    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 172 of 191 Page 165 centers to act as liaisons with the Company operations center in the event of major storm emergencies. Id., pp. 2 and 6-8. Improvements in training for electrical hazard situations is a major component of ERTF’s recommendations. Emergency services (fire, police and EMS) and local public works personnel would be offered comprehensive and refresher training on electrical hazards and safe work procedures. An added module to the current training mandated by the Office of Statewide Emergency Telecommunications (OSET) would provide for local emergency telecommunicators to receive recurring in-service training on incidents involving electrical hazards. All state agencies responsible for training would work cooperatively to develop a standardized multidiscipline curriculum for safe response to electrical emergencies. In addition, electrical hazard training props would be installed in statewide training centers and the Company and other electric utilities would provide support for ongoing training efforts for local and state agencies. The Company would also offer an Electrical Safety Program and video for enhanced training on electric distribution systems and hazard responses. Id., pp. 2 and 10-11. A critical element of the ERTF recommendation is the development of an acceptable range of response times for electrical emergencies. The ERTF reviewed data and recommended an average response time of 23 minutes for Level 1 and Level 2 emergencies with an ultimate time goal of less than 20 minutes. ERTF also recommended that the Company schedule linemen to serve on-call by the zone in which they live and establish the number of personnel to respond to Level 1 and Level 2 emergencies. A minimum of two responders would be dispatched with the closest lineman dispatched first. A back-up coverage system would be developed in the event that all linemen available for emergency call outs were working and unavailable to respond to a new emergency. Id., pp. 2 and 13-14. The recommendations of the Task Force were subsequently accepted and implemented in the 14 towns in the Company’s Enfield/Tolland district. Implementation is currently underway in the remaining 21 in the Capitol Region Council of Governments (CRCOG) that are not part of the Enfield/Tolland District. The schedule for implementation of the remaining 114 towns within the Company’s territory is presently being developed with an expected goal for final implementation by the end of 1999. Response to Interrogatory EL-353. Additional ERTF recommendations for possible future consideration include: the installation of equipment for remotely switching lines to de-energize an area; the installation of external disconnect on residential services, pending the approval of state and local authorities; and the mutual support of adjacent districts for response in Level 1 emergencies. Response to Interrogatory EL-353; Late Filed Exhibits Nos.123 and 123SP01. The Department recognizes the potential for improvements to the Company’s internal system for response to safety and emergency situations. The Company has identified two key areas that require upgrading to improve the Company’s ability to handle public safety situations. The first targeted area for internal improvement is the staffing of the number of emergency response personnel who provide coverage after hours. The Company is devoting more resources to hiring more personnel. The
  2. Page 173 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 173 of 191 Page 166 Company is also increasing the use of cellular phones in its aerial trucks to augment its radio communication. Late Filed Exhibit No. 124. The second area is the advancement of the Company’s distribution SCADA program. SCADA has two uses that enhance the ability to monitor the distribution system: one is to provide information about the status of the distribution system; the other is to de-energize lines remotely, actually opening and closing devices. Tr. 9/28/98, p. 2788; Tr. 10/15/98, pp. 3669-3670. Currently, the Company has installed some SCADA equipment for the purpose of reporting information to dispatch centers. There are two or three substations throughout the distribution system that have some SCADA where the dispatch centers are able to open and close devices as well as receive intelligence from devices. In 1999 and beyond, the Company plans to expand the use of the SCADA system both by developing a front end to be located at the dispatch centers that will interpret data and also by installing remote terminal units at additional devices throughout the system. In the first year of a three-year expansion plan, the Company will install SCADA at sitespecific locations where the need to operate the devices is considered critical. In subsequent years, SCADA will be installed at devices where there is a maximum benefit from being able to operate it as a central location open or closed. Five years from now, the Company envisions that it will have installed SCADA as a way of de-energizing down conductors at its remote rural substations. Subsequent to this, the Company will install SCADA on field devices throughout all of its circuits and will have about 70 percent coverage for opening and closing its system. Tr. 9/28/98, pp. 2787-2790; Tr. 10/15/98, pp. 3669 and 3670. The Company’s efforts in implementing the recommendations of the ERTF and its internal improvements are positive steps toward improving the Company’s current emergency responses. The continual improvement of the Company’s internal emergency response system is an integral component of ensuring public safety. The Department will continue to monitor the statewide implementation of the ERTF recommendations and also recognizes the need to monitor the Company’s internal improvements going forward into the future. The Department will require the Company to submit a formal plan for internal improvements that includes details on each area scheduled for improvement, the specific improvements to be made and the target dates for implementation of the improvements.
  3. Page 174 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 174 of 191 Page 167 III. FINDINGS OF FACT 1. The Company's CUO study did not consider fuel diversity, environmental impacts or employment. 2. MP1 was retired 12 years earlier than its license expiration date of 2010. 3. MP1 was retired for economic reasons, but there were other factors taken into consideration. 4. Replacement power cost forecasts are speculative. 5. The continued operation of MP1 would have provided CL&P ratepayers $84.5 million of positive economic value if it operated in 1999 and 2000. 6. The estimated restart date for MP1 was July 1, 1999, at a cost of $112 million. 7. MP2 may not return to service until early 1999. 8. CL&P proposes to replace the current ORB non-cash accrual with a cash credit on customers’ bills for MP2 costs contained in the rate year effective September 28, 1998, for the period MP2 is shut down. 9. CL&P filed a MP2 ORB calculation based on the revised Application. 10. CL&P did not include materials and supplies in the MP2 ORB calculation. 11. CL&P calculated MP2 RPC by annualizing first quarter 1999 revised simulated replacement energy and capacity costs. 12. Total production for MP2 is estimated to be 5,527,000 MWhs at a total direct cost of $24,466,800. 13. CL&P did not reflect reduced oil prices in its MP2 ORB calculation. 14. The Company’s filing includes MP2 O&M expenses $34.5 million higher than the 1990 - 1995 average, and MP3 expenses $11.8 million higher than this average. 15. The Work Planning and Control changes are intended to facilitate compliance with the NRC's Maintenance Rule. 16. The Material Condition Improvement Program integrates all coating and painting work in one department. 17. The Commitment Tracking Program changes create a centralized tracking system for all NRC commitments. 18. The Personal Computer Leasing Program replaces the previous policy of buying all personal computers.
  4. Page 175 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 175 of 191 Page 168 19. The Consolidation of Information Technology and Support consolidated all information technology functions in one department. 20. The Calculation Tracking System creates a new system for tracking calculations. 21. The Material Equipment Parts List changes allow more detailed tracking of plant components. 22. The Condition Based Maintenance program creates methods to trend equipment performance to identify common component failures. 23. The proposed expense for non-capital modifications are consistent with historical expenses and the projects comprising them are typical of small modifications that occur throughout the life of a nuclear plant. 24. The Company’s plant additions includes $1.12 million for the expansion of the Four Mile River Road building in East Lyme. 25. The Company’s plant additions include $4 million for installation of underground oil tanks at MP1, that the Company is planning to modify for use at MP2, but the plans have not been finalized. 26. The Company’s filing originally included $29,004,000 for plant additions at MP2 in 1999, which was subsequently reduced to $5,081,000. 27. The Company’s request includes plant additions for T&D system improvements incurred in 1996 and 1997 at a cost of $16,066,474 to increase transmission import capacity during the Millstone outages. 28. The Company did not provide any information supporting the claim that transmission and distribution system improvements would have been required absent the Millstone outages, other than certain capacitor installations. 29. The Company’s proposal for construction in 1999 totals approximately $312,250,000. 30. The forecast of future capital expenditures is consistent with past expenditures with the exception of distribution, which are expected to increase due to reliability improvement projects. 31. The Company’s filing includes revenue requirements for four Devon Station gas turbines that were installed in 1996 to provide replacement capacity and energy while the Millstone units were out of service. 32. The Company filed revised decommissioning amounts of $512,000,000 for MP1; $460,000,000 for MP2; and $519,400,000 for MP3. The Company based the MP1 and MP2 amounts on the NRC minimum amount, and the MP3 amount on the site specific study for that unit.
  5. Page 176 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 176 of 191 Page 169 33. The NRC does not consider the cost of non-radioactive waste removal to be a decommissioning cost. 34. The negative net salvage component of depreciation totals $7,210,587 for the fossil and hydroelectric plants. 35. The Company does not plan to shut down any fossil or hydroelectric plant prior to divestiture of those units. 36. Distribution reliability was affected by major storms in 1995 and 1996. 37. CL&P’s enhanced tree trimming efforts are designed to prevent service interruptions. 38. Company documents demonstrate the effectiveness of covered wire and enhanced tree trimming in preventing tree contact outages. 39. The Company plans to expand the proportion of covered wire in its distribution system from 37% to 50% by 2003. 40. The nuclear units will be divested by January 1, 2004. The Company has no plans to shut down any nuclear units before MP2’s operating license expires in 2015. 41. The Company continues to employ the practice of no bills on customer accounts, the number and potential dollar amount of which it can only estimate. 42. The Company has established extended service hours for off-hour appointments or meter reading. The Company did not provide the actual off-hours available to customers. The Department is not informed of changes to the service hours made available to customers by the Company. 43. The increased calculation on the Company’s revised prorated bill format is more confusing than the prior format. 44. The Company did not provide criteria and rationale for determining average holdtimes for calls from customers, as reported to the Department monthly. 45. The Company has incurred additional financing costs in the Niantic Bay Fuel Trust that have resulted from higher interest rates and fees associated with the prolonged nuclear outages at the Millstone plants. 46. A pension salary growth rate assumption of 4.5% would place CL&P at the mean of a 1997 Fortune 500 survey group of electric and gas companies for this actuarial assumption. 47. The Company’s financial ratings remain two steps below investment grade at Ba2 (Moody’s) and BB (S&P’s).
  6. Page 177 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 177 of 191 Page 170 48. Since Docket No. 97-05-12, the Company has been able to extend into the future two sources of external capital, $180 million financing in the Niantic Bay Fuel Trust and $362 million in pollution control notes. 49. The Company plans to use short-term debt as bridge financing until early 2000, when CL&P expects to securitize the proceeds of its sale of non-nuclear assets. 50. The Company’s revised 1999 forecast overstates the amount of long-term pollution control notes held as variable rate securities, and as such, understates the embedded cost of long-term debt. 51. The Department approved cost of long-term debt is 7.14%. 52. The Company intends to hold approximately 5.5% of its capital structure in shortterm debt during 1999 and the early part of 2000. 53. The Department approved capital structure is: short-term debt, 2.82%; long-term debt, 54.71%; preferred stock, 7.54%, and common equity, 34.93%. 54. Based on the evidence available, the Company’s rate of return on equity should be 10.3% for ratemaking purposes. 55. Based on the evidence available, the Company’s weighted cost of capital should be 8.12% for ratemaking purposes. 56. CL&P removed all MP1 out of rate base costs and revenues from the Application, except for the 1999 O&M Accrual. 57. CL&P retired MP1 on July 24, 1998. 58. MP1 was placed in extended maintenance mode prior to 1998. 59. CL&P ceased recording depreciation for MP1 when the unit was retired. 60. CL&P has not asked the Department to make a finding in this proceeding on the amount of MP1 regulatory assets it will be allowed to recover. 61. CL&P plans to release the Devon leased units at the end of their five-year lease. 62. CL&P’s sales and revenues forecast reflects lost fixed costs as a result of C&LM initiatives. 63. CL&P currently recovers the costs of C&LM, including the amortization of capitalized expenditures, lost fixed costs, and a bonus incentive through base rates and the CAM. 64. CL&P achieved gains on sales of property each year from 1992 - 1997.
  7. Page 178 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 178 of 191 Page 171 65. Section 8(h)(3) and (4) of the Act mandates that stranded costs for nuclear generation assets be reduced by the net proceeds that are above book value received by an electric company for the sale or lease of any real property after July 1, 1998. 66. MY currently has a proceeding before FERC to determine the rates it may charge its owners, including CL&P. 67. CL&P did not include CMEEC costs in the Application. 68. A new refueling outage O&M Accrual began on January 1, 1997, as part of the Settlement Agreement. 69. In the Application, CL&P estimated the next refueling outage for MP2 would occur in 1999. 70. CL&P currently estimates that the next refueling outage for MP2 will not occur until 2000. 71. The Application contained 1999 MP2 and MP3 annual O&M Accruals of $8.5 million and $7.2 million, respectively. 72. CL&P projects 1999 D&O insurance expense will be higher than prior years due to claims paid and higher liability limits. 73. CL&P proposes to use the revenue sufficiency contained in the Application to accelerate the amortization of the regulatory asset balance related to SFAS 109 deferrals by $19 million. 74. In accordance with the Decision dated April 29, 1998, in Docket No. 92-11-11, CL&P recorded an out of rate base accrual, with interest, from MP3 of $7.382 million from July 1, to 18, 1998. 75. The Company used the operating results for the 12 months ended December 31, 1997, as its test year. 76. The Company did not budget for potential employee lawsuit settlements prior to 1998. 77. The Company projected $1.1 million for employee relocation expenses for the 1999 rate year. 78. The Company included $550,000 in its advertising expense for the grassroots program. 79. The Company included $1.4 million in its advertising expense for industry restructuring.
  8. Page 179 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 179 of 191 Page 172 80. Section 17 of the Act specifically states that it is the Department’s responsibility to develop a public outreach program that will educated consumers on the issue of industry restructuring. 81. The Electric Power Research Institute, which has two taxable subsidiariesEPRICSG, Inc. and EPRIGEN, Inc. provides extensive research and development services to the electric utility industry. 82. In 1997, the Company entered into a Transition and Retirement Agreement with its former CEO to reflect his election to retire. He is carrying out work as a consultant in support of litigation that pertains to outage related issues. 83. The Company has negotiated with its telephone service carriers to reduce costs. 84. The Company used a 1999 labor escalation rate of 3.6% derived from the Data Resources, Inc. review of the U. S. Economy, May 1997. 85. The actual labor escalation rates for 1996 and 1997 were 3.8% and 3.9%, respectively. 86. The actual salary increase for employees in 1998 was 4% versus the budget of 3.9%. 87. The total payroll for CL&P is a combination of direct labor CL&P charges and allocations from NUSCO and NNECO. 88. The actual NNECO employee level for September 1998 was 1,659. 89. The Company projects NNECO employee levels of 1,814 for 1999. 90. The Company has reduced contractors at Millstone in the range of 500 to 600. 91. The Company budgeted 2,456 CL&P employees for 1998. The actual as of September 1998 is 2,368. 92. The Company projects CL&P employee levels to be 2,589 for 1999. 93. The Company transferred approximately 250 positions from NUSCO to CL&P. 94. The Company budgeted 2,447 NUSCO employees for 1998. The actual as of September 1998 is 2,234. 95. The Company projects NUSCO employee levels to be 2,467 for 1999. 96. The 1999 salary program is based on the expected actual level of FTE’s and labor dollars. 97. A new executive incentive plan which includes a deferred compensation plan, was implemented in 1998.
  9. Page 180 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 180 of 191 Page 173 98. Executive incentive plans are paid by shareholders. 99. Executive base salary is the amount of executive compensation that has traditionally been allowed for ratemaking purposes. 100. The Company’s top executives received a 4% salary increase in 1998. The Company has projected a 3.6% increase for 1999 for executives and other staff. 101. From 1995 to 1998, executive base salaries have increased approximately 70%. 102. Non-management bonus/incentives were $11.1 million in 1995, $13.9 million in 1996, and $15.5 million in 1997. 103. In 1998, the employee incentive compensation program was based on how well the departments perform against their own incentive goals and the financial health of the Company, which will be determined by the EPS. 104. The Company included $5.1 million in outside services related to the Millstone Units restart efforts. 105. Property tax expense is based on the latest estimated mill rates and assessments. 106. CL&P’s fuel costs are recovered through base rates and the EAC. 107. The EAC reconciles CL&P’s total actual fuel cost to the revenue collected through the BRFR. 108. The Company’s current BRFR is $.02185/kWh. 109. The Company proposes to increase the BRFR to $.03089/kWh. 110. The BRFR has traditionally used a forecasted rate year capacity factor for each nuclear power plant. 111. The Company does not rely on historical operating performance of nuclear plants when forecasting rate year capacity factors. 112. Since 1995, annual and average performance at SB and VY has exceeded CL&P’s proposed capacity factors for these units. 113. Recent historical capacity factors for MP2 and MP3 are unavailable because these units have not operated since 1996. 114. MY was retired on August 6, 1997. 115. Recovery of MY RPC is subject to refund pending a final decision by the Federal Energy Regulatory Commission in Docket No. ER98-570-000.
  10. Page 181 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 181 of 191 Page 174 116. CY was retired on December 4, 1996. 117. CL&P has deferred CY RPC since the plant was retired. 118. Recovery of CY RPC is subject to refund pending a final decision by the Federal Energy Regulatory Commission in Docket No. ER97-913-000. 119. CL&P’s Fuel Simulation relied on a forecasted price of oil that ranged between $16-$18 per barrel. 120. The price of oil has declined during 1998. 121. Norwalk Harbor Station demonstrates the lowest price of oil among CL&P’s generating plants. 122. The price of oil at Norwalk Harbor was approximately $12/bbl at the close of hearing. 123. The price of natural gas trends with oil. 124. The BRFR reflects the total cost for purchases under CL&P’s cogeneration contracts. 125. The Energy Policy Act of 1992 requires electric utilities to fund the D&D costs of DOE’s uranium enrichment plants. 126. CL&P proposes to amortize an accumulated unrecovered balance of $22.3 million reflecting unrecovered D&D costs. 127. During the outages at CL&P’s nuclear units, fossil generation replaced unavailable nuclear production. 128. D&D costs are embedded in CL&P’s current BRFR. 129. The Company did not recover D&D costs during periods in which its nuclear units were out of rate base. 130. CL&P proposes to use the FERC Method for recovering D&D costs. 131. CL&P’s current delivery efficiency percentage is .92225 and its proposed percentage is .92040. 132. Historical average delivery efficiency percentages are greater than the proposed percentage. 133. The Sharing Agreement allocates the energy cost savings resulting from the economic dispatch of the combined NU and PSNH systems.

As listed on the current system

Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)