Interrogatory responses
Answers to questions 874, 885, 886
Files5
OCC-874_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download OCC-874_Final.pdfRead the text of OCC-874_Final.pdf
OCC-874 Attachment 1 REDACTED.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download OCC-874 Attachment 1 REDACTED.pdfRead the text of OCC-874 Attachment 1 REDACTED.pdf
OCC-885_Final.pdf
PDF · 77 KB · 1 pageText searchable
Download OCC-885_Final.pdfRead the text of OCC-885_Final.pdf
OCC-886_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download OCC-886_Final.pdfRead the text of OCC-886_Final.pdf
OCC-886 Attachment 1.pdf
PDF · 10 MB · 191 pagesText searchable
Download OCC-886 Attachment 1.pdfRead the text of OCC-886 Attachment 1.pdf
Text of OCC-886_Final.pdf
Extracted from the file · 1 page · 1,819 characters
Page 12 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 12 of 191 Page 5 The Company requests that the Department find that MP1 was retired for economic reasons. Roman Additional Testimony, p. 5; Tr. 10/16/98, pp. 3877-3880. The Company requests the Department’s authority to reflect a regulatory asset representing full recovery of the costs associated with its unrecovered investment in MP1, which will be submitted to the Department as part of the ongoing restructuring proceedings. CL&P is also seeking the Department’s authority to defer, in the interim between the shutdown and January 1, 2000, all costs related to post-retirement safe shutdown and site protection, and costs incurred for work being done in preparation for the decommissioning of the unit. The amortization of this deferral would be reflected in the Company’s proposed Systems Benefits Charge (SBC) calculation to be filed April 1, 1999. Roman Supp. PFT, pp. 9 and 10. No parties or intervenors in this proceeding support CL&P’s proposal. AG, OCC and PRO all recommend that the recovery of remaining costs associated with MP1 be denied. In its Brief, the AG states that the Department should flatly refuse to adopt CL&P’s requested treatment of MP1. MP1 was shut down as a result of the Company’s imprudence and is not allowed to restart without specific permission of the NRC. There has been no finding in this or any previous docket that MP1 was shut down for economic reasons and CL&P has failed to present any credible evidence to support such a finding in this case. The DPUC should not permit the Company to establish a regulatory asset for MP1 when the Company has shown absolutely no assurance that it will be allowed any recovery under P.A. 98-28. In fact, since the Company has failed to show that the recovery of MP1 is assured, the DPUC should force CL&P to write this asset off its books pursuant to the mitigation provisions of P.A. 98-28. AG Brief, p. 23. OCC states the Department should reject this CL&P proposal with respect to MP1 at this time. Acceptance of this proposal would amount to a DPUC allowance for CL&P to write itself a blank check with respect to this asset, which would eventually be payable by the Company’s ratepayers. This resolution of MP1’s regulatory status is singularly inappropriate, particularly in light of this unit’s current out-of-rate-base. . . status. OCC Brief, p. VI-3. PRO also recommends that the Department make a finding that MP1 was not retired for economic reasons and not allow recovery of carrying charges. “It would be wholly improper for the Department to make the requested finding that MP1 was retired for economic, not prudence-related reasons.” PRO Brief, p. 5. The Department must evaluate recovery of MP1 costs based on current law and regulatory case history. Section 8(j)(1) of the Act denies recovery of stranded costs for nuclear generation assets or for any generation related regulatory asset that is not operating as a result of an order by the Nuclear Regulatory Commission (NRC). Section 8(j)(2) however contains an exception for a plant meeting the description ofPage 13 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 13 of 191 Page 6 MP1. The Act allows the owner of such a plant to apply to the Department for approval of early retirement for economic reasons under the general ratemaking statutes. The Company states it is also significant that the Act reflects a policy that MP1 costs should be recovered by the Company in the event of early retirement of the unit for economic reasons. In effect, the Legislature has expressed the policy that, if MP1 should be retired for economic reasons, the Company should go ahead and do so with the knowledge that its right to recover its costs will be protected. Morris Supp. PFT, pp. 9 and 10. The Department strongly disagrees with CL&P’s interpretation of the Act, which clearly allows the Company to apply for recovery of costs if the plant is retired for economic reasons, but does not guarantee that recovery will be granted. The Company has conducted what it refers to as a “first level” economic analysis that compares the revenue requirements of continued operation to the revenue requirements of replacement energy, capacity, and applicable costs in retirement, should these units be prematurely retired from service. Issues such as transmission modifications, environmental impacts, fuel diversity, employment and taxes were not considered. Based on its analysis, the Company concludes that there is insufficient value to justify the continued operation of MP1. The Company implies that the economics of the continued operation of MP1 is marginal. However, it is not just a break-even proposition as the Company suggests. The economics of MP1 are not overwhelming as is the case for MP2; however, they are positive. The Company’s own analysis indicates that the continued operation of MP1 would produce $19 million in benefits over the 12 remaining years of its license period, on a present value basis. Since present value analysis is positive, it provides the Company a return slightly higher than 9.2%, the discount rate used by the Company in its analysis. 1998 Study, Exhibit II. The positive value of $19 million on a present value basis is in addition to a return of 9.2%, which is higher than the return of 8.05% being allowed in this rate case. Perhaps even more important than the overall economic benefits is the distribution of annual economic benefits or penalties of operating MP1. Exhibit 1 of the 1998 Study indicates that the unit provides $64.3 million (nominal dollars) of positive benefits in 1999 and another $45.1 million in 2000 or $109.4 million over the first two years. Over the next 6 years from 2001-2006, the plant is estimated to break even with alternating years of positive and negative benefits. At the end of 2006 the economic benefits total $110.7 million. The remaining four years of the license period are projected to be the worst economically. In those years, the plant’s annual economics are negative, $198 million. These penalties outweigh the positive benefits of the first eight years, resulting in a penalty of $87.1 million in nominal dollars over the remaining license period. This equates to a positive $19 of benefits on a present value basis because the benefits in the early years are discounted less than the penalties in the later years. On a present value basis, the economics would increase to approximately $105 million if the plant were retired for purposes of the analysis in 2007 rather than 2010. 1998 Study, Exhibit 1.Page 14 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 14 of 191 Page 7 The economic assumptions chosen for the 1998 Study are key to understanding its results. On one side of the equation is the cost to operate the plant. Developing the estimated cost to operate MP1 over its remaining life involves a number of assumptions such as O&M costs, capital additions, nuclear fuel and the capacity factor. The cost to operate the plant is compared to the cost of providing power under alternative options. In this case, CL&P has used purchased power. Changes to these assumptions can have a significant impact on the final results and therefore the decision to operate or retire MP1. A recurring theme in the Company’s testimony is that costs other than purchased power, may be higher than expected, which would reduce any benefits from the continued operation of MP1. Tr. 9/25/98, pp. 2711 and 2712. Morris Supp. PFT, p. 5. In general, the Department does not believe the assumptions used by the Company are overly optimistic. While actual costs may be higher than expected, they could also be lower than presented in the base case scenario. The 1998 Study includes projections of O&M and capital expenditures through the end of each unit’s licensed life. The O&M amounts for the years 1998 - 2003 are consistent with amounts the Company has represented elsewhere in this proceeding, (see Dente Testimony, Exhibit TJD-2; Responses to Interrogatories OCC-99 and OCC-172, and the June 30, 1998, Supplemental Filing, Nuclear Business Group). The basis for these projections is discussed in Section II.F.7. For the years 2000 through 2002, the Company’s forecast presumes the Millstone units are in the third quartile in comparison to their sister units. Beyond 2002, the forecast presumes that the units improve to the second quartile, due to the impact of the Company’s nuclear performance improvement program. Response to Interrogatory EL-389. Historically, the units have generally been in the third quartile prior to the NRC Watch List outages. Response to Interrogatories EL-6 and EL-161; Tr. 9/17/98, pp. 1614-1616. Since these amounts are consistent throughout the proceeding, and with recent expenditures1 their inclusion in the 1998 Study is appropriate. Beyond 2003, the Company escalated O&M at 3% annually for the continued operation case. This appears to be a moderate and reasonable expectation. However, it is contrary to assumptions used in the 1997 Study in which the Company ramped down O&M over the final two years of operation, to about 60% of its maximum amount. The Company’s justification for ramping down O&M at that time was “[a]s the unit approached the end of its license life, various staffing and or other resource requirements were adjusted accordingly during the final 18-24 months of service.” The Company states that it did not ramp down O&M because it now believes that the NRC will require a nuclear unit to be maintained at the same level throughout its life. Tr. 9/25/98, p. 2715. The Department believes this is reasonable, since the unit must still be operated and maintained in accordance with its license requirements. There may be some areas where O&M will be curtailed toward the end of life, particularly in non-safety related areas of the plant where preventive maintenance activities and engineering support functions can be reduced. However, since a high proportion of non-fuel nuclear O&M expense is driven by regulatory requirements, the impact of such 1 See Section II.F.7.Page 15 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 15 of 191 Page 8 reduction in non-safety related O&M is probably minimal. Additionally, there are no case histories where a nuclear plant has operated to the end of its licensed life, therefore the magnitude of any such ramp down effect is a matter of conjecture. Since the Company’s overall O&M escalation appears moderate, the Department will accept the absence of a ramp down in O&M at end of life, and approve the projected O&M expense as filed. The 1997 Study included a ramp down of capital expenditures over the final five years of operation of MP1, from $19,400,000 in 2005 to $0 in 2010, the final year of operation. 1997 Study, p. 20. Similar to O&M, the 1998 Study escalated capital expenditures annually through 2010. The Company’s justification was the same as with O&M; the NRC will require the unit to be maintained in good condition throughout its license life. Tr. 9/25/98, p. 2715. However, in the case of capital expenditures, the Department does not believe this argument holds merit. Many capital expenditures are made for the purpose of significantly extending the life of equipment, and may be unnecessary when the equipment only needs to operate for the next few years. This is particularly true of equipment in the secondary side of the plant, where no extensive NRC license requirements apply. Other capital expenditures are desirable only to improve efficiencies and would likely be unnecessary as the unit approaches its license expiration date. Therefore, the Department finds that the assumptions regarding capital expenditures in the 1997 Study were more reasonable. By applying the 1997 rampdown schedule to the 1998 Study, the Department estimates that capital expenditures are reduced by a total of $72,200,000 over the last five years of MP1’s original license life. The Company has included $8.4 million associated with Nuclear Regulatory Commission (NRC) Watch List items as a cost of continued operation in its CUO analysis. Response to Interrogatory OCC-322. Since the Department has ruled that it is not appropriate to recover these costs, they should be removed. This improves the economics of continuing to operate MP1. The Company uses a capacity factor of 79.7% for MP1 in its economic analysis and assumes that the unit will operate at an 86% capacity factor between refueling outages. Refueling outages are planned to last 49 days and generally occur every 24 months. 1998 Study, p. 14. The Company’s assumption is aggressive but not unrealistic. MP1 operated at a capacity factor of 69.6% from 1970 to 1995. The NRC, Information Digest, 1997 Edition indicates that the average capacity factor for the industry over the five year period from 1992-1996 is 75%. Digest, p. 24. The capacity factor usually increases several percentage points when a unit returns to service after being on the Watch List. Response to Interrogatory EL-5. The Company has included the cost of decommissioning in its analysis, estimating $642 million in its shutdown scenario and $482 million if the plant continues to operate. 1998 Study, Appendix A, pp. 4 and 5. These estimates are preliminary and have not been accepted by the Department for ratemaking purposes; however, there is no basis for any adjustment at this time and therefore they are acceptable for the CUO analysis.Page 16 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 16 of 191 Page 9 The single most important assumption in the CUO analysis is the cost of replacement power. CL&P states that “ . . . replacement power costs are clearly the most important driver in the economics.” Tr. 9/25/98, p. 2732. CL&P’s assumption in its CUO analysis is that replacement power (energy and capacity) is purchased in the New England market. 1998 Study, p. 6. The Company has forecasted replacement power costs to be $38.10/MWh in 1998 which increases to $44.80/MWh in 2007, a compound annual increase of approximately 1.8%. Response to Interrogatory OCC-323. The Company’s response to Interrogatory EL-391 indicates that a 10% increase in the cost of replacement power would increase the present value benefits associated with continued operation of MP1 from $19 million to $122 million. Benefits would jump to $225 million, on a present value basis, if replacement power costs were 20% higher than CL&P’s estimates. On the other hand, a decline in purchase power costs would reduce the economic value of continuing to operate MP1 by a similar magnitude. The Company’s forecast of replacement power was developed in-house. Tr. 9/25/98, p. 2700. These purchased power estimates were first used by the Company in its stranded cost testimony for PSNH before the Public Utilities Commission of New Hampshire in November 1997. Response to Interrogatory OCC-323. The Company’s study did not provide any alternative supply options, purchased power forecasts, or scenario analyses to evaluate the sensitivity of the study results to changes in replacement power costs. Although the Department asked several interrogatories and questioned the Company’s CUO witness at the hearing to examine this issue further, the Company provided very little evidence to verify and support its purchased power cost estimates. The Company could not provide any recent replacement power price forecasts from independent organizations or other utilities in New England. The only replacement power costs the Company could submit were done in 1996 by the joint owners of Connecticut Yankee. These estimates were lower than those forecasted by the Company. The Company states that these projections were developed with what is an obsolete methodology today. Late Filed Exhibit No. 120. In addition, the Company’s Response to Interrogatory OCC-323 included a replacement power forecast that was also used in PSNH’s 1997 stranded cost proceeding. Overall, that projection was about 10 percent higher in the 1998-2000 time period and approximately 20 percent higher beginning in 2002. Response to Interrogatory, OCC-323. Replacement power costs are very difficult to predict with a strong degree of accuracy. Replacement power is made up of the forecasted cost of capacity and energy. The capacity value is estimated based on the balance between the supply of generation resources and the demand for electricity in the region. Changes to supply or demand can change the value of capacity in the market. Energy costs are based on fuels forecasts for oil and gas, which are extremely difficult to predict. For example, over the past two years the price of oil at the Company’s Norwalk Harbor Station increased from $15.97/bbl in March 1997 to a high of $21.75/bbl in October 1997 then dropped to approximately $12.00/bbl in October 1998. The Company and most others who have attempted to forecast fuel prices have done a poor job over the past 20 years. One of the primary reasons Connecticut has high cost nuclear power plants (Seabrook and Millstone Unit III (MP3) and purchasedPage 17 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 17 of 191 Page 10 power contracts is fuel forecasting errors. These plants and contracts were all projected to be cost effective based on oil price forecasts made at the time the units were built or the contracts were negotiated. The Company, as well as most experts, has overestimated future fuel prices in the past. For example, in its Integrated Resource Plan, 5 th Annual Filing, Docket No. 90-04-01, April 1, 1990, the Company forecasted avoided costs to be $.056/kWh in 1998 and $.153/kWh in 2008. In its 12th annual filing, Docket No. 97-04-01, dated April 1, 1997, the Company’s forecast for 1998 had dropped by almost 50% to $.03/kWh and its projection for 2008 was $.042/kWh. In its original filing in the instant proceeding, CL&P based its 1999 oil and gas price projections on February 1998 Cambridge Energy Research Associates (CERA) forecasts. Schedule C-3. The Company forecasted oil prices to range between $16 and $18 per barrel for the rate year. Tr. 9/11/98, p. 662; Late Filed Exhibit No. 57. In contrast, oil prices are at or below $12 per barrel today. CL&P’s forecast is off by 25% to 30% in less than nine months. Fuel prices have declined since the Company made its replacement price estimates and could decline further. A number of new generation units are now planned that were not included when the Company made its replacement power forecast. Fuel prices are at their lowest levels since 1973 and could increase from these levels. Oil and gas prices remain tied to international events that are beyond the Company’s control. Difficulty projecting fuel prices, combined with changes due to electric restructuring create considerable uncertainty about future replacement power costs. When asked about the Company’s ability to forecast replacement power costs, its CUO witness said: “Clearly, it is a daunting task.” Tr. 9/25/98, p. 2733. The Company has not provided adequate evidence to support its purchased power forecast. The decision to shut down MP1 would not need to be made based on such a speculative forecast if it were operating today. A decision to retire or to continue to operate a nuclear power plant requires more than just a first level economic analysis. One of the most important factors facing the Company was that MP1 was not in operation. If it were, there would not be a compelling reason to retire the plant simply based on a forecast, given the inherent uncertainty and economics at the time. In fact, Exhibit 1 of the 1998 Study indicates that there was positive economic value of $109.4 million in 1999 and 2000 if the plant continued to operated. As discussed above, the economics do not turn negative until 2007. But the plant had been out of service for approximately 56 months and was unable to restart without NRC approval. Its costs remained in rates for approximately 51 months of the shutdown. In the February 25, 1998 Interim Decision in Phase 1 of the instant docket, the Department removed MP1 from rate base. It was officially retired five months later, effective July 24, 1998. Roman Supp. PFT, p. 1. At that time, all work to bring MP1 back on line had been suspended, as all efforts were concentrated on the restart of MP3 and then MP2. The Company did not expect that MP1 would be brought back on line until July 1, 1999, the Company testified that the cost to restart it was estimated to be $112 million. Tr. 9/12/98, p. 2714. Restart costs must be born by the Company and therefore are not relevant for ratepayers in considering whether MP1 should continue operating. The CompanyPage 18 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 18 of 191 Page 11 appropriately excluded most restart costs from its economic analysis but not from its decision to retire MP1. It is clear that cost of restart, its effect on the Company’s financial situation, and the time and effort required of employees were important factors in the Company’s decision. As Mr. Morris testified “. . . bringing the unit back to service would continue to burden CL&P’s financial and other resources. . . .” Morris Supp. PFT, p. 4. Restructuring of the electric industry is another reason the Company uses to justify its decision to retire MP1. In a competitive generation market, nuclear plants will no longer recover their costs on the basis of full cost of service ratemaking. Instead, they will have to recover their costs from the revenues they derive from selling their output. For units like MP1, the revenue margin above costs will be relatively thin and could get thinner if there were unscheduled outages or the capacity factor were lower. These events would put pressure on cash flow. Morris Supp. PFT, pp. 4, 6 and 7. The restructuring of the electric industry will not change the cost of operating the plant. It could lower the cost of competitive alternatives thereby reducing the economics of MP1 relative to other sources. More importantly, restructuring will shift the risk of cost recovery from ratepayers to generation companies. In the past, if a generation plant was less economic than other facilities, ratepayers paid the difference and the Company recovered all costs. In the future, as the Company states, recovery will be less certain. Any under recovery will be borne by the generation company, but it will also benefit from higher profits if it is a low cost producer. At this point, the overall level of risk the Company will face is not known. The market price for power, competition in the generation sector, and stranded costs are speculative. The Department’s determination of stranded costs will establish the costs these units must recover in the future to be economically viable. After further questioning as to the impacts of restructuring on the CUO study results, the Company stated: “. . . without an understanding of how the relevant markets will evolve, it is impossible to speculate what the impact on the CUO studies may be.” Response to Interrogatory EL-384. By shutting down the plant, the Company believes it should receive the full return of and on its unrecovered rate base balance at the time of retirement of $229 million. A ruling by the Department that retirement of MP1 is appropriate would eliminate the need to spend $112 million in restart costs and reduce the risk of recovery of O&M costs for the 12 remaining years of its license period. In addition, retiring the plant would essentially end the out of rate base treatment set by the Department. The Department had disallowed the recovery of MP1 costs by removing them from rates and this would continue until the unit returned to service, which was not expected until July 1999. The Company is now requesting to defer for future recovery all costs as of the retirement date of July 1998. The Company’s logic creates perverse incentives that are contrary to those faced by competitive businesses. Businesses in the competitive world lose money if economics sour and even more if they must shut down or go bankrupt. This creates a strong incentive to cut costs and operate more efficiently. CL&P, on the other hand, has quickly retired a generation plant that was not operating and for which it was receivingPage 19 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 19 of 191 Page 12 no return in the hopes of guaranteeing recovery of its past investments. competition or under regulation, such an outcome is not appropriate. Under The Company did not consider transmission impacts in its CUO study. When asked if there were any associated with the retirement of MP1, the Company testified that the improvements made over the past two years to bring Millstone Station on line eliminate the need for additional ones. Tr. 9/25/98, p. 2744. The Company did not consider required transmission impacts in the 1997 Study even though upgrades would have been needed if MP1 were retired. 1997 Study, p. 2. While the Company has attempted to rationalize its results in the 1998 CUO Study, it should have specifically examined the impacts of transmission when the study was conducted. The Department is not convinced that there will be no impact to ratepayers for the replacement of MP1 with new generating facilities in Connecticut or out of state; however, there is not sufficient evidence to support any adjustment to the 1998 Study at this time. The Company also did not consider environmental impacts and fuel diversity in its economic analysis. Tr. 9/25/98, p. 2707. The environmental impacts of nuclear power are significant. An important justification for its use has been the environmental benefit of replacing fossil fuel generation, which emits air pollutants. In the Company’s justification of cost recovery, Mr. Morris testified that MP1: has been a good performer. It has also made substantial contributions to cleaner air in Connecticut by eliminating the need to burn fossil fuels, thereby avoiding the emissions of millions of tons of air pollutants and has been important to the economy of the region by providing jobs and property tax revenue. Morris Supp. PFT, pp. 9 and 10. However, the Company did not attempt to quantify or value these benefits or consider them in its analysis to retire the unit. Fuel diversity has been a cornerstone of energy policy for the Company, the Department and the State since the oil embargo of 1973. Reducing price volatility and potential disruptions was always a justification for nuclear power plants when they were being built and licensed. The associated effects on national security and the balance of payments from reducing the use of imported oil were also considered benefits. Fuel diversity remains relevant today, since units run by oil and gas will likely make up for the generation lost by the retirement of MP1. Imports of oil have increased as older plants have had to operate to replace the production from retired nuclear units or those out of service. In the future, gas will be the fuel of choice and many developers are rushing to build new generation units that will use gas supplied primarily from Canada. Environmental impacts and other issues such as fuel diversity and employment are difficult to quantify, but they are important and should be considered in a continued operation study. It would be irresponsible to follow “first level” economics blindly, as the Company’s analysis and conclusions imply. If decisions were based solely on the economics, there would be no diversification. This is not a sound risk management approach for a generation company given the ever changing prices for fuels.Page 20 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 20 of 191 Page 13 In support of its request to recover the remaining costs for MP1, the Company states that the plant: “. . . has generated a great deal of energy for CL&P customers and created a great deal of value to the State of Connecticut during its operating life.” Morris Supp. PFT, p. 8. The facts speak for themselves. MP1 operated at a capacity factor of 69.6% from 1970 to 1995. This is generally consistent with industry averages and expectations when the plant was being constructed. The last two years prior to its retirement it did not operate. In addition, the unit was retired 12 years earlier than its license expiration date of 2010, thereby reducing its useful life by approximately 30%. In its rush to retire the plant, the Company has precluded options that may have increased value to ratepayers and/or provided an opportunity for the facility to operate at a future date. It does not appear that the Company attempted to sell the facility or develop a strategy to bring it back at a later date if the economics prove more favorable than now forecasted. Mr. Morris testified that: Based upon our current expectations concerning the market for nuclear power plants, we do not believe that the potential proceeds from the sale of MP1 would significantly offset CL&P’s stranded costs. Two ownership interests in nuclear plants have recently sold in the northeast. The units involved, Three Mile Island Unit I and Seabrook, are both operating very well, and in both cases the sellers received very little for their interests. Any value from the sale of MP1 is expected to be derived from its site value, not from the fact that it is operating. Morris Supp. PFT, p. 7. The Company has not provided any estimates of sales value with MP1 in operation or if the plant is retired. The value will certainly be less if the facility is not operating. Although CL&P stated that sellers received very little for their interest, the difference could still be tens of millions of dollars. Ratepayers are entitled to this money to offset stranded costs. The Company’s economic study is too simplistic and speculative to justify the retirement of MP1. The Company did not comprehensively examine alternative economic scenarios and failed to consider important factors such as environmental impacts and fuel diversity. Based on the economic analysis the Company provided, the Department must conclude that the Company would not have retired MP1 if it had been operating, particularly given the positive economic benefits in the early years and the uncertainty of the forecasted assumptions later on. There would be no compelling reason to retire the plant in 1998 if it were still operating. A more appropriate response, had the plant been operating, would be to continue to operate the plant, attempt to improve efficiency and periodically reevaluate its economic viability. The Company’s analysis shows that it is economic to continue to operate the unit. There is risk that the economic viability can decline but it could also improve if the operating conditions are better than those forecasted. The Department concludes that MP1 was retired for economic reasons, but other factors related to the outage were considerations in the decision. By retiring the plantPage 21 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 21 of 191 Page 14 the Company can avoid an estimated cost of $112 million to bring the unit back to service. In addition, the Company hoped to end the out of rate base treatment and reduce operational risks it would face with electric restructuring by requesting full recovery of its unamortized rate base balance with a return from the date the plant was retired. The Department has discussed the shortcomings in the Company’s analyses and changes that could increase the benefits of continued operation; however, other factors particularly lower purchased power costs, could offset the benefits. The Department will therefore accept the Company’s reference case forecast of benefits/penalties as filed for ratemaking purposes. The Department believes that some sharing of the remaining costs between ratepayers and shareholders is appropriate because the study indicates that it may be economic to retire MP1 in the future for economic reasons. Further, the Department believes that ratepayers are entitled to the benefits from 1999 and 2000 that they would have received if the unit had not been retired prematurely. In addition, the Company should not benefit from retiring MP1 before its expected return to service date of July 1, 1999. In its written exceptions, the Company urges the Department to adjust the $109 million in economic benefits to reflect the following: (1) CL&P’s 81% ownership of MP 1; (2) the present value of the economic benefits; (3) lower energy and capacity costs approved elsewhere in the Decision; and (4) lower decommissioning costs consistent with decommissioning costs allowed in the Decision. CL&P Written Exceptions, p. 8. The Department agrees that the economic benefits should be adjusted to reflect CL&P’s ownership share of MP 1 and will do so. In addition, the Department agrees that the economic benefits should be calculated on a present value basis since they are presented in the CUO study in nominal dollars. However, the Department does not agree with the Company’s calculation or the present value adjustment. Since the rate year is 1999, 1999 benefits are on a present value basis and no adjustment is necessary. The Department will discount 2000 economic benefits by one year at a discount rate of 9.2%, as used in the CUO study. The revised economic benefit ratepayers will forgo due to the early retirement of MP 1 is $84.5 million. The Department does not agree that the economic benefits should be adjusted to reflect lower fuel prices or decommissioning costs. It is unclear how the Company calculated their adjustments for energy and decommissioning. These adjustments are not supported by the record and therefore inappropriate at this time. While adjusting these components in the CUO study might seem consistent with the Department’s ratemaking in this Decision, it would be inconsistent with the other components of the CUO study. Many of the assumptions in the CUO study have changed since the Company conducted its analysis. It is not appropriate to selectively adjust assumptions that benefit the Company. Updating or quantifying other factors could increase the economic benefits of the continued operation of MP 1, which would offset the adjustments proposed by the Company. The Department notes that it did not increase the economic benefits for the $8.4 million associated with the Watch List items identified above that should be removed for the costs of continued operation. In addition, CL&P
As listed on the current system
Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026