Interrogatory responses
Answers to questions 874, 885, 886
Files5
OCC-874_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download OCC-874_Final.pdfRead the text of OCC-874_Final.pdf
OCC-874 Attachment 1 REDACTED.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download OCC-874 Attachment 1 REDACTED.pdfRead the text of OCC-874 Attachment 1 REDACTED.pdf
OCC-885_Final.pdf
PDF · 77 KB · 1 pageText searchable
Download OCC-885_Final.pdfRead the text of OCC-885_Final.pdf
OCC-886_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download OCC-886_Final.pdfRead the text of OCC-886_Final.pdf
OCC-886 Attachment 1.pdf
PDF · 10 MB · 191 pagesText searchable
Download OCC-886 Attachment 1.pdfRead the text of OCC-886 Attachment 1.pdf
Text of OCC-886_Final.pdf
Extracted from the file · 1 page · 1,819 characters
Page 134 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 134 of 191 Page 127 this has been done. CL&P should establish a meter conversion schedule to assure that an adequate sampling of customer demand is available for study. Based on the foregoing, the Department will allow CL&P to begin installing kVA meters and to issue comparative bills based on the proposed rates. However, customer bills must indicate that the rates are being issued for comparative purposes only and are subject to final review and approval by the Department. Further, the Company must notify its customers of the implementation of this program and the means by which power factors can be corrected. The Company will be required to submit this information to the Department. In addition, Section 20 of the Act requires that the total rate charged under the standard offer must be at least 10% less than CL&P’s base rates that were effective on December 31, 1996.16 Therefore rates may need to be adjusted to assure compliance with the Act. This matter will be addressed in a subsequent proceeding. 5. Expanded Streetlighting Options The Company proposes to expand its streetlight offerings in response to customer requests and as a strategy against the erosion of streetlighting sales and revenues. The expanded offering includes a limited number of decorative poles and fixtures, metal halide lamps and bullet resistant shields for the street and security lighting and a spotlight designed to produce narrow beam, specialty lighting. Roncaioli PFT, p. 11; Response to Interrogatory CCM-1 SP 1; Tr. 9/28/98, p. 2951. The proposed rates for decorative streetlights include the cost of the pole, fixture, maintenance and energy. The rates for fixtures, poles and vandal shields were developed by applying an annual carrying charge rate of 14.75% to the installed cost of these items. The annual rate assumes a cost of capital of 8.5%, a property tax rate of 1.7% and a 5% gross earnings tax rate. The proposed spot lighting rate was set at the Company’s existing rate for similar floodlight fixtures. Responses to Interrogatories EL-277 and 278; Schedule E-1.0. The Company indicates that some municipalities have installed decorative fixtures because CL&P does not offer these services. In these cases, the municipality contracts for the installation of the pole and fixture and then owns and maintains it. The customer generally replaces existing streetlighting with the decorative fixture and then receives service under Rate 117, Partial Street Lighting Service. 17 Responses to Interrogatories EL-271 and 272. The Company currently offers decorative streetlighting under Rate 116 but the number and types of fixtures are limited. As such, the Company seeks to offer its 16 The standard offer includes the electric transmission and distribution services, the conservation and load management program change, the renewable energy investment charge, electric generation services, the CTA and the SBC. 17 Rate 117 is essentially an ‘energy only’ rate because the customer owns and maintains the fixture. Rate 116 is a full service rate that recovers the cost of installation and maintenance of the fixture and the energy to operate it. Under Rate 116, CL&P owns the fixture.Page 135 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 135 of 191 Page 128 customers an expanded selection of decorative lighting. Response to Interrogatory CCM-1 SP 1 Bulk. Department review of the proposed rates finds them to be reasonable. However, final rates must reflect the cost of capital approved herein. Therefore, the Department approves CL&P’s proposal to offer specialty lighting and protective devices for streetlights subject to the cost of capital approved herein. CL&P will be directed to submit final tariffs for these rates. 6. Streetlighting Rates The Connecticut Conference of Municipalities (CCM) opposes CL&P’s proposal to reduce rates uniformly, stating that because streetlighting Rates 116 and 117 provide a rate of return well in excess of the Company’s average rate or return, special consideration must be given to these rates. Further, as historical rates of return demonstrate, this class has paid rates in excess of its cost of service for many years. CCM Brief, pp. 1-8; Response to Interrogatory CCM-5. Section 20 of the Act requires a 10% reduction to base rates in 2000. 18 In addition, restructuring offers all customers the opportunity to shop for competitive generation rates to achieve further cost savings. Therefore, the Department believes it is appropriate to treat streetlighting rates consistently with other firm rates at this time. 7. New Business Rates CL&P’s customer service policies include its New Business (NB) policies and charges. The charges cover such items as the installation of primary and secondary cable, direct buried service conductors, primary risers, ground level transformer installations, trenching, installation and removal of poles, temporary service connections, three-phase extensions and street and security lighting. The charges, which are effective throughout CL&P’s service territory, have been developed to provide uniform rates and standard estimating unit charges for electric supply to all classes of customers. NU Policies NB-1, NB-2, NB-5, NB-10, NB-12, NB-21, and NB-200. These policies and charges were last approved in the Decision dated June 15, 1995, in Docket No. 93-11-13, Application of The Connecticut Light and Power Company to Revise Customer Service Policies. CL&P is uncertain whether it will apply to the Department to amend these charges. Late Filed Exhibit No. 13 and Supplement; Tr. 10/16/98, p. 3813. The NB rates, which reflect the average installed cost of a wide range of items, are developed using the cost of material, labor, equipment, and ‘loaders’. Materials are based on then current costs, while the assignment of labor and equipment is based on average hourly rates multiplied by an estimate of the time required to perform each task. Time studies, adjusted periodically to reflect changes in work methods, provide the time estimates used to develop the rates. ‘Loaders’ recover costs that are not directly assigned to individual jobs. For example, the total cost to operate CL&P’s storage 18 Section 20 of the Act requires that on January 1, 2000, base rates be 10% less than those that were effective December 31, 1996. The 10% reduction does not apply to customers receiving service under special contract.Page 136 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 136 of 191 Page 129 facilities is assigned to all work orders through a stores expense loader. Decision, Docket No. 93-11-13, pp. 1-9. The Company indicated that as part of a reengineering effort that was underway at the time, it would be reviewing the man-hour allocations and its NB management practices in general following the issuance of the Decision in Docket No. 93-11-13. The Decision noted the following: in light of the Company’s current reengineering efforts and work practices review, requiring the Company to update the time study would not be cost effective. The Department accepts the time estimates assigned to the work task portion of the total man-hours but remains concerned about the use of outdated time study data to support steadily increasing man-hour requirements for these charges. Decision, p. 3. The Department accepted the time estimates and did not require CL&P to perform a new time study. However, to date the Company has not amended its NB rates nor submitted any information to indicate it has reexamined the basis for these charges. The current NB rates are based on material, labor and loader costs that are nearly four years old, while the time study used to develop the rates is over 20 years old. Therefore, the Department will require the Company to submit these policies and rates for review in a subsequent proceeding. 8. Campground Rates Public Act 98-149 states: each electric company or electric distribution company, as defined by section 16-1, shall allow the installation of submeters at a recreational campground or in any other location as approved by the department and shall provide electricity to such campground at a rate no greater than the residential rate for the service territory in which the campground is located. The Company proposed to modify its residential Rates 1, 5 and 7 to comply with Public Act 98-149. Roncaioli PFT, p. 7; Schedule E-10. The Company believes that implementation should be consistent with the Legislature’s intent, but is uncertain how to implement the Public Act and seeks the Department’s assistance in doing so. Further, CL&P believes it is inappropriate to estimate sub-meter usage at these facilities. Tr. 10/20/98, p. 3918-3926. The Company states that there are many combinations of service provided at campgrounds. These can include service provided through a single meter or multiple meters and can include uses such as camping, convenience store and auto repair facility consumption. Id. Further, in the past, campgrounds were allowed to sub-meter “for their [own] purposes” but that metering was unrelated to CL&P’s provision of service. Tr. 10/20/98, p. 3923. The intent of Public Act 98-149 is found in its legislative history. As stated by Rep. Stratton, “this Amendment . . . is intended to say that . . . when electricity isPage 137 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 137 of 191 Page 130 charged to residents in campgrounds, that they [campground owners] may not charge more than the residential rate to those individuals [campers].” Further, the amendment “allows the installation of sub-meters at recreational campgrounds. If such meters are in place, the rate that is charged [by the utility] . . . would have to be . . . no greater than the residential rate.” 1998 House Proceedings, May 1, 1998, pp. 281-283. The Department believes that the Legislature intended that campgrounds be allowed to sub-meter ‘residential-like’ consumption (e. g., lighting, cooking and air conditioning) for purposes of billing individual camp sites. Therefore, the legislation requires the electric utility to provide service for such use at no greater than the utility’s residential rate. Although the Company expressed concern regarding implementation of this change, the Department believes that Conn. Agencies Regs. Sections 16-11-236, 116-11-237 and 16-11-238, provide clear direction regarding implementation. These regulations address the installation, maintenance and testing of the sub-meters as well as the campground’s responsibilities as they relate to the billing of individual users. Essentially, sub-meters are owned, installed and maintained by the campground and must be tested in accordance with the most recent American National Standards Institute (ANSI) Code for Electric Meters. Meter testing records must be maintained for at least two years and must be made available to the Department upon request. Further, the campground must read its meters monthly, at regularly scheduled intervals, or, at the time that service is initiated and terminated to a sub-metered service (campsite). Written bills must be issued to each camper and must include a calculation of the average cost per kWh for all relevant periods, the present and previous meter readings and billing history, if requested. To assure that a campground is not ‘reselling electricity for profit,’ the regulations require that the campground cannot recover any more than the amount it is being charged by the electric utility for the provision of service. Periodic reconciliation (i.e., audit) of the total revenue recovered from campers and the total electric bill paid by the campground, assures compliance with this requirement. Therefore, the average rate charged to campers cannot exceed the average rate being charged to the campground. As noted, CL&P believes that it is inappropriate to estimate sub-metered consumption. The Department agrees. Consumption of electricity at these facilities is subject to occupancy and seasonal variations. Given that existing campgrounds are using electricity for multiple uses, including commercial applications, it would be unduly burdensome to require CL&P to attempt to break out the residential portion of that service and then attempt to true up that estimated residential use to the actual readings provided to CL&P by the campground. The Department concludes that compliance with the regulations requires all sub-metered ‘residential-like’ consumption at campgrounds to be metered separately by the electric company. This will provide accurate consumption data that can be used by the electric company and the campground to reconcile billing data. Therefore, CL&P will be required to modify its Rates 1, 5 and 7 as discussed herein and to submit these rates for approval. Further, CL&P will be directed to notify all campgrounds regarding the requirements of Conn. Agencies Regs. Sections 16-11-236, 116-11-237 and 16-11-238.Page 138 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 138 of 191 Page 131 The Company is not familiar with every service arrangement at campgrounds; therefore, the Department cannot determine how separate meters in existing facilities might affect current customers. CL&P will be required to examine this issue and submit a report of its findings to the Department. The report should include, but not be limited to, the number of facilities served, the number of meters and types of service being provided, the number of campgrounds that provide sub-metering, whether the sub-metered usage is separately metered and the cost implications of requiring separate metering for residential-type use. 9. Amended Rules and Regulations Pursuant to Order No. 1 in the Decision dated September 9, 1998, in Docket No. 97-11-14, Application of CareMatrix Corp. for Declaratory Ruling Regarding Metering Requirements for Assisted Living Facilities, CL&P submitted revised Rules and Regulations to address master-metering of Assisted Living Facilities. Letter dated October 23, 1998. Department review of CL&P’s revised Rules and Regulations finds that they are in compliance with the Decision in Docket No. 97-11-14. The Company will be required to submit final revisions to its Rules and Regulations. 10. Energy Adjustment Clause Conn. Gen. Stat. Section 16-19b(f) states: the Department shall not suspend or discontinue a purchased gas adjustment clause or an energy adjustment clause which it has approved except (1) after general rate hearings for the companies affected by the clause, and (2) upon a finding by the department of public utility control that the market prices of purchased gas or the costs of energy have stabilized and are likely to remain stable. The EAC is a formula-based tariff that allows the Company to true-up forecasted and actual fuel costs. The current EAC was approved pursuant to the Decision dated October 8, 1996, in Docket No. 95-07-05, DPUC Investigation of a Fully Tracking Energy Adjustment Clause for Electric Companies. In that Decision the Department concluded that adoption of the EAC would protect the interests of ratepayers better than would the continued operation of CL&P’s then current fuel recovery mechanisms, the Fuel Adjustment Clause (FAC) and the Generation Utilization Adjustment Clause (GUAC). The Department found that as the result of changes that had occurred since implementation of the FAC and GUAC, the clauses were not functioning as designed. Significant among the changes that had affected the FAC and GUAC was the increase of nuclear power in the Company’s generation mix and the influence of the Company’s marginal cost on total fuel cost recovery. Decision, pp. 9-13. The Decision in Docket No. 97-07-05 modified CL&P’s previous energy adjustment clauses in several ways. The EAC merged the FAC and GUAC into a single clause, changed the adjustment period from a monthly to a semi-annual true-up, incorporated an incentive mechanism and eliminated the ‘floor’ for overall nuclear performance.Page 139 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 139 of 191 Page 132 CL&P did not propose changing the EAC in the instant docket, stating that it should remain untouched. However, if the EAC is changed, the Company believes that the incentive collar should be eliminated or modified to exclude costs that the Company cannot control, such as the market price of fossil fuels and production from hydro-electric facilities. CL&P Brief, pp. 36-40; CL&P Reply Brief, pp. 47 and 48. In addition, CL&P states that it should be allowed to recover carrying costs if forecasting is removed from the EAC. Response to Interrogatory EL-98. OCC believes the EAC should be eliminated, citing stability of fuel costs as the basis for suspension. OCC Brief, pp. V-1 - V-5. AG also cites fuel cost stability as the basis for its proposal to eliminate the EAC. AG Brief, p. 20. At the time the Department approved the EAC, nuclear plants provided approximately 54% of CL&P’s generation. Id. The Company acknowledges the significance that CL&P’s then current generation mix played in establishing the EAC, stating, “the generation mix issue was a very important issue and finding in that decision as to the potential financial harm to the company and the potential large variation in cost to the supply of generation.” Tr. 9/11/98, p. 620. Since then, MY, CY and MP1 have been retired and CL&P’s generation mix has changed. Based on the Company’s revised Fuel Simulation, nuclear sources will provide approximately 41% of total production in 1999 (10,019 GWhs 24,231 GWhs).19 The current BRFR assumed 17,309 GWhs of nuclear production. Docket No. 92-11-11, 1997 Settlement Fuel Factors, Table OL3-97-1. Nuclear generation is forecasted to provide 10,019 GWhs in 1999, a decline of 7,290 or 42% from the level of nuclear generation embedded in the current BRFR (17,309 – 10,019).20 Decision, Docket No. 95-07-05, p. 6; Tr. 9/11/98, pp. 654-659; Revised WPC-3.8. The marginal cost of fuel (i.e., the cost that replaces production when a nuclear plant does not run) was approximately $40/MWh when the EAC was established. FAC filing dated August 26, 1996, Factor FCb, $.03999/kWh.21 The Company forecasts its marginal cost at approximately $25.60/MWh in 1999. Revised WPC-3.8, p. 1. However, the marginal cost declines to $21.56/MWh under the Final Fuel Simulation. The average cost of nuclear generation is $5/MWh. As a result of the reduction in marginal cost, the net cost to replace nuclear generation has declined from $35/MWh to $16.56/MWh (marginal cost incurred minus the avoided nuclear cost). Combined with the change in CL&P’s generation mix, the decline in the marginal cost of replacement energy has reduced the exposure for increased total fuel cost associated with variations in nuclear performance. This has reduced CL&P’s financial risk. The forecasted production and cost from PPP facilities is based on the contract CL&P has with each plant. The majority of these agreements extend beyond 2010 and each is based on essentially a fixed purchase price for production. Historical 19 Total forecasted nuclear generation divided by system requirements. 20 Total nuclear generation per the Settlement minus forecasted nuclear generation. 21 Factor FCb is the CL&P retail average fossil fuel cost approved in Docket No. 92-11-11. This value reflected the cost to replace nuclear generation and was embedded in the FAC and GUAC. The cost per MWh equals the cost per kWh times 1000.Page 140 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 140 of 191 Page 133 production, adjusted for planned outages, provides the basis for the forecast of output used in the Fuel Simulation. CL&P has contracts with 27 PPP facilities. Of these, five provide in excess of 75% of the total purchases and demonstrate historical capacity factors in excess of 85%. In total, past performance has shown the performance of PPP plants to be predictable and reliable. CL&P’s Integrated Resource Plan, dated April 1, 1998, Table II-2; Tr. 9/11/98, pp. 625-627. The Fuel Simulation embeds the entire costs of each PPP contract in the BRFR at an average rate of $85/MWh. The forecast reflects the maximum contractual purchase obligation (i.e., production and cost) under each agreement. When a facility does not operate, CL&P replaces the ‘lost’ production at its marginal cost. In addition, if production exceeds the maximum contractual obligation, CL&P purchases the additional energy at its then current marginal cost. Based on the Final Fuel Simulation, PPP costs reflect $296,958,000, or 47% of CL&P’s fuel costs ($296,958,000 $637,888,000). Although CL&P essentially ‘purchases the plant’ by taking energy and capacity, the Company does not separate PPP costs into capacity and energy, booking all PPP costs as energy. Id.; Tr. 9/11/98, p. 695; Revised WPC-3.1. Cogeneration costs account for 47% of CL&P’s total fuel expense and these costs are fixed by contract. When a cogeneration facility does not operate, the Company’s overall fuel costs decline on average by $63/MWh, the difference between the average embedded cost of cogeneration and the Company’s marginal cost of fuel ($85/MWh - $21.56/MWh). However, the cost reduction can vary based on the PPP facility. For example, CL&P purchases from the Wallingford Resource Recovery Facility at $245/MWh. Therefore, the Company’s costs decline by $224/MWh when this facility does not operate as planned ($245 - $21.56). If a PPP generates more than expected, CL&P purchases the output at its marginal cost. Therefore, forecasted cogeneration costs can only decline based on actual performance of these facilities. Historical data show that these plants have performed reliably and consistently in the past and there is no evidence to suggest performance will decline. Based on the above, the Department concludes that the cost of energy associated with CL&P’s cogeneration contracts is stable and likely to remain stable. The cost of nuclear fuel is determined at the time of each reload (i.e., during a refueling outage). Once the fuel is loaded the cost does not change. CL&P states that nuclear fuel is only expensed as it is burned; therefore, “the mill rate is stable in the simulation because we set one mill rate for a fuel cycle. The mill rate is subject to change, but we set the mill rate so we can take the mill rate times the generation and fully amortize the cost of that fuel load.” Tr. 9/11/98, p. 634. Fuel cycles are either 18 or 24 months depending on the facility. Under the Final Fuel Simulation, nuclear fuel represents 7% of CL&P’s total forecasted fuel cost for 1999 ($45,092,000 $637,888,000). Late Filed Exhibit No. 138 SP 1; Revise Schedule WPC-3.8. The cost of nuclear fuel is fixed at the start of each fuel cycle and because the length of a fuel cycle is known, these costs are stable over that period. Based on the above, the Department concludes that the cost of nuclear fuel is stable and likely to remain stable.Page 141 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 141 of 191 Page 134 Oil, natural gas and coal-fired generation reflect approximately 33% of the Company’s total 1999 fuel cost ($208,634,000 $637,888,000). Late Filed Exhibit No. 138 SP 1. CL&P states that the price of oil is far less volatile than it has been in the past, but cautions that, despite relative price stability, a $2 or $3 per barrel swing can represent a significant change when applied to current prices. It is the “potential instability” of the price of oil that can dramatically affect the Company’s earnings. Tr. 9/11/98, pp. 641-644. The Company indicates that the price of natural gas trends with the price of oil; therefore, the price of gas is also unstable. Id.; Late Filed Exhibit No. 88. The Company uses financial instruments such as hedges, derivatives and ‘swaps’ (collectively, Swaps) in its fossil fuel procurement practices. See Decision dated January 25, 1995, in Docket No. 94-05-01, Public Hearing to Investigate Whether Charges or Credits Made under the Purchased Gas and/or Generation Utilization Adjustment Clauses Are Accurate for the Preceding Three Months as Filed by: Bozrah Light and Power Company, et al. An oil swap is a specific type of energy derivative, or financial instrument, whose value is determined in whole or in part by an underlying energy-related commodity, such as oil. Specifically, an oil swap is an agreement between a buyer and seller for a specific volume of oil at a specified price over a specified period of time. In a swap, the seller, generally a financial institution, agrees to pay the buyer of the swap, in this case CL&P, the difference between the actual market price of oil and the agreed upon swap price of oil, if the actual price is higher. If the actual price is lower than the contracted swap price, the buyer pays the seller the difference. The actual market price of oil is based upon a predetermined benchmark, such as No. 6, 1% sulfur fuel oil New York Harbor cargo price. Decision dated January 25, 1995, Docket No. 94-05-01, pp. 2-5. Swaps essentially lock in the cost of a commodity, such as oil, either through delivery of the commodity at a predetermined price or through a ‘paper hedge’ in which the price is fixed but the commodity is not delivered. Tr. 9/11/98, pp. 645-649. The Company has recently converted Middletown Unit Nos. 2 and 3 to dual-fuel capability, allowing the Company to burn oil or natural gas at this site. Conversion of these units was finalized in 1998. In addition to Middletown Station, Devon Units Nos. 7 and 8 and Montville Unit No. 5 are dual-fueled. CL&P converted these units to control fuel cost, reduce the risk associated with the availability of oil and to address environmental concerns. Tr. 9/11/98, pp. 645-649. The Final Fuel Simulation assumes market purchases for the second half of 1999. These transactions represent purchases with other energy suppliers and account for approximately 5% of total fuel costs ($30,033,000 $637,888,000). The Company states that market purchases are driven by the price of oil because fossil-fueled units provide marginal generation throughout New England. Tr. 9/11/98, pp. 639. The Final Fuel Simulation includes production from PSNH and WMECO coal fired plants. Production from these plants is available as the result of the continuation of the NUG&T and Sharing Agreement in 1999. In general, coal is purchased under contracts that range from one to three years. Late Filed Exhibit No. 17.Page 142 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 142 of 191 Docket No. 98-01-02 Page 135 The Company began limited use of Swaps in 1995 where at that time Swaps was limited. See Decision in Docket No. 94-05-01, p. 3. Since then CL&P has increased the use of Swaps to control fuel costs. Middletown Station was recently converted to dual-fuel capability, adding to the number of CL&P generating units that are dual-fueled. The conversion of Middletown Station provides CL&P with a cost control technique that was not available when the EAC was implemented. A percentage of coal is purchased under contract; therefore, a portion of the cost of this source of energy is stable and likely to remain stable. The Department concludes that the number of fuel cost-control techniques available to CL&P has increased since the implementation of the EAC. While there are mechanisms available to assist CL&P in controlling the cost of oil and natural gas, they do not stablize market prices for these commodities or for the energy produced from plants that burn these fuels. The cost of oil declined 40% from approximately $20/bbl in November 1997 to the current price of $12/bbl. Natural gas costs trend with oil; therefore, gas prices have also changed. In addition, because market purchase costs are driven by the price of fossil fuels, these costs have also changed. Oil, natural gas and market purchases represent approximately 38% of the Company’s total fuel cost. The price of oil has fluctuated by 40% within the last 11 months and there is no guarantee that the price of this commodity will not experience similar swings in the future. A 40% swing in price cannot be defined as stable and because the price of oil influences gas and market purchases, the fuel cost for these sources of generation is also unstable. Therefore, the Department finds that the cost of oil and natural gas is not stable. The Department notes that the effect of declining fossil fuel prices has been reflected in the EAC, and, as a result of the EAC Collar, has provided benefit to ratepayers and shareholders. Absent the EAC, ratepayers would have lost these benefits. In the past, the fuel cost associated with variations in nuclear performance was passed along to ratepayers through the GUAC. Historically, 72% was used as the forecasted capacity factor for nuclear plant performance and was embedded in the BRFR. Therefore, under the GUAC, when nuclear performance fell below 72% ratepayers funded the replacement energy costs while performance above 72% reduced fuel costs. Based on historical plant performance, the GUAC resulted in a charge for the operation of MP2 and MP3 for most years between 1991-1996. The following summarizes the historical performance of these units. Historical Capacity Factors, Millstone Unit Nos. 2 and 3 1991 1992 1993 1994 1995 1996 1997 1998* Millstone Unit 2 52.3% 35.6% 82.2% 48.0% 35.8% 13.6% 0.0% 0.0% Millstone Unit 3 28.7% 65.4% 64.6% 93.7% 79.6% 24.6% 0.0% 0.0% Source: Response to Interrogatory EL-33. * Data reflect January through June 1998 Data demonstrate that nuclear plants returning from the Watch List tend to perform above the industry average. Response to Interrogatory EL-5. The CompanyPage 143 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 143 of 191 Page 136 did not adjust the forecasted capacity factors for MP2 or MP3 based on improved performance that may result as these plants return to service. In addition, because there is no guarantee that performance will improve, the Department accepted the forecasted capacity factors for these units. However, if the EAC is suspended, ratepayers will lose the benefit of reduced fuel costs should performance at MP2 and 3 improve. The Department believes that ratepayer interests are best served through continued use of the EAC to capture potential improved nuclear performance at MP2 and 3. Factor FC in the EAC formula allows CL&P to forecast its fuel costs for the upcoming six-month EAC billing period. Forecasting under the EAC was suspended until one or more of CL&P’s nuclear units returns to service. Decision, Docket No. 97-07-05, pp. 20 and 21. CL&P’s nuclear units have been off-line since the EAC was implemented; therefore, CL&P has not forecasted costs through the EAC. As a result, the EAC has been essentially a prior period adjustment mechanism, truing up base fuel revenue recovery to CL&P’s booked fuel costs. This has simplified review and administration of the EAC. The Department believes that elimination of forecasting from the EAC best serves the interests of the Company and its ratepayers. The Department notes that due to a lag in accounting for some costs, the Company has estimated certain values in the EAC (e.g., the marginal cost) requiring a true up in a subsequent EAC filing. The Department intends to eliminate all forecasting and estimating from the clause to have it reflect only actual data. Therefore, CL&P will be required to propose a mechanism to accomplish this goal. The Company proposes to apply carrying charges to the EAC if forecasting is eliminated. Response to Interrogatory EL-98. The elimination of forecasting creates a lag in fuel cost recovery. Therefore, the proposal to apply carrying costs to the EAC recoveries is reasonable. Carrying costs will be determined in each EAC billing period and calculated with each EAC filing. They will be applied to outstanding EAC balances, plus or minus, so that ratepayers and the Company are treated equally. As noted in Section II.G.1, above, the Department accepts CL&P’s proposed nuclear capacity factors for MP2 and 3. a. Incentive Collar The EAC includes a $9 million annual incentive collar Factor IC (Collar). The Collar allows CL&P to retain the first $9 million of savings if actual fuel costs are less than forecasted and does not allow the Company to recover the first $9 million if actual fuel costs exceed the forecast. Decision, Docket No. 97-07-05, p. 25; EAC Factor IC. The Collar was designed to share risk and benefit. Id. The Company states that setting the BRFR using current, low oil prices, and ‘aggressive’ nuclear capacity factors assures that the Company’s fuel costs will exceed the BRFR, forcing CL&P to absorb the full value of the Collar. CL&P Brief, pp. 36-41. Therefore, the Company believes the Collar should be eliminated. Id. The Department does not agree that the approved capacity factors are aggressive. In past rate proceedings, the BRFR was generally set using a 72%
As listed on the current system
Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026