Interrogatory responses
Answers to questions 874, 885, 886
Files5
OCC-874_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download OCC-874_Final.pdfRead the text of OCC-874_Final.pdf
OCC-874 Attachment 1 REDACTED.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download OCC-874 Attachment 1 REDACTED.pdfRead the text of OCC-874 Attachment 1 REDACTED.pdf
OCC-885_Final.pdf
PDF · 77 KB · 1 pageText searchable
Download OCC-885_Final.pdfRead the text of OCC-885_Final.pdf
OCC-886_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download OCC-886_Final.pdfRead the text of OCC-886_Final.pdf
OCC-886 Attachment 1.pdf
PDF · 10 MB · 191 pagesText searchable
Download OCC-886 Attachment 1.pdfRead the text of OCC-886 Attachment 1.pdf
Text of OCC-886_Final.pdf
Extracted from the file · 1 page · 1,819 characters
Page 138 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 138 of 191 Page 131 The Company is not familiar with every service arrangement at campgrounds; therefore, the Department cannot determine how separate meters in existing facilities might affect current customers. CL&P will be required to examine this issue and submit a report of its findings to the Department. The report should include, but not be limited to, the number of facilities served, the number of meters and types of service being provided, the number of campgrounds that provide sub-metering, whether the sub-metered usage is separately metered and the cost implications of requiring separate metering for residential-type use. 9. Amended Rules and Regulations Pursuant to Order No. 1 in the Decision dated September 9, 1998, in Docket No. 97-11-14, Application of CareMatrix Corp. for Declaratory Ruling Regarding Metering Requirements for Assisted Living Facilities, CL&P submitted revised Rules and Regulations to address master-metering of Assisted Living Facilities. Letter dated October 23, 1998. Department review of CL&P’s revised Rules and Regulations finds that they are in compliance with the Decision in Docket No. 97-11-14. The Company will be required to submit final revisions to its Rules and Regulations. 10. Energy Adjustment Clause Conn. Gen. Stat. Section 16-19b(f) states: the Department shall not suspend or discontinue a purchased gas adjustment clause or an energy adjustment clause which it has approved except (1) after general rate hearings for the companies affected by the clause, and (2) upon a finding by the department of public utility control that the market prices of purchased gas or the costs of energy have stabilized and are likely to remain stable. The EAC is a formula-based tariff that allows the Company to true-up forecasted and actual fuel costs. The current EAC was approved pursuant to the Decision dated October 8, 1996, in Docket No. 95-07-05, DPUC Investigation of a Fully Tracking Energy Adjustment Clause for Electric Companies. In that Decision the Department concluded that adoption of the EAC would protect the interests of ratepayers better than would the continued operation of CL&P’s then current fuel recovery mechanisms, the Fuel Adjustment Clause (FAC) and the Generation Utilization Adjustment Clause (GUAC). The Department found that as the result of changes that had occurred since implementation of the FAC and GUAC, the clauses were not functioning as designed. Significant among the changes that had affected the FAC and GUAC was the increase of nuclear power in the Company’s generation mix and the influence of the Company’s marginal cost on total fuel cost recovery. Decision, pp. 9-13. The Decision in Docket No. 97-07-05 modified CL&P’s previous energy adjustment clauses in several ways. The EAC merged the FAC and GUAC into a single clause, changed the adjustment period from a monthly to a semi-annual true-up, incorporated an incentive mechanism and eliminated the ‘floor’ for overall nuclear performance.Page 139 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 139 of 191 Page 132 CL&P did not propose changing the EAC in the instant docket, stating that it should remain untouched. However, if the EAC is changed, the Company believes that the incentive collar should be eliminated or modified to exclude costs that the Company cannot control, such as the market price of fossil fuels and production from hydro-electric facilities. CL&P Brief, pp. 36-40; CL&P Reply Brief, pp. 47 and 48. In addition, CL&P states that it should be allowed to recover carrying costs if forecasting is removed from the EAC. Response to Interrogatory EL-98. OCC believes the EAC should be eliminated, citing stability of fuel costs as the basis for suspension. OCC Brief, pp. V-1 - V-5. AG also cites fuel cost stability as the basis for its proposal to eliminate the EAC. AG Brief, p. 20. At the time the Department approved the EAC, nuclear plants provided approximately 54% of CL&P’s generation. Id. The Company acknowledges the significance that CL&P’s then current generation mix played in establishing the EAC, stating, “the generation mix issue was a very important issue and finding in that decision as to the potential financial harm to the company and the potential large variation in cost to the supply of generation.” Tr. 9/11/98, p. 620. Since then, MY, CY and MP1 have been retired and CL&P’s generation mix has changed. Based on the Company’s revised Fuel Simulation, nuclear sources will provide approximately 41% of total production in 1999 (10,019 GWhs 24,231 GWhs).19 The current BRFR assumed 17,309 GWhs of nuclear production. Docket No. 92-11-11, 1997 Settlement Fuel Factors, Table OL3-97-1. Nuclear generation is forecasted to provide 10,019 GWhs in 1999, a decline of 7,290 or 42% from the level of nuclear generation embedded in the current BRFR (17,309 – 10,019).20 Decision, Docket No. 95-07-05, p. 6; Tr. 9/11/98, pp. 654-659; Revised WPC-3.8. The marginal cost of fuel (i.e., the cost that replaces production when a nuclear plant does not run) was approximately $40/MWh when the EAC was established. FAC filing dated August 26, 1996, Factor FCb, $.03999/kWh.21 The Company forecasts its marginal cost at approximately $25.60/MWh in 1999. Revised WPC-3.8, p. 1. However, the marginal cost declines to $21.56/MWh under the Final Fuel Simulation. The average cost of nuclear generation is $5/MWh. As a result of the reduction in marginal cost, the net cost to replace nuclear generation has declined from $35/MWh to $16.56/MWh (marginal cost incurred minus the avoided nuclear cost). Combined with the change in CL&P’s generation mix, the decline in the marginal cost of replacement energy has reduced the exposure for increased total fuel cost associated with variations in nuclear performance. This has reduced CL&P’s financial risk. The forecasted production and cost from PPP facilities is based on the contract CL&P has with each plant. The majority of these agreements extend beyond 2010 and each is based on essentially a fixed purchase price for production. Historical 19 Total forecasted nuclear generation divided by system requirements. 20 Total nuclear generation per the Settlement minus forecasted nuclear generation. 21 Factor FCb is the CL&P retail average fossil fuel cost approved in Docket No. 92-11-11. This value reflected the cost to replace nuclear generation and was embedded in the FAC and GUAC. The cost per MWh equals the cost per kWh times 1000.Page 140 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 140 of 191 Page 133 production, adjusted for planned outages, provides the basis for the forecast of output used in the Fuel Simulation. CL&P has contracts with 27 PPP facilities. Of these, five provide in excess of 75% of the total purchases and demonstrate historical capacity factors in excess of 85%. In total, past performance has shown the performance of PPP plants to be predictable and reliable. CL&P’s Integrated Resource Plan, dated April 1, 1998, Table II-2; Tr. 9/11/98, pp. 625-627. The Fuel Simulation embeds the entire costs of each PPP contract in the BRFR at an average rate of $85/MWh. The forecast reflects the maximum contractual purchase obligation (i.e., production and cost) under each agreement. When a facility does not operate, CL&P replaces the ‘lost’ production at its marginal cost. In addition, if production exceeds the maximum contractual obligation, CL&P purchases the additional energy at its then current marginal cost. Based on the Final Fuel Simulation, PPP costs reflect $296,958,000, or 47% of CL&P’s fuel costs ($296,958,000 $637,888,000). Although CL&P essentially ‘purchases the plant’ by taking energy and capacity, the Company does not separate PPP costs into capacity and energy, booking all PPP costs as energy. Id.; Tr. 9/11/98, p. 695; Revised WPC-3.1. Cogeneration costs account for 47% of CL&P’s total fuel expense and these costs are fixed by contract. When a cogeneration facility does not operate, the Company’s overall fuel costs decline on average by $63/MWh, the difference between the average embedded cost of cogeneration and the Company’s marginal cost of fuel ($85/MWh - $21.56/MWh). However, the cost reduction can vary based on the PPP facility. For example, CL&P purchases from the Wallingford Resource Recovery Facility at $245/MWh. Therefore, the Company’s costs decline by $224/MWh when this facility does not operate as planned ($245 - $21.56). If a PPP generates more than expected, CL&P purchases the output at its marginal cost. Therefore, forecasted cogeneration costs can only decline based on actual performance of these facilities. Historical data show that these plants have performed reliably and consistently in the past and there is no evidence to suggest performance will decline. Based on the above, the Department concludes that the cost of energy associated with CL&P’s cogeneration contracts is stable and likely to remain stable. The cost of nuclear fuel is determined at the time of each reload (i.e., during a refueling outage). Once the fuel is loaded the cost does not change. CL&P states that nuclear fuel is only expensed as it is burned; therefore, “the mill rate is stable in the simulation because we set one mill rate for a fuel cycle. The mill rate is subject to change, but we set the mill rate so we can take the mill rate times the generation and fully amortize the cost of that fuel load.” Tr. 9/11/98, p. 634. Fuel cycles are either 18 or 24 months depending on the facility. Under the Final Fuel Simulation, nuclear fuel represents 7% of CL&P’s total forecasted fuel cost for 1999 ($45,092,000 $637,888,000). Late Filed Exhibit No. 138 SP 1; Revise Schedule WPC-3.8. The cost of nuclear fuel is fixed at the start of each fuel cycle and because the length of a fuel cycle is known, these costs are stable over that period. Based on the above, the Department concludes that the cost of nuclear fuel is stable and likely to remain stable.Page 141 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 141 of 191 Page 134 Oil, natural gas and coal-fired generation reflect approximately 33% of the Company’s total 1999 fuel cost ($208,634,000 $637,888,000). Late Filed Exhibit No. 138 SP 1. CL&P states that the price of oil is far less volatile than it has been in the past, but cautions that, despite relative price stability, a $2 or $3 per barrel swing can represent a significant change when applied to current prices. It is the “potential instability” of the price of oil that can dramatically affect the Company’s earnings. Tr. 9/11/98, pp. 641-644. The Company indicates that the price of natural gas trends with the price of oil; therefore, the price of gas is also unstable. Id.; Late Filed Exhibit No. 88. The Company uses financial instruments such as hedges, derivatives and ‘swaps’ (collectively, Swaps) in its fossil fuel procurement practices. See Decision dated January 25, 1995, in Docket No. 94-05-01, Public Hearing to Investigate Whether Charges or Credits Made under the Purchased Gas and/or Generation Utilization Adjustment Clauses Are Accurate for the Preceding Three Months as Filed by: Bozrah Light and Power Company, et al. An oil swap is a specific type of energy derivative, or financial instrument, whose value is determined in whole or in part by an underlying energy-related commodity, such as oil. Specifically, an oil swap is an agreement between a buyer and seller for a specific volume of oil at a specified price over a specified period of time. In a swap, the seller, generally a financial institution, agrees to pay the buyer of the swap, in this case CL&P, the difference between the actual market price of oil and the agreed upon swap price of oil, if the actual price is higher. If the actual price is lower than the contracted swap price, the buyer pays the seller the difference. The actual market price of oil is based upon a predetermined benchmark, such as No. 6, 1% sulfur fuel oil New York Harbor cargo price. Decision dated January 25, 1995, Docket No. 94-05-01, pp. 2-5. Swaps essentially lock in the cost of a commodity, such as oil, either through delivery of the commodity at a predetermined price or through a ‘paper hedge’ in which the price is fixed but the commodity is not delivered. Tr. 9/11/98, pp. 645-649. The Company has recently converted Middletown Unit Nos. 2 and 3 to dual-fuel capability, allowing the Company to burn oil or natural gas at this site. Conversion of these units was finalized in 1998. In addition to Middletown Station, Devon Units Nos. 7 and 8 and Montville Unit No. 5 are dual-fueled. CL&P converted these units to control fuel cost, reduce the risk associated with the availability of oil and to address environmental concerns. Tr. 9/11/98, pp. 645-649. The Final Fuel Simulation assumes market purchases for the second half of 1999. These transactions represent purchases with other energy suppliers and account for approximately 5% of total fuel costs ($30,033,000 $637,888,000). The Company states that market purchases are driven by the price of oil because fossil-fueled units provide marginal generation throughout New England. Tr. 9/11/98, pp. 639. The Final Fuel Simulation includes production from PSNH and WMECO coal fired plants. Production from these plants is available as the result of the continuation of the NUG&T and Sharing Agreement in 1999. In general, coal is purchased under contracts that range from one to three years. Late Filed Exhibit No. 17.Page 142 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 142 of 191 Docket No. 98-01-02 Page 135 The Company began limited use of Swaps in 1995 where at that time Swaps was limited. See Decision in Docket No. 94-05-01, p. 3. Since then CL&P has increased the use of Swaps to control fuel costs. Middletown Station was recently converted to dual-fuel capability, adding to the number of CL&P generating units that are dual-fueled. The conversion of Middletown Station provides CL&P with a cost control technique that was not available when the EAC was implemented. A percentage of coal is purchased under contract; therefore, a portion of the cost of this source of energy is stable and likely to remain stable. The Department concludes that the number of fuel cost-control techniques available to CL&P has increased since the implementation of the EAC. While there are mechanisms available to assist CL&P in controlling the cost of oil and natural gas, they do not stablize market prices for these commodities or for the energy produced from plants that burn these fuels. The cost of oil declined 40% from approximately $20/bbl in November 1997 to the current price of $12/bbl. Natural gas costs trend with oil; therefore, gas prices have also changed. In addition, because market purchase costs are driven by the price of fossil fuels, these costs have also changed. Oil, natural gas and market purchases represent approximately 38% of the Company’s total fuel cost. The price of oil has fluctuated by 40% within the last 11 months and there is no guarantee that the price of this commodity will not experience similar swings in the future. A 40% swing in price cannot be defined as stable and because the price of oil influences gas and market purchases, the fuel cost for these sources of generation is also unstable. Therefore, the Department finds that the cost of oil and natural gas is not stable. The Department notes that the effect of declining fossil fuel prices has been reflected in the EAC, and, as a result of the EAC Collar, has provided benefit to ratepayers and shareholders. Absent the EAC, ratepayers would have lost these benefits. In the past, the fuel cost associated with variations in nuclear performance was passed along to ratepayers through the GUAC. Historically, 72% was used as the forecasted capacity factor for nuclear plant performance and was embedded in the BRFR. Therefore, under the GUAC, when nuclear performance fell below 72% ratepayers funded the replacement energy costs while performance above 72% reduced fuel costs. Based on historical plant performance, the GUAC resulted in a charge for the operation of MP2 and MP3 for most years between 1991-1996. The following summarizes the historical performance of these units. Historical Capacity Factors, Millstone Unit Nos. 2 and 3 1991 1992 1993 1994 1995 1996 1997 1998* Millstone Unit 2 52.3% 35.6% 82.2% 48.0% 35.8% 13.6% 0.0% 0.0% Millstone Unit 3 28.7% 65.4% 64.6% 93.7% 79.6% 24.6% 0.0% 0.0% Source: Response to Interrogatory EL-33. * Data reflect January through June 1998 Data demonstrate that nuclear plants returning from the Watch List tend to perform above the industry average. Response to Interrogatory EL-5. The CompanyPage 143 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 143 of 191 Page 136 did not adjust the forecasted capacity factors for MP2 or MP3 based on improved performance that may result as these plants return to service. In addition, because there is no guarantee that performance will improve, the Department accepted the forecasted capacity factors for these units. However, if the EAC is suspended, ratepayers will lose the benefit of reduced fuel costs should performance at MP2 and 3 improve. The Department believes that ratepayer interests are best served through continued use of the EAC to capture potential improved nuclear performance at MP2 and 3. Factor FC in the EAC formula allows CL&P to forecast its fuel costs for the upcoming six-month EAC billing period. Forecasting under the EAC was suspended until one or more of CL&P’s nuclear units returns to service. Decision, Docket No. 97-07-05, pp. 20 and 21. CL&P’s nuclear units have been off-line since the EAC was implemented; therefore, CL&P has not forecasted costs through the EAC. As a result, the EAC has been essentially a prior period adjustment mechanism, truing up base fuel revenue recovery to CL&P’s booked fuel costs. This has simplified review and administration of the EAC. The Department believes that elimination of forecasting from the EAC best serves the interests of the Company and its ratepayers. The Department notes that due to a lag in accounting for some costs, the Company has estimated certain values in the EAC (e.g., the marginal cost) requiring a true up in a subsequent EAC filing. The Department intends to eliminate all forecasting and estimating from the clause to have it reflect only actual data. Therefore, CL&P will be required to propose a mechanism to accomplish this goal. The Company proposes to apply carrying charges to the EAC if forecasting is eliminated. Response to Interrogatory EL-98. The elimination of forecasting creates a lag in fuel cost recovery. Therefore, the proposal to apply carrying costs to the EAC recoveries is reasonable. Carrying costs will be determined in each EAC billing period and calculated with each EAC filing. They will be applied to outstanding EAC balances, plus or minus, so that ratepayers and the Company are treated equally. As noted in Section II.G.1, above, the Department accepts CL&P’s proposed nuclear capacity factors for MP2 and 3. a. Incentive Collar The EAC includes a $9 million annual incentive collar Factor IC (Collar). The Collar allows CL&P to retain the first $9 million of savings if actual fuel costs are less than forecasted and does not allow the Company to recover the first $9 million if actual fuel costs exceed the forecast. Decision, Docket No. 97-07-05, p. 25; EAC Factor IC. The Collar was designed to share risk and benefit. Id. The Company states that setting the BRFR using current, low oil prices, and ‘aggressive’ nuclear capacity factors assures that the Company’s fuel costs will exceed the BRFR, forcing CL&P to absorb the full value of the Collar. CL&P Brief, pp. 36-41. Therefore, the Company believes the Collar should be eliminated. Id. The Department does not agree that the approved capacity factors are aggressive. In past rate proceedings, the BRFR was generally set using a 72%Page 144 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 144 of 191 Page 137 composite nuclear factor. Although the approved capacity factors result in an 80.4% composite rate, these values are based on CL&P’s forecast and reflect normal and prudent operation of these units. Revised Filing, Schedule WPC-3.8. As such the Department views the forecasted nuclear capacity factors are attainable. As discussed above, the number of fuel cost control mechanisms available to CL&P has increased since the EAC was implemented. This in turn has reduced the financial risk associated with the Company’s overall fuel costs. Also, as discussed above, nuclear plants returning from the Watch List generally tend to perform above the industry average. However, the Department did not adjust forecasted nuclear performance to account for this trend. As such, the Department has provided CL&P an opportunity to reduce its fuel costs through increased nuclear performance. Elimination of the Collar would reduce this incentive. Based on the foregoing the Department concludes that it is appropriate to retain the Collar at this time. b. Implementation of the EAC The $46.8 million of capacity costs will be recovered through the BRFR over 12 months or approximately $3.9 million per month. The traditional treatment of expenses through the EAC requires the expense to be recognized in the EAC in the period in which the expense is incurred. Therefore, because these capacity costs will be incurred during the first half of 1999, but recovered through the BRFR over 12 months, a mismatch in the timing of the recovery of this expense will occur. This unintended result will affect the EAC and the Collar as follows. Because the BRFR assumes an average annual recovery of this expense, base fuel revenues will recover $23.4 million in each six month period (6 months x $3.9 million). However, the Company will book $46.8 million for this expense in the first half of the year and $0 in the second half. As noted, for purposes of the EAC actual fuel costs are based on the costs in a given period. Therefore, as the result of including these capacity costs in the BRFR, the actual average fuel cost per kWh will be greater than the BRFR in the first half of the year and lower in the second half. This could result in a disallowance under the Collar and an EAC charge during the first half of 1999. In the second half of the year the Collar could allow CL&P to retain a portion of its actual fuel cost because its actual fuel cost will appear to be lower than the BRFR and ratepayers could receive a credit through the EAC for the difference. Recovery of capacity costs will also affect the EAC rate that will be calculated for the retroactive period, September 28, 1998, to the date of this Decision (Retroactive Period). Results similar to those expected for the first half of 1999 appear likely for this period, resulting in a potential disallowance under the Collar and charge to customers through the EAC. To avoid these outcomes, the Department will require the Company to apply a portion of the revenue reduction from the Retroactive Period to the calculation of the EAC so that the EAC rate, as calculated for the Retroactive Period will be zero. In addition, because the EAC is being calculated in hindsight, for the Retroactive Period, the Department believes it is in the best interest of the Company and its ratepayers to suspend operation of the Collar for the Retroactive Period. Operation of the CollarPage 145 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 145 of 191 Docket No. 98-01-02 Page 138 would resume effective the date of this Decision. Simply stated, because fuel costs are known, the EAC should not be billing a charge or credit for the Retroactive Period and the Company should be held harmless for costs above or below the BRFR for the Retroactive Period. In addition, for 1999, the Department will require the Company to defer a portion of these costs during the first half of 1999 and amortize the balance in the second half of the year to avoid the over/underrecovery noted above. J. RELIABILITY OF SERVICE The Department recently reviewed the reliability of the Company’s service in the joint Decision in Docket No. 86-12-03, and Docket No. 97-11-10. The Department found that CL&P’s reliability, excluding major storms, generally has been improving since 1992. When the impact of major storms was considered, however, reliability generally was found to be declining. Decision dated August 21, 1998, in Docket Nos. 86-12-03 and 97-11-10, p. 3. The table below summarizes CL&P’s system reliability data for the past six years. CL&P Reliability Indices 1992 - 1997 WITHOUT MAJOR STORMS YEAR 1992 1993 1994 1995 1996 1997 SAIDI22 142 136 169 150 130 118 SAIFI23 1.35 1.26 1.49 1.32 1.16 1.24 CAIDI24 105 108 114 113 112 95 WITH MAJOR STORMS SAIDI 266 262 288 515 893 321 SAIFI 1.62 1.68 1.70 2.21 2.54 1.70 CAIDI 164 156 169 233 352 * Note: All of the above reliability indices reflect the new major storm exclusion criterion. *Not provided Id. In Docket No. 97-05-12, the Department found that the changes in SAIDI and SAIFI data are influenced by the frequency and severity of major storms. Decision, p. 47. The Company maintains data to determine outages that qualify for storm exclusion in the calculation of the Company’s reliability statistics. Pursuant to the new major storm exclusion criterion, which was approved by the Department by Decision dated March 22, 1995, in Docket No. 86-12-03, it is necessary for CL&P to track, on a daily basis, the number of trouble locations on its system where line crews performed service restoration work. Based on statistical analysis of data from the most recent four calendar years, days in which work locations exceed a predetermined threshold are considered storm periods. Interruptions during these periods, including those extending 22 SAIDI (System Average Interruption Duration Index): The average interruption duration in minutes per customer served. It is calculated by dividing the sum of all customer interruption duration during a year by the number of customers served. 23 SAIFI (System Average Interruption Frequency Index): The average number of times that a system customer is interrupted during a year. It is calculated by dividing the total number of customers interrupted in a year by the average number of customers served during the year. A customer interruption is considered to be one interruption to one customer. 24 CAIDI (Customer Average Interruption Duration Index): The average service restoration time or the average interruption duration for those customers interrupted during a year. It is calculated by dividing the sum of all customer interruption duration by the total number of customers interrupted in a year.Page 146 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 146 of 191 Page 139 into subsequent days, are classified as storm related. A comparison of the number of trouble locations requiring restoration work for the years 1992 through 1997 shows the following: Trouble Locations 1992 - 1997 YEAR STORM RELATED NON-STORM RELATED TOTAL 1992 4,329 16,338 20,667 1993 5,185 16,685 21,870 1994 3,270 14,780 18,050 1995 6,482 12,631 19,113 1996 12,094 11,521 23,615 1997 4,429 12,460 16,889 Response to Interrogatory EL-180. The data clearly correlate changes in storm-related activity to the reliability indices noted above. The total sum of the periods of major storms for the last six years follows: Total Major Storm Periods 1992 - 1997 Year Sum of Storm Periods 1992 5 days - 15 hours 1993 9 days - 10 hours 1994 7 days 1995 16 days - 12 hours 1996 21 days 1997 14 days Response to Interrogatory EL-181. It can be concluded from the data that major storms affected the Company’s distribution system significantly in 1995 and 1996, but less so in 1997. This impact was translated into increased SAIDI and SAIFI values for 1995 and 1996. However, the SAIDI value including major storms was still high in 1997 (321) compared to 1992 1994. In the August 21, 1998, Decision in Docket Nos. 86-12-03 and 97-11-10, the Department indicated its belief that widespread use of covered wire and a wellmanaged tree trimming program are primary ingredients of a successful reliability improvement program for CL&P. Decision, p. 11. The Department noted that CL&P intended to report to the Department on its future plans in this area by September 30, 1998. The Company submitted this report on September 3, 1998 (Report). The Report compiled extensive data on tree contact outages in the CL&P distribution system, and on the effectiveness of covered wire and enhanced tree trimming (removal of hazard branches and trees outside the normal trim zone) in preventing these outages. The Report reached the following conclusions that, in the Department’s opinion, are significant concerning covered wire and enhanced tree trimming. The consensus of Senior Circuit Owners, Vegetation Management personnel, and line surveyors is that all three-phase backbones and some major sidetaps should receive both reconductoring with covered wire and enhanced tree trimming (Report, p. 5);Page 147 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 147 of 191 Page 140 Circuits with covered wire and spacer cable have significantly lower outage frequency from all causes (approximately 70% lower) than bare wire, since, when a circuit is rebuilt with covered wire, other rebuild improvements are made as well (Report, p. 7); The average number of tree caused outages per 100 miles of line in 1996 - 1997 was 5.4 for covered wire vs. 23.4 for bare wire (Report, p. 7); Increasing the proportion of covered wire from 37% to 50% should reduce outages by 12% and reduce annual outage-related costs by $11,000,000 (Report, p. 13). The above conclusions reinforce those of the Department regarding the effectiveness of covered wire and tree trimming in the August 21, 1998, Decision in Docket Nos. 86-1203 and 97-11-10. As described in Section II.E.4, the Company plans to expand the proportion of covered wire in its system to 50% by 2003. Given the history of tree contact outages and the effectiveness of covered wire and enhanced tree trimming in preventing these outages, and given other improvements the Company is implementing in its system (see Section II.E.4), the planned reliability improvements are appropriate. Additionally, the Company plans to complete enhanced tree trimming on all three-phase backbones by 2002. Tr. 9/28/98, p. 2816. The Department concludes that the Company’s efforts to improve reliability are reasonable. The Department reaffirms the conclusions it reached in the August 21, 1998 Decision in Docket Nos. 86-12-03 and 97-11-10 that the reliability of CL&P’s distribution system should be improved, particularly under major storm conditions. Implementing covered wire and related rebuild work, combined with enhanced tree trimming on threephase backbones, should provide a major benefit in terms of reducing tree contact outages, under both storm and non-storm conditions. These programs represent a major new commitment on the part of the Company to improve its service reliability following years of neglect. The Department encourages the Company to follow through on these programs as they have been represented in this proceeding. The Department will follow the Company’s efforts in this regard in Docket No. 86-12-03 and in future reviews of the Company’s Line Maintenance Program. K. EXCESS CAPACITY As required by Conn. Gen. Stat. §16-19aa, the Department conducted a review and analysis of CL&P's electric capacity resources and requirements. The Department determines that, under current and near-term conditions, CL&P's total capacity entitlement for the summer of 1999 is 5,283 megawatts (MW). Response to Interrogatory EL-31. This total capacity level represents total reserves of approximately 638 MW or 13.7% above the Company's projected peak load requirement of 4645 MW. Id. Reliability Reserve Requirements and other appropriate adjustments to these total reserves, as provided for under Conn. Gen. Stat. §16-19aa, yield a net reserve capacity projection of -1291 MW.
As listed on the current system
Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026