Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 874, 885, 886

Files5

Search terms highlighted
Eversource rate increase is on 67 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of OCC-886_Final.pdf

Extracted from the file · 1 page · 1,819 characters

Words on different pagesRead the text of OCC-886_Final.pdf
67 pages match
  1. Page 103 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 103 of 191 Page 96 that each Millstone unit was out of rate base. Based on the evidence presented, the Department is unable to determine that amount but will do so in a subsequent EAC proceeding. CL&P was directed to exclude Unrecovered D&D from the Final BRFR and to identify the effect on the BRFR. Tr. 10/20/98, p. 4110. However, the Company did not remove the Unrecovered D&D from its Final Fuel Simulation. Instead, it included four options for recovery of these costs. Late Filed Exhibit No. 138-SP-1, pp. 3 and 4. Based on the above, the Department reduces CL&P’s net forecasted fuel expense by the amount of the Unrecovered D&D, $22.3 million. As discussed below, the Department approves CL&P proposal to modify the recovery method for current D&D costs. Therefore, it is reasonable to remove the full amount of the Unrecovered D&D because the Final BRFR embeds current recovery of D&D under the proposed FERC method effective October 1998. k. D&D Recovery Methodology CL&P also requested a change in the method of recovery for current D&D costs. The requested method would expense each of the remaining D&D annual assessments over a 12-month period in line with FERC guidelines. As noted above, the Fuel Burn Method could result in the build-up of a regulatory deferral should the Company experience an extended outage under normal, prudent operations. The Department believes that the use of the FERC method will levelize recovery of D&D costs and avoid the potential for deferring these costs. Therefore, the Company’s proposal is approved. The FERC method was assumed in the original Fuel Simulation and was carried forward to the Revised Fuel Simulation and Final BRFR. Therefore, no further adjustment to the Final Fuel Simulation is required. l. Delivery Efficiency Delivery efficiency (DE) represents the difference between retail sales and retail requirements (i.e., generation) needed to serve those sales. The value is expressed as a percentage and can be accounted for primarily by line losses, company use and billing lag. Losses are primarily incurred on the transmission and distribution systems as the result of transmitting power from generation sources to the ultimate users. According to CL&P, billing lag can be affected by “drastic temperature changes at year end, and to a smaller degree by estimating customers usage.” Late Filed Exhibit No. 62. DE can also fluctuate due to changes in the mix of sales among major classes of service as well as the gain or loss of large customer loads. Id. The DE percentage approved in Docket No. 92-11-11 is .92225. CL&P proposes to reduce it to .92040 in this proceeding. Schedule WPC-3.1, p. 16; Response to Interrogatory EL-288.
  2. Page 104 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 104 of 191 Docket No. 98-01-02 Page 97 Historical Delivery Efficency Percentages Actual 1993 1994 1995 1996 1997 91.63% 93.26% 92.11% 92.77% 92.11% Proposed 92.04% Five-Year Average Four-Year Three-Year Average Average 92.33% 92.56% 92.38% Source: Late Filed Exhibit No. 62 CL&P states that the DE percentage does not ‘drive’ the determination of generation requirements from forecasted sales. Instead, CL&P forecasts its energy requirements and retail sales separately, then determines its DE percentage based on these forecasted values (sales divided by requirements). Therefore, the proposed DE percentage ‘falls out’ of these separate forecasts. Tr. 9/16/98, pp. 1361-1367; Tr. 10/20/98, pp. 1362 and 4091-4098. The Company’s method of deriving DE appears to be reasonable, but the result should be compared to actual. It was not. According to the Company the proposed percentage reflects “an increase in unaccounted for losses,” an undesirable trend. Id. The DE percentage provides a link between sales and generation; the lower the DE percentage, the more electricity that must be generated and the greater the total fuel cost needed to serve the forecasted load. As such, the DE percentage should drive the determination of requirements or at least be used as a check against the reasonableness of forecasted generation and fuel cost. The table above demonstrates that DE has improved in the recent past; therefore, the Department finds CL&P’s proposed DE percentage unsupported. The three, four and five-year averages are higher that the DE proposed by CL&P and the five-year average provides a reasonable, long-term DE. Therefore the Department approves it. CL&P was directed to use 92.38%, the five-year average, in its Final Fuel Simulation. Tr. 10/20/98, p. 4099. m. Sharing Agreement and NUG&T The 1992 merger of NU and PSNH resulted in a sharing agreement designed to allocate the energy cost savings resulting from the economic dispatch of the combined NU and PSNH systems (Sharing Agreement). In addition, the Sharing Agreement includes a mechanism for allocating capacity and related costs between PSNH and NU to share the surplus capacity of the combined systems (Capacity Transfer) when one of the systems is capacity deficient. According to CL&P, the Sharing Agreement “defines the mechanical process” regarding energy cost savings and the transfer of surplus capacity. Tr. 9/16/98, pp. 1194-1286. The Northeast Utilities Generation and Transmission Agreement (NUG&T) came about following the creation of NU, which essentially consolidated the Western Massachusetts Electric Company (WMECO), Holyoke Water and Power (HWP) and
  3. Page 105 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 105 of 191 Page 98 CL&P (combined, NU Initial System Companies).10 The NUG&T allows NU Initial System Companies to plan and dispatch for system need based on the operation of the combined companies instead of on a stand-alone basis. The savings that result from this single system approach are shared among the companies. Roman PFT, pp. 2-7; Id. Restructuring activities are underway in New Hampshire and Massachusetts and those activities require PSNH, WMECO and HWP to sell their generation and generation-related assets. Based on the timetable for restructuring in those states, CL&P anticipated that the sale of PSNH, WMECO and HWP generation assets would be completed prior to 1999.11 The sale of those assets would render the Sharing Agreement and NUG&T unworkable because the companies would no longer control generation. The Fuel Simulation submitted with the original filing assumed that the Sharing Agreement and NUG&T were not in effect throughout 1999. Therefore, the Proposed BRFR was based on a Fuel Simulation in which CL&P assumed operation of its generation system on a stand-alone basis for the rate year. Id.; Tr. 9/16/98, pp. 1202 and 1237; Shuckerow PFT, pp. 3-8. Implementation of retail choice in New Hampshire and Massachusetts has been delayed. As a result, CL&P states that the Sharing Agreement and NUG&T will remain in effect through the first half of 1999. The Revised Fuel Simulation assumes operation of the NUG&T through June 1999 and continuation of the Sharing Agreement through April 1999. Id.; Filing dated September 30, 1999, Revised Schedule C-3.8 and WPC-3.8. CL&P states that including the NUG&T in the revised filing for the first half of 1999 increases capacity costs but reduces energy costs. Essentially, “CL&P incurs capacity charges for being a member of the NUG&T and receives energy benefits for being a member.” Tr. 9/16/98, p. 1242. The Company estimates the annual net effect of these two items as an increase to costs of approximately $8 million, or $4 million for the half year assumed in the revised filing. Tr. 9/16/98, p. 1244. The Sharing Agreement provides energy cost benefits to CL&P through the pooled dispatch of PSNH resources. However, the NU Initial System Companies are capacity deficient as a result of the extended outages at Millstone Station and the retirement of MP1, CY and MY. Under the Capacity Transfer provisions of the Sharing Agreement, the NU Initial Companies must take surplus capacity from PSNH at formula-based rates. The cost of capacity under the ‘must take’ provision of the Sharing Agreement is in excess of current market rates and, although there are energy cost benefits included with these transfers, there is a net increase to expenses associated with the transfer. Therefore, the revised filing reflects increased capacity costs and reduced energy costs associated with the Sharing Agreement through April 1999. Id.; Tr. 9/16/98, 1234-1258. 10 The NU Operating Companies are referred to as the NU Initial System, whereas the operation of NU including PSNH, is referred to as the Combined System. 11 For example, Massachusetts legislation provided for implementation of retail choice by March 1998.
  4. Page 106 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 106 of 191 Page 99 The Capacity Transfer provision requires CL&P to take PSNH surplus capacity for six-month periods (Capability Period) that run from November through April and May through October. For 1999, CL&P included a forecast of capacity costs reflecting four months of PSNH capacity in its revised filing. The four-month period, January through April, represents the final months of the November 1998 through April 1999 Capability Period. CL&P states that the capacity costs reflect the transfer of 270 MWs of capacity for this Capability Period at a forecasted average monthly cost of $2.5 million. Id.; Tr. 9/16/98, pp. 1204-1215. At the time CL&P prepared its rate filing, it appeared that restructuring activities in Massachusetts and New Hampshire would render the Sharing Agreement and NUG&T unworkable for the rate year. As a result, CL&P submitted its original filing based on the assumption that these agreements would not be in effect throughout 1999. However, restructuring is a complex task and although delays were not expected, it is not unreasonable for them to occur, as they have. The Department believes that the Company acted reasonably in assuming that the Sharing Agreement and NUG&T would terminate prior to the rate year, given the information available to it at the time. Once CL&P became aware that the agreements would go forward into 1999, it was reasonable for the Company to amend its filing and include continued operation of the agreements for the first half of 1999. Therefore, the Department accepts continued operation of these agreements for the first half of 1999. The combined PSNH and NUG&T capacity costs are forecasted to total $46.8 million for January through June 1998. Late Filed Exhibit No. 151; Revised Schedule C-3.8; Late Filed Exhibit No. 138 SP 1. These costs reflect the operation of the NUG&T for the full six-month period and the operation of the Sharing Agreement through April 1999. The four-month recovery of PSNH capacity costs assumes approval of CL&P’s proposal to transfer its wholesale contracts to an unregulated subsidiary. See Section II.G.5. Therefore, the Final Fuel Simulation did not demonstrate PSNH capacity costs for May and June, nor did it include the energy benefits associated with the transfer for these months. CL&P embedded $46.8 million in capacity costs in the non-fuel component of base rates in its revised filing. At the Department’s request, CL&P isolated NUG&T and PSNH capacity costs in the BRFR under the Final Fuel Simulation. Tr. 10/20/98, p. 4103; Late Filed Exhibit No. 138 SP 1. The Company states that reflecting NUG&T and PSNH capacity costs in the calculation of the BRFR will not change the overall revenue requirement but will assure tracking of these costs through the EAC. Id. However, the Company believes that capacity costs are not permitted in the EAC; therefore, it is inappropriate to include these costs in the BRFR. The Department disagrees. At present, the EAC is truing-up the capacity costs associated with the MP2 out-of-rate-base disallowance. Docket No. 98-06-01, EAC filing, p. 79. In addition, CL&P recovers the full cost of PPP contracts through the BRFR and these costs are trued-up in the EAC. Although CL&P books all PPP purchases as energy, it is clear that these costs reflect both energy and capacity. See Section II.I.10.
  5. Page 107 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 107 of 191 Page 100 Traditionally, the BRFR has excluded recovery of non-PPP capacity costs. However, the capacity costs associated with the NUG&T and Sharing Agreement will end at the mid-point of the rate year. If these costs are embedded in non-fuel rates, there is no adjustment mechanism should actual costs deviate from forecasted levels. The Company would continue to recover at the level embedded in rates beyond 1999 unless base rates are reset at that time. If these cost are included in the BRFR, the Department can true them up with a simple adjustment through the EAC. Therefore, the Department will include $46.8 million in the BRFR. These costs will be trued-up to actual through the EAC. The Department notes that embedding these costs in the BRFR increases that rate by approximately 2 mills while reducing non-fuel base rates by an equal amount. CL&P has proposed to transfer its wholesale contracts to an NU subsidiary to avoid PSNH capacity payments for May and June 1999, the first two months of the next Capability Period. Consistent with this proposal, CL&P has excluded a forecast of PSNH capacity costs for May and June 1999, therefore, the Final BRFR does not reflect recovery of these costs. Late Filed Exhibit No. 138 SP 1; Late Filed Exhibit No. 151. As discussed in Section II.G.5., the Department approves CL&P’s proposal to transfer its wholesale contracts to an unregulated subsidiary. Therefore, it appears that CL&P will not incur PSNH capacity costs for May and June 1999. However, the Department notes that if MP2 does not returned to service by April 1999, CL&P will remain capacity deficient and may require PSNH capacity in May and June. If this occurs, the Department will address the matter in the appropriate EAC proceeding. n. Price of No. 6 oil As noted above, the price of oil at CL&P’s oil-fired plants can be estimated based on the price of oil at the Norwalk Harbor Station. Therefore, the system average production cost of oil-fired generation can also be determined based on the price of oil at this facility. The Company’s original Fuel Simulation assumed the price of oil at Norwalk Harbor Station to be $16.70/bbl.12 That Fuel Simulation demonstrated an average production cost of $27.70/MWh from oil-fired generation based on production of 4,208,000 MWhs and total cost of $116,552,000. Late Filed Exhibit No. 57; Schedule WPC-3.1 The Final Fuel Simulation used $13.50/bbl as the price of oil at Norwalk Harbor Station. Tr. 10/20/98, p. 4108; Late Filed Exhibit No. 138 SP 1. The Final Fuel Simulation demonstrated an average production cost of $22.46/MWh from oil-fired generation based on production of 6,582,000 MWhs and total cost of $147,816,000. Based on these costs, the average production cost per dollar price is $1.66/MWh ($27.70 $16.70) and ($22.46 $13.50). See table below. As discussed above, the Department directed the Company to use $13.50/bbl in the Final Fuel Simulation, because it was unlikely that the $12/bbl price would be sustained. However, oil prices have not increased; therefore it is reasonable to adjust the Company’s forecasted total fuel cost to reflect the price as of the last day of the 12 Norwalk Harbor Station demonstrates the lowest price of oil among CL&P’s generating plants, approximately $12/bbl at the close of hearing. Tr. 10/20/98, pp. 4108-4110. The cost of oil at CL&P’s remaining plants was based on the Norwalk Harbor price. Id.
  6. Page 108 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 108 of 191 Docket No. 98-01-02 Page 101 hearing. Therefore, the Department reduces the price of oil at Norwalk Harbor Station to $12/bbl. The Department examined the forecasted production cost and price of oil demonstrated in WPC-3.1 and Late Filed Exhibit No. 138 SP 1. The following table demonstrates these values. Fuel Cost Adjustment Change In Oil Price (1) (2) (3) (4) (5) Price/bbl Production Total Cost Cost per MWh Production Cost* (Mwhs) (Per MWh) (3/2) (4/1) Original Fuel Simulation $16.70 4,208,000 $116,552,000 $27.70 $1.66 Final Fuel Simulation** $13.50 5,964,000 $133,946,000 $22.46 $1.66 (2x4) (1x5) (5) $118,802,880 $15,143,120 $19.92 $1.66 DPUC Adjustment** Difference/Adjustment $12.00 5,964,000 Source: Schedule WP C-3.1; Late Filed Exhibit No. 138 SP 1. * Price is per MWh per dollar a barrel cost. ** January through June production and cost are adjusted to a CL&P basis using .85 as a multiplier. A review of these data finds that a relationship exists between the price of oil and the forecasted cost of production. Each dollar of cost reflects a production cost of approximately $1.66/MWh. See table above, column 5. Therefore, reducing the base price of oil to $12/bbl reduces total fuel cost for oil-fired generation by approximately $15.1 million. This value was determined by subtracting the total fuel cost for oil-fired production at $12/bbl, $19.92/MWh ($1.66 x $12/bbl) times total production of 5,964,000 MWhs, from the total fuel cost for oil-fired production reflected in the Final Fuel Simulation, $133,946,000. Although a change in the price of oil drives changes to production from oil and gas-fired facilities as well as market purchases, the Department has not attempted to capture these changes in this adjustment. The adjustment herein reflects the approximate effect of the change in oil prices and all other changes will be captured through the EAC. The table above demonstrates this adjustment. o. Marginal Cost A change in the price of oil drives a change in the forecasted marginal cost, which in turn drives a change in expense associated with an adjustment to sales. The Department did not request a Fuel Simulation using $12/bbl as the base price. Therefore, the Department has calculated an estimated marginal cost based on a $12/bbl base price of oil. The Department examined the forecasted marginal cost and price of oil demonstrated in WPC-3.1, Late Filed Exhibit No. 138 and Late Filed Exhibit No. 138 SP 1. The following table demonstrates the price of oil and resulting marginal cost.
  7. Page 109 of 191Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 109 of 191 Docket No. 98-01-02 Page 102 Com pa rison of Oil Price s a nd Ma rgina l Cost Exhibit Price $/bbl W PC-3.1 LFE 138 LFE 138 SP 1 DPUC Adjusted $16.70 $15.00 $13.50 $12.00 Percentage Marginal Change In Change Cost Marginal Cost 10.18% 10.00% 11.11% $25.40 $23.45 $21.56 $19.46 $1.95 $1.89 $2.10 A review of these data finds that a relationship exists between the price of oil and the forecasted marginal cost. For each 10% decline in the price of oil, the marginal cost declines by approximately $1.90, or $0.19 for each percent decline in price ($1.90/10). The use of $12/bbl reduces the price of oil by $1.50 or 11.1% from $13.50/bbl used in the Final Fuel Simulation. Applying the average percentage and dollar changes noted in the table results in a forecasted marginal cost of $19.46 [$21.56-($.19x11.1)]. The Department used $19.46 as the marginal cost in its expense adjustment for increased sales discussed in Section II.G.1.q, below. p. Nuclear Fuel Final Core Amortization The Company’s filing includes $1.845 million for amortization of unburned fuel that will exist at the end of the life of the nuclear units. Response to Interrogatory OCC-86, p. 4. The intent of this item is to avoid placing high nuclear fuel costs on ratepayers over the final two or three fuel cycles, due to the need to recover the cost of unburned fuel that will exist when the unit is retired. Response to Interrogatory EL-367. The Company based the unburned fuel amount on the value of the unburned fuel at the end of the most recent fuel cycle for each unit. Response to Interrogatory EL-159. The discussion in Section II.F.10, above, regarding final M&S expense also applies to the final core fuel amortization. Therefore, the Department will disallow this expense, reducing fuel expense by $1.845 million. q. Expense Adjustments Associated with Sales Adjustments In Section G.2, below, the Department has made certain adjustments to Company sales. Fuel and taxes are the only expenses that will increase significantly as the result of an increase in the sales forecast. Response to Interrogatory EL-247; Schedule F-6.2; Schedule WPF-6.2. CL&P determined the cost associated with increased sales based on its forecasted marginal cost of fuel as calculated in Schedule C-3.1. Id. It is reasonable to increase expenses based on the sales adjustments made herein and to use a forecast of CL&P’s marginal cost as the basis for the adjustment. As a result of adjustments made to CL&P’s base rate fuel revenue assumptions, the original forecast of marginal cost has changed. Therefore, the Department will use the updated marginal cost, $19.46/MWh, discussed above, as the basis for this expense adjustment. The following table summarizes the adjustment.
  8. Page 110 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 110 of 191 Docket No. 98-01-02 Page 103 Sales Related Expense Adjustment Item kWhs Marginal Cost/kWh Expense Residential Sales Commercial Sales Industrial Sales Reliability Improvements (34,421,000) 249,427,000 53,659,000 1,931,643 $0.01946 $0.01946 $0.01946 $0.01946 ($669,833) $4,853,849 $1,044,204 $37,590 Total Expense Adjustment 270,596,643 $5,265,811 Therefore, based on the sales adjustments made herein the Department increases expenses by $5,265,811. r. Niantic Bay Fuel Trust Expense As discussed in Section II.F.5, above, the Department reduces the Trust expense by $1,269,000. s. Summary of Adjustments The Company was directed to incorporate the adjustments discussed above in the Final BRFR and Final Fuel Simulation. Tr. 10/20/98, pp. 4098-4121; Late Filed Exhibit No. 138-SP-1. Based on the Final Fuel Simulation, adjustments made herein and the sales adjustments discussed in Section II.G.2, the Final BRFR equals $.02697/kWh, reflecting approved total fuel costs of $637,888,000. This reduces forecasted total fuel costs by $96,360,000 ($734,248,000 - $637,888,000) and forecasted net fuel costs by $74,807,000 ($646,061,000 - $571,254,000). The following table compares the Proposed and Final BRFRs.
  9. Page 111 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 111 of 191 Docket No. 98-01-02 Page 104 Final Base Rate Fuel Revenue Less: Less: Plus: Less: As Filed Schedule C-3.1 As Revised LFE 138 SP-1 CL&P forecasted fuel expense Fuel cost: Market Based Contracts $734,248 $66,766 $637,888 $58,363 $637,888 $58,363 Net CL&P forecasted fuel expense NUG&T and Sharing Agreement Capacity $667,482 $0 $667,482 $579,525 $46,788 $626,313 $579,525 $46,788 $626,313 Int., Econ. Development and Sp. Contract Costs Fuel expense associated with sales adjustment $21,421 $18,117 $18,117 $5,266 CL&P net forecasted fuel expense $646,061 $608,196 $613,462 DPUC Adjustments Capacity Factor Adjustment Unrecovered D&D Reduced cost, No. 6 oil Nuclear Fuel Final Core Amortization Niantic Bay Fuel Trust CL&P base fuel recovery rate 2. BRFR (1,651) (22,300) (15,143) (1,845) (1,269) Adjusted net fuel expense CL&P forecasted firm retail sales DPUC sales adjusment Allowed sales Approved $571,254 20,914,110 20,914,110 20,914,110 270,597 21,184,707 $0.03089 $0.02908 $0.02697 Retail Sales and Revenue a. General The Company forecasts pro forma revenues at present rates of $2,368,187,000 for 1999. These revenues are based on forecasted sales of 24,281,328 MWhs. Response to Interrogatory EL-258; Late Filed Exhibit No. 139; Tr. 10/8/98, p. 3059. The following table provides a breakdown of forecasted sales and revenues.
  10. Page 112 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 112 of 191 Docket No. 98-01-02 Page 105 1999 Fore cast of Sale s and Revenue Sales (MW hs) Revenue ($000) Residential Commercial Industrial Streetlighting Railroad Total Retail 8,745,306 8,742,722 3,862,933 117,032 213,335 21,681,328 $1,012,159 $856,161 $297,140 $25,385 $15,389 $2,206,234 W holesale 2,600,000 $110,069 Retail Other Tota l n/a 24,281,328 $51,884 $2,368,187 Sourc e: Responses to Interrogatories EL-257 and 258 and OCC-125. Sales and revenues for 1998 are forecasted and form the basis for the 1999 sales and revenue projections. Tr. 9/28/98, p. 2931. Therefore, it is necessary to examine the accuracy of the 1998 forecast to determine the reasonableness of the 1999 forecast. The Company submitted its 1998 Monthly Sales and Revenue Reports for January through September (Monthly Sales Report). Late Filed Exhibit No. 139 SP 2. The Monthly Sales Report provides actual sales and revenues by class. The Department relied on the 1998 Monthly Sales Report to determine the reasonableness of the 1998 forecast for each customer class. The Company also provided a breakdown of revenues by class for 1997-1999. Revenues were identified as total (Total Revenues), fuel (Fuel Revenues) and base (Base Revenues). Base Revenues equal Total Revenues minus Fuel Revenues. Response to Interrogatory EL-258. Fuel Revenues, that is, those recovered through the EAC or its predecessor clauses, the Fuel Adjustment Clause (FAC) and Generation Utilization Adjustment Clause (GUAC), vary annually. Therefore, Total Revenues do not provide a basis for comparing historical and forecasted revenues per customer, per class or average revenues per kWh. However, CL&P’s tariff rates have not changed since 1996. As a result, a comparison of annual and average historical Base Revenues, which are essentially ‘tariff revenues,’ and exclude fuel adjustment revenues, provides a reasonable basis for analyzing forecasted revenues. Therefore, the Department examined the reasonableness of the 1998 and 1999 revenue forecasts based on a comparison of forecasted average Base Revenues per kWh as demonstrated in the response to Interrogatory EL-258, and actual average Base Revenues per kWh, as developed from the 1998 Monthly Sales and Revenue Report. Sales and revenue adjustments are detailed below. b. Residential Sales and Revenues The Company forecasts 1999 residential sales of 8,745,306 MWhs, resulting in approximately 1% growth above 1998 sales. This equates to pro forma revenues at

As listed on the current system

Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)