Interrogatory responses
Answers to questions 874, 885, 886
Files5
OCC-874_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download OCC-874_Final.pdfRead the text of OCC-874_Final.pdf
OCC-874 Attachment 1 REDACTED.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download OCC-874 Attachment 1 REDACTED.pdfRead the text of OCC-874 Attachment 1 REDACTED.pdf
OCC-885_Final.pdf
PDF · 77 KB · 1 pageText searchable
Download OCC-885_Final.pdfRead the text of OCC-885_Final.pdf
OCC-886_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download OCC-886_Final.pdfRead the text of OCC-886_Final.pdf
OCC-886 Attachment 1.pdf
PDF · 10 MB · 191 pagesText searchable
Download OCC-886 Attachment 1.pdfRead the text of OCC-886 Attachment 1.pdf
Text of OCC-886_Final.pdf
Extracted from the file · 1 page · 1,819 characters
Page 164 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 164 of 191 Docket No. 98-01-02 Page 157 Department accepted Mr. Sutphin's 8.28% earnings growth DCF model, recognizing that a DCF estimate for a BBB-rated utility group would be somewhat higher than Mr. Sutphin's A-rated proxy group. Mr. Wiater's blended DCF estimate of a BBB-rated proxy group and the Value Line Industrial Composite, as adjusted by the Department, resulted in an ROE estimate of 8.73%. While the Department has already pointed out that Mr. Wiater's proxy group is somewhat riskier than a BBB+ rated utility, the 8.73% indicated ROE serves as a useful low-end estimate. The Department believes that the 12.0% projected equity earnings of the Value Line Industrial Composite provides the maximum for the reasonable cost of equity range. It is not reasonable to assume that the risk of a BBB+ rated electric utility, not yet transitioned to competition, would exceed that of the nonregulated market. The higher equity costs of Mr. Wiater's (Department updated) 12.59% risk premium and 12.77% CAPM models are considered, subject to this 12.0% ceiling. The midpoint of the reasonable range is 10.36%, and the Department concludes that 10.3% is a just and reasonable return on equity that adequately compensates investors for the risks assumed. Also to be considered in the setting of a 10.3% ROE are the interest rate changes since the Department's financial review of the Company in Docket No. 97-0512. In that Decision, dated December 15, 1997, the Department deemed an ROE of 10.7% as reasonable and appropriate. An examination of short-term, intermediate and long-term US Treasury bonds, and electric utility bonds during mid-October to midNovember 1997 and mid-October to mid-November 1998 (four weeks preceding the close of hearings in both dockets) show the following: 1-Year US Treasury 5-Year US Treasury 20-Year US Treasury Standard&Poor's Electric Utility Bond Index (avg. maturity:15 years) October 1997 5.44% 5.86% 6.30% 7.23% October 1998 4.27% 4.38% 5.45% 6.70% Basis Point Change -117 -148 -85 -53 Given the significant decline in interest costs over the last 12 months, the Department has made a reasonable adjustment of 40 basis points from the allowed return on equity of 10.7% set in Docket No. 97-05-12. The Department approved capitalization, below, is based on Schedule D-1.0, Revised. An allowed return on equity of 10.3% enables the Company to earn an overall return on rate base of 8.05%. For purposes of §16-19(g) of the Conn. Gen. Stat. the Company will be monitored based on actual average equity (cost of capital).Page 165 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 165 of 191 Docket No. 98-01-02 6. Page 158 Weighted Cost of Capital The Department finds a weighted cost of capital to CL&P of 8.12% to be reasonable and appropriate for year end 1998 based on the following weighting of component costs. ALLOWED WEIGHTED COST OF CAPITAL 1998 FINANCIAL INSTRUMENT PERCENT COMPONENT COST Short-term Debt Long-term Debt Preferred Stock Common Stock 2.82% 54.71% 7.54% 34.93% 5.23% 7.14% 6.27% 10.30% Total 100.00% N. WEIGHTED COST 0.15% 3.91% 0.47% 3.60% 8.12% CL&P'S FINANCIAL CONDITION OF FINANCIAL GOALS Meeting the increased O&M and replacement power expenses associated with the ongoing Millstone outages has had a significant negative effect on the earnings and financial ratings of CL&P. Although MP3 returned to service in July 1998, the effect of the continued outage at MP2 from incremental O&M and ORB customer surcredits is to increase costs by approximately $11 million per month. Notwithstanding the delay in the restart of MP2 from the 4th quarter of 1998 to the 1st quarter of 1999, the return to service of MP3 and the expected return of MP2 have enabled the Company to take the initial steps toward financial recovery. On July 22, 1998, in response to the restart of MP3, Moody’s upgraded CL&P’s rating from Ba3 to Ba2. Standard & Poor’s (S&P’s), which had placed the Company on credit watch on April 8, 1996, removed the credit watch status on July 21, 1998. Despite these improved ratings, the Company remains two steps below investment grade at Ba2 (Moody’s) and BB (S&P’s). Tr. 9/10/98, p. 303. To address the deteriorated financial circumstances of NU and its subsidiaries, on November 21, 1996, NU, CL&P and WMECO entered into a new revolving credit agreement (New Credit Agreement) and on May 30, 1997, NU entered into a First Amendment and Waiver to the New Credit Agreement. Interest coverage and common equity ratio requirements were revised downward to enable the companies to meet their financial requirements. Under the First Amendment and Waiver, CL&P has been required to maintain a common equity to total capitalization of at least 32% after December 31, 1997. The First Amendment and Waiver has also required the Company to maintain an interest coverage ratio of 1.25 through December 31, 1997; 1.5 from January 1, 1998, through June 30, 1998; 2.0 from July 31, 1998, through September 30, 1998; and 2.5 thereafter.32 The Company was able to meet its covenant requirements 32 Docket No. 97-05-12, Decision dated December 15, 1997, p. 54.Page 166 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 166 of 191 Docket No. 98-01-02 Page 159 for the first and second quarters of 1998; however, CL&P’s witness, Mr. Forsgren, predicted that the Company would be unable to meet its requirements for the 3rd and 4th quarters of 1998.33 Tr. 9/10/98, p. 304. Due to the anticipated inability to meet these requirements, the Company has renegotiated its covenant terms with its banks. 34 The Company believes that renegotiated benchmarks will afford it the financial flexibility during late 1998 and all of 1999, particularly before the restart of MP2. According to Mr. Forsgren, the banks have been willing to renegotiate the terms of the covenant agreements because of their confidence in CL&P’s financial recovery due to the restart of MP3. Tr. 9/10/98, p. 309. In summarizing CL&P’s financial outlook, Mr. Forsgren concluded that “while the company’s financial condition is and will remain stressed, the ongoing recovery of the company’s nuclear program will enable the company to continue to improve over the next several quarters.” Tr. 9/10/98, p. 305. In Docket No. 97-05-12, the Company expressed concern over its ability to extend into the future two sources of external capital, the $90 million short-term financing vehicle in the Niantic Bay Fuel Trust and the letters of credit (which expire during the 3rd and 4th quarters of 1998) required to extend $362 million in tax-exempt variable rate pollution control notes. Decision, p. 55. Since the Decision in Docket No. 97-05-12, these uncertainties have been eliminated. With regard to the Niantic Bay Fuel Trust, on June 1, 1998, the Company issued $180 million in Series G notes, the proceeds of which were used to refinance $80 million in Series F Intermediate Term Notes that expired on June 5, 1998, and to refinance $90 million in short-term borrowings held in the Trust. Thus, the short-term borrowing instrument in the Niantic Bay Fuel Trust was effectively eliminated. Docket No. 91-06-04, Application of The Connecticut Light and Power Company and Western Massachusetts Electric Company with Respect to Nuclear Fuel Financing Arrangements, Decision dated May 27, 1998. In the case of the pollution control notes, on October 1, 1998, CL&P converted $361.9 33 The Company’s 1998 performance with regard to its required financial ratios is as follows: Equity Ratio 1998 Q1 1998 Q2 Coverage Ratio 32.54% 32.66% 3.05 1.59 Projected equity and coverage ratio for the 3rd and 4th quarter of 1998 are as follows: Equity Ratio 1998 Q3 1998 Q4 Coverage Ratio 31.80% 31.27% 1.47 1.97 Source: Late Filed Exhibit No. 2, pp. 11 and 12. 34 The Second Amendment and Waiver imposed the following covenant requirements on CL&P: Sept. 1998 Interest Coverage Ratio: 1.25 Equity Ratio 31.0 Source: Late Filed Exhibit No. 2, pp. 11 and 12. Dec. 1998 Mar. 1999 1.35 31.0 Jun. 1999 1.75 31.0 2.00 31.0Page 167 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 167 of 191 Page 160 million in pollution control notes from variable to fixed rate securities. By issuing fixed rate notes, CL&P eliminated the need for the extensions of the letters of credit. Docket No. 88-09-01, Decision dated September 23, 1998. The Company’s ability to borrow has been limited by its lowered financial ratings. Under the First Amendment and Waiver, CL&P is able to assume up to $225 million in short-term borrowings; however, because the Company risks violation of its covenant restrictions, it has been effectively prohibited from borrowing the full amount. The Company’s First Mortgage Bond indenture prohibits CL&P from issuing new money bonds when its interest coverage ratio falls below 2.0. The Accounts Receivable Program enables the Company to draw up to $200 million and is not considered debt for accounting purposes. CL&P is able to draw upon these funds since its financial ratings remain above the BB- (S&P) and Ba3 (Moody’s) financial benchmarks. The Company’s forecasted capital structure shows short-term debt rising to approximately $281.3 million by year-end 1999, for an average of $180.7 million during 1999. For the 1999 rate year, short-term debt is projected to average 5.54% of capital structure and to rise to 8.51% of capital structure by year-end 1999. Schedule D-1, Revised; Schedule D-1.1, Revised. Mr. Forsgren explained that the Company plans to use short-term debt as bridge financing until early 2000, when CL&P expects to securitize the proceeds of its sale of non-nuclear assets. Tr. 9/10/98, pp. 377 and 378. The Company plans to finance its rising short-term debt in 1999 through its Revolving Credit Agreement; however, the 1999 projected short-term debt of $253.4 million exceeds the Company’s short-term borrowing limit of $225 million under the current terms of the Revolving Credit Agreement. The Company hopes that the restart of MP2 will significantly enhance its borrowing capabilities under the covenant restrictions of the Revolving Credit Agreement. Moreover, the Company intends to negotiate a new revolving credit agreement in 1999, after MP2 returns to service. The Company believes that it would be able to negotiate more favorable terms (e.g., a higher borrowing limit) in a new short-term borrowing agreement. Tr. 9/14/98, pp. 768-770. The Company’s 1999 financial projections show modest progress in earnings recovery during 1999, assuming the first quarter 1999 restart of MP2 and CL&P’s proposed rate plan. Late Filed Exhibit No. 2, pp. 11 and 12. In addition to spending on priority O&M and reliability measures, the Company intends to use the additional earnings to pay down long-term debt maturities and eventually to restore dividends on common stock. Tr. 9/10/98, pp. 405 and 406. O. CUSTOMER SERVICE ISSUES 1. Customer Billing a. No Bills The Company does not produce a bill for an account when there is insufficient information on the customer’s usage. This practice is known as generating a “no bill.” The Company currently tracks only the potential no bills, that is, customer accounts that possibly will not have a bill produced in any given month. The Company manually calculates billing for some of these accounts, using estimates or new meter readings.Page 168 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 168 of 191 Page 161 However, for the remainder, a bill is not generated for the account. Tr. 10/20/98, p. 3906. The Company’s billing system automatically creates a monthly summary report of the potential no bill accounts. The Company stated that “for the vast majority of the accounts on this report an actual reading can be obtained or an estimated reading can be generated, and the Company will then manually intervene to produce a bill for the customer.” Late Filed Exhibit No. 174. However, the Company has no internal tracking mechanism that reconciles the number of potential no bills with the number of no bills that were manually worked and the number of accounts for which no billing actually occurred in any given month. Therefore, the Company can only estimate the actual number of no bills for any given month or year. Tr. 10/20/98, pp. 3903 and 3906. According to Company estimates, the number no bills is well below one percent of the total bills generated. Late Filed Exhibit No. 174. The Department is concerned about the Company’s use of no bills on customer accounts and the inadequacy of the Company’s system for tracking its no bills to their final conclusion. Since the actual number of no bills is small, and the Company has the capability to intervene and manually produce a bill, the Company should produce a bill for each customer account. The Department cannot find any justification for the Company’s continued use of no bills and concludes that a monthly bill should be produced for each customer account. The Company shall produce a customer statement for each potential no bill every month, either through the normal billing process or through manual intervention. b. Prorated Bill Format The Company recently revised its format for prorated bills to indicate the monthly customer charge as a separate line item. Previously, the Company included the customer charge with the prorated energy charge. Late Filed Exhibit No. 127. The revision has increased the number of computations that appear on the bill. In addition, the Company now normalizes prorated bills. Tr. 10/15/98, pp. 3637-3639. Normalization involves two separate calculations. The first step normalizes the kWh consumption, projecting the kWh consumption on a monthly basis. In the second step, the normalized amount is prorated by using the actual number of days within the billing period. However, CL&P does not explain normalization or why it is used. As the Company stated, customers who have trouble with the normalization formula must call the Company for an explanation. Tr. 10/15/98, pp. 3637-3638. The Department is concerned about the increased level of detail that the calculation involves and the lack of explanation. The Company initiated this change without prior Department notification or review. The Department believed that chances such as these should be subject to review. Therefore, the Company must submit any future changes in its customer billing policies, practices or forms to the Department for prior approval and will be required to meet with the Department’s Consumer and Assistance Unit to develop a prorated bill format that is easier to understand.Page 169 of 191
Docket No. 98-01-02 2. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 169 of 191 Page 162 Customer Service a. Off-hours The Company’s business offices provide regular hours for customer service either between 7:30 a.m. and 3:30 p.m. or between 8:00 a.m. and 4:30 p.m. In addition, the Company also provides off-hour appointments or meter readings on Saturdays or in the early a.m. The Company submitted a list of its 12 business offices with their normal operating hours for customer appointments. However, the Company’s list did not itemize the hours that are available for off-hour customer appointments on Saturdays or in the morning. Late Filed Exhibit No. 131. During the hearing, the Company stated that Saturday hours are generally the same as normal business hours, 7:30 a.m. to 4:00 p.m. Tr. 10/15/98, pp. 3640-3642. The Department questions whether these off-hours are regularly offered by the individual business offices, because the Company’s list indicates that they are available “when required.” It is also questionable whether the Company’s customer service representatives are aware of the variation in Saturday and morning hours as the Company’s list does not itemize the hours. Customers may not be provided with consistent and correct information about the hours that are available. The Department will order the Company to submit a list of its customer service hours that itemizes the actual off-hours available for each business office. The Department also believes that the Company should provide the Department with any changes that it makes to its customer service policies and procedures prior to their implementation. b. Average Hold-Time for Customer Calls According to testimony, the Company has stopped setting an Average Speed of Answer (ASA) target for hold-times for answering customer calls. The Company utilizes two separate methods for determining hold-time for calls, one for in-house use and one for reporting to the Department. For in-house use, the Company sets its target for holdtimes based on the percentage of calls answered within 60 seconds. The average holdtime is calculated from the time the Company’s phone system initially accepts the customer call and begins its recorded message. Two phone numbers are utilized in determining this average hold-time, the number for the customer service call center in Wethersfield and the number for the credit and collections call center in Berlin. The Company continuously monitors hold-times in the call centers using a display board system showing all staff the average hold-time for the last 10 minutes. The Company sets different targets for the percentage of calls answered in 60 seconds for each center, 68% for Wethersfield and 59% for Berlin. Late Filed Exhibit No. 168, Read-In AAA. However, the Company did not indicate why it has established different targets for these two centers. The Company stated that it sets an official goal for these hold-times once a year, but was not specific on the details of the goal setting process. In addition, the Company did not explain its method for determining the average call hold-times that it reports in seconds of duration to the Department monthly nor did it explain how the percentage targets it uses in-house correlate with the average hold-times reported in seconds. Tr. 10/20/98, pp. 3908-3912. The Company’s testimony raised more questions than it answered. Therefore, the Department willPage 170 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 170 of 191 Page 163 require the Company to submit its criteria and rationale for determining the reported average hold-times for customer calls. 3. Most Beneficial Rate CL&P’s Rules and Regulations state that all customers are entitled to request service under the lowest applicable rate and that the Company will, upon request, assist a customer in choosing the most favorable rate. CL&P Rules and Regulations, Choice of Rate, Section 1.6. Further, CL&P’s Commercial/Industrial Rate Assignments & Changes Policy CS-3 (Policy CS-3) states that a reasonable effort will be made to advise and assist a customer in the selection of a proper rate. Policy CS-3, Item III. In addition, the Company uses bill inserts to notify customers of available rate schedules. These bill inserts are distributed annually and include a request for customers to review their billing information. Late Filed Exhibit No. 171. Although there is a “process that should happen,” to insure customers are served at the most beneficial rate, there is no formal policy in place to assure that it does. Tr. 10/15/98, p. 3670; Response to Interrogatory EL-350; Late Filed Exhibits No. 126 and 171. The Company has no formal procedure for assisting residential customers in selecting the best rate. CL&P attempts to satisfy customer requests concerning rate assignments over the phone and if the customer requires additional assistance Company personnel will schedule a site visit. Site visits are not automatic and are done on a case-by-case basis. Appointments are rarely scheduled at a customer’s home. Tr. 9/28/98, pp. 2780-2783. The vast majority of residential customers are assigned to Rate 1 or 5. Response to Interrogatory EL-350. For commercial accounts, the Company generally relies on historical load information from each service location to determine the rate assigned to the new customer and the rate assignment is based on anticipated demand. For example, demands of less than 350 kW are assigned to Rate 30 or 35, while demands in excess of 350 kW are assigned to one of CL&P’s Time-Of-Day rates Tr. 10/15/98, p. 3647-3648. For industrial customers, the Company monitors the billing demand of accounts taking service under Rates 55, 56, 57 and 58. If the demand does not exceed 350 kW for 12 consecutive months, the customer has the option to take service on Rate 35. In these situations, service under Rate 35 will generally reduce a customer’s bill. Response to Interrogatory EL-350. Although Policy CS-3 mentions the assignment of a rate, it essentially deals with a follow-up review once a customer has been assigned to a rate. This policy establishes procedures for the review of historical billing data for commercial and industrial customers assigned to Rates 30, 35 and 40. This procedure, commonly referred to as the Most Beneficial Rate Report (MBR), does not require the evaluation of all commercial and industrial accounts or accounts that have less than 6 months’ billing history. CS-3 Appendix I. The MBR is generally issued twice annually, although there is no requirement that this occur. Id. There are no procedures in place to assure that all customers are receiving service under the most beneficial rate. Although CL&P’s account representatives query new customers to determine rate assignments, this does not always result in thePage 171 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 171 of 191 Page 164 provision of service at the most beneficial rate. Late Filed Exhibit No. 171. It is ultimately the customer’s responsibility to request additional information or assistance on rate assignment, with the final choice of rate being determined by the customer. Tr. 9/28/98, pp. 2782-2783. Utility costs for CL&P’s largest customers generally represent a significant component of operation and maintenance expense. These customers often possess the expertise to evaluate the assignment to, and ongoing provision of, service under an appropriate rate. However, the majority of customers lack this expertise. In these cases it appears reasonable for the customer to rely on the Company to aid in the selection of the most advantageous rate. However, CL&P’s current policies are not set up to assure this result. Instead, current policies place the burden of choosing a rate with the customer. This must change. The Company must be proactive in assuring not only that customers are made aware that there may be more beneficial rates available, but that the best possible rate is selected initially. However, the customer remains responsible for notifying the Company when a change in usage or equipment might result in the provision of service under a more beneficial rate. Therefore, the Department will require CL&P to develop a policy to address this issue. 4. Emergency Response Procedures In the recent past, the Company’s emergency responses to de-energize power lines were inadequate. The Company established the Emergency Response Task Force (ERTF) to examine issues related to its response time in de-energizing power lines in emergencies. The ERTF was composed of representatives of police and fire departments within the Tolland area, State of Connecticut fire and public safety departments and CL&P personnel. The ERTF’s goal was to develop recommendations that would ensure the safety of emergency workers and the public and also protect property by optimizing the Company’s response to emergency incidents. Recommendations would be proposed statewide, but implementation in any area was subject to acceptance by local and state emergency personnel. ERFT Final Report, September 1997, p. 1. In its final report dated September 1997, the ERTF focused on three key areas for improvement: communications, response and training. To improve communications, the Company developed the Priority Level System (PLS) to promote a statewide system for communication between local and state emergency response personnel and Company personnel. PLS categorizes electrical emergencies into three priority levels: Level 1 for a life threatening situation; Level 2 for a situation that hinders operations; and Level 3 for a routine downed wire or other non-emergency situation. In utilizing the PLS, the Company reports to an incident commander for better assessment of the situation, using a common terminology developed to communicate when safety at the scene is secured. The Company has also developed a plan to review and critique all Level 1 Priority Calls, to solicit input from its craft workers for improving responses, and to schedule regular follow-up meetings to monitor the response system. In addition, the Company has offered to make its employees available to town emergency operationsPage 172 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 172 of 191 Page 165 centers to act as liaisons with the Company operations center in the event of major storm emergencies. Id., pp. 2 and 6-8. Improvements in training for electrical hazard situations is a major component of ERTF’s recommendations. Emergency services (fire, police and EMS) and local public works personnel would be offered comprehensive and refresher training on electrical hazards and safe work procedures. An added module to the current training mandated by the Office of Statewide Emergency Telecommunications (OSET) would provide for local emergency telecommunicators to receive recurring in-service training on incidents involving electrical hazards. All state agencies responsible for training would work cooperatively to develop a standardized multidiscipline curriculum for safe response to electrical emergencies. In addition, electrical hazard training props would be installed in statewide training centers and the Company and other electric utilities would provide support for ongoing training efforts for local and state agencies. The Company would also offer an Electrical Safety Program and video for enhanced training on electric distribution systems and hazard responses. Id., pp. 2 and 10-11. A critical element of the ERTF recommendation is the development of an acceptable range of response times for electrical emergencies. The ERTF reviewed data and recommended an average response time of 23 minutes for Level 1 and Level 2 emergencies with an ultimate time goal of less than 20 minutes. ERTF also recommended that the Company schedule linemen to serve on-call by the zone in which they live and establish the number of personnel to respond to Level 1 and Level 2 emergencies. A minimum of two responders would be dispatched with the closest lineman dispatched first. A back-up coverage system would be developed in the event that all linemen available for emergency call outs were working and unavailable to respond to a new emergency. Id., pp. 2 and 13-14. The recommendations of the Task Force were subsequently accepted and implemented in the 14 towns in the Company’s Enfield/Tolland district. Implementation is currently underway in the remaining 21 in the Capitol Region Council of Governments (CRCOG) that are not part of the Enfield/Tolland District. The schedule for implementation of the remaining 114 towns within the Company’s territory is presently being developed with an expected goal for final implementation by the end of 1999. Response to Interrogatory EL-353. Additional ERTF recommendations for possible future consideration include: the installation of equipment for remotely switching lines to de-energize an area; the installation of external disconnect on residential services, pending the approval of state and local authorities; and the mutual support of adjacent districts for response in Level 1 emergencies. Response to Interrogatory EL-353; Late Filed Exhibits Nos.123 and 123SP01. The Department recognizes the potential for improvements to the Company’s internal system for response to safety and emergency situations. The Company has identified two key areas that require upgrading to improve the Company’s ability to handle public safety situations. The first targeted area for internal improvement is the staffing of the number of emergency response personnel who provide coverage after hours. The Company is devoting more resources to hiring more personnel. ThePage 173 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 173 of 191 Page 166 Company is also increasing the use of cellular phones in its aerial trucks to augment its radio communication. Late Filed Exhibit No. 124. The second area is the advancement of the Company’s distribution SCADA program. SCADA has two uses that enhance the ability to monitor the distribution system: one is to provide information about the status of the distribution system; the other is to de-energize lines remotely, actually opening and closing devices. Tr. 9/28/98, p. 2788; Tr. 10/15/98, pp. 3669-3670. Currently, the Company has installed some SCADA equipment for the purpose of reporting information to dispatch centers. There are two or three substations throughout the distribution system that have some SCADA where the dispatch centers are able to open and close devices as well as receive intelligence from devices. In 1999 and beyond, the Company plans to expand the use of the SCADA system both by developing a front end to be located at the dispatch centers that will interpret data and also by installing remote terminal units at additional devices throughout the system. In the first year of a three-year expansion plan, the Company will install SCADA at sitespecific locations where the need to operate the devices is considered critical. In subsequent years, SCADA will be installed at devices where there is a maximum benefit from being able to operate it as a central location open or closed. Five years from now, the Company envisions that it will have installed SCADA as a way of de-energizing down conductors at its remote rural substations. Subsequent to this, the Company will install SCADA on field devices throughout all of its circuits and will have about 70 percent coverage for opening and closing its system. Tr. 9/28/98, pp. 2787-2790; Tr. 10/15/98, pp. 3669 and 3670. The Company’s efforts in implementing the recommendations of the ERTF and its internal improvements are positive steps toward improving the Company’s current emergency responses. The continual improvement of the Company’s internal emergency response system is an integral component of ensuring public safety. The Department will continue to monitor the statewide implementation of the ERTF recommendations and also recognizes the need to monitor the Company’s internal improvements going forward into the future. The Department will require the Company to submit a formal plan for internal improvements that includes details on each area scheduled for improvement, the specific improvements to be made and the target dates for implementation of the improvements.
As listed on the current system
Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026