Interrogatory responses
Answers to questions 874, 885, 886
Files5
OCC-874_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download OCC-874_Final.pdfRead the text of OCC-874_Final.pdf
OCC-874 Attachment 1 REDACTED.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download OCC-874 Attachment 1 REDACTED.pdfRead the text of OCC-874 Attachment 1 REDACTED.pdf
OCC-885_Final.pdf
PDF · 77 KB · 1 pageText searchable
Download OCC-885_Final.pdfRead the text of OCC-885_Final.pdf
OCC-886_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download OCC-886_Final.pdfRead the text of OCC-886_Final.pdf
OCC-886 Attachment 1.pdf
PDF · 10 MB · 191 pagesText searchable
Download OCC-886 Attachment 1.pdfRead the text of OCC-886 Attachment 1.pdf
Text of OCC-886_Final.pdf
Extracted from the file · 1 page · 1,819 characters
Page 143 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 143 of 191 Page 136 did not adjust the forecasted capacity factors for MP2 or MP3 based on improved performance that may result as these plants return to service. In addition, because there is no guarantee that performance will improve, the Department accepted the forecasted capacity factors for these units. However, if the EAC is suspended, ratepayers will lose the benefit of reduced fuel costs should performance at MP2 and 3 improve. The Department believes that ratepayer interests are best served through continued use of the EAC to capture potential improved nuclear performance at MP2 and 3. Factor FC in the EAC formula allows CL&P to forecast its fuel costs for the upcoming six-month EAC billing period. Forecasting under the EAC was suspended until one or more of CL&P’s nuclear units returns to service. Decision, Docket No. 97-07-05, pp. 20 and 21. CL&P’s nuclear units have been off-line since the EAC was implemented; therefore, CL&P has not forecasted costs through the EAC. As a result, the EAC has been essentially a prior period adjustment mechanism, truing up base fuel revenue recovery to CL&P’s booked fuel costs. This has simplified review and administration of the EAC. The Department believes that elimination of forecasting from the EAC best serves the interests of the Company and its ratepayers. The Department notes that due to a lag in accounting for some costs, the Company has estimated certain values in the EAC (e.g., the marginal cost) requiring a true up in a subsequent EAC filing. The Department intends to eliminate all forecasting and estimating from the clause to have it reflect only actual data. Therefore, CL&P will be required to propose a mechanism to accomplish this goal. The Company proposes to apply carrying charges to the EAC if forecasting is eliminated. Response to Interrogatory EL-98. The elimination of forecasting creates a lag in fuel cost recovery. Therefore, the proposal to apply carrying costs to the EAC recoveries is reasonable. Carrying costs will be determined in each EAC billing period and calculated with each EAC filing. They will be applied to outstanding EAC balances, plus or minus, so that ratepayers and the Company are treated equally. As noted in Section II.G.1, above, the Department accepts CL&P’s proposed nuclear capacity factors for MP2 and 3. a. Incentive Collar The EAC includes a $9 million annual incentive collar Factor IC (Collar). The Collar allows CL&P to retain the first $9 million of savings if actual fuel costs are less than forecasted and does not allow the Company to recover the first $9 million if actual fuel costs exceed the forecast. Decision, Docket No. 97-07-05, p. 25; EAC Factor IC. The Collar was designed to share risk and benefit. Id. The Company states that setting the BRFR using current, low oil prices, and ‘aggressive’ nuclear capacity factors assures that the Company’s fuel costs will exceed the BRFR, forcing CL&P to absorb the full value of the Collar. CL&P Brief, pp. 36-41. Therefore, the Company believes the Collar should be eliminated. Id. The Department does not agree that the approved capacity factors are aggressive. In past rate proceedings, the BRFR was generally set using a 72%Page 144 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 144 of 191 Page 137 composite nuclear factor. Although the approved capacity factors result in an 80.4% composite rate, these values are based on CL&P’s forecast and reflect normal and prudent operation of these units. Revised Filing, Schedule WPC-3.8. As such the Department views the forecasted nuclear capacity factors are attainable. As discussed above, the number of fuel cost control mechanisms available to CL&P has increased since the EAC was implemented. This in turn has reduced the financial risk associated with the Company’s overall fuel costs. Also, as discussed above, nuclear plants returning from the Watch List generally tend to perform above the industry average. However, the Department did not adjust forecasted nuclear performance to account for this trend. As such, the Department has provided CL&P an opportunity to reduce its fuel costs through increased nuclear performance. Elimination of the Collar would reduce this incentive. Based on the foregoing the Department concludes that it is appropriate to retain the Collar at this time. b. Implementation of the EAC The $46.8 million of capacity costs will be recovered through the BRFR over 12 months or approximately $3.9 million per month. The traditional treatment of expenses through the EAC requires the expense to be recognized in the EAC in the period in which the expense is incurred. Therefore, because these capacity costs will be incurred during the first half of 1999, but recovered through the BRFR over 12 months, a mismatch in the timing of the recovery of this expense will occur. This unintended result will affect the EAC and the Collar as follows. Because the BRFR assumes an average annual recovery of this expense, base fuel revenues will recover $23.4 million in each six month period (6 months x $3.9 million). However, the Company will book $46.8 million for this expense in the first half of the year and $0 in the second half. As noted, for purposes of the EAC actual fuel costs are based on the costs in a given period. Therefore, as the result of including these capacity costs in the BRFR, the actual average fuel cost per kWh will be greater than the BRFR in the first half of the year and lower in the second half. This could result in a disallowance under the Collar and an EAC charge during the first half of 1999. In the second half of the year the Collar could allow CL&P to retain a portion of its actual fuel cost because its actual fuel cost will appear to be lower than the BRFR and ratepayers could receive a credit through the EAC for the difference. Recovery of capacity costs will also affect the EAC rate that will be calculated for the retroactive period, September 28, 1998, to the date of this Decision (Retroactive Period). Results similar to those expected for the first half of 1999 appear likely for this period, resulting in a potential disallowance under the Collar and charge to customers through the EAC. To avoid these outcomes, the Department will require the Company to apply a portion of the revenue reduction from the Retroactive Period to the calculation of the EAC so that the EAC rate, as calculated for the Retroactive Period will be zero. In addition, because the EAC is being calculated in hindsight, for the Retroactive Period, the Department believes it is in the best interest of the Company and its ratepayers to suspend operation of the Collar for the Retroactive Period. Operation of the CollarPage 145 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 145 of 191 Docket No. 98-01-02 Page 138 would resume effective the date of this Decision. Simply stated, because fuel costs are known, the EAC should not be billing a charge or credit for the Retroactive Period and the Company should be held harmless for costs above or below the BRFR for the Retroactive Period. In addition, for 1999, the Department will require the Company to defer a portion of these costs during the first half of 1999 and amortize the balance in the second half of the year to avoid the over/underrecovery noted above. J. RELIABILITY OF SERVICE The Department recently reviewed the reliability of the Company’s service in the joint Decision in Docket No. 86-12-03, and Docket No. 97-11-10. The Department found that CL&P’s reliability, excluding major storms, generally has been improving since 1992. When the impact of major storms was considered, however, reliability generally was found to be declining. Decision dated August 21, 1998, in Docket Nos. 86-12-03 and 97-11-10, p. 3. The table below summarizes CL&P’s system reliability data for the past six years. CL&P Reliability Indices 1992 - 1997 WITHOUT MAJOR STORMS YEAR 1992 1993 1994 1995 1996 1997 SAIDI22 142 136 169 150 130 118 SAIFI23 1.35 1.26 1.49 1.32 1.16 1.24 CAIDI24 105 108 114 113 112 95 WITH MAJOR STORMS SAIDI 266 262 288 515 893 321 SAIFI 1.62 1.68 1.70 2.21 2.54 1.70 CAIDI 164 156 169 233 352 * Note: All of the above reliability indices reflect the new major storm exclusion criterion. *Not provided Id. In Docket No. 97-05-12, the Department found that the changes in SAIDI and SAIFI data are influenced by the frequency and severity of major storms. Decision, p. 47. The Company maintains data to determine outages that qualify for storm exclusion in the calculation of the Company’s reliability statistics. Pursuant to the new major storm exclusion criterion, which was approved by the Department by Decision dated March 22, 1995, in Docket No. 86-12-03, it is necessary for CL&P to track, on a daily basis, the number of trouble locations on its system where line crews performed service restoration work. Based on statistical analysis of data from the most recent four calendar years, days in which work locations exceed a predetermined threshold are considered storm periods. Interruptions during these periods, including those extending 22 SAIDI (System Average Interruption Duration Index): The average interruption duration in minutes per customer served. It is calculated by dividing the sum of all customer interruption duration during a year by the number of customers served. 23 SAIFI (System Average Interruption Frequency Index): The average number of times that a system customer is interrupted during a year. It is calculated by dividing the total number of customers interrupted in a year by the average number of customers served during the year. A customer interruption is considered to be one interruption to one customer. 24 CAIDI (Customer Average Interruption Duration Index): The average service restoration time or the average interruption duration for those customers interrupted during a year. It is calculated by dividing the sum of all customer interruption duration by the total number of customers interrupted in a year.Page 146 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 146 of 191 Page 139 into subsequent days, are classified as storm related. A comparison of the number of trouble locations requiring restoration work for the years 1992 through 1997 shows the following: Trouble Locations 1992 - 1997 YEAR STORM RELATED NON-STORM RELATED TOTAL 1992 4,329 16,338 20,667 1993 5,185 16,685 21,870 1994 3,270 14,780 18,050 1995 6,482 12,631 19,113 1996 12,094 11,521 23,615 1997 4,429 12,460 16,889 Response to Interrogatory EL-180. The data clearly correlate changes in storm-related activity to the reliability indices noted above. The total sum of the periods of major storms for the last six years follows: Total Major Storm Periods 1992 - 1997 Year Sum of Storm Periods 1992 5 days - 15 hours 1993 9 days - 10 hours 1994 7 days 1995 16 days - 12 hours 1996 21 days 1997 14 days Response to Interrogatory EL-181. It can be concluded from the data that major storms affected the Company’s distribution system significantly in 1995 and 1996, but less so in 1997. This impact was translated into increased SAIDI and SAIFI values for 1995 and 1996. However, the SAIDI value including major storms was still high in 1997 (321) compared to 1992 1994. In the August 21, 1998, Decision in Docket Nos. 86-12-03 and 97-11-10, the Department indicated its belief that widespread use of covered wire and a wellmanaged tree trimming program are primary ingredients of a successful reliability improvement program for CL&P. Decision, p. 11. The Department noted that CL&P intended to report to the Department on its future plans in this area by September 30, 1998. The Company submitted this report on September 3, 1998 (Report). The Report compiled extensive data on tree contact outages in the CL&P distribution system, and on the effectiveness of covered wire and enhanced tree trimming (removal of hazard branches and trees outside the normal trim zone) in preventing these outages. The Report reached the following conclusions that, in the Department’s opinion, are significant concerning covered wire and enhanced tree trimming. The consensus of Senior Circuit Owners, Vegetation Management personnel, and line surveyors is that all three-phase backbones and some major sidetaps should receive both reconductoring with covered wire and enhanced tree trimming (Report, p. 5);Page 147 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 147 of 191 Page 140 Circuits with covered wire and spacer cable have significantly lower outage frequency from all causes (approximately 70% lower) than bare wire, since, when a circuit is rebuilt with covered wire, other rebuild improvements are made as well (Report, p. 7); The average number of tree caused outages per 100 miles of line in 1996 - 1997 was 5.4 for covered wire vs. 23.4 for bare wire (Report, p. 7); Increasing the proportion of covered wire from 37% to 50% should reduce outages by 12% and reduce annual outage-related costs by $11,000,000 (Report, p. 13). The above conclusions reinforce those of the Department regarding the effectiveness of covered wire and tree trimming in the August 21, 1998, Decision in Docket Nos. 86-1203 and 97-11-10. As described in Section II.E.4, the Company plans to expand the proportion of covered wire in its system to 50% by 2003. Given the history of tree contact outages and the effectiveness of covered wire and enhanced tree trimming in preventing these outages, and given other improvements the Company is implementing in its system (see Section II.E.4), the planned reliability improvements are appropriate. Additionally, the Company plans to complete enhanced tree trimming on all three-phase backbones by 2002. Tr. 9/28/98, p. 2816. The Department concludes that the Company’s efforts to improve reliability are reasonable. The Department reaffirms the conclusions it reached in the August 21, 1998 Decision in Docket Nos. 86-12-03 and 97-11-10 that the reliability of CL&P’s distribution system should be improved, particularly under major storm conditions. Implementing covered wire and related rebuild work, combined with enhanced tree trimming on threephase backbones, should provide a major benefit in terms of reducing tree contact outages, under both storm and non-storm conditions. These programs represent a major new commitment on the part of the Company to improve its service reliability following years of neglect. The Department encourages the Company to follow through on these programs as they have been represented in this proceeding. The Department will follow the Company’s efforts in this regard in Docket No. 86-12-03 and in future reviews of the Company’s Line Maintenance Program. K. EXCESS CAPACITY As required by Conn. Gen. Stat. §16-19aa, the Department conducted a review and analysis of CL&P's electric capacity resources and requirements. The Department determines that, under current and near-term conditions, CL&P's total capacity entitlement for the summer of 1999 is 5,283 megawatts (MW). Response to Interrogatory EL-31. This total capacity level represents total reserves of approximately 638 MW or 13.7% above the Company's projected peak load requirement of 4645 MW. Id. Reliability Reserve Requirements and other appropriate adjustments to these total reserves, as provided for under Conn. Gen. Stat. §16-19aa, yield a net reserve capacity projection of -1291 MW.Page 148 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 148 of 191 Page 141 The Department therefore concludes that under current and projected conditions all of CL&P's capacity is: 1) needed to meet expected loads; 2) needed for reliability reserves; 3) sold through capacity contracts; or 4) appropriately excluded from consideration as excess capacity. Therefore, no generating capacity costs are excluded from the Company's rates under §16-19aa in this case. Further, no transmission capacity costs are excluded from rates as excess at this time. 1. Background This statute requires that, as part of every rate case under §16-19, the Department: (1) review the facilities utilized by the company for the generation and transmission of electricity; (2) determine the level of the company's reserve capacity; (3) determine the company's net reserve capacity by making such adjustments as the Department deems appropriate; (4) determine the level of reserve capacity which would provide a net economic benefit to customers of the company (with specific considerations); and (5) exclude from the company's rates (in a manner which shall provide the optimal short-term and long-term benefits to customers) the costs associated with generating facilities which provide net reserve capacity in excess of the level determined in (4) above. An "excess capacity exclusion" under (5) above would ultimately result from determinations made in the following sequence: 1. NET CAPACITY (C) - PEAK LOAD (P) = TOTAL RESERVE CAPACITY (T); 2. TOTAL RESERVE CAPACITY (T) - REQUIRED RELIABILITY RESERVE (R) = SURPLUS RESERVE CAPACITY (S) 3. SURPLUS RESERVE CAPACITY (S) - APPROPRIATE ADJUSTMENTS (A) = NET RESERVE (Rn); 4. NET RESERVE (Rn) - ANY Rn of NET ECONOMIC BENEFIT (B) = EXCESS CAPACITY (X); and 5. EXCESS CAPACITY (X) * COST ($) = EXCLUSION (E). This process produces an excess capacity exclusion (E) only if each of the prior determinations yield positive values. The determination of each of the factors in the sequence may require assumptions, judgments and/or adjustments that influence itsPage 149 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 149 of 191 Page 142 value. The statute’s third charge in particular requires that the Department consider specific adjustments in its determination of net reserve capacity. The Department has completed a number of independent investigations related to the adequacy of electric transmission and distribution systems and overall service reliability to Connecticut electric customers. It remains clear that no excess of transmission capacity exists on the CL&P system. 2. Determination of Net Capacity (factor C) This analysis focuses on CL&P's mid-year (summer) capacity situation, which represents the annual peak load period for the Company as well as the lowest rating period for seasonably variable capacity. Net capacity available is the total generating capacity owned, adjusted for contract purchases and sales. In the context of a §1619aa Excess Capacity determination, net capacity can also reflect capacity adjustments for policy considerations or other appropriate reasons as determined by the Department. CL&P reports total capacity entitlements of 5,283.25 MW for summer 1999. Response to Interrogatory EL-31. The Company proposes to adjust (reduce) this amount for Excess Capacity purposes as follows: Capacity Sales and Exchanges of 682 MW; Conservation and Load Management effects of 493 MW; Contracts with Qualifying Facilities; Resource Recovery Facilities of 417 MW; and Hydro Quebec Interconnection impacts of 337 MW. Id. The Department finds these 1928 MW of capacity adjustments appropriate because they reflect State and Department policy consistent with §16-19aa. Therefore, the Department determines that CL&P's Net Capacity (C) for the summers of 1999 is 3354 MW. 3. Determination of Demand and Total Reserve (factors P and T) Total Reserve Capacity is defined as the amount of Net Generating Capacity above that required to meet the Peak Load of the given period. This analysis considers the summer peak load forecast as it relates to projected levels of installed and contracted generating capacity for 1999. The Company forecasts a summer peak load of 4,645 MW. Response to Interrogatory EL-31. Based on the above, CL&P's Total Reserves (T) for Excess Capacity purposes are -1291 MW. Therefore, no generating capacity costs are excluded from the Company's rates under §16-19aa in this case.Page 150 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 150 of 191 Docket No. 98-01-02 Page 143 Conn. Gen. Stat. §16-19aa, CL&P Excess Capacity Evaluation for 1999 MW VALUE Total Capacity 5283 Adjustments: Capacity Sales C&LM Programs QFs & RRs. H.Q. 682 493 417 337 NET CAPACITY (C) 3354 PEAK LOAD (P) 4645 TOTAL RESERVE (T) -1291 Source: Response to Interrogatory EL-31. L. ENVIRONMENTAL COMPLIANCE Generally, under the primary jurisdiction of either the federal Environmental Protection Agency (EPA) or the Connecticut Department of Environmental Protection (DEP), consideration of the environmental consequences and costs (both internal and external) of CL&P’s provision of electric services and this Department’s Decisions remain an explicit charge of this Department under Conn. Gen. Stat §16-19mm, as well as various State policies. These considerations are also an explicit part of the Department’s review of “continued unit operation” studies in this and other proceedings. The Department has reviewed CL&P’s activities related to the purchase and sale of Sulfur Dioxide (SO2) Allowances under Title IV of the federal Clean Air Act Amendments of 1990 (42 USC 7104, et seq.) and its transactions involving Emission Reduction Credits (ERCs) for Nitrogen Oxide (NO X) compliance requirements under state and federal requirements. Response to Interrogatory EL-34. The Department finds the overall level of these activities appropriate for environmental compliance purposes and the costs consistent with the markets for these transactions. The Department applauds CL&P’s voluntary efforts to reduce its overall emissions beyond the levels mandated by state or federal requirements as announced in Northeast Utilities’ News Release of June 10, 1998. Tr. 9/14/98, pp. 861-866; Late Filed Exhibit No. 34. To the extent that these effects can be accomplished at no incremental cost to ratepayers or to the extent that any direct costs to ratepayers can be sufficiently offset by ERC savings or sales, the Department is fully supportive of such efforts. However, to the extent that the Company determines to reduce pollution below the standards deemed sufficient by the primary environmental regulatory authorities (EPA and DEP) and such activities result in net costs (including the opportunity costs of retired Allowances or ERCs), the Department concludes that the recovery of such costs from customers through rates, absent compelling argument to the contrary, isPage 151 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 151 of 191 Page 144 inappropriate. The Department further concludes that unquantified general health benefits to the overall population is not such a compelling argument for cost recovery from CL&P ratepayers. Late Filed Exhibit No. 34. As discussed in the Decision dated July 20, 1994 in Docket No. 93-04-07, the Department believed that the donation of the allowances by CL&P to the American Lung Association (ALA) was a charitable contribution and thus required the Company to reimburse the ratepayers for the full value of the donation of the allowances. Docket No. 93-04-07, Order No. 7. The Department believes that the voluntary emission reduction efforts by the Company are similar to the donation to the ALA in 1993. Since such transactions including emission credits remains very uncertain for 1999, the Department will not impute any revenues at this time. However, the Department will require the Company to credit customers for the value of any future emission credit donations or voluntary retirements in accordance with Order No. 7 in Docket No. 93-04-07. The Department’s treatment of the revenues/costs associated with ongoing environmental compliance can be found in Sections II.E.7 of this Decision. The Department acknowledges that its direct review of many environmental cost issues will diminish as electric restructuring under Public Act 98-28 is implemented. M. COST OF CAPITAL 1. Introduction The United States Supreme Court, in Federal Power Commission v. Hope Natural Gas Company, 320 US 591 (1944), established criteria to determine the cost of capital allowances. In its Decision, the Court determined that companies need to be allowed to earn a level of revenues sufficient to enable them to operate successfully, maintain their financial integrity, to attract capital and compensate their investors for their risk. By law, utilities are entitled to a level of revenues that will allow them “ . . . to cover their operating and capital costs, to attract needed capital and to maintain their financial integrity, and yet provide appropriate protection for the relevant public interest both existing and foreseeable.” Conn Gen. Stat. §16-19e(a)(4). To determine a rate of return on rate base that is appropriate for CL&P’s overall cost of capital, the Department first identifies the components of the Company’s capital structure. The cost of each capital component is then estimated and weighted according to its proportion of total capitalization. These weighted costs are summed to determine the Company’s overall cost of capital, which becomes the allowed rate of return on rate base (ROR).Page 152 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 152 of 191 Docket No. 98-01-02 2. Page 145 CL&P Proposed Capital Structure and Cost of Capital The Company proposed a weighted cost of capital and capital structure based on the average capitalization for the 1999 forecast year. The Company’s proposed weighted cost of capital and associated cost for each class of capital are shown below: Proposed 1999 Average Capitalization LT Debt Pfd Stock Common Eq. Total 1999 Average Capitalization ($000) Percent of Total 1,735,098 239,206 1,107,842 3,082,146 56.30% 7.76% 35.94% 100.00% Weighted Cost Cost 6.90% 6.27% 11.40% 3.89% 0.49% 4.10% 8.48% Source: Schedule D-1.0 (Revised) The Company’s capital structure, including short-term debt, and the associated cost of each component is shown below: Proposed 1999 Average Capitalization Including Short-term Debt Short-Term Debt Long-term Debt Preferred Stock Common Equity Total 1999 Average Capitalization ($000) Percent of Total 180,715 1,735,098 239,206 1,107,842 3,262,861 5.54% 53.18% 7.33% 33.95% 100.00% Cost 5.23% 6.90% 6.27% 11.40% Weighted Cost 0.29% 3.67% 0.46% 3.87% 8.29% Source: Schedule D-1.0, Revised The Department’s allowed cost of debt, preferred stock and common equity are discussed below. 3. Cost of Long-term and Short-term Debt The Company’s average forecasted 1999 long-term embedded cost of debt is estimated at 6.90%. Schedule D-1.0, Revised. Schedule D-1.0, Revised reflects the Company’s adjustment of its estimated 1999 annual interest costs that eliminates the higher interest rate impact of two series of bonds for which the Company incurred higher interests costs as a result of its prolonged outages at the Millstone plants. In the case of the 7-3/4% $200 million 1997 Series C Bonds, the Department estimated that the Company had incurred additional annual interest costs of 60 basis points as a result of CL&P financial downgrades due to the Millstone outages. Docket No. 97-03-23,
As listed on the current system
Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026