Interrogatory responses
Answers to questions 874, 885, 886
Files5
OCC-874_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download OCC-874_Final.pdfRead the text of OCC-874_Final.pdf
OCC-874 Attachment 1 REDACTED.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download OCC-874 Attachment 1 REDACTED.pdfRead the text of OCC-874 Attachment 1 REDACTED.pdf
OCC-885_Final.pdf
PDF · 77 KB · 1 pageText searchable
Download OCC-885_Final.pdfRead the text of OCC-885_Final.pdf
OCC-886_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download OCC-886_Final.pdfRead the text of OCC-886_Final.pdf
OCC-886 Attachment 1.pdf
PDF · 10 MB · 191 pagesText searchable
Download OCC-886 Attachment 1.pdfRead the text of OCC-886 Attachment 1.pdf
Text of OCC-886_Final.pdf
Extracted from the file · 1 page · 1,819 characters
Page 124 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 124 of 191 Page 117 dollars. In addition, the Company’s proposal to test the waters with a $10 rebate is shortsighted because if a $10 rebate fails to solve this problem, additional annual credits will be lost. However, if CL&P offered a $50 rebate, the current average annual credit, the Company loses nothing since it would have lost at least $50 in the year following an unreported water heater change-out. In fact, the Company gains since it will avoid the payment of future annual credits. In addition, an offer of $50 may address past unreported change-outs if the rebate entices customers to report a past event or encourages plumbing contractors or others to ‘seek out’ disconnected controllers. Therefore, the Department will require CL&P to increase its rebate to $50. The Department is concerned that despite knowing that it is losing nearly a half a million dollars annually, CL&P has done nothing. This is especially disturbing in light of the Company’s pleas in many recent proceedings that its financial situation is tenuous. The Company did not need Department approval to study this situation or to contact its Controlled Heater customers to inquire about the removal of control devices. Further, it appears the Company is indifferent to the level of current, unidentified losses because it includes them in its 1999 revenue requirement. Simply stated, the Company willingly passed these losses onto its ratepayers. The Department will not tolerate such ill management. Based on the above, the Department adjusts 1999 revenues by $440,850, the Company’s estimated annual Controlled Heater credit losses. While there will be some administrative costs associated with this program, they are included in the filing since the Company proposed this program. Therefore, no expense adjustment is warranted. CL&P will be required to initiate the $50 rebate effective immediately and keep the Department abreast of its efforts. This shall include providing the Department with information regarding implementation of the program and reporting as to the results of its efforts. The Company must track past and current water heater change-outs. 4. Summary of Revenue and Sales Adjustments The Company states that its proposed base rates produce revenues that are uniformly lower than present base rates by 1.04%. Roncaioli PFT, p. 3. The Company defines current base rates as: the rates in effect on July 1, 1996, as reflected in the Settlement Agreement approved by the Department on that date in Docket No. 92-11-11, net of the credit to customer bills ordered by the Department in its February 25, 1998 decision in Phase I of this proceeding, in which the Department removed MP1 from rate base effective March 1, 1998. Mahoney PFT, p. 6. The Company demonstrated rate year revenues at current rates $2,337,807,000 and revenues at proposed rates of $2,316,330,000. Schedule C-1. ofPage 125 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 125 of 191 Docket No. 98-01-02 Page 118 The Decision dated February 25, 1998, in Phase I of this proceeding, required the Company to apply an across-the-board credit of 1.39% to customer bills to reflect the removal of MP1 from rate base. The Decision states that “in lieu of an adjustment to base rates, the Department will require CL&P to apply a credit to customer bills.” Decision, p. 2. Therefore, CL&P’s base rates were not adjusted as a result of the MP1 credit and have not been adjusted since approved in the Decision dated July 1, 1996, in Docket No. 92-11-11. Thus, the Department defines current base rates as those approved in that Decision, that is, CL&P’s currently approved tariff rates (Current Rates). Based on the foregoing, the Department’s rate year revenues at present rates, revenue adjustments, rate reduction and rate design changes discussed herein are based on Current Rates. Therefore, the Department determines pro forma revenues at present rates to be $2,395,385,000 ($2,368,187,000 + $27,198,604). The following table summarizes the sales and revenue adjustments made herein. Sales and Revenue Adjustment Summary Item kWhs Revenue Residential Sales Commercial Sales Industrial Sales Wholesale Sales Rate 58 Flex Rider Discounts Rental Income Reliability Improvements Radio Controlled Heaters (34,421,000) 249,427,000 53,659,000 n/a n/a n/a n/a 1,931,643 0 ($3,982,510) 24,418,903 4,126,360 (3,100,000) 1,100,000 3,100,000 935,000 160,000 440,850 Total Revenue Adjustment 5. $27,198,604 Reassignment of CL&P’s Wholesale Market-Based Contracts In the past, NU entered into wholesale market-based contracts (MBC) in an effort to market the surplus capacity of its operating companies. Surplus capacity is defined as the amount of capacity not needed to meet the requirements of the companies’ franchise customers. NU as a system has been in a capacity surplus position since the mid 1980’s and as a result, it has made substantial capacity sales since that time. The economic benefit of these transactions, reduced retail revenue requirements, has flowed to ratepayers in past rate case proceedings. However, strong economic activity within the CL&P service territory has led to higher loads, while the retirement of MP1, Connecticut Yankee and Maine Yankee has reduced NU’s total capacity. As a result, CL&P is no longer capacity surplus. In fact, it is capacity deficient when MBCs are factored into its capacity requirements. Shuckerow Supplemental Testimony, pp. 8-11. The Company states that by retaining its MBCs, it will remain capacity deficient for the Capability Period that begins in May 1999. Therefore, as a result of the continuation of the Sharing Agreement through June 1999, the Company would be required to take PSNH capacity, at above market rates, at that time. However, byPage 126 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 126 of 191 Page 119 transferring these contracts to NU’s unregulated wholesale marketing subsidiary, the capacity position of the NU Initial system would change and the need for a capacity transfer from PSNH to CL&P for May and June 1999 would be avoided. Id. The contracts permit assignment to an NU affiliate without customer consent while any other assignment requires that consent. The majority of these agreements are priced above current market rates. Therefore, if CL&P were to attempt to transfer the contracts to a non-NU affiliate, customers would likely not grant consent and would instead renegotiate these agreements down to current market rates. By doing so, CL&P would lose the value of these contracts. Transfer to an NU affiliate would preserve the value. Further, CL&P believes that its MBC proposal is consistent with Public Act 98-28, which requires regulated distribution companies to separate their transmission and distribution functions from generation services by October 1, 1999. Therefore, CL&P is requesting that it be authorized to assign its MBC contracts to NU’s unregulated wholesale marketing subsidiary. The value of these contracts during 1999 will be passed on to CL&P’s customers as a reduction to CL&P’s revenue requirements for the rate year. Id. CL&P’s MBC proposal addresses 24 contracts and approximately 450 MW of capacity. The majority of the contracts were entered into in the mid 1990’s and the contract rates (i.e., revenue to CL&P) were based on capacity and energy cost assumptions at that time. Most of the agreements end in 2004 and the vast majority of the benefits from these contracts will be realized between 2000-2004. CL&P estimates the future value of these contracts at $65 million, $15 million of which is realized in 1999. Tr. 9/18/98, pp. 1696-1717; Late Filed Exhibit No. 89. Under the Company’s proposal, ratepayers would retain the benefit of these contracts in 1999 and would avoid the risk that these agreements would become uneconomic in the future. Id. CL&P’s MBC proposal is intended to avoid PSNH capacity transfer costs for May and June 1999. These costs can range from $2.5 to $5 million per month depending on the amount of capacity transferred. Tr. 9/18/98, p. 1706. To avoid these costs, CL&P must reduce its capacity requirements in those months. The transfer of 450 MW of capacity associated with the MBCs will accomplish this goal. The estimated future value of these contracts was determined in late 1997, using the cost assumptions relied on in the MP1 CUO study. Current market prices have declined since that time. Therefore, the future, above market value of these contracts is understated. The Company states that the value of these contracts could be reduced to zero if the market price of capacity and energy increases by 20% above the levels assumed in its analysis. Id. As noted, prices have declined since the analysis was done, therefore, current costs would need to increase by greater that 20% to negate all future benefit. The vast majority of future benefits will be achieved between 2000 and 2004. Tr. 9/18/98, p. 1714. If the MBCs are transferred as proposed, ratepayers lose all benefits beyond 1999. Those benefits would flow to NU’s unregulated wholesale marketing group. The Company’s proposal does not attempt to capture any of this value for ratepayers.Page 127 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 127 of 191 Page 120 MBC customers are paying more than they would at today’s prices because the cost assumptions that drove the MBC rates have declined since the mid-1990’s. Therefore, these contracts are providing benefits in excess of those assumed at the time they were negotiated. The Department believes that these agreements will continue to provide benefits beyond 1999, benefits that may exceed the Company’s current estimates. Under the Company’s proposal, ratepayers would forfeit $50 million in potential future benefit to avoid a maximum $10 million cost in 1999. The Department believes CL&P can avoid PSNH capacity costs while retaining future ratepayer benefits from these contracts. Therefore, the Department will allow CL&P to transfer its MBC to an NU affiliate, but will require that the future value of these agreements be used to offset stranded costs. The Department will assess the post December 31, 1999, above market value of the agreements when the Company’s stranded costs are determined and will offset such costs by that amount. H. COST OF SERVICE The Decision dated June 16, 1993, in Docket No. 92-11-11, required CL&P to make certain changes to its Cost of Service Study (COSS). These included the development of a weighting of residential line transformer costs, the assignment of production and transmission (P&T) costs to interruptible customers, the separation of Rates 116 and 117 and an investigation into the use of marginal cost as the basis for allocating flex rider discounts. Decision, pp. 69-76. The Company states it has complied with these directives. Roncaioli PFT, p. 4. The Company has proposed to reduce rates across-the-board in this proceeding. The Company states that its rate design proposal is based in part on the requirements of Public Act 98-28. Section 20 of the Act requires that, effective January 1, 2000, the total rate charged to customers must be at least 10% less than the base rates that were effective on December 31, 1996. The Company is concerned that if rate modifications made subsequent to year-end 1996 are not applied equally to all classes, some rate changes would have to be undone to comply with the Act. This could mean that although some customers could see decreases now, these same customers might experience rate increases in 2000, or, that some would see rates reduced in excess of the minimum 10% set by the Act, while others would achieve only the minimum reduction. Tr. 9/22/98, pp. 1902-1905, 1914. Further, the Company states that applying an equal reduction to all customers is consistent with the rate reduction ordered in the Interim Decision dated February 25, 1998, in the instant proceeding. Roncaioli PFT, p. 3. The OCC argues that the COSS improperly allocates inter-class costs in two ways. First, it allocates demand-related generation and transmission costs by using non-coincident demand as an indicator for coincident demand costs. Second, the COSS allocates distribution costs by classifying too large a portion of distribution costs as customer related and none as energy related. In addition, the OCC states that changes should be made to the COSS to reduce the subsidization among rate classes that currently exists. To accomplish this, OCC believes that the Department should reject CL&P’s across-the-board rate decrease proposal and adopt a rate designPage 128 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 128 of 191 Page 121 strategy that considers the disproportionate rates of return demonstrated in the COSS. OCC Brief, pp. V-5 through V-17. The Department’s review of CL&P’s COSS finds that the Company has complied with the directives contained in the Decision dated June 16, 1993, in Docket No. 92-11-11. Individual changes are discussed in Section II.I. Although the Company amended its COSS, it did not propose revenue allocations based on the amended study. Instead, it proposed an across-the-board rate reduction. Regarding OCC’s argument that the COSS inappropriately allocates demand-related generation and transmission costs, a review finds that OCC’s arguments are identical to those offered in Docket No. 92-11-11 and addressed by the Department in the Decision in that case. See Decision, pp. 69, 70, 73 and 74. In that case the Department stated that: The Company's COSS . . . incorporates the Average and Excess Demand ("AED") methodology using the average of the 12 monthly coincident peaks ("12CP") as the system peak and class non-coincident peaks ("NCP") for class peak responsibilities. Under the AED/12CP-NCP methodology, production capacity is allocated to each rate class on the basis of two demand components. The first component is the class average demand and the second component, excess demand, is a function of the amount by which class peak demand exceeds its average demand. The AED/12CP-NCP has historically been found by the Department to be an acceptable and appropriate COSS methodology for the CL&P system. Decision, p. 69. In past proceedings the Department has found the Company’s application of the AED/12CP-NCP method to be reasonable. The Department also has found the customer component of distribution costs, as developed by the Company, to be reasonable. The Department adopts those finding herein. A review of the COSS finds that CL&P has developed its study using previously approved methods. In addition, the Department accepts the changes to the Company COSS that reflect the directives contained in the Decision in Docket No. 92-11-11. Absent these changes, no new evidence has been presented to convince the Department that it is appropriate to amend the COSS at this time. Given the 10% rate reduction for each rate class required in 2000, the Department believes that an across-the-board decrease is appropriate for all rate classes except interruptible, special contract and certain Flex Rider rates, as discussed in Section II.I. CL&P is concerned that if rates are not changed uniformly in this proceeding, the rate reduction provision of the Act may create ‘rate design problems’ in 2000. As noted above, Section 20 of the Act requires that the total rate charged to customers must be at least 10% less than the base rates that were effective on December 31, 1996. Any change made herein will be considered when setting rates in compliance with Section 20 of the Act.Page 129 of 191
Docket No. 98-01-02 I. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 129 of 191 Page 122 RATE DESIGN 1. Residential Rates The Decision in Docket No. 92-11-11 required the Company to develop a weighted average for line transformers that is consistent with the actual number of line transformers for each customer class and to incorporate the average in its next COSS. Decision, p. 72. The Company states it has complied with this directive. Roncaioli PFT, p. 4. This change shifts approximately $5 million in costs from the residential class, increasing the rate of return for this class from 7.1% to 7.2%. Although the rate of return increases, the return for the residential class remains below the Company’s overall return of 8.9%. Although residential rates could be reduced as a result of this change, the Company believes that rates should not be modified at this time. The Company states that because Public Act 98-28 requires an across-the-board rate reduction in 2000, rate modifications are inappropriate at this time. Schedule E-6.0; Tr. 9/22/98, pp. 1900-1905. The Department believes that the COSS should be modified as proposed. However, because the rate of return for this class remains below the Company’s overall return, except for the across-the-board reduction being applied herein, residential rates should not be modified further at this time. 2. Interruptible Rates The Company presently offers interruptible service under Rates 19, 20, 21 and 39 and its Demand Reduction Rider. These rates were designed to produce revenue sufficient to cover the Company’s short-run cost plus make a small contribution to fixed costs. The contribution is small compared to the cost of production and transmission, which customers on interruptible rates do not pay. Roncaioli PFT, p. 9. In the Decision in Docket No. 92-11-11, the Department concluded that production and transmission costs (P&T) were not being assigned to interruptible rates at that time and required CL&P to assign a level of P&T to interruptible rates in its next COSS. Decision, pp. 72 and 90. CL&P assigned P&T to interruptible customers in the COSS submitted in this proceeding, but did not propose to modify their rates. The Company believes it is inappropriate to adjust rates at this time because assigning these costs to interruptible rates would materially affect the bills of existing customers. Id. Instead of modifying rates, CL&P proposes to close its interruptible rates to new customers and to continue to provide service to existing customers at current rates. Therefore, under the Company’s proposal these rates would not be reduced. Tr. 9/22/98, p. 1911; Schedule E-1.0. The Company states that under restructuring it will no longer be able to offer discounted transmission or generation service to interruptible customers. Instead, the market will set interruptible rates for generation services and it is not clear how the market will price this service. Rather than increase interruptible rates now, CL&P prefers to address rate structure changes for this class in future unbundling procedures. By closing the rates to new entrants, and not adjusting them, the Company will have time to prepare its interruptible customers for the changes that will occur underPage 130 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 130 of 191 Page 123 competition. Id.; Tr. 9/22/98, pp. 1908-1914. If interruptible rates are increased, the revenue requirement from all other classes would be reduced. Response to Interrogatory EL-236; Late Filed Exhibit No. 94. CIEC believes that it is premature to close these rates before competitive generation services are available. In addition, by closing these rates, the Department may be eliminating an opportunity to further economic development in the state. Therefore, interruptible rates should not be closed at this time. CIEC Brief, p. 9. Interruptible customers are paying distribution and transmission costs but contribute little toward fixed generation costs. The Department agrees that restructuring will change the cost of energy for these customers and that the effect of that change is uncertain at this time. However, given the limited contribution to production costs, it appears likely that their costs will rise. Based on the assignment of P&T, the revenue requirement from interruptible customers could rise by as much as $3 million. Late Filed Exhibit No. 94. Interruptible customers currently provide approximately $4.2 million in revenues. Schedule E-2.1. Therefore, interruptible rates would rise by 70% if the total increase were applied to them. Rates would rise by 33% or 17%, respectively, if one-half or one-quarter of the total were applied. Although it appears that these rates may rise under restructuring, the effect of restructuring on this class is uncertain. At this time it is not clear how the rate reduction provision of the Act, Section 20, will be applied to these rates. Further, Section 3 of the Act states that for the period from July 1, 1998, until December 31, 1999, base rates shall not exceed the rates that were in effect on December 31, 1996. Therefore, these rates cannot be increased at this time. Given that these customers demonstrate a negative rate of return, the Department will direct CL&P to maintain interruptible rates at current levels. Further, the negative rate of return and the fact that all customers will be eligible to explore competitive options in the very near future, make it reasonable to close these rates at this time. As discussed below, flexible rate riders will remain in place and are therefore available to further economic development in the state. 3. Flexible Rate Riders The Company has several flexible rate riders including its Five-Year and Long-Term Economic Development Riders, Business Recovery Rider and Competitive Generation Rider (collectively, Flex Riders). Flex Riders were introduced in the early 1990’s when Connecticut was experiencing a significant loss of industry and jobs. Customers can apply for either a rate discount or non-cash assistance and approval is based on CL&P’s assessment of each customer’s needs. Roncaioli PFT, pp. 7 and 8. CL&P states that restructuring will provide customers the opportunity to purchase electricity from their supplier of choice at a negotiated price. In addition, the Act mandates a 10% reduction for non-contract (i.e., non Flex Rider) customer bills. These changes will have a major impact on contracting for the price of electricity. In addition, the Connecticut economy and the economy in general are healthier than at the time the Flex Riders were initiated. CL&P believes that the combination of a healthy economy,Page 131 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 131 of 191 Page 124 future choice of power supplier and the 10% bill reduction will eliminate the need for rate discounting in all but the most extreme cases. As a result, CL&P proposes to eliminate its flexible rate riders at this time. Although existing contracts and those under negotiation will be honored, Flex Riders will not otherwise be available in the future. Id. The Company states that it: effectively ceased entering into new or renegotiated flexible rate rider contracts when Public Act 98-28 became law. The only exceptions, and there were few, were situations where flex rider applications had been filed earlier, had been evaluated and found to qualify and where the Company had made a commitment to the customer. Response to Interrogatory EL-231. However, the Company clarified its response to that interrogatory stating that "for the short, five-year ED [tariffs] where the company doesn’t really have the discretionary powers to say no, those [Riders] are still open." Tr. 9/22/98, p. 1922. Further, the Company states that all contracts entered into after April 29, 1998, the effective date of the Act, will comply with it. Id., p. 1926. CIEC believes that CL&P’s proposal to eliminate Flex Riders should be rejected because the need for these riders continues to exist, the elimination is inconsistent with the Act,and absent these discounts, industrial customers have no other means to lower their electric rates at this time. CIEC Brief, pp. 3-7. Conn. Gen. Stat. § 16-19hh, as amended by Section 57 of the Act requires the Company to continue to offer Flex Riders. The Act also addresses the treatment of Flex Riders subsequent to the April 29, 1998 passage date. Section 57 requires CL&P to provide for recovery of the competitive assessment charge (CTA) and the SBC in any contract that is renegotiated, extended, renewed or entered into subsequent to passage of the Act. The Act permits CL&P to honor the terms of all contracts that were entered into prior to April 29, 1998, and because these contracts did not address recovery of the CTA or SBC, customers receiving service under said contracts will not be required to pay those charges until their contracts expire or are renegotiated. However, the Legislature intended the CTA and SBC to be non-bypassable. Therefore, the Act requires that the CTA and SBC, charges that will be assessed effective January 1, 2000, be recovered from all other customers. Section 58 of the Act, which becomes effective July 1, 2000, eliminates the requirement that electric companies offer Flex Riders. Based on the foregoing, CL&P must continue to offer flexible pricing tariffs; therefore, its request to eliminate Flex Riders is denied. 4. Kilovolt Ampere Metering Customer demand is currently measured in terms of kilowatts (kW). However, CL&P states that a better measure is kilovolt ampere (kVA). Metering kVAs has many benefits over kW metering, but until recently, the high cost of kVA meters precluded their widespread use. Solid state technology and increasing use of these meters hasPage 132 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 132 of 191 Page 125 reduced their cost to the point where they are only slightly more expensive than the kW meters now in use. As a result, CL&P proposes to implement kVA billing. Roncaioli PFT, pp. 12 and 13. Customers predominantly have a net inductive load, often resulting from running highly inductive loading such as the motors that drive pumps and fans. See Section II.E.3 for a discussion on inductive load. This is particularly the case with commercial and industrial customers. As noted above, an inductive load will drive the customer’s power factor further from unity, resulting in greater kVA consumption per kW. This requires CL&P to install necessary power correction devices, such as capacitors, on its system. The cost of this equipment is borne by all customers within a rate class because customers with poor power factors cannot be identified through the use of kW metering. Therefore, because customer demand is currently measured and billed on a kW basis, the customer has no financial incentive to operate its facilities to minimize reactive power. The Company states that kVA metering is not an issue of revenue recovery because current rates recover CL&P’s distribution costs. Instead, it is an issue of fairness between customers because when demand is metered and billed on the basis of kW, customers with higher-than-average power factors are subsidizing those with lower-than-average power factors. Based on the experience with its larger customers, CL&P might extend kVA metering to customers below 1000 kW, although this is not proposed at this time. Id. Metering kVAs provides a better link between cost causation and the amount each customer pays. The Company proposes to implement kVA billing to allow it to identify poor power factor customers and to provide these customers with an opportunity to improve their power factor. If the customer does not correct its power factor, CL&P would install the appropriate corrective equipment off of the customer’s facility and, through rates, hold the customer financially liable. Id. CL&P is proposing that all services with demands of 1000 kW or more be metered and billed based on kVA. The Company believes it can accomplish the necessary meter conversion for these customers, essentially its Rate 57 and 58 customers, by the end of 2000. The proposal calls for comparative billing at proposed rates (i.e., kW vs. kVA) also for six months after a kVA meter is installed. During this time the customer would continue to pay on the basis of kW demand, but after six months, kVA billing would begin. This initial period is intended to provide the customer time to correct its power factor. If comparative billing data suggest that different kVA charges are appropriate, there would be time for the Department and CL&P to adjust the charges to assure revenue neutrality. Id. The Company provided comparisons under Rate 57 to demonstrate how kVA billing could affect customer bills. These billing data use an 85% power factor as representing a ‘base line’ customer under current rates. Under proposed rates, the total charge to a customer with an 85% power factor would not change. Response to Interrogatory EL-241. The following demonstrates potential bill impacts. The actual level of change would depend on each customer’s demand, power factor and on/off-peak consumption.Page 133 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 133 of 191 Docket No. 98-01-02 Page 126 Bill Impacts Based on Power Factor Power Factor Potential Inc./(Dec.) 95% 85% 75% 60% (4%) 0% 5% 17% Source: Interrogatory EL-241 Over the long term it is reasonable to expect customers to improve their power factors. This in turn should mitigate the need for CL&P to invest in power factor adjusting equipment. However, initially, CL&P’s overall distribution costs will not be reduced. Response to Interrogatory EL-243. Assuming that traditional ratemaking continues, all customers should benefit from reduced distribution costs over the longer term. Response to Interrogatories EL-242 and 243. Customers can minimize reactive power by installing power factor correction devices and modifying the operation of their equipment. CL&P estimates that a 100 kW demand customer with a power factor of 75% can increase its power factor to 90% with an investment of approximately $3,000. Response to Interrogatory EL-244. Therefore, it is reasonable to expect that a 1000 kW demand customer with a similar power factor will spend no more than $30,000 to achieve similar results. 15 Based on the proposal, customers can achieve a bill reduction by improving their power factor beyond 85% thereby recovering their investment and reducing CL&P’s costs. CIEC supports the installation of kVA meters, but believes that the proposed rates are speculative and should not be approved at this time. CIEC states that kVA billing should be delayed until sufficient data are gathered and evaluated to determine appropriate rates. CIEC Brief, p. 9. Traditionally, rates have been designed to reflect cost causation and this advance in meter technology provides an opportunity for CL&P to identify and isolate cost causation. As such, CL&P’s proposal is consistent with sound ratemaking. However, the Department is concerned about potential bill increases at proposed rates. In addition, absent actual billing data, it is not clear whether the proposed rates will achieve revenue neutrality. Therefore, a comparative billing period must be used to gather the data necessary to set appropriate kVA demand rates. The Company has proposed a six-month comparative billing period. Given that meters will be installed over time, a sufficient number may not be in place in the first six months to gather the data necessary to develop rates for varied demands. A 12-month period would allow for evaluation of seasonal demand data. The information can then be evaluated for purposes of finalizing demand rates and implementation of kVA billing would occur once 15 Based on economies of scale, the cost of corrective equipment for the 1000 kW customer is likely less than $30,000 (10 times $3,000).
As listed on the current system
Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026