment 1.pdf

Extracted from the file · 1 page · 633 characters

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: Sheet 1] 1 | The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 OCC-824 Attachment 1 Page 1 of 1 The Connecticut Light and Power Company Insurance Expense Public Liability Rate Year Calculation (Thousands of Dollars) Description | Total | Allocated Percentage | Amount CL&P Public Liability Reserve Low Scenario Amount EESCO Public Liability Reserve Low Scenario Amount Total Rate Year Amount Note: Amounts shown above may not add due to rounding.

As listed on the current system

Question(s) Answered 818, 822, 824 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)