Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 874, 885, 886

Files5

Search terms highlighted
Eversource rate increase is on 67 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of OCC-886_Final.pdf

Extracted from the file · 1 page · 1,819 characters

Words on different pagesRead the text of OCC-886_Final.pdf
67 pages match
  1. Page 16 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 16 of 191 Page 9 The single most important assumption in the CUO analysis is the cost of replacement power. CL&P states that “ . . . replacement power costs are clearly the most important driver in the economics.” Tr. 9/25/98, p. 2732. CL&P’s assumption in its CUO analysis is that replacement power (energy and capacity) is purchased in the New England market. 1998 Study, p. 6. The Company has forecasted replacement power costs to be $38.10/MWh in 1998 which increases to $44.80/MWh in 2007, a compound annual increase of approximately 1.8%. Response to Interrogatory OCC-323. The Company’s response to Interrogatory EL-391 indicates that a 10% increase in the cost of replacement power would increase the present value benefits associated with continued operation of MP1 from $19 million to $122 million. Benefits would jump to $225 million, on a present value basis, if replacement power costs were 20% higher than CL&P’s estimates. On the other hand, a decline in purchase power costs would reduce the economic value of continuing to operate MP1 by a similar magnitude. The Company’s forecast of replacement power was developed in-house. Tr. 9/25/98, p. 2700. These purchased power estimates were first used by the Company in its stranded cost testimony for PSNH before the Public Utilities Commission of New Hampshire in November 1997. Response to Interrogatory OCC-323. The Company’s study did not provide any alternative supply options, purchased power forecasts, or scenario analyses to evaluate the sensitivity of the study results to changes in replacement power costs. Although the Department asked several interrogatories and questioned the Company’s CUO witness at the hearing to examine this issue further, the Company provided very little evidence to verify and support its purchased power cost estimates. The Company could not provide any recent replacement power price forecasts from independent organizations or other utilities in New England. The only replacement power costs the Company could submit were done in 1996 by the joint owners of Connecticut Yankee. These estimates were lower than those forecasted by the Company. The Company states that these projections were developed with what is an obsolete methodology today. Late Filed Exhibit No. 120. In addition, the Company’s Response to Interrogatory OCC-323 included a replacement power forecast that was also used in PSNH’s 1997 stranded cost proceeding. Overall, that projection was about 10 percent higher in the 1998-2000 time period and approximately 20 percent higher beginning in 2002. Response to Interrogatory, OCC-323. Replacement power costs are very difficult to predict with a strong degree of accuracy. Replacement power is made up of the forecasted cost of capacity and energy. The capacity value is estimated based on the balance between the supply of generation resources and the demand for electricity in the region. Changes to supply or demand can change the value of capacity in the market. Energy costs are based on fuels forecasts for oil and gas, which are extremely difficult to predict. For example, over the past two years the price of oil at the Company’s Norwalk Harbor Station increased from $15.97/bbl in March 1997 to a high of $21.75/bbl in October 1997 then dropped to approximately $12.00/bbl in October 1998. The Company and most others who have attempted to forecast fuel prices have done a poor job over the past 20 years. One of the primary reasons Connecticut has high cost nuclear power plants (Seabrook and Millstone Unit III (MP3) and purchased
  2. Page 17 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 17 of 191 Page 10 power contracts is fuel forecasting errors. These plants and contracts were all projected to be cost effective based on oil price forecasts made at the time the units were built or the contracts were negotiated. The Company, as well as most experts, has overestimated future fuel prices in the past. For example, in its Integrated Resource Plan, 5 th Annual Filing, Docket No. 90-04-01, April 1, 1990, the Company forecasted avoided costs to be $.056/kWh in 1998 and $.153/kWh in 2008. In its 12th annual filing, Docket No. 97-04-01, dated April 1, 1997, the Company’s forecast for 1998 had dropped by almost 50% to $.03/kWh and its projection for 2008 was $.042/kWh. In its original filing in the instant proceeding, CL&P based its 1999 oil and gas price projections on February 1998 Cambridge Energy Research Associates (CERA) forecasts. Schedule C-3. The Company forecasted oil prices to range between $16 and $18 per barrel for the rate year. Tr. 9/11/98, p. 662; Late Filed Exhibit No. 57. In contrast, oil prices are at or below $12 per barrel today. CL&P’s forecast is off by 25% to 30% in less than nine months. Fuel prices have declined since the Company made its replacement price estimates and could decline further. A number of new generation units are now planned that were not included when the Company made its replacement power forecast. Fuel prices are at their lowest levels since 1973 and could increase from these levels. Oil and gas prices remain tied to international events that are beyond the Company’s control. Difficulty projecting fuel prices, combined with changes due to electric restructuring create considerable uncertainty about future replacement power costs. When asked about the Company’s ability to forecast replacement power costs, its CUO witness said: “Clearly, it is a daunting task.” Tr. 9/25/98, p. 2733. The Company has not provided adequate evidence to support its purchased power forecast. The decision to shut down MP1 would not need to be made based on such a speculative forecast if it were operating today. A decision to retire or to continue to operate a nuclear power plant requires more than just a first level economic analysis. One of the most important factors facing the Company was that MP1 was not in operation. If it were, there would not be a compelling reason to retire the plant simply based on a forecast, given the inherent uncertainty and economics at the time. In fact, Exhibit 1 of the 1998 Study indicates that there was positive economic value of $109.4 million in 1999 and 2000 if the plant continued to operated. As discussed above, the economics do not turn negative until 2007. But the plant had been out of service for approximately 56 months and was unable to restart without NRC approval. Its costs remained in rates for approximately 51 months of the shutdown. In the February 25, 1998 Interim Decision in Phase 1 of the instant docket, the Department removed MP1 from rate base. It was officially retired five months later, effective July 24, 1998. Roman Supp. PFT, p. 1. At that time, all work to bring MP1 back on line had been suspended, as all efforts were concentrated on the restart of MP3 and then MP2. The Company did not expect that MP1 would be brought back on line until July 1, 1999, the Company testified that the cost to restart it was estimated to be $112 million. Tr. 9/12/98, p. 2714. Restart costs must be born by the Company and therefore are not relevant for ratepayers in considering whether MP1 should continue operating. The Company
  3. Page 18 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 18 of 191 Page 11 appropriately excluded most restart costs from its economic analysis but not from its decision to retire MP1. It is clear that cost of restart, its effect on the Company’s financial situation, and the time and effort required of employees were important factors in the Company’s decision. As Mr. Morris testified “. . . bringing the unit back to service would continue to burden CL&P’s financial and other resources. . . .” Morris Supp. PFT, p. 4. Restructuring of the electric industry is another reason the Company uses to justify its decision to retire MP1. In a competitive generation market, nuclear plants will no longer recover their costs on the basis of full cost of service ratemaking. Instead, they will have to recover their costs from the revenues they derive from selling their output. For units like MP1, the revenue margin above costs will be relatively thin and could get thinner if there were unscheduled outages or the capacity factor were lower. These events would put pressure on cash flow. Morris Supp. PFT, pp. 4, 6 and 7. The restructuring of the electric industry will not change the cost of operating the plant. It could lower the cost of competitive alternatives thereby reducing the economics of MP1 relative to other sources. More importantly, restructuring will shift the risk of cost recovery from ratepayers to generation companies. In the past, if a generation plant was less economic than other facilities, ratepayers paid the difference and the Company recovered all costs. In the future, as the Company states, recovery will be less certain. Any under recovery will be borne by the generation company, but it will also benefit from higher profits if it is a low cost producer. At this point, the overall level of risk the Company will face is not known. The market price for power, competition in the generation sector, and stranded costs are speculative. The Department’s determination of stranded costs will establish the costs these units must recover in the future to be economically viable. After further questioning as to the impacts of restructuring on the CUO study results, the Company stated: “. . . without an understanding of how the relevant markets will evolve, it is impossible to speculate what the impact on the CUO studies may be.” Response to Interrogatory EL-384. By shutting down the plant, the Company believes it should receive the full return of and on its unrecovered rate base balance at the time of retirement of $229 million. A ruling by the Department that retirement of MP1 is appropriate would eliminate the need to spend $112 million in restart costs and reduce the risk of recovery of O&M costs for the 12 remaining years of its license period. In addition, retiring the plant would essentially end the out of rate base treatment set by the Department. The Department had disallowed the recovery of MP1 costs by removing them from rates and this would continue until the unit returned to service, which was not expected until July 1999. The Company is now requesting to defer for future recovery all costs as of the retirement date of July 1998. The Company’s logic creates perverse incentives that are contrary to those faced by competitive businesses. Businesses in the competitive world lose money if economics sour and even more if they must shut down or go bankrupt. This creates a strong incentive to cut costs and operate more efficiently. CL&P, on the other hand, has quickly retired a generation plant that was not operating and for which it was receiving
  4. Page 19 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 19 of 191 Page 12 no return in the hopes of guaranteeing recovery of its past investments. competition or under regulation, such an outcome is not appropriate. Under The Company did not consider transmission impacts in its CUO study. When asked if there were any associated with the retirement of MP1, the Company testified that the improvements made over the past two years to bring Millstone Station on line eliminate the need for additional ones. Tr. 9/25/98, p. 2744. The Company did not consider required transmission impacts in the 1997 Study even though upgrades would have been needed if MP1 were retired. 1997 Study, p. 2. While the Company has attempted to rationalize its results in the 1998 CUO Study, it should have specifically examined the impacts of transmission when the study was conducted. The Department is not convinced that there will be no impact to ratepayers for the replacement of MP1 with new generating facilities in Connecticut or out of state; however, there is not sufficient evidence to support any adjustment to the 1998 Study at this time. The Company also did not consider environmental impacts and fuel diversity in its economic analysis. Tr. 9/25/98, p. 2707. The environmental impacts of nuclear power are significant. An important justification for its use has been the environmental benefit of replacing fossil fuel generation, which emits air pollutants. In the Company’s justification of cost recovery, Mr. Morris testified that MP1: has been a good performer. It has also made substantial contributions to cleaner air in Connecticut by eliminating the need to burn fossil fuels, thereby avoiding the emissions of millions of tons of air pollutants and has been important to the economy of the region by providing jobs and property tax revenue. Morris Supp. PFT, pp. 9 and 10. However, the Company did not attempt to quantify or value these benefits or consider them in its analysis to retire the unit. Fuel diversity has been a cornerstone of energy policy for the Company, the Department and the State since the oil embargo of 1973. Reducing price volatility and potential disruptions was always a justification for nuclear power plants when they were being built and licensed. The associated effects on national security and the balance of payments from reducing the use of imported oil were also considered benefits. Fuel diversity remains relevant today, since units run by oil and gas will likely make up for the generation lost by the retirement of MP1. Imports of oil have increased as older plants have had to operate to replace the production from retired nuclear units or those out of service. In the future, gas will be the fuel of choice and many developers are rushing to build new generation units that will use gas supplied primarily from Canada. Environmental impacts and other issues such as fuel diversity and employment are difficult to quantify, but they are important and should be considered in a continued operation study. It would be irresponsible to follow “first level” economics blindly, as the Company’s analysis and conclusions imply. If decisions were based solely on the economics, there would be no diversification. This is not a sound risk management approach for a generation company given the ever changing prices for fuels.
  5. Page 20 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 20 of 191 Page 13 In support of its request to recover the remaining costs for MP1, the Company states that the plant: “. . . has generated a great deal of energy for CL&P customers and created a great deal of value to the State of Connecticut during its operating life.” Morris Supp. PFT, p. 8. The facts speak for themselves. MP1 operated at a capacity factor of 69.6% from 1970 to 1995. This is generally consistent with industry averages and expectations when the plant was being constructed. The last two years prior to its retirement it did not operate. In addition, the unit was retired 12 years earlier than its license expiration date of 2010, thereby reducing its useful life by approximately 30%. In its rush to retire the plant, the Company has precluded options that may have increased value to ratepayers and/or provided an opportunity for the facility to operate at a future date. It does not appear that the Company attempted to sell the facility or develop a strategy to bring it back at a later date if the economics prove more favorable than now forecasted. Mr. Morris testified that: Based upon our current expectations concerning the market for nuclear power plants, we do not believe that the potential proceeds from the sale of MP1 would significantly offset CL&P’s stranded costs. Two ownership interests in nuclear plants have recently sold in the northeast. The units involved, Three Mile Island Unit I and Seabrook, are both operating very well, and in both cases the sellers received very little for their interests. Any value from the sale of MP1 is expected to be derived from its site value, not from the fact that it is operating. Morris Supp. PFT, p. 7. The Company has not provided any estimates of sales value with MP1 in operation or if the plant is retired. The value will certainly be less if the facility is not operating. Although CL&P stated that sellers received very little for their interest, the difference could still be tens of millions of dollars. Ratepayers are entitled to this money to offset stranded costs. The Company’s economic study is too simplistic and speculative to justify the retirement of MP1. The Company did not comprehensively examine alternative economic scenarios and failed to consider important factors such as environmental impacts and fuel diversity. Based on the economic analysis the Company provided, the Department must conclude that the Company would not have retired MP1 if it had been operating, particularly given the positive economic benefits in the early years and the uncertainty of the forecasted assumptions later on. There would be no compelling reason to retire the plant in 1998 if it were still operating. A more appropriate response, had the plant been operating, would be to continue to operate the plant, attempt to improve efficiency and periodically reevaluate its economic viability. The Company’s analysis shows that it is economic to continue to operate the unit. There is risk that the economic viability can decline but it could also improve if the operating conditions are better than those forecasted. The Department concludes that MP1 was retired for economic reasons, but other factors related to the outage were considerations in the decision. By retiring the plant
  6. Page 21 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 21 of 191 Page 14 the Company can avoid an estimated cost of $112 million to bring the unit back to service. In addition, the Company hoped to end the out of rate base treatment and reduce operational risks it would face with electric restructuring by requesting full recovery of its unamortized rate base balance with a return from the date the plant was retired. The Department has discussed the shortcomings in the Company’s analyses and changes that could increase the benefits of continued operation; however, other factors particularly lower purchased power costs, could offset the benefits. The Department will therefore accept the Company’s reference case forecast of benefits/penalties as filed for ratemaking purposes. The Department believes that some sharing of the remaining costs between ratepayers and shareholders is appropriate because the study indicates that it may be economic to retire MP1 in the future for economic reasons. Further, the Department believes that ratepayers are entitled to the benefits from 1999 and 2000 that they would have received if the unit had not been retired prematurely. In addition, the Company should not benefit from retiring MP1 before its expected return to service date of July 1, 1999. In its written exceptions, the Company urges the Department to adjust the $109 million in economic benefits to reflect the following: (1) CL&P’s 81% ownership of MP 1; (2) the present value of the economic benefits; (3) lower energy and capacity costs approved elsewhere in the Decision; and (4) lower decommissioning costs consistent with decommissioning costs allowed in the Decision. CL&P Written Exceptions, p. 8. The Department agrees that the economic benefits should be adjusted to reflect CL&P’s ownership share of MP 1 and will do so. In addition, the Department agrees that the economic benefits should be calculated on a present value basis since they are presented in the CUO study in nominal dollars. However, the Department does not agree with the Company’s calculation or the present value adjustment. Since the rate year is 1999, 1999 benefits are on a present value basis and no adjustment is necessary. The Department will discount 2000 economic benefits by one year at a discount rate of 9.2%, as used in the CUO study. The revised economic benefit ratepayers will forgo due to the early retirement of MP 1 is $84.5 million. The Department does not agree that the economic benefits should be adjusted to reflect lower fuel prices or decommissioning costs. It is unclear how the Company calculated their adjustments for energy and decommissioning. These adjustments are not supported by the record and therefore inappropriate at this time. While adjusting these components in the CUO study might seem consistent with the Department’s ratemaking in this Decision, it would be inconsistent with the other components of the CUO study. Many of the assumptions in the CUO study have changed since the Company conducted its analysis. It is not appropriate to selectively adjust assumptions that benefit the Company. Updating or quantifying other factors could increase the economic benefits of the continued operation of MP 1, which would offset the adjustments proposed by the Company. The Department notes that it did not increase the economic benefits for the $8.4 million associated with the Watch List items identified above that should be removed for the costs of continued operation. In addition, CL&P
  7. Page 22 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 22 of 191 Page 15 did not request that the Department update the CUO results to reflect reduced nuclear employee levels approved in the Decision. Doing so would reduce O&M costs and increase the economic benefits of continued operation. Finally, the Department has not attempted to quantify benefits such as fuel diversity, employment and environmental impacts, which the Company did not include in its analysis. For these reasons, the Department will not adjust the economic benefits for changes in fuel prices and decommissioning as requested by the Company. a. Treatment of Millstone Unit 1 in the Application The Company originally forecast MP1 to restart on July 1, 1999. Consequently, the 1999 forecast contains incremental restart costs for the first six months and normal operating costs for the last six months of the year. Response to Interrogatory EL-152. As of March 1, 1998, ratepayers have not been supporting MP1 and have received a 1.39% credit on their monthly bills to reflect removal of MP1 costs. The total credit for MP1 was dependent upon actual sales and the time before rates are adjusted. If MP1 remained out of service at the conclusion of phase two of this docket, the Department would determine the appropriate rate treatment for crediting customers in the phase two Decision. This credit was not subject to true-up, as waived by the Company in Docket No. 97-05-12. Interim Decision, pp. 3 and 4. The total credit was not dependent on the retirement of MP1. The Company reflected the MP1 credit in revenues for the first six months of 1999, effectively eliminating MP1 costs for that period. The Company then adjusted the forecast to reflect the continuation of the credit for the last six months. The Company also removed all MP1 costs from the Application. The end result is that revenue requirements and proposed rates for 1999 do not include MP1 costs; they do, however, include MP1 RPC. Tr. 9/17/98, pp. 1401-1415. The Department notes and the Company agrees, that the costs in the 1999 forecast do not equate to the current MP1 credit, which was based on an estimate of 1998 costs. Tr. 9/17/98, pp. 1411 and 1412. However, because the Company proposes to roll the credit into base rates and the expenses have been removed, any difference from the credit that would be calculated based on estimated 1999 expenses is captured in the calculation of revenue requirements and ultimately in the revenue sufficiency. The Department concludes that CL&P’s treatment of MP1 costs in the Application is appropriate. b. Retirement of Millstone Unit 1 Pursuant to the Act The Company retired MP1 on July 24, 1998. Roman Supp. PFT, p. 1. Therefore, its next set of financial statements must reflect this change in plant status. Section 8(j)(2) of the Act contains specific provisions for regulatory treatment for MP1 should it be prematurely retired. The Company may not receive stranded costs for MP1 if the Department determines that it was not retired for economic reasons. The treatment differs if the Department should find that the retirement was due solely for economic reasons. The Company claims the retirement decision was made solely based on economic reasons. Consequently, the Company asks the Department to rule
  8. Page 23 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 23 of 191 Page 16 that CL&P’s decision to retire MP1 was prudent. Morris Supplemental PFT, pp. 3-7; Tr. 10/16/98, p. 3880. The Company continued to depreciate the MP1 plant asset while it was out of rate base before it was retired. In effect, that expense flowed directly to the bottom line because the Company was not receiving revenues from ratepayers in support of the expense. Tr. 9/17/98, pp. 1517-1520. The Company ceased recording depreciation when the unit was retired. Any future recovery of the plant (i.e., depreciation) from the date of retirement will depend on future regulatory decisions. CL&P requests approval to reclassify the undepreciated plant balance at retirement along with its associated construction work in progress (CWIP), deferred taxes, nuclear fuel and materials and supplies, net of CMEEC costs, as a regulatory asset for a total of $228.7 million. Roman Supplemental PFT, p. 2; Tr. 10/8/98, pp. 3239-3242; Tr. 10/16/98, pp. 3860 and 3861; Late Filed Exhibit Nos. 15 and 165. MP1 was placed in extended maintenance mode prior to 1998. The Company decided that it did not have sufficient funds to restart the three Millstone units and it was going to concentrate on MP2 and 3. Tr. 9/10/98, pp. 353 and 354. CL&P has incurred about $5.5 million ($6.8 million x 81% ownership) per month to keep MP1 in extended maintenance mode and expects that level to continue through 1998. The Company would not seek recovery of costs incurred to keep MP1 in extended maintenance mode. Response to Interrogatory OCC-169; Tr. 9/11/98, p. 565. The Company did not make many capital expenditures for MP1 while it was in extended maintenance mode. Tr. 9/11/98, p. 567. The Company reclassified the extended maintenance mode costs as post shutdown, pre-decommissioning costs when MP1 was retired. These costs contain expenditures for certain activities that were performed prior to retirement and will continue to be performed after retirement. The Company requests explicit Department approval to create a new regulatory asset for these expenditures. CL&P believes the post shutdown, pre-decommissioning costs it has incurred prior to new rates being effective are different from regular operating costs and the requested deferral is consistent with the treatment contemplated by the Act. The Company has not requested that the Department come to a conclusion on the level of recovery. The Company believes that the primary vehicle for reviewing the appropriateness of these costs is the proceeding to begin in 1999 for the calculation of the SBC. Roman Supp. PFT, p. 5; Tr. 10/8/98, pp. 3212-3218 and 3247; Late Filed Exhibit No. 166. The Company has not requested to receive a return on its investment during 1999, the rate year in this docket; however, it has requested that the Department allow it to create a regulatory asset for the return on the investment (i.e., carrying costs) from retirement to January 1, 2000, and defer discussions on the amount recoverable. The Company would file for recovery of deferred balances when it begins collecting the Competitive Transition Assessment permitted in the Act. The proposal to defer the carrying costs is a reversal from the current out of rate base treatment and the Company’s original filing, where it removed MP1 rate base effectively eliminating recovery of carrying costs. The Company also has created a regulatory asset for the unrecovered decommissioning liability that it must now recognize. The Company will only have to write off the components of the regulatory assets that the Department explicitly or Department precedent says are not likely to be recovered. Right now CL&P believes there is no reason to write off any assets. Roman Supp. PFT, p. 4; Tr. 9/11/98,
  9. Page 24 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 24 of 191 Page 17 pp. 599, 600, 611 and 612; Tr. 10/8/98, pp. 3236 and 3254. If the Department denies the deferral of the carrying costs, the Company would not be able to recognize those carrying costs. If the Department concludes that the Company would never be allowed to receive carrying costs on the remaining investment, SFAS 90 requires the Company to recognize a level of return on the unrecovered balance that is at least equal to its incremental cost of borrowing. The Company would have to discount the cash flows associated with recovering the balance at its incremental borrowing rate and compare that discounted amount to the amount on the Company’s books. The difference, which CL&P estimates to be $40 million, would have to be written off. Tr. 10/8/98, pp. 32553259; Tr. 10/16/98, p. 3879. SFAS 71 and SFAS 121 give guidance as to when a regulated entity can record an item as an asset on its books and when it must write off that asset if the future revenue stream is not sufficient to recover all costs. On each balance sheet date, the Company must determine that recovery of its assets, including regulatory assets associated with MP1, is likely. If it determines that recovery has been impaired, then it must write off the amount it is not likely to recover. The Company believes that based upon Department precedent, the Act and a Department ruling in this proceeding that the retirement of MP1 was made for prudent reasons, it can create all regulatory assets it believes are required and will not need to write off any costs. The Company has not asked the Department to make a finding on the amount of the regulatory assets the Company will be allowed to recover. The Company has asked that the Department agree that the appropriate proceeding to determine the amounts to be recovered is in a restructuring proceeding. As a result of that proceeding, the Company would true-up the initial entries for any changes that occur. Tr. 9/11/98, pp. 564, 583-587; Tr. 10/8/98, pp. 3252 and 3253. The Company believes it would have to take a write down if the Department said that a certain amount of the unrecovered plant will never be recovered. That would be a clear signal that an asset has been impaired. Tr. 10/8/98, p. 3238. CL&P has requested the Department be very careful with its language regarding creating a regulatory asset for carrying costs and future recovery of the asset. Without any specific denials, the Company believes it can record all the regulatory assets it needs and not incur any write-offs at this time. Tr. 10/16/98, pp. 3878 and 3879. The Department has set September 28, 1998, as the effective date of new rates in phase two. By reclassifying MP1 costs as regulatory assets as of the retirement date, the Company is seeking not to be denied recovery of MP1 costs from the retirement date until the conclusion of phase two. The Department concludes that it is not appropriate for CL&P to recover any MP1 costs from July 24, 1998, to September 28, 1998, the time period for which the Department, in the Interim Decision, ordered the Company to credit ratepayers for MP1 costs. MP1 was not expected to restart until July 1, 1999. Response to Interrogatory EL-152. The Company did not expect to recover the costs of restarting MP1. Morris Supp. PFT, p. 8. If CL&P had not decided to retire MP1, it would have continued to depreciate the plant, would not have been earning a return on its investment, and would have been expensing extended maintenance mode and restart costs as they were incurred. Therefore, the Department concludes that CL&P is not entitled to recover any MP1 costs through July 1999.
  10. Page 25 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 25 of 191 Page 18 The Department will include in rates the recovery of rate base as of July 1, 1999, based on the projected unamortized balance at that time, which includes amortization of $18.1 million minus $84.5 million associated with the benefits if the unit had continued to operate though 2000. The amortization is equal to the depreciation contained in Schedule C-2. Therefore, the total regulatory asset to be recovered, net of CMEEC, is $126.1 million, as shown on the following table: Millstone Unit 1 Regulatory Asset ($ Millions) CL&P Estimate $196.2 21.1 50.0 14.2 281.5 DPUC Allowed $196.2 21.1 50.0 14.2 281.5 -43.4 238.1 -43.4 238.1 Less: Benefits Through 2000 Amortization of Unrecovered Plant CMEEC 4.3% of Unrecovered Plant & CWIP -9.4 -84.5 -18.1 -9.4 Total Net Unrecovered Millstone Unit 1 Balance 228.7 126.1 Net Unrecovered Plant In-Service CWIP Nuclear Fuel Materials and Supplies Sub-total Unrecovered Assets Accumulated Deferred Income Taxes Net Unrecovered Balance The Department will not allow a return on the Company’s remaining investment since the plant is not operating. The Department believes it is crucial to strike a balance between the Company and ratepayers on recovery of MP1 costs. Since CL&P will be allowed to recover some MP1 costs, which are now reclassified as a regulatory asset, and the Act contemplates mitigation and recovery of regulatory assets, the MP1 regulatory asset should not be subject to further analysis in the future. The Department also believes it is not appropriate to have that regulatory asset remain long into the future and determines that recovery over three years is appropriate. Therefore, the Department allows amortization of the regulatory asset in the amount of $42.033 million for the rate year. The Department does find that it is appropriate to establish regulatory assets for the post shutdown, predecommissioning costs CL&P will incur subsequent to July 1, 1999, and the decommissioning costs. The Department will examine the appropriate amount of recovery in an upcoming restructuring docket. 3. Millstone Unit 2 The 1998 Study indicates net benefits of $669 million or $433 million on a present value basis with the continued operation of MP2 over the remaining years of its license. 1998 Study, Exhibit 2. The Company concludes that MP2 is economic for ratepayers. Id., p. 1. The Company indicated that the continued operation of MP2 was significantly more cost effective than MP1 primarily due to its longer remaining life. MP2

As listed on the current system

Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)