Interrogatory responses
Answers to questions 874, 885, 886
Files5
OCC-874_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download OCC-874_Final.pdfRead the text of OCC-874_Final.pdf
OCC-874 Attachment 1 REDACTED.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download OCC-874 Attachment 1 REDACTED.pdfRead the text of OCC-874 Attachment 1 REDACTED.pdf
OCC-885_Final.pdf
PDF · 77 KB · 1 pageText searchable
Download OCC-885_Final.pdfRead the text of OCC-885_Final.pdf
OCC-886_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download OCC-886_Final.pdfRead the text of OCC-886_Final.pdf
OCC-886 Attachment 1.pdf
PDF · 10 MB · 191 pagesText searchable
Download OCC-886 Attachment 1.pdfRead the text of OCC-886 Attachment 1.pdf
Text of OCC-886_Final.pdf
Extracted from the file · 1 page · 1,819 characters
Page 106 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 106 of 191 Page 99 The Capacity Transfer provision requires CL&P to take PSNH surplus capacity for six-month periods (Capability Period) that run from November through April and May through October. For 1999, CL&P included a forecast of capacity costs reflecting four months of PSNH capacity in its revised filing. The four-month period, January through April, represents the final months of the November 1998 through April 1999 Capability Period. CL&P states that the capacity costs reflect the transfer of 270 MWs of capacity for this Capability Period at a forecasted average monthly cost of $2.5 million. Id.; Tr. 9/16/98, pp. 1204-1215. At the time CL&P prepared its rate filing, it appeared that restructuring activities in Massachusetts and New Hampshire would render the Sharing Agreement and NUG&T unworkable for the rate year. As a result, CL&P submitted its original filing based on the assumption that these agreements would not be in effect throughout 1999. However, restructuring is a complex task and although delays were not expected, it is not unreasonable for them to occur, as they have. The Department believes that the Company acted reasonably in assuming that the Sharing Agreement and NUG&T would terminate prior to the rate year, given the information available to it at the time. Once CL&P became aware that the agreements would go forward into 1999, it was reasonable for the Company to amend its filing and include continued operation of the agreements for the first half of 1999. Therefore, the Department accepts continued operation of these agreements for the first half of 1999. The combined PSNH and NUG&T capacity costs are forecasted to total $46.8 million for January through June 1998. Late Filed Exhibit No. 151; Revised Schedule C-3.8; Late Filed Exhibit No. 138 SP 1. These costs reflect the operation of the NUG&T for the full six-month period and the operation of the Sharing Agreement through April 1999. The four-month recovery of PSNH capacity costs assumes approval of CL&P’s proposal to transfer its wholesale contracts to an unregulated subsidiary. See Section II.G.5. Therefore, the Final Fuel Simulation did not demonstrate PSNH capacity costs for May and June, nor did it include the energy benefits associated with the transfer for these months. CL&P embedded $46.8 million in capacity costs in the non-fuel component of base rates in its revised filing. At the Department’s request, CL&P isolated NUG&T and PSNH capacity costs in the BRFR under the Final Fuel Simulation. Tr. 10/20/98, p. 4103; Late Filed Exhibit No. 138 SP 1. The Company states that reflecting NUG&T and PSNH capacity costs in the calculation of the BRFR will not change the overall revenue requirement but will assure tracking of these costs through the EAC. Id. However, the Company believes that capacity costs are not permitted in the EAC; therefore, it is inappropriate to include these costs in the BRFR. The Department disagrees. At present, the EAC is truing-up the capacity costs associated with the MP2 out-of-rate-base disallowance. Docket No. 98-06-01, EAC filing, p. 79. In addition, CL&P recovers the full cost of PPP contracts through the BRFR and these costs are trued-up in the EAC. Although CL&P books all PPP purchases as energy, it is clear that these costs reflect both energy and capacity. See Section II.I.10.Page 107 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 107 of 191 Page 100 Traditionally, the BRFR has excluded recovery of non-PPP capacity costs. However, the capacity costs associated with the NUG&T and Sharing Agreement will end at the mid-point of the rate year. If these costs are embedded in non-fuel rates, there is no adjustment mechanism should actual costs deviate from forecasted levels. The Company would continue to recover at the level embedded in rates beyond 1999 unless base rates are reset at that time. If these cost are included in the BRFR, the Department can true them up with a simple adjustment through the EAC. Therefore, the Department will include $46.8 million in the BRFR. These costs will be trued-up to actual through the EAC. The Department notes that embedding these costs in the BRFR increases that rate by approximately 2 mills while reducing non-fuel base rates by an equal amount. CL&P has proposed to transfer its wholesale contracts to an NU subsidiary to avoid PSNH capacity payments for May and June 1999, the first two months of the next Capability Period. Consistent with this proposal, CL&P has excluded a forecast of PSNH capacity costs for May and June 1999, therefore, the Final BRFR does not reflect recovery of these costs. Late Filed Exhibit No. 138 SP 1; Late Filed Exhibit No. 151. As discussed in Section II.G.5., the Department approves CL&P’s proposal to transfer its wholesale contracts to an unregulated subsidiary. Therefore, it appears that CL&P will not incur PSNH capacity costs for May and June 1999. However, the Department notes that if MP2 does not returned to service by April 1999, CL&P will remain capacity deficient and may require PSNH capacity in May and June. If this occurs, the Department will address the matter in the appropriate EAC proceeding. n. Price of No. 6 oil As noted above, the price of oil at CL&P’s oil-fired plants can be estimated based on the price of oil at the Norwalk Harbor Station. Therefore, the system average production cost of oil-fired generation can also be determined based on the price of oil at this facility. The Company’s original Fuel Simulation assumed the price of oil at Norwalk Harbor Station to be $16.70/bbl.12 That Fuel Simulation demonstrated an average production cost of $27.70/MWh from oil-fired generation based on production of 4,208,000 MWhs and total cost of $116,552,000. Late Filed Exhibit No. 57; Schedule WPC-3.1 The Final Fuel Simulation used $13.50/bbl as the price of oil at Norwalk Harbor Station. Tr. 10/20/98, p. 4108; Late Filed Exhibit No. 138 SP 1. The Final Fuel Simulation demonstrated an average production cost of $22.46/MWh from oil-fired generation based on production of 6,582,000 MWhs and total cost of $147,816,000. Based on these costs, the average production cost per dollar price is $1.66/MWh ($27.70 $16.70) and ($22.46 $13.50). See table below. As discussed above, the Department directed the Company to use $13.50/bbl in the Final Fuel Simulation, because it was unlikely that the $12/bbl price would be sustained. However, oil prices have not increased; therefore it is reasonable to adjust the Company’s forecasted total fuel cost to reflect the price as of the last day of the 12 Norwalk Harbor Station demonstrates the lowest price of oil among CL&P’s generating plants, approximately $12/bbl at the close of hearing. Tr. 10/20/98, pp. 4108-4110. The cost of oil at CL&P’s remaining plants was based on the Norwalk Harbor price. Id.Page 108 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 108 of 191 Docket No. 98-01-02 Page 101 hearing. Therefore, the Department reduces the price of oil at Norwalk Harbor Station to $12/bbl. The Department examined the forecasted production cost and price of oil demonstrated in WPC-3.1 and Late Filed Exhibit No. 138 SP 1. The following table demonstrates these values. Fuel Cost Adjustment Change In Oil Price (1) (2) (3) (4) (5) Price/bbl Production Total Cost Cost per MWh Production Cost* (Mwhs) (Per MWh) (3/2) (4/1) Original Fuel Simulation $16.70 4,208,000 $116,552,000 $27.70 $1.66 Final Fuel Simulation** $13.50 5,964,000 $133,946,000 $22.46 $1.66 (2x4) (1x5) (5) $118,802,880 $15,143,120 $19.92 $1.66 DPUC Adjustment** Difference/Adjustment $12.00 5,964,000 Source: Schedule WP C-3.1; Late Filed Exhibit No. 138 SP 1. * Price is per MWh per dollar a barrel cost. ** January through June production and cost are adjusted to a CL&P basis using .85 as a multiplier. A review of these data finds that a relationship exists between the price of oil and the forecasted cost of production. Each dollar of cost reflects a production cost of approximately $1.66/MWh. See table above, column 5. Therefore, reducing the base price of oil to $12/bbl reduces total fuel cost for oil-fired generation by approximately $15.1 million. This value was determined by subtracting the total fuel cost for oil-fired production at $12/bbl, $19.92/MWh ($1.66 x $12/bbl) times total production of 5,964,000 MWhs, from the total fuel cost for oil-fired production reflected in the Final Fuel Simulation, $133,946,000. Although a change in the price of oil drives changes to production from oil and gas-fired facilities as well as market purchases, the Department has not attempted to capture these changes in this adjustment. The adjustment herein reflects the approximate effect of the change in oil prices and all other changes will be captured through the EAC. The table above demonstrates this adjustment. o. Marginal Cost A change in the price of oil drives a change in the forecasted marginal cost, which in turn drives a change in expense associated with an adjustment to sales. The Department did not request a Fuel Simulation using $12/bbl as the base price. Therefore, the Department has calculated an estimated marginal cost based on a $12/bbl base price of oil. The Department examined the forecasted marginal cost and price of oil demonstrated in WPC-3.1, Late Filed Exhibit No. 138 and Late Filed Exhibit No. 138 SP 1. The following table demonstrates the price of oil and resulting marginal cost.Page 109 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 109 of 191 Docket No. 98-01-02 Page 102 Com pa rison of Oil Price s a nd Ma rgina l Cost Exhibit Price $/bbl W PC-3.1 LFE 138 LFE 138 SP 1 DPUC Adjusted $16.70 $15.00 $13.50 $12.00 Percentage Marginal Change In Change Cost Marginal Cost 10.18% 10.00% 11.11% $25.40 $23.45 $21.56 $19.46 $1.95 $1.89 $2.10 A review of these data finds that a relationship exists between the price of oil and the forecasted marginal cost. For each 10% decline in the price of oil, the marginal cost declines by approximately $1.90, or $0.19 for each percent decline in price ($1.90/10). The use of $12/bbl reduces the price of oil by $1.50 or 11.1% from $13.50/bbl used in the Final Fuel Simulation. Applying the average percentage and dollar changes noted in the table results in a forecasted marginal cost of $19.46 [$21.56-($.19x11.1)]. The Department used $19.46 as the marginal cost in its expense adjustment for increased sales discussed in Section II.G.1.q, below. p. Nuclear Fuel Final Core Amortization The Company’s filing includes $1.845 million for amortization of unburned fuel that will exist at the end of the life of the nuclear units. Response to Interrogatory OCC-86, p. 4. The intent of this item is to avoid placing high nuclear fuel costs on ratepayers over the final two or three fuel cycles, due to the need to recover the cost of unburned fuel that will exist when the unit is retired. Response to Interrogatory EL-367. The Company based the unburned fuel amount on the value of the unburned fuel at the end of the most recent fuel cycle for each unit. Response to Interrogatory EL-159. The discussion in Section II.F.10, above, regarding final M&S expense also applies to the final core fuel amortization. Therefore, the Department will disallow this expense, reducing fuel expense by $1.845 million. q. Expense Adjustments Associated with Sales Adjustments In Section G.2, below, the Department has made certain adjustments to Company sales. Fuel and taxes are the only expenses that will increase significantly as the result of an increase in the sales forecast. Response to Interrogatory EL-247; Schedule F-6.2; Schedule WPF-6.2. CL&P determined the cost associated with increased sales based on its forecasted marginal cost of fuel as calculated in Schedule C-3.1. Id. It is reasonable to increase expenses based on the sales adjustments made herein and to use a forecast of CL&P’s marginal cost as the basis for the adjustment. As a result of adjustments made to CL&P’s base rate fuel revenue assumptions, the original forecast of marginal cost has changed. Therefore, the Department will use the updated marginal cost, $19.46/MWh, discussed above, as the basis for this expense adjustment. The following table summarizes the adjustment.Page 110 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 110 of 191 Docket No. 98-01-02 Page 103 Sales Related Expense Adjustment Item kWhs Marginal Cost/kWh Expense Residential Sales Commercial Sales Industrial Sales Reliability Improvements (34,421,000) 249,427,000 53,659,000 1,931,643 $0.01946 $0.01946 $0.01946 $0.01946 ($669,833) $4,853,849 $1,044,204 $37,590 Total Expense Adjustment 270,596,643 $5,265,811 Therefore, based on the sales adjustments made herein the Department increases expenses by $5,265,811. r. Niantic Bay Fuel Trust Expense As discussed in Section II.F.5, above, the Department reduces the Trust expense by $1,269,000. s. Summary of Adjustments The Company was directed to incorporate the adjustments discussed above in the Final BRFR and Final Fuel Simulation. Tr. 10/20/98, pp. 4098-4121; Late Filed Exhibit No. 138-SP-1. Based on the Final Fuel Simulation, adjustments made herein and the sales adjustments discussed in Section II.G.2, the Final BRFR equals $.02697/kWh, reflecting approved total fuel costs of $637,888,000. This reduces forecasted total fuel costs by $96,360,000 ($734,248,000 - $637,888,000) and forecasted net fuel costs by $74,807,000 ($646,061,000 - $571,254,000). The following table compares the Proposed and Final BRFRs.Page 111 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 111 of 191 Docket No. 98-01-02 Page 104 Final Base Rate Fuel Revenue Less: Less: Plus: Less: As Filed Schedule C-3.1 As Revised LFE 138 SP-1 CL&P forecasted fuel expense Fuel cost: Market Based Contracts $734,248 $66,766 $637,888 $58,363 $637,888 $58,363 Net CL&P forecasted fuel expense NUG&T and Sharing Agreement Capacity $667,482 $0 $667,482 $579,525 $46,788 $626,313 $579,525 $46,788 $626,313 Int., Econ. Development and Sp. Contract Costs Fuel expense associated with sales adjustment $21,421 $18,117 $18,117 $5,266 CL&P net forecasted fuel expense $646,061 $608,196 $613,462 DPUC Adjustments Capacity Factor Adjustment Unrecovered D&D Reduced cost, No. 6 oil Nuclear Fuel Final Core Amortization Niantic Bay Fuel Trust CL&P base fuel recovery rate 2. BRFR (1,651) (22,300) (15,143) (1,845) (1,269) Adjusted net fuel expense CL&P forecasted firm retail sales DPUC sales adjusment Allowed sales Approved $571,254 20,914,110 20,914,110 20,914,110 270,597 21,184,707 $0.03089 $0.02908 $0.02697 Retail Sales and Revenue a. General The Company forecasts pro forma revenues at present rates of $2,368,187,000 for 1999. These revenues are based on forecasted sales of 24,281,328 MWhs. Response to Interrogatory EL-258; Late Filed Exhibit No. 139; Tr. 10/8/98, p. 3059. The following table provides a breakdown of forecasted sales and revenues.Page 112 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 112 of 191 Docket No. 98-01-02 Page 105 1999 Fore cast of Sale s and Revenue Sales (MW hs) Revenue ($000) Residential Commercial Industrial Streetlighting Railroad Total Retail 8,745,306 8,742,722 3,862,933 117,032 213,335 21,681,328 $1,012,159 $856,161 $297,140 $25,385 $15,389 $2,206,234 W holesale 2,600,000 $110,069 Retail Other Tota l n/a 24,281,328 $51,884 $2,368,187 Sourc e: Responses to Interrogatories EL-257 and 258 and OCC-125. Sales and revenues for 1998 are forecasted and form the basis for the 1999 sales and revenue projections. Tr. 9/28/98, p. 2931. Therefore, it is necessary to examine the accuracy of the 1998 forecast to determine the reasonableness of the 1999 forecast. The Company submitted its 1998 Monthly Sales and Revenue Reports for January through September (Monthly Sales Report). Late Filed Exhibit No. 139 SP 2. The Monthly Sales Report provides actual sales and revenues by class. The Department relied on the 1998 Monthly Sales Report to determine the reasonableness of the 1998 forecast for each customer class. The Company also provided a breakdown of revenues by class for 1997-1999. Revenues were identified as total (Total Revenues), fuel (Fuel Revenues) and base (Base Revenues). Base Revenues equal Total Revenues minus Fuel Revenues. Response to Interrogatory EL-258. Fuel Revenues, that is, those recovered through the EAC or its predecessor clauses, the Fuel Adjustment Clause (FAC) and Generation Utilization Adjustment Clause (GUAC), vary annually. Therefore, Total Revenues do not provide a basis for comparing historical and forecasted revenues per customer, per class or average revenues per kWh. However, CL&P’s tariff rates have not changed since 1996. As a result, a comparison of annual and average historical Base Revenues, which are essentially ‘tariff revenues,’ and exclude fuel adjustment revenues, provides a reasonable basis for analyzing forecasted revenues. Therefore, the Department examined the reasonableness of the 1998 and 1999 revenue forecasts based on a comparison of forecasted average Base Revenues per kWh as demonstrated in the response to Interrogatory EL-258, and actual average Base Revenues per kWh, as developed from the 1998 Monthly Sales and Revenue Report. Sales and revenue adjustments are detailed below. b. Residential Sales and Revenues The Company forecasts 1999 residential sales of 8,745,306 MWhs, resulting in approximately 1% growth above 1998 sales. This equates to pro forma revenues atPage 113 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 113 of 191 Docket No. 98-01-02 Page 106 present rates of $1,012,159,000, and an average Base Revenue rate of $.1157 per kWh for this class of customers. Response to Interrogatory EL-258. The Company updated its 1999 forecast of residential sales (Revised Residential Forecast), increasing rate year sales by 83,000 MWhs (8,828,000 – 8,745,000). The Revised Residential Forecast demonstrates growth above 1998 sales of approximately 2%. Late Filed Exhibit No. 139 SP 3. The following table demonstrates historical and forecasted residential sales and growth as originally filed. Historical and Forecasted Residential Sales Sales (Mwhs) Annual Change (Mwhs) Percentage Change 1993 1994 1995 1996 1997 1998* 1999* 8,296,454 8,536,314 239,860 2.89% 8,404,752 (131,562) (1.54%) 8,573,444 168,692 2.01% 8,487,115 (86,329) (1.01%) 8,652,351 165,236 1.95% 8,745,306 92,955 1.07% Source: Response to Interrogatory EL-258. * Forecasted CL&P’s original sales forecast reflected 1998 residential growth of approximately 1.9% (8,652,351 - 8,487,115). Response to Interrogatory EL-258. However, based on the 1998 Monthly Sales Report, CL&P’s residential sales for the year-to-date period ending September 1998 have increased by approximately 1.55% above sales for the same period in 1997. Therefore, based on actual sales data, residential growth in 1998 has lagged behind CL&P’s forecast. Based on the above table, although the growth associated with CL&P’s original forecast or its Revised Residential Forecast can be viewed as consistent with historical trends, it is inconsistent with year-to-date 1998 sales. Therefore, the use of either forecast would overstate revenues from this class in 1999. Therefore, the Department rejects the original and Revised Residential Forecast. As noted above, year-to-date 1998 residential sales have lagged behind the Company’s forecast. As a result, the Company’s 1998 and 1999 sales forecasts are overstated as originally filed and must be adjusted. Consistent with the adjustment to commercial sales below, 1998 residential sales will be based on annualized year-to-date data. Year-to-date residential sales through September 1998 total 6,379,537 MWhs, an increase of 97,253 MWhs or 1.55% above 1997 sales for the same period. Late Filed Exhibit No. 139 SP 2. Residential sales for 1997 total 8,487,115 MWhs. Response to Interrogatory EL-258. Based on a growth rate of 1.55%, annualized 1998 sales total approximately 8,618,665 MWhs (8,487,115 x 1.0155%). Therefore, the Department adjusts 1998 sales to 8,618,665 MWhs. The Company’s projected 1999 residential growth rate is 1.07% and is consistent with historical trends for this class. Therefore, the Department will apply this growth rate to the adjusted 1998 sales to determine 1999 sales. As a result, projected 1999 residential sales total 8,710,885 MWhs, (8,618,665 x 1.0107%) a reduction of 34,421 MWhs from the Company’s forecast as filed (8,745,306 - 8,710,885). The Company calculated residential average Base Revenues of $.1162/kWh and $.1157/kWh for 1998 and 1999, respectively. Department review of this calculationPage 114 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 114 of 191 Docket No. 98-01-02 Page 107 finds residential average Base Revenues per kWh to be reasonable. The Department used 1999 average residential Base Revenues in its revenue adjustment for this class. The decrease associated with the Department’s adjusted residential sales results in a decrease to pro forma revenues of $3,982,510 ($.1157/kWh x 34,421 MWhs). Therefore, the Department adjusts pro forma revenues at present rates by this amount. The decrease to expenses associated with this adjustment is discussed in Section II.G.1.q, above. The following summarizes the residential sales adjustment. Residential Sales Adjustment (Mwhs) ` Sales as filed Sales as adjusted Adjustment* Growth Percentage 1997 1998 1999 8,487,115 8,652,351 8,618,665 (33,686) 1.55% 8,745,306 8,710,885 (34,421) 1.07% Source: Response to Interrogatory EL-258. *Adjusted sales less sales as filed. c. Commercial Sales and Revenues The Company forecasts 1999 commercial sales of 8,742,722 MWhs. This level of sales results in pro forma revenues at present rates of $856,161,000, and an average rate per kWh of $.0979/kWh for this class of customers. Response to Interrogatory EL-258. The following table demonstrates historical and forecasted commercial sales and growth. Historical and Forecasted Commercial Sales Sales (Mwhs) Annual Change (Mwhs) Percentage Change 1993 1994 1995 1996 1997 1998* 1999* 7,899,077 8,143,891 244,814 3.10% 8,233,196 89,305 1.10% 8,468,757 235,561 2.86% 8,567,369 98,612 1.16% 8,665,104 97,735 1.14% 8,742,722 77,618 0.90% Source: Response to Interrogatory EL-258. * Forecasted The Company updated its 1999 forecast of commercial sales (Revised Commercial Forecast) in Late Filed Exhibit No. 139 SP 3. Sales under the Revised Commercial Forecast equal 8,896,000 MWhs, increasing rate year sales by 153,000 MWhs above the original forecast [8,896,000 – 8,743,000 (rounded)]. Based on the Revised Commercial Forecast, 1999 sales would increase by 328,000 MWhs above 1997 levels, or approximately 3.8% over this two-year period [8,896,000 - 8,567,000 (rounded)]. Late Filed Exhibit No. 139 SP 3. The Company states that its Revised Commercial Forecast reflects a slowing in the rate of growth in 1999. Tr. 10/8/98, p. 3088; Tr. 10/20/98, pp. 3945-3957. In addition, the Company states that 1998 commercial sales will exceed its original forecast by approximately 2%, but notes that commercial sales should be adjusted to account for Company use at Millstone Station and other CL&P facilities (Company Use). Tr. 10/8/98, pp. 3078-3090. In addition, the Company cautions that current, tenuousPage 115 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 115 of 191 Page 108 global economic conditions should be considered when adjusting 1999 sales for the commercial and industrial classes. CL&P believes that a forecast that simply applies historical growth trends to actual 1998 sales could overstate rate year sales and revenues for these classes. Tr. 10/8/98, pp. 3090-3097. However, the Company’s witness stated that forecasting is not science and that they “had a very difficult time trying to figure out . . . a good outlook for 1999 . . . because things have been changing so rapidly and erratically that frankly no one knows . . . what is likely to happen in 1999.” Tr. 10/20/98, p. 3955. Based on the 1998 Monthly Sales Report, commercial sales for the year-to-date period ending September 1998 have increased by 4% above sales for the same period in 1997. Late Filed Exhibit No. 139 SP 3. As the above table demonstrates, CL&P forecasts commercial sales to increase by 1.14% and .9% in 1998 and 1999, respectively. Based on actual data, 1998 year-to-date commercial sales through September have increased by 259,598 MWhs (6,707,169 – 6,447,571) over the same year-to-date period ending September 1997. Id. Through September 1998, monthly commercial sales have exceeded 1997 actual sales and the Company’s 1998 forecast in seven of the nine months reviewed. Based on these data, it appears likely that commercial sales will continue at levels that exceed 1997 sales for the remainder of 1998. As a result, the Department believes that 1998 commercial sales will exceed the 1999 Revised Commercial Forecast of 8,896,000 MWhs. Even if commercial sales for October through December 1998 slowed, only equaling 1997 levels for the remainder of 1998, the year-to-date increase to commercial sales has nearly equaled the increase to 1997 sales forecasted under the Company’s Revised Commercial Forecast for 1999 (259,598 vs. 328,631). For the most part, the Company has experienced annual growth in commercial sales since 1974 and forecasts annual growth in commercial sales through 2017 with a compound growth rate of 1.9% for this class through the forecast period. 13 Response to Interrogatory OCC-229, NU 1998 Forecast of Loads and Resources for 1998-2017, Table II-1; OCC Brief, p. IV-9. Therefore, the use of CL&P’s 1999 Revised Commercial Forecast would require that 1999 commercial sales stall at, or decline from, anticipated 1998 levels. This is inconsistent with the historical and forecasted growth trends for this class. Based on the foregoing, the Department rejects CL&P’s 1999 Revised Commercial Forecast. The Company states that because Millstone Station has not been supplying its own generation, the Station is supplied energy off the grid and that this consumption has been treated as a commercial sale. Tr. 10/8/98, p. 3079. As a result, CL&P believes that Company Use should be removed from commercial sales when calculating 1998 sales. Id.; Late Filed Exhibit No. 139 SP 3. According to the Company, September 1998 year-to-date Company Use totaled approximately 160,000 MWhs (6,707,169 - 6,546,605). Id. Actual 1997 and year-to-date 1998 commercial sales include Company Use. Tr. 10/8/98, p. 3082. Although the Company demonstrated an adjustment based on Company Use, it did not adjust revenues. Id. 13 In 1989 commercial sales declined by 9,000 MWhs or less than 1/10th of one percent.
As listed on the current system
Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026