Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 874, 885, 886

Files5

Search terms highlighted
Eversource rate increase is on 67 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of OCC-886_Final.pdf

Extracted from the file · 1 page · 1,819 characters

Words on different pagesRead the text of OCC-886_Final.pdf
67 pages match
  1. Page 148 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 148 of 191 Page 141 The Department therefore concludes that under current and projected conditions all of CL&P's capacity is: 1) needed to meet expected loads; 2) needed for reliability reserves; 3) sold through capacity contracts; or 4) appropriately excluded from consideration as excess capacity. Therefore, no generating capacity costs are excluded from the Company's rates under §16-19aa in this case. Further, no transmission capacity costs are excluded from rates as excess at this time. 1. Background This statute requires that, as part of every rate case under §16-19, the Department: (1) review the facilities utilized by the company for the generation and transmission of electricity; (2) determine the level of the company's reserve capacity; (3) determine the company's net reserve capacity by making such adjustments as the Department deems appropriate; (4) determine the level of reserve capacity which would provide a net economic benefit to customers of the company (with specific considerations); and (5) exclude from the company's rates (in a manner which shall provide the optimal short-term and long-term benefits to customers) the costs associated with generating facilities which provide net reserve capacity in excess of the level determined in (4) above. An "excess capacity exclusion" under (5) above would ultimately result from determinations made in the following sequence: 1. NET CAPACITY (C) - PEAK LOAD (P) = TOTAL RESERVE CAPACITY (T); 2. TOTAL RESERVE CAPACITY (T) - REQUIRED RELIABILITY RESERVE (R) = SURPLUS RESERVE CAPACITY (S) 3. SURPLUS RESERVE CAPACITY (S) - APPROPRIATE ADJUSTMENTS (A) = NET RESERVE (Rn); 4. NET RESERVE (Rn) - ANY Rn of NET ECONOMIC BENEFIT (B) = EXCESS CAPACITY (X); and 5. EXCESS CAPACITY (X) * COST ($) = EXCLUSION (E). This process produces an excess capacity exclusion (E) only if each of the prior determinations yield positive values. The determination of each of the factors in the sequence may require assumptions, judgments and/or adjustments that influence its
  2. Page 149 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 149 of 191 Page 142 value. The statute’s third charge in particular requires that the Department consider specific adjustments in its determination of net reserve capacity. The Department has completed a number of independent investigations related to the adequacy of electric transmission and distribution systems and overall service reliability to Connecticut electric customers. It remains clear that no excess of transmission capacity exists on the CL&P system. 2. Determination of Net Capacity (factor C) This analysis focuses on CL&P's mid-year (summer) capacity situation, which represents the annual peak load period for the Company as well as the lowest rating period for seasonably variable capacity. Net capacity available is the total generating capacity owned, adjusted for contract purchases and sales. In the context of a §1619aa Excess Capacity determination, net capacity can also reflect capacity adjustments for policy considerations or other appropriate reasons as determined by the Department. CL&P reports total capacity entitlements of 5,283.25 MW for summer 1999. Response to Interrogatory EL-31. The Company proposes to adjust (reduce) this amount for Excess Capacity purposes as follows: Capacity Sales and Exchanges of 682 MW; Conservation and Load Management effects of 493 MW; Contracts with Qualifying Facilities; Resource Recovery Facilities of 417 MW; and Hydro Quebec Interconnection impacts of 337 MW. Id. The Department finds these 1928 MW of capacity adjustments appropriate because they reflect State and Department policy consistent with §16-19aa. Therefore, the Department determines that CL&P's Net Capacity (C) for the summers of 1999 is 3354 MW. 3. Determination of Demand and Total Reserve (factors P and T) Total Reserve Capacity is defined as the amount of Net Generating Capacity above that required to meet the Peak Load of the given period. This analysis considers the summer peak load forecast as it relates to projected levels of installed and contracted generating capacity for 1999. The Company forecasts a summer peak load of 4,645 MW. Response to Interrogatory EL-31. Based on the above, CL&P's Total Reserves (T) for Excess Capacity purposes are -1291 MW. Therefore, no generating capacity costs are excluded from the Company's rates under §16-19aa in this case.
  3. Page 150 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 150 of 191 Docket No. 98-01-02 Page 143 Conn. Gen. Stat. §16-19aa, CL&P Excess Capacity Evaluation for 1999 MW VALUE Total Capacity 5283 Adjustments: Capacity Sales C&LM Programs QFs & RRs. H.Q. 682 493 417 337 NET CAPACITY (C) 3354 PEAK LOAD (P) 4645 TOTAL RESERVE (T) -1291 Source: Response to Interrogatory EL-31. L. ENVIRONMENTAL COMPLIANCE Generally, under the primary jurisdiction of either the federal Environmental Protection Agency (EPA) or the Connecticut Department of Environmental Protection (DEP), consideration of the environmental consequences and costs (both internal and external) of CL&P’s provision of electric services and this Department’s Decisions remain an explicit charge of this Department under Conn. Gen. Stat §16-19mm, as well as various State policies. These considerations are also an explicit part of the Department’s review of “continued unit operation” studies in this and other proceedings. The Department has reviewed CL&P’s activities related to the purchase and sale of Sulfur Dioxide (SO2) Allowances under Title IV of the federal Clean Air Act Amendments of 1990 (42 USC 7104, et seq.) and its transactions involving Emission Reduction Credits (ERCs) for Nitrogen Oxide (NO X) compliance requirements under state and federal requirements. Response to Interrogatory EL-34. The Department finds the overall level of these activities appropriate for environmental compliance purposes and the costs consistent with the markets for these transactions. The Department applauds CL&P’s voluntary efforts to reduce its overall emissions beyond the levels mandated by state or federal requirements as announced in Northeast Utilities’ News Release of June 10, 1998. Tr. 9/14/98, pp. 861-866; Late Filed Exhibit No. 34. To the extent that these effects can be accomplished at no incremental cost to ratepayers or to the extent that any direct costs to ratepayers can be sufficiently offset by ERC savings or sales, the Department is fully supportive of such efforts. However, to the extent that the Company determines to reduce pollution below the standards deemed sufficient by the primary environmental regulatory authorities (EPA and DEP) and such activities result in net costs (including the opportunity costs of retired Allowances or ERCs), the Department concludes that the recovery of such costs from customers through rates, absent compelling argument to the contrary, is
  4. Page 151 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 151 of 191 Page 144 inappropriate. The Department further concludes that unquantified general health benefits to the overall population is not such a compelling argument for cost recovery from CL&P ratepayers. Late Filed Exhibit No. 34. As discussed in the Decision dated July 20, 1994 in Docket No. 93-04-07, the Department believed that the donation of the allowances by CL&P to the American Lung Association (ALA) was a charitable contribution and thus required the Company to reimburse the ratepayers for the full value of the donation of the allowances. Docket No. 93-04-07, Order No. 7. The Department believes that the voluntary emission reduction efforts by the Company are similar to the donation to the ALA in 1993. Since such transactions including emission credits remains very uncertain for 1999, the Department will not impute any revenues at this time. However, the Department will require the Company to credit customers for the value of any future emission credit donations or voluntary retirements in accordance with Order No. 7 in Docket No. 93-04-07. The Department’s treatment of the revenues/costs associated with ongoing environmental compliance can be found in Sections II.E.7 of this Decision. The Department acknowledges that its direct review of many environmental cost issues will diminish as electric restructuring under Public Act 98-28 is implemented. M. COST OF CAPITAL 1. Introduction The United States Supreme Court, in Federal Power Commission v. Hope Natural Gas Company, 320 US 591 (1944), established criteria to determine the cost of capital allowances. In its Decision, the Court determined that companies need to be allowed to earn a level of revenues sufficient to enable them to operate successfully, maintain their financial integrity, to attract capital and compensate their investors for their risk. By law, utilities are entitled to a level of revenues that will allow them “ . . . to cover their operating and capital costs, to attract needed capital and to maintain their financial integrity, and yet provide appropriate protection for the relevant public interest both existing and foreseeable.” Conn Gen. Stat. §16-19e(a)(4). To determine a rate of return on rate base that is appropriate for CL&P’s overall cost of capital, the Department first identifies the components of the Company’s capital structure. The cost of each capital component is then estimated and weighted according to its proportion of total capitalization. These weighted costs are summed to determine the Company’s overall cost of capital, which becomes the allowed rate of return on rate base (ROR).
  5. Page 152 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 152 of 191 Docket No. 98-01-02 2. Page 145 CL&P Proposed Capital Structure and Cost of Capital The Company proposed a weighted cost of capital and capital structure based on the average capitalization for the 1999 forecast year. The Company’s proposed weighted cost of capital and associated cost for each class of capital are shown below: Proposed 1999 Average Capitalization LT Debt Pfd Stock Common Eq. Total 1999 Average Capitalization ($000) Percent of Total 1,735,098 239,206 1,107,842 3,082,146 56.30% 7.76% 35.94% 100.00% Weighted Cost Cost 6.90% 6.27% 11.40% 3.89% 0.49% 4.10% 8.48% Source: Schedule D-1.0 (Revised) The Company’s capital structure, including short-term debt, and the associated cost of each component is shown below: Proposed 1999 Average Capitalization Including Short-term Debt Short-Term Debt Long-term Debt Preferred Stock Common Equity Total 1999 Average Capitalization ($000) Percent of Total 180,715 1,735,098 239,206 1,107,842 3,262,861 5.54% 53.18% 7.33% 33.95% 100.00% Cost 5.23% 6.90% 6.27% 11.40% Weighted Cost 0.29% 3.67% 0.46% 3.87% 8.29% Source: Schedule D-1.0, Revised The Department’s allowed cost of debt, preferred stock and common equity are discussed below. 3. Cost of Long-term and Short-term Debt The Company’s average forecasted 1999 long-term embedded cost of debt is estimated at 6.90%. Schedule D-1.0, Revised. Schedule D-1.0, Revised reflects the Company’s adjustment of its estimated 1999 annual interest costs that eliminates the higher interest rate impact of two series of bonds for which the Company incurred higher interests costs as a result of its prolonged outages at the Millstone plants. In the case of the 7-3/4% $200 million 1997 Series C Bonds, the Department estimated that the Company had incurred additional annual interest costs of 60 basis points as a result of CL&P financial downgrades due to the Millstone outages. Docket No. 97-03-23,
  6. Page 153 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 153 of 191 Page 146 Application of The Connecticut Light and Power Company to Issue First and Refunding Mortgage Bonds, Decision dated May 14, 1997, p. 11. The Company’s revised Schedule D-1.0 also reflected a downward adjustment of 10 basis points in the annual interest cost of the $160 million 7-7/8% Series A Bonds. In the June 12, 1996, Decision in Docket No. 94-07-16, Application of The Connecticut Light and Power Company to Issue First and Refunding Mortgage Bonds and Preferred Stock, p. 6, the Department found that “the recent downgrade of the Company’s securities has likely raised the coupon rate of the Bonds by approximately 10 basis points.” Id., p. 6. The revised Schedule D-1.0 also reflected adjustments on three series of adjustable rate pollution control notes. The Company’s revised 1999 forecast overstates the amount of long-term pollution control notes held as variable rate securities, and as such, understates the embedded cost of long-term debt. Schedule D-3, p. 1; Tr. 10/8/98, pp. 3208 and 3209. On October 1, 1998, the Company converted $361.9 million principal amount of pollution control notes from an average variable rate of approximately 3.98% to fixed rates ranging from 5.85% to 5.95%. Docket No. 88-09-01, Application of The Connecticut Light and Power Company for Approval to Finance Pollution Control and/or Sewage or Solid Waste Disposal Facilities, Decision dated September 23, 1998. 25 In Docket No. 88-09-01, the Company estimated that the Notes would be priced at 5.7% to 6.0% if the Company were rated BBB+, or approximately 65 basis points less than the estimated interest rate of 6.5%. Id., p. 5. Subtracting the 65 basis points from the actual rates of 5.85% to 5.95% results in an increase in interest rates of $4,139,500, compared to the average 3.98% variable rates submitted by the Company in its 1999 forecast. This results in a rise in the embedded cost of long-term debt from 6.90% to 7.14%. Two series of long-term debt will have matured during 1998 and 1999. The 71/4% Series W, principal amount of $74 million matured on July 1998 and the 5-1/2% 1994 Series A, principal amount $140 million expires in February 1999. The Company testified that it did not anticipate issuing long-term debt holdings during 1999, but instead intended to increase its short-term debt obligations during 1999. Tr. 9/10/98, pp. 377 and 378. For that reason, 1999 forecasted short-term debt rises to $180.7 million, approximately 5.5% of capital structure. Schedule D-1.0, Revised. The Company intends to hold these moneys in short-term debt until some time in 2000 so that it can securitize its debt obligations as allowed in the Act. The Department finds it appropriate to include a portion of short-term debt as a component of the Company’s capital structure for the purposes of this rate case, given the Company’s plans for increasing short-term debt during 1999. See Decision, Section II,N, pp. 157-158. Only the amount of short-term debt in excess of the 1999 projected average Construction Work in Progress (CWIP) will be included as short-term debt. Schedule F-8, p. 1; CL&P Written Exceptions, pp. 14-16. The Department reduces the $180,715,000 projected average 1999 short-term debt by $91,158,000, the projected average 1999 CWIP, resulting in $89,557,000 to be included in the short-term debt component of the capital 25 The estimated interest rate in the Decision is 6.5%. In a letter dated October 2, 1998, pursuant to Order No. 3 of the Decision, the Company indicated that the interest rates on the five issues ranged between 5.85% and 5.95%
  7. Page 154 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 154 of 191 Page 147 structure. The Department accepts as the Company’s allowed cost of short-term debt. Schedule D-2, Revised. 4. Cost of Preferred Stock The Company is expected to have $239,206,000 in preferred stock in its capital structure at a cost of 6.27%. The Department accepts the Company’s proposed 6.27% cost as submitted in Schedule D-4, Revised. 5. Cost of Equity a. Introduction Three witnesses presented testimony recommending a cost of equity for CL&P. The Company's witness, Michael A Wiater, advocated an allowed rate of return on equity (ROE) of 11.4%. Wiater PFT, p. 3. James K. Sutphin, witness for Prosecutorial, recommended an ROE of 9.25%. Sutphin PFT, p. 2. James A. Rothschild, representing OCC, advocated a return on equity of 9.35%. Rothschild PFT, p. 6. Each witness performed a discounted cash flow model (DCF) and risk premium analysis to support his recommendation. These two models are described in the Sections II.M.5.b through II.M.e below. b. DCF Model The DCF model assumes that the return received by investors is the sum of the future flow of dividends plus the anticipated growth in the selling price of the stock, discounted to the present. Assuming that the stock price increases consistently with dividend growth, this cash flow of dividends and future selling price equates to the future flow of dividends, and the DCF model takes the basic form: K = D1/P0 + g where: K = investors' required return or equity cost of capital D1 = next period dividend payment g = estimated growth rate P0 = current market price of common stock Mr. Wiater developed a proxy group of nine companies with the following characteristics: BBB long-term debt rating, significant nuclear exposure, companies undergoing some degree of industry restructuring, companies not involved in merger activities, and utilities with a Value Line beta of less than 1.0. His proxy group excluded Northeast Utilities (NU), given its suspension of dividends and below investment grade financial rating; however, NU stock performance and growth rates were included for informational purposes. Mr. Wiater justified the use of the BBB rating as the one that CL&P expects to receive when all of the Millstone nuclear units return to service and when regulatory uncertainties are resolved with regard to industry restructuring. Wiater PFT, pp. 3-6.
  8. Page 155 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 155 of 191 Page 148 According to Mr. Wiater, a proxy group of electric utilities may not accurately reflect investors' required return given the industry restructuring toward greater competition. He argued that many electric utilities are reducing the growth rate of their dividends in an effort to strengthen their financial position in response to the onset of competition. Therefore, near-term growth rate may not reflect the earnings and dividend growth rates of the industry in the long run. To model the effect of competition in the electric utility industry, Mr. Wiater used the Value Line Industrial Composite of 785 major industrial companies as the proxy for the "nonregulated sector." Wiater PFT, pp. 16-21. To calculate the yield for the nine electric utilities, Mr. Wiater used average closing stock prices from 20 consecutive trading days, April 13, 1998, to May 5, 1998. Dividends, D1, were taken from Value Line's forecasted 1998 yields. This resulted in a yield of 5.24% for the regulated proxy group. Wiater PFT, p. 19; Exhibits MAW-5 and MAW-6. The 1.54% yield for the nonregulated sector was calculated as a composite dividend per share of $0.80 divided by the composite per share price of $52. Exhibit MAW-7. Growth rates for the proxy group were calculated using the average of the six-year earnings and book value growth rates as projected by Value Line. Mr. Wiater did not use Value Line's projected dividend growth rates "because the electric utility industry as a whole has been holding back dividend growth by reducing dividend payout ratios to prepare for restructuring." The growth rate for the regulated proxy group was calculated at 2.44%. Wiater PFT, p. 19; Exhibit MAW-6. Mr. Wiater averaged Value Line projected growth rates for earnings, dividends and book value to obtain a composite growth rate of 10.33% for the nonregulated sector. Exhibit MAW-7. Mr. Wiater obtained a DCF estimated cost of equity of 7.68% for the regulated utility proxy group and 11.87% for the non-regulated industrial composite. He combined the nonregulated and regulated DCF results by weighting the two DCF estimates according to the percent of book value corresponding to generation and non-generation (e.g., transmission and distribution) assets of the nine proxy utility companies; generation and non-generation assets accounted for 51.4% and 48.6%, respectively, of the net current book value for the utility proxy group. Using these weighted averages of the regulated and non-regulated proxy groups resulted in an estimated cost of equity of 9.83%. Wiater PFT, p. 21. Mr. Sutphin chose a proxy group of 10 electric utilities, based on their beta, percentage of nuclear generation, common equity ratio, Standard & Poor's (S&P) bond rating, and financial strength as rated by Value Line. NU was excluded from his proxy group. To calculate the yield, he used an average of stock prices for the proxy group from the period June 1, 1998, to June 30, 1998, then divided the current yield, D 0, by the current price, Po. He adjusted the current dividend yield by one-half of the average of Value Line's dividend and earnings growth rate to obtain the next period's yield (D1/P0) for each of the proxy group utilities. Exhibit JKS-8. This resulted in an average yield of 4.58%. Growth rates were calculated by using Value Line estimates for earnings growth and dividend growth. This resulted in two separate DCF calculations of 8.28% and 6.89%, respectively. Exhibits JKS-8 and JKS-9.
  9. Page 156 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 156 of 191 Page 149 Mr. Rothschild used Moody's 24 electric companies as a proxy group as representative of the industry as a whole. He also used the nine companies selected by Mr. Waiter as a proxy group. Although Mr. Rothschild asserted that NU was excluded from the Moody's 24 electric companies, his exhibits show that NU is among the companies included in the proxy group. Rothschild PFT, p. 13; Schedules JAR 5 through JAR-9. Dividend yields were computed by using a spot price as of July 21, 1998, and an average of the high and low prices during the year ended July 21, 1998. The next period's dividend yield was obtained by adding one-half of the projected growth rate onto the current yield. This resulted in dividend yields between 4.80% and 5.14% for the Moody's 24 companies and between 5.09% and 5.72% for Mr. Wiater's proxy group. Rothschild PFT, p. 16; Schedule JAR-4, p. 1. Mr. Rothschild employed two variants of the DCF, the simplified model and the two-stage model. In the first model, Mr. Rothschild used forecasted retention growth rates to estimate the growth rate component of the DCF model. He employed the b x r method -- the expected earnings retention rate, b, multiplied by the expected return on book equity, r, allowing for the impact of sales or purchases of new common stock above book value -- for estimating the growth rate. Rothschild PFT, p. 17. Using the forecasted rates of return on equity from Value Line, Zacks Research, and actual equity earned returns in 1996, Mr. Rothschild obtained average forecasted ROEs (r) of 12.0% for the Moody's 24 electric companies and Mr. Wiater's BBB proxy group. Schedule JAR-4, pp. 1 and 2. Using this forecasted value for r, the retention growth rate is computed using the dividend yield to book, market-to-book (M/B) ratios, and allowance for dilution of stock prices due to new equity sales. This results in an estimated cost of equity ranging from 7.68% to 8.30% for the Moody's 24 and 7.59% to 8.71% for Mr. Wiater's selected group. Schedule JAR-3; Schedule JAR-4, pp. 1 and 2. Mr. Rothschild's two-stage DCF was formulated to take into account any perceived differences in expected short-term vs. long-term growth rates. He used Value Line's five-year forecasts of DPS and EPS to incorporate near-term expected growth rates. Long-term expected growth rates were estimated by using the same b x r computations as in his single stage DCF. Estimates for the second stage of the DCF model were projected 40 years into the future. The estimated future stock price assumes that the current market-to-book ratio remains constant and the dividend payout ratio is also assumed constant. An average of the July 21, 1998 spot price and average stock price for the 12 months ended July 21, 1998, is used as the current stock price. Mr. Rothschild's two-stage DCF model, obtained by computing an internal rate of return, results in a cost of equity of between 8.43% and 8.94% for the Moody's 24 electric companies. Schedule JAR-3; Schedule JAR-5, pp. 1 and 2. c. Department Analysis of DCF Models The Department assessed the witnesses' proxy groups to determine whether they accurately reflected the risks incurred by CL&P, absent its nuclear problems. The Department also evaluated the growth rates proffered by the witnesses, since much of the disagreement over the DCF results centered on the choice of growth rates. With regard to the choice of a proxy group, the Department believes that a BBB+ financial rating is an appropriate financial benchmark to evaluate CL&P cost of equity as
  10. Page 157 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 157 of 191 Page 150 if it did not have its nuclear problems. In recent Decisions, the Department has used the BBB+ financial rating as a benchmark for evaluating interest rate costs CL&P would have incurred were it not for its extended nuclear outages.26 Mr. Wiater agreed that the BBB financial benchmark used for his group was lower than the BBB+ rating the Company held for approximately 10 years prior to the commencement of its nuclear outages in spring of 1996. Tr. 9/23/98, p. 2125. In fact, Mr. Wiater admitted that his proxy group had an average financial rating of slightly below BBB. Tr. 9/23/98, p. 2126. Mr. Wiater's group also included Public Service of New Mexico, which has a long-term debt rating of BB+, below investment grade. The Department accepts Mr. Wiater's proxy group as a group that is financially more risky than CL&P, prior to the onset of its nuclear problems. Mr. Wiater's averaging of the growth rates of the Value Line Industrial Composite with the nine-company proxy group was the subject of considerable controversy. According to Mr. Wiater, an important variable in choosing the proxy group was that each of the companies had undergone some degree of industry restructuring. The composite DCF estimated cost of equity was a weighted average, according to the average percentage of book value of assets of the proxy group allocated to transmission and distribution vs. generation, i.e., regulated vs. nonregulated assets in a restructured industry. Although this seems at first glance to be a reasonable method for measuring the cost of equity for the regulated and deregulated sectors of a restructured electric utility industry, it overstates the risks faced by investors. Mr. Wiater admitted that among the proxy group companies currently undergoing restructuring, investors would already have taken restructuring into account in terms of the companies' stock prices and growth expectations. Tr. 9/23/98, p. 2141. Mr. Wiater's 48.6% weighting for the "regulated" sector contains investors' expectations of the riskiness of an industry that is becoming deregulated. The Department does not share Mr. Wiater's conclusion that "the risk of a regulated utility [may be] higher, equal, or . . . lower than competitively delivered electric generation." Tr. 9/23/98, p. 2144. The Department believes that a regulated monopolist's risk would more likely viewed as lower than the competitive sector of the electric industry. Mr. Wiater indirectly concurred with this conclusion by asserting that the electric industry "would probably be perceived as slightly less risky than industrials overall if you weight the regulated and nonregulated.” Tr. 9/23/98, p. 2145. In the DCF calculation for the nonregulated industries, Mr. Wiater's model also fails to discern an important difference between the emerging deregulated electric industry and industries in the nonregulated sector of the economy. In weighting the generation or nonregulated sector at book value, Mr. Wiater's model does not take into account investors' expectations that for the electric power industry, assets for which the market value is less than the book value will be recovered as stranded assets. Although the Department shares Mr. Wiater's wishes that, "Hopefully, none of it is stranded," the fact that several states' restructuring statutes have allowed utilities a return on their stranded assets lowers investors' perception of risk for the electric utility industry. Tr. 9/23/98, p. 2164-2169. 26 See Docket No. 91-06-04, Application of The Connecticut Light and Power Company and Western Massachusetts Electric Company with Respect to Nuclear Fuel Financing Arrangements, Decision dated May 27, 1998, p. 6.

As listed on the current system

Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)