Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 874, 885, 886

Files5

Search terms highlighted
Eversource rate increase is on 67 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of OCC-886_Final.pdf

Extracted from the file · 1 page · 1,819 characters

Words on different pagesRead the text of OCC-886_Final.pdf
67 pages match
  1. Page 27 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 27 of 191 Page 20 accrue the credit to customers, plus interest, and include the accrued credit in base rates in the rate year. The Department could then decide to apply the accumulated MP2 non-cash accrual against the CY deferral or use it for something else. Roman Supp. PFT, pp. 1-3; Tr. 10/13/98, pp. 3455-3461. In Exhibit 1-SP01, the Company filed an ORB calculation based on the revised Application. It was similar in format to the current ORB calculation. The rate base data were also contained in the response to Interrogatory OCC-98. The Company annualized first quarter 1999 revised simulated replacement energy and capacity costs (RPC) as a proxy for 1999 RPC. The annualized RPC was used to match the annualized numbers used in the rest of the ORB calculation. The Company believes the credit is most likely to be in effect only for the first quarter of 1999, and, therefore, wanted the RPC and the credit to reflect what it projects the actual costs will be. The RPC would continue to be subject to true-up in the Energy Adjustment Clause (EAC), as is done currently. Tr. 10/13/98, pp. 3464-3466. OCC believes that MP2 should continue its ORB status, although on a cash reduction basis. However, OCC believes the proper MP2 ORB calculation should remove property taxes and not allow recovery of replacement capacity costs. OCC believes that ratepayers should not be required to fund property taxes for a generation plant that is not used and useful. OCC Brief, pp. VI-8 and 9. OCC did not identify any record evidence in support of its belief that CL&P does not need to buy capacity. OCC also would like to change the terms under which the MP2 surcredit would end. OCC believes the unit should run at 95% power for 200 hours and that specific Department approval should be required. OCC Brief, pp. VI-9 and 10. The Decision dated April 29, 1998, in Docket No. 92-11-11 states that upon notification to the Department that MP2 or Millstone Unit 3 (MP3) has operated at no less than 95% power for 100 continuous hours, the corresponding accrual would end without further Department action. Decision, pp. 7 and 9. The Department finds no basis to use OCC’s recommended terms to end the ORB treatment. When MP3 returned from the 10CFR50.54(f) outage, the unit required an extensive power escalation and testing program prior to returning to full power. This program required a slow, deliberate escalation in reactor power and long hold points at pre-defined power levels for testing purposes. This program required several weeks to complete. Given that MP2 will require a similar power escalation program, the unit will have operated for a long period of time prior to exceeding 95% power. The Department believes that this requirement should therefore be relaxed for MP2, and deems that MP2 will be returned to service when it has operated at no less than 75% power for 100 continuous hours. Once MP2 meets that standard, it will be returned to rate base without further Department action. While the Department finds CL&P’s method of calculating MP2 costs for 1999 reasonable, it disagrees with the amounts used and the final ORB estimate. The rate base calculation filed in response to Interrogatory OCC-98 did not contain a materials and supplies (M&S) component. The M&S component of the prior ORB calculation was $13,248,000. Docket No. 97-05-12, Response to Interrogatory EL-95. Consistent with the discussion in Section II.F.6, the Department increases the M&S component to calculate an average M&S for 1999 and includes it in the ORB calculation. The
  2. Page 28 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 28 of 191 Page 21 Department has not removed the MP2 refueling outage accrual, as calculated in Section II.F.23, in the O&M to assure the Company that it will continue to collect the accrual while MP2 is out of rate base. The Department also adjusts MP2 working capital to reflect changes made to total allowed working capital in Section II.E.6.e. The Department also adjusts rate base and O&M by the MP2 adjustments made in Sections II.E.2 and II.F.7.c and f of this Decision. The Department’s adjustments result in a rate base reduction of $325,136,000 and O&M removal of $114,534,000 as compared to CL&P’s proposed rate base reduction of $333,061,000 and O&M removal of $115,696,000. The Department calculates replacement energy costs based on production and costs contained in this Decision less direct nuclear fuel. The Final Fuel Simulation, as discussed in Section II.G.1, demonstrates total production for MP2 for 1999 to be 5,257,000 MWhs and direct nuclear fuel cost of $24,466,800. Revise WPC-3.1. This total includes an adjustment to the production for January through June to reduce production to a CL&P basis. The adjusted marginal cost as calculated by the Department is $19.46/MWh. Total estimated replacement energy for MP2 is $77,834,420 [(5,257,000 MWhs x $19.46) - $24,466,800]. Consistent with the discussion in Section II.G.1.k, the Department has not removed nuclear fuel indirect costs to assure the Company that it will continue to collect D&D while MP2 is out of rate base. The Department finds CL&P’s method of calculating replacement capacity costs of $19,164,000, using an annualized estimate of first quarter 1999 for MP2, reasonable and accepts that number. Late Filed Exhibit No. 167. The Department finds no basis for OCC’s statement that CL&P need not buy replacement capacity for MP2; therefore, net RPC for MP2 is $96,998,420. This compares to CL&P’s estimate of $150,824,000. The primary difference is the estimate for the marginal cost of energy due to the fact that oil prices have dropped significantly and were not reflected in CL&P’s estimate. The final ORB change to CL&P’s retail revenues is $79,032,000 as can be seen on the following table. The RPC will continue to be subject to true-up in the energy adjustment clause, as is done currently.
  3. Page 29 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 29 of 191 Docket No. 98-01-02 Page 22 Millstone Unit 2 ORB Calculation Rate Base Changes ($000's) Rate Base Reduction Return on Rate Base (325,136) 8.05% Reduction in Operating Income Revenue Conversion Factor (26,173) 1.758 Revenue Reduction - re Rate Base & Capitalization Interest Synchronization (46,013) 9,474 Operating Expenses O&M Depreciation Replacement Power: 1999 Gross Receipts & Bad Debts Factor Total Change in Revenues Less: CMEEC Ownership Entitlement TOTAL CHANGE IN CL&P RETAIL REVENUES (114,534) (26,500) 96,998 (44,036) 1.0456 (46,044) (82,583) 3,551 (79,032) The Department believes it is most appropriate to continue the non-cash accrual for the MP2 disallowance to be used as an offset to the potential ratepayer liability for the accumulated Connecticut Yankee RPC deferral (CY Deferral). As of September 28, 1998, the monthly accrual will be $6,586,000 ($79,032,000 / 12) and will earn interest at the Company’s weighted cost of capital approved in Section II.M.6. As the Company has already recorded a monthly accrual of $3.1 million per month plus interest for the period from September 28, 1998, through February 5, 1999, the Company should record an additional monthly accrual from February to May 1999 to account for the additional $3,486,000 monthly accrual plus interest for the previous period. Once the accrual exceeds the deferred balance, CL&P shall return the excess MP2 accrual to ratepayers through the EAC. If it is determined that ratepayers are not responsible for CY RPC the Department will determine the ratemaking treatment in a future EAC proceeding. However, if it is determined that ratepayers are responsible for CY RPC and the MP2 accrual plus interest is less than the deferral at that time, the MP2 accrual will be applied in its entirety against the CY Deferral. Thereafter, the remaining CY Deferral will be amortized at the rate of the monthly revenue reduction associated with MP2 being removed from rate base until the deferral is eliminated or MP2 returns to service. If the deferral is not eliminated before MP2 returns to service, the balance will be recovered through the EAC. C. ISSUES FROM DOCKET NO. 97-05-12 In the Decision dated December 31, 1997, in Docket No. 97-05-12, the Department concluded that CL&P could potentially overearn during 1998 by approximately $261 million. Decision, Table III. The Department opened this docket to
  4. Page 30 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 30 of 191 Page 23 continue its review undertaken in Docket No. 97-05-12 and to conduct a full rate review. In phase one of this docket, the Department concluded that $110.479 million in overearnings should be used for additional amortizations of regulatory assets subject to true up in the phase two Decision. Interim Decision, pp. 1 and 4. The Application prescribes rate reductions of $21 million representing 1999 forecasted current outage costs for MP2 and 3 and applies $19 million in revenue sufficiency overearnings to amortization of the deferred balance of Financial Accounting Standard (SFAS) 109. Morris PFT, pp. 3 - 5. The Company filed an exhibit that addressed $150 million in potential overearnings identified in Docket No. 97-05-12 that were not addressed in phase one, summarized them and indicated how the Company treated them in the Application. The Company removed some costs from the rate year, adjusted the amounts of others, and left some in 1999, as it believed was appropriate. The Company believes it addressed all issues from Docket No. 97-05-12; therefore, the rate year is clean. Late Filed Exhibit No. 9; Tr. 9/11/98, pp. 495-506; Tr. 10/16/98, pp. 3797-3808. The Company’s efforts to exclude some of the Docket No. 97-05-12 Decision items from the rate year should have lead to a greater rate decrease than proposed. However, the Company contends that other items contained in the Application, such as depreciation, fuel costs and cost of capital, have increased since the Department’s review in Docket No. 97-05-12. In the September 30, 1998, revised schedules, the Company recommended adjustments to the Application that it deemed necessary to arrive at appropriate rates that it should be allowed to charge customers. OCC, AG, PRO, CIEC and CCM also recommended adjustments in their briefs. The Department has reviewed the rate base, expenses, revenues and the cost of capital contained in the Application and has taken into consideration recommended adjustments. Based on that comprehensive review, the Department has made appropriate adjustments to the Application and orders additional reductions and amortizations for the rate year. When the Orders are implemented, the Company will have the opportunity to earn the allowed return on equity set in Section II.M, below, and will no longer be collecting revenues in excess of its needs. Therefore, the potential overearnings that were identified in Docket No. 97-05-12 and partially addressed in the phase one Decision are moot.
  5. Page 31 of 191

    Docket No. 98-01-02 D. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 31 of 191 Page 24 TEST YEAR / RATE YEAR It is the practice of this Department in utility rate cases to establish rates prospectively upon the basis of a historical test year, adjusted for pro forma purposes. In this case, the Company has used the operating results for the 12 months ended December 31, 1997, as its test year. The Department will accept this time period as the test year. Historically, the Company has adjusted its test year to reflect its rate base and capital structure to the midpoint of the rate year (i.e., the year that rates will be in effect). Additionally, revenues were adjusted for weather normalization and forecasted year customers and certain expenses were adjusted for known changes. The Company also applied an inflation factor to those expenses that were not specifically adjusted elsewhere. The Department believes it is appropriate to begin with the 1997 budget upon which the 1998 forecast was based and then the 1999 rate year projected. In developing the 1999 forecast, the Company has not reflected any MP1 capital and operating costs in the calculation of revenue requirements but has included a full year of replacement power costs. Although MP2 and 3 are forecasted to be operating in 1999, the Company removed from its revenue requirements $21 million of its budgeted operation and maintenance expense levels. Mahoney PFT, pp. 3 and 4. Other costs with known changes, such as fossil outages and amortizations, also were adjusted discretely. The remaining costs were escalated using factors of 1.8% for materials and 3.6% for labor. E. RATE BASE 1. Fossil/Hydroelectric Plant Additions a. Bulls Bridge Hydroelectric Station The Company’s initial filing included additions totaling $2,370,600 related to “automation of station/units” at the Bulls Bridge hydroelectric station. Supplemental Filing dated June 30, 1998, FHEO Capital, p. 4. The Company has since indicated that this project will be canceled. Response to Interrogatory EL-75, Supplement 1. The Company also revised its plant additions by $1,307,600 to reflect cancellations or postponements of miscellaneous projects at its fossil units. Late Filed Exhibit No. 6; AR-OCC-67. The Company states that plant additions should not be reduced by these amounts, since it has determined that new additions have been identified that will be required to comply with Phase II of the Clean Air Act. However, the Company did not provide justifications of these projects or any further detail on them. Id. The Department cannot consider the Phase II Clean Air Act additions without supporting evidence. Additionally, the Company did not quantify these expenditures. Therefore, there is insufficient justification to include them in rate base. The Department reduces average rate base by $1,839,100 [($2,370,600 + $1,307,600)/2].
  6. Page 32 of 191Match

    Docket No. 98-01-02 b. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 32 of 191 Page 25 Middletown 1 The Company reactivated Middletown 1 due to the need for increased capacity and predicted it would make capital additions to that plant in 1998. The Company does not anticipate making the capital additions; therefore, $285,000 in rate base should be removed for the rate year. Response to Interrogatory EL-287; Tr. 9/15/98, pp. 10591061. The Department concurs and reduces rate base by $285,000. c. Devon Station Gas Turbines CL&P installed four gas turbines at Devon Station in 1996 to provide replacement capacity and energy while the Millstone units were out of service. The installation of the leased turbines was directly related to the Millstone outages. The units were procured under a five-year lease, and it is presently planned to release the units upon termination of the lease, or sooner. Response to Interrogatory EL-219. The Company spent $13.7 million in 1996 and $.5 million in 1997 to install the units. Late Filed Exhibit No. 130. The Company forecasts to spend an additional $1.4 million in capital additions on the units. Late Filed Exhibit No. 168, Read-In YY. As with the T&D reliability additions related to the Millstone outages, see Section II.E.3, the Department concludes that the Devon Station gas turbines were added solely due to the Millstone outages, and therefore all costs associated with these units should be disallowed. The Department assumes the capital installation costs are depreciated over the life of the lease and calculates rate base for the leased units as total capital expenditures less accumulated depreciation and reduces rate base by $6.688 million. In its written exceptions, CL&P sought clarification that the net proceeds from the eventual divestiture of the Devon units will be allocated to shareholders. Written Exceptions, p. 4. The Department is only engaged with the current ratemaking aspects of the Devon units in this case. The Department does not make any ruling as to the assignment of proceeds from divestiture of the Devon units in this case, but will review the assignment of proceeds in other proceedings relating to the implementation of the Act. The Department makes an out-of-rate-base calculation for MP2 due to the continued outage, which allows CL&P to recover replacement power costs, including replacement capacity costs. See Section II.A.3, above. The cost of capacity related to the Devon leased units is significantly higher than the market price of capacity today. The Department will allow CL&P to use the Devon leased units as replacement capacity, but only at the market price of capacity. Consequently, even though CL&P will not earn a return on the capital costs or receive operating costs through base rates, when the units are used to serve retail load, ratepayers will be partially responsible for the costs of the units in the EAC. 2. Nuclear Plant Additions The Company included in its filing the expansion of the Four Mile River Road building in East Lyme at a cost of $1.12 million. However, Company documents reveal that this expansion was necessary to accommodate personnel working on the Millstone outages. Late Filed Exhibit No. 6, AR-OCC-35. OCC states that this expenditure
  7. Page 33 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 33 of 191 Page 26 should be disallowed. Schlissel Testimony, p. 67. Since the expenditure is directly related to the Millstone outages, the Department will remove the cost from rate base. However, the Department will reconsider this issue in a future rate proceeding if the Company provides evidence that the addition has value apart from the Millstone outage. The Company’s plant additions also include $4 million for underground oil tanks installed at MP1. Response to Interrogatory EL-163. However, the tanks were installed on the premise that MP1 would restart from the current outage, which is no longer the case. The Company did not seek to include this amount in rates, since all MP1 costs are excluded from rates. However, the Company is considering modifying the tanks and associated piping for use at MP2. The Company has not finalized these plans. Late Filed Exhibit No. 71. Therefore, the Department will not allow this addition in rate base at this time. However, the Department will reconsider this issue in a future rate proceeding if the Company provides evidence that the fuel tanks are being used at MP2. The Company’s filing originally included $29,004,000 in plant additions for MP2 in 1999. Schedule H-1.2. This amount includes projects to be done during the next refueling outage, which was scheduled to occur in 1999 at the time the initial filing was made. Since then, the Company postponed the refueling outage to 2000. Late Filed Exhibit No. 172. The plant additions associated with that outage are therefore not appropriate for inclusion in rate base, because they fall outside the rate year. 2 The actual amount of plant additions at MP2 is $5,081,000, reflecting only those projects still scheduled for 1999 that do not require a refueling outage. Late Filed Exhibit No. 165, Supplement 1. Therefore, the Department reduces rate base for MP2 by $11,961,500 [$29,004,000 - $5,081,000) x (50%)]. 3. Transmission and Distribution Additions The Company’s request includes plant additions for T&D system improvements incurred in 1996 and 1997 at a cost of $16,066,474 to increase transmission import capacity during the Millstone outages. Response to Interrogatory EL-219. The improvements were located in the Enfield and Suffield areas. The Company states that these additions should be allowed, regardless of their origin, since they will allow customers access to a wider array of power sources after the industry is opened to competition in 1999. Louth Testimony, p. 10. The Company states that these upgrades will improve the flexibility and security of the system even after the nuclear plants are returned to service. Id., p. 11. The Company also states that many of these upgrades would have been necessary in the next 10 years regardless of the loss of the Millstone units and that many had been previously contemplated as system improvements. Response to Interrogatory EL-219, p . 3. The Department sought information from the 1995 time frame that indicated whether any of these projects were planned at that time to determine whether any of the subject improvements would have been implemented regardless of the Millstone outages. Tr. 9/28/98, pp. 2807-2809. The Company was unable to provide any such 2 Rate base is limited to 50% of 1999 plant additions, since the Department uses the average rate base for the rate year.
  8. Page 34 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 34 of 191 Page 27 information. Instead, it provided documentation on the projects that dated to the 1996 (post Millstone outage) time frame. The Company also provided information from a study concerning T&D improvements in the western and southern portions of the state. Late Filed Exhibit No. 129, Attachments A and B. However, there is no mention of pending improvements to the T&D system in the Enfield and Suffield areas in these documents. The Company was therefore unable to support its claim that some of these projects were planned prior to the Millstone outages. The Company states that the projects that involve installation of capacitors would not appear in the 1995 documentation, since capacitors are installed on an ongoing basis as part of good utility practice. Tr. 9/28/98, p. 2808. The Department agrees that this is the case, since installation of capacitors does not involve significant preplanning/engineering work, in relation to other system improvements. Capacitors are installed in utility distribution systems to counteract inductive loading, or leading power factor, in a portion of the system. Inductive loading tends to increase over time as system loads increase, therefore, a utility system installs capacitors as a normal course of business. Installation of these devices is therefore part of ongoing system maintenance. The Department requested data on system inductive loading or power factor in the subject portions of the T&D system from the 1995 time frame. Id. The Company provided power factor data by district from 1995. Late Filed Exhibit No. 129, Attachment C. When the electric system contains only resistance, the current (amperes) and voltage remain in step (rise and fall in value together and reverse in direction at the same instant - referred to as “in-phase”). In this case, the product of volts times amperes (“volt-amperes”) equal watts, which, when measured over time, equal watthours. When the system contains inductance equipment, such as transformers and, to a lesser extent, the power lines themselves, the current is shifted “out-of-phase” with the voltage causing the current to lag the voltage. The amount of shift depends on the relative amounts of resistance and inductance. When the current is out-of-phase with the voltage, the power in watts is no longer equal to the volt-amperes (apparent power) but rather is equal to the product of volt-amperes times the “power factor.” The power factor can be defined as the ratio of actual power (in watts) to volt-amperes or the ratio of actual power to apparent power. When the current and voltage are in-phase, the power factor is unity (1.00), the largest value possible, and as current lag increases the power factor decreases. The power factor represents the portion of electric energy supplied that is converted into useful work or heat and lighting (“actual power” or “active power”). The remainder of the electric energy supplied is required to produce or sustain the magnetic fields necessary for the operation of induction devices and performs no work. This is the “reactive power.” In practice, a “perfect” power factor of 1.0 is almost never achieved. The data the Company provided on power factor indicate that the system power factor in 1995 in the Enfield district was not materially in need of capacitance. The Enfield district power factor under maximum load was 0.9788, and under average load was 0.9865. Late Filed Exhibit No. 129, Attachment C. Both of these values are relatively high. In fact, they were higher than any of the other three districts that comprise the Eastern Region. Of the 11 other districts in the CL&P system, the Enfield district was in better condition from a power factor standpoint than eight of them.
  9. Page 35 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 35 of 191 Page 28 Although this simple comparison does not conclusively demonstrate that no capacitors would have been required at any point in the system at that time, there are no data that indicate that additional capacitors were necessary in the Enfield district. Therefore, the Company has not demonstrated that the capacitors would have been required absent the Millstone outages. However, this evidence also demonstrates that capacitor additions were required in substantially all the other districts. The Department believes that a sharing of the capacitor costs is therefore appropriate and will allow the Company to include 50% of these costs in rate base, or $3,540,569. The Company also states that the T&D additions may have value after the Millstone units have returned to service and the industry is opened to competition in 1999. However, the extent to which this is true will depend heavily on how the market evolves, and the emergence of new generation resources within Connecticut. The impact of these T&D resources on the market is therefore uncertain at this time. In addition, it is not clear at this time as to who would be responsible for the costs of transmission system upgrades under competition. It is possible that they would be the responsibility of the electric suppliers who want to move power over the transmission lines to serve end-use customers. Thus, they would not be recovered through transmission charges. The Department concludes that the there is no substantial evidence that the T&D additions related to the Millstone outages, other than the capacitors discussed above, provide any benefit to the Company’s T&D system, other than importing power while the units are shut down. The future value of these additions is uncertain. Therefore, the Department will not allow these additions in rate base. The majority of these additions are recorded in accounts 353 and 356. Late Filed Exhibit No. 177. Therefore, the Department will assume an average service life of 42 years and reduce rate base, net of accumulated depreciation by $11,880,092. However, the Department will reconsider this issue in a future rate proceeding if the Company provides evidence that the additions have value apart from the Millstone outages. 4. Construction Program The Company’s proposal for construction in 1999 totals approximately $312,250,000 and for the five-year period 1999 through 2003 totals approximately $1,663,630,000, which equates to an average expenditure of $332,726,000 per year. The breakdown of these amounts is as follows:
  10. Page 36 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 36 of 191 Docket No. 98-01-02 Page 29 Construction Program Forecast ($000) Production Transmission Distribution General Removal Total Schedule F-7.0. 1999 1999-2003 Total 1999-2003 Average 80,245 4,582 195,879 8,655 20,301 309,662 294,783 51,262 1,202,122 22,229 97,039 1,663,630 58,957 10,252 240,424 4,446 19,407 332,726 The Company’s average capital expenditures for the years 1993 through 1997 were $148,690,000. Response to Interrogatory EL-365. In general, the forecast of capital expenditures is consistent with the past, with the exception of distribution. Distribution expenditures increased from $75,476,000 in 1993 to $88,756,000 in 1997. Id. Distribution expenditures are expected to increase to a maximum of $263,846,000 in 2001. Schedule F-7.0. The primary reason this increases is a greater focus on improving reliability. Louth Testimony, p. 3. Capital intensive components of the Company’s reliability improvement program include: CL&P Reliability Expenditures Forecast, 1999 Program Funding Forecast Replace Obsolete Overhead Replace Direct Buried Cable Replace Transmission/Substation Equip. Bare Wire Upgrade to Covered Wire Louth Testimony, pp. 20-23. $17M in 1999, escalating to $60M in 2003 $7M $11M $11M The Company’s line maintenance program describes how the Company maintains and improves its distribution plant. The Department last reviewed the Company’s line maintenance program in Docket No. 86-12-03, Long Range Investigation to Examine the Adequacy of the Transmission and Distribution Systems of The Connecticut Light and Power Company and The United Illuminating Company, and Docket No. 97-11-10, DPUC Review of Electric Utility Line Maintenance Plans - 1998. In the joint Decision in those dockets, the Department stated that it “expects significant improvements in CL&P’s system reliability . . .” and found that the Company’s new policies for replacement of failure prone equipment, including direct buried cable and overhead equipment, were necessary and should improve system reliability. Decision dated August 21, 1998, pp. 9 and 11. The Department also found that the Company did not have a systematic program for replacing bare wire with covered wire, but that such a program was necessary to improve reliability, given the conclusive data on the effectiveness of covered wire in preventing tree-caused outages. Id., p. 11.

As listed on the current system

Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)