Interrogatory responses
Answers to questions 874, 885, 886
Files5
OCC-874_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download OCC-874_Final.pdfRead the text of OCC-874_Final.pdf
OCC-874 Attachment 1 REDACTED.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download OCC-874 Attachment 1 REDACTED.pdfRead the text of OCC-874 Attachment 1 REDACTED.pdf
OCC-885_Final.pdf
PDF · 77 KB · 1 pageText searchable
Download OCC-885_Final.pdfRead the text of OCC-885_Final.pdf
OCC-886_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download OCC-886_Final.pdfRead the text of OCC-886_Final.pdf
OCC-886 Attachment 1.pdf
PDF · 10 MB · 191 pagesText searchable
Download OCC-886 Attachment 1.pdfRead the text of OCC-886 Attachment 1.pdf
Text of OCC-886_Final.pdf
Extracted from the file · 1 page · 1,819 characters
Page 30 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 30 of 191 Page 23 continue its review undertaken in Docket No. 97-05-12 and to conduct a full rate review. In phase one of this docket, the Department concluded that $110.479 million in overearnings should be used for additional amortizations of regulatory assets subject to true up in the phase two Decision. Interim Decision, pp. 1 and 4. The Application prescribes rate reductions of $21 million representing 1999 forecasted current outage costs for MP2 and 3 and applies $19 million in revenue sufficiency overearnings to amortization of the deferred balance of Financial Accounting Standard (SFAS) 109. Morris PFT, pp. 3 - 5. The Company filed an exhibit that addressed $150 million in potential overearnings identified in Docket No. 97-05-12 that were not addressed in phase one, summarized them and indicated how the Company treated them in the Application. The Company removed some costs from the rate year, adjusted the amounts of others, and left some in 1999, as it believed was appropriate. The Company believes it addressed all issues from Docket No. 97-05-12; therefore, the rate year is clean. Late Filed Exhibit No. 9; Tr. 9/11/98, pp. 495-506; Tr. 10/16/98, pp. 3797-3808. The Company’s efforts to exclude some of the Docket No. 97-05-12 Decision items from the rate year should have lead to a greater rate decrease than proposed. However, the Company contends that other items contained in the Application, such as depreciation, fuel costs and cost of capital, have increased since the Department’s review in Docket No. 97-05-12. In the September 30, 1998, revised schedules, the Company recommended adjustments to the Application that it deemed necessary to arrive at appropriate rates that it should be allowed to charge customers. OCC, AG, PRO, CIEC and CCM also recommended adjustments in their briefs. The Department has reviewed the rate base, expenses, revenues and the cost of capital contained in the Application and has taken into consideration recommended adjustments. Based on that comprehensive review, the Department has made appropriate adjustments to the Application and orders additional reductions and amortizations for the rate year. When the Orders are implemented, the Company will have the opportunity to earn the allowed return on equity set in Section II.M, below, and will no longer be collecting revenues in excess of its needs. Therefore, the potential overearnings that were identified in Docket No. 97-05-12 and partially addressed in the phase one Decision are moot.Page 31 of 191
Docket No. 98-01-02 D. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 31 of 191 Page 24 TEST YEAR / RATE YEAR It is the practice of this Department in utility rate cases to establish rates prospectively upon the basis of a historical test year, adjusted for pro forma purposes. In this case, the Company has used the operating results for the 12 months ended December 31, 1997, as its test year. The Department will accept this time period as the test year. Historically, the Company has adjusted its test year to reflect its rate base and capital structure to the midpoint of the rate year (i.e., the year that rates will be in effect). Additionally, revenues were adjusted for weather normalization and forecasted year customers and certain expenses were adjusted for known changes. The Company also applied an inflation factor to those expenses that were not specifically adjusted elsewhere. The Department believes it is appropriate to begin with the 1997 budget upon which the 1998 forecast was based and then the 1999 rate year projected. In developing the 1999 forecast, the Company has not reflected any MP1 capital and operating costs in the calculation of revenue requirements but has included a full year of replacement power costs. Although MP2 and 3 are forecasted to be operating in 1999, the Company removed from its revenue requirements $21 million of its budgeted operation and maintenance expense levels. Mahoney PFT, pp. 3 and 4. Other costs with known changes, such as fossil outages and amortizations, also were adjusted discretely. The remaining costs were escalated using factors of 1.8% for materials and 3.6% for labor. E. RATE BASE 1. Fossil/Hydroelectric Plant Additions a. Bulls Bridge Hydroelectric Station The Company’s initial filing included additions totaling $2,370,600 related to “automation of station/units” at the Bulls Bridge hydroelectric station. Supplemental Filing dated June 30, 1998, FHEO Capital, p. 4. The Company has since indicated that this project will be canceled. Response to Interrogatory EL-75, Supplement 1. The Company also revised its plant additions by $1,307,600 to reflect cancellations or postponements of miscellaneous projects at its fossil units. Late Filed Exhibit No. 6; AR-OCC-67. The Company states that plant additions should not be reduced by these amounts, since it has determined that new additions have been identified that will be required to comply with Phase II of the Clean Air Act. However, the Company did not provide justifications of these projects or any further detail on them. Id. The Department cannot consider the Phase II Clean Air Act additions without supporting evidence. Additionally, the Company did not quantify these expenditures. Therefore, there is insufficient justification to include them in rate base. The Department reduces average rate base by $1,839,100 [($2,370,600 + $1,307,600)/2].Page 32 of 191
Docket No. 98-01-02 b. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 32 of 191 Page 25 Middletown 1 The Company reactivated Middletown 1 due to the need for increased capacity and predicted it would make capital additions to that plant in 1998. The Company does not anticipate making the capital additions; therefore, $285,000 in rate base should be removed for the rate year. Response to Interrogatory EL-287; Tr. 9/15/98, pp. 10591061. The Department concurs and reduces rate base by $285,000. c. Devon Station Gas Turbines CL&P installed four gas turbines at Devon Station in 1996 to provide replacement capacity and energy while the Millstone units were out of service. The installation of the leased turbines was directly related to the Millstone outages. The units were procured under a five-year lease, and it is presently planned to release the units upon termination of the lease, or sooner. Response to Interrogatory EL-219. The Company spent $13.7 million in 1996 and $.5 million in 1997 to install the units. Late Filed Exhibit No. 130. The Company forecasts to spend an additional $1.4 million in capital additions on the units. Late Filed Exhibit No. 168, Read-In YY. As with the T&D reliability additions related to the Millstone outages, see Section II.E.3, the Department concludes that the Devon Station gas turbines were added solely due to the Millstone outages, and therefore all costs associated with these units should be disallowed. The Department assumes the capital installation costs are depreciated over the life of the lease and calculates rate base for the leased units as total capital expenditures less accumulated depreciation and reduces rate base by $6.688 million. In its written exceptions, CL&P sought clarification that the net proceeds from the eventual divestiture of the Devon units will be allocated to shareholders. Written Exceptions, p. 4. The Department is only engaged with the current ratemaking aspects of the Devon units in this case. The Department does not make any ruling as to the assignment of proceeds from divestiture of the Devon units in this case, but will review the assignment of proceeds in other proceedings relating to the implementation of the Act. The Department makes an out-of-rate-base calculation for MP2 due to the continued outage, which allows CL&P to recover replacement power costs, including replacement capacity costs. See Section II.A.3, above. The cost of capacity related to the Devon leased units is significantly higher than the market price of capacity today. The Department will allow CL&P to use the Devon leased units as replacement capacity, but only at the market price of capacity. Consequently, even though CL&P will not earn a return on the capital costs or receive operating costs through base rates, when the units are used to serve retail load, ratepayers will be partially responsible for the costs of the units in the EAC. 2. Nuclear Plant Additions The Company included in its filing the expansion of the Four Mile River Road building in East Lyme at a cost of $1.12 million. However, Company documents reveal that this expansion was necessary to accommodate personnel working on the Millstone outages. Late Filed Exhibit No. 6, AR-OCC-35. OCC states that this expenditurePage 33 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 33 of 191 Page 26 should be disallowed. Schlissel Testimony, p. 67. Since the expenditure is directly related to the Millstone outages, the Department will remove the cost from rate base. However, the Department will reconsider this issue in a future rate proceeding if the Company provides evidence that the addition has value apart from the Millstone outage. The Company’s plant additions also include $4 million for underground oil tanks installed at MP1. Response to Interrogatory EL-163. However, the tanks were installed on the premise that MP1 would restart from the current outage, which is no longer the case. The Company did not seek to include this amount in rates, since all MP1 costs are excluded from rates. However, the Company is considering modifying the tanks and associated piping for use at MP2. The Company has not finalized these plans. Late Filed Exhibit No. 71. Therefore, the Department will not allow this addition in rate base at this time. However, the Department will reconsider this issue in a future rate proceeding if the Company provides evidence that the fuel tanks are being used at MP2. The Company’s filing originally included $29,004,000 in plant additions for MP2 in 1999. Schedule H-1.2. This amount includes projects to be done during the next refueling outage, which was scheduled to occur in 1999 at the time the initial filing was made. Since then, the Company postponed the refueling outage to 2000. Late Filed Exhibit No. 172. The plant additions associated with that outage are therefore not appropriate for inclusion in rate base, because they fall outside the rate year. 2 The actual amount of plant additions at MP2 is $5,081,000, reflecting only those projects still scheduled for 1999 that do not require a refueling outage. Late Filed Exhibit No. 165, Supplement 1. Therefore, the Department reduces rate base for MP2 by $11,961,500 [$29,004,000 - $5,081,000) x (50%)]. 3. Transmission and Distribution Additions The Company’s request includes plant additions for T&D system improvements incurred in 1996 and 1997 at a cost of $16,066,474 to increase transmission import capacity during the Millstone outages. Response to Interrogatory EL-219. The improvements were located in the Enfield and Suffield areas. The Company states that these additions should be allowed, regardless of their origin, since they will allow customers access to a wider array of power sources after the industry is opened to competition in 1999. Louth Testimony, p. 10. The Company states that these upgrades will improve the flexibility and security of the system even after the nuclear plants are returned to service. Id., p. 11. The Company also states that many of these upgrades would have been necessary in the next 10 years regardless of the loss of the Millstone units and that many had been previously contemplated as system improvements. Response to Interrogatory EL-219, p . 3. The Department sought information from the 1995 time frame that indicated whether any of these projects were planned at that time to determine whether any of the subject improvements would have been implemented regardless of the Millstone outages. Tr. 9/28/98, pp. 2807-2809. The Company was unable to provide any such 2 Rate base is limited to 50% of 1999 plant additions, since the Department uses the average rate base for the rate year.Page 34 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 34 of 191 Page 27 information. Instead, it provided documentation on the projects that dated to the 1996 (post Millstone outage) time frame. The Company also provided information from a study concerning T&D improvements in the western and southern portions of the state. Late Filed Exhibit No. 129, Attachments A and B. However, there is no mention of pending improvements to the T&D system in the Enfield and Suffield areas in these documents. The Company was therefore unable to support its claim that some of these projects were planned prior to the Millstone outages. The Company states that the projects that involve installation of capacitors would not appear in the 1995 documentation, since capacitors are installed on an ongoing basis as part of good utility practice. Tr. 9/28/98, p. 2808. The Department agrees that this is the case, since installation of capacitors does not involve significant preplanning/engineering work, in relation to other system improvements. Capacitors are installed in utility distribution systems to counteract inductive loading, or leading power factor, in a portion of the system. Inductive loading tends to increase over time as system loads increase, therefore, a utility system installs capacitors as a normal course of business. Installation of these devices is therefore part of ongoing system maintenance. The Department requested data on system inductive loading or power factor in the subject portions of the T&D system from the 1995 time frame. Id. The Company provided power factor data by district from 1995. Late Filed Exhibit No. 129, Attachment C. When the electric system contains only resistance, the current (amperes) and voltage remain in step (rise and fall in value together and reverse in direction at the same instant - referred to as “in-phase”). In this case, the product of volts times amperes (“volt-amperes”) equal watts, which, when measured over time, equal watthours. When the system contains inductance equipment, such as transformers and, to a lesser extent, the power lines themselves, the current is shifted “out-of-phase” with the voltage causing the current to lag the voltage. The amount of shift depends on the relative amounts of resistance and inductance. When the current is out-of-phase with the voltage, the power in watts is no longer equal to the volt-amperes (apparent power) but rather is equal to the product of volt-amperes times the “power factor.” The power factor can be defined as the ratio of actual power (in watts) to volt-amperes or the ratio of actual power to apparent power. When the current and voltage are in-phase, the power factor is unity (1.00), the largest value possible, and as current lag increases the power factor decreases. The power factor represents the portion of electric energy supplied that is converted into useful work or heat and lighting (“actual power” or “active power”). The remainder of the electric energy supplied is required to produce or sustain the magnetic fields necessary for the operation of induction devices and performs no work. This is the “reactive power.” In practice, a “perfect” power factor of 1.0 is almost never achieved. The data the Company provided on power factor indicate that the system power factor in 1995 in the Enfield district was not materially in need of capacitance. The Enfield district power factor under maximum load was 0.9788, and under average load was 0.9865. Late Filed Exhibit No. 129, Attachment C. Both of these values are relatively high. In fact, they were higher than any of the other three districts that comprise the Eastern Region. Of the 11 other districts in the CL&P system, the Enfield district was in better condition from a power factor standpoint than eight of them.Page 35 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 35 of 191 Page 28 Although this simple comparison does not conclusively demonstrate that no capacitors would have been required at any point in the system at that time, there are no data that indicate that additional capacitors were necessary in the Enfield district. Therefore, the Company has not demonstrated that the capacitors would have been required absent the Millstone outages. However, this evidence also demonstrates that capacitor additions were required in substantially all the other districts. The Department believes that a sharing of the capacitor costs is therefore appropriate and will allow the Company to include 50% of these costs in rate base, or $3,540,569. The Company also states that the T&D additions may have value after the Millstone units have returned to service and the industry is opened to competition in 1999. However, the extent to which this is true will depend heavily on how the market evolves, and the emergence of new generation resources within Connecticut. The impact of these T&D resources on the market is therefore uncertain at this time. In addition, it is not clear at this time as to who would be responsible for the costs of transmission system upgrades under competition. It is possible that they would be the responsibility of the electric suppliers who want to move power over the transmission lines to serve end-use customers. Thus, they would not be recovered through transmission charges. The Department concludes that the there is no substantial evidence that the T&D additions related to the Millstone outages, other than the capacitors discussed above, provide any benefit to the Company’s T&D system, other than importing power while the units are shut down. The future value of these additions is uncertain. Therefore, the Department will not allow these additions in rate base. The majority of these additions are recorded in accounts 353 and 356. Late Filed Exhibit No. 177. Therefore, the Department will assume an average service life of 42 years and reduce rate base, net of accumulated depreciation by $11,880,092. However, the Department will reconsider this issue in a future rate proceeding if the Company provides evidence that the additions have value apart from the Millstone outages. 4. Construction Program The Company’s proposal for construction in 1999 totals approximately $312,250,000 and for the five-year period 1999 through 2003 totals approximately $1,663,630,000, which equates to an average expenditure of $332,726,000 per year. The breakdown of these amounts is as follows:Page 36 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 36 of 191 Docket No. 98-01-02 Page 29 Construction Program Forecast ($000) Production Transmission Distribution General Removal Total Schedule F-7.0. 1999 1999-2003 Total 1999-2003 Average 80,245 4,582 195,879 8,655 20,301 309,662 294,783 51,262 1,202,122 22,229 97,039 1,663,630 58,957 10,252 240,424 4,446 19,407 332,726 The Company’s average capital expenditures for the years 1993 through 1997 were $148,690,000. Response to Interrogatory EL-365. In general, the forecast of capital expenditures is consistent with the past, with the exception of distribution. Distribution expenditures increased from $75,476,000 in 1993 to $88,756,000 in 1997. Id. Distribution expenditures are expected to increase to a maximum of $263,846,000 in 2001. Schedule F-7.0. The primary reason this increases is a greater focus on improving reliability. Louth Testimony, p. 3. Capital intensive components of the Company’s reliability improvement program include: CL&P Reliability Expenditures Forecast, 1999 Program Funding Forecast Replace Obsolete Overhead Replace Direct Buried Cable Replace Transmission/Substation Equip. Bare Wire Upgrade to Covered Wire Louth Testimony, pp. 20-23. $17M in 1999, escalating to $60M in 2003 $7M $11M $11M The Company’s line maintenance program describes how the Company maintains and improves its distribution plant. The Department last reviewed the Company’s line maintenance program in Docket No. 86-12-03, Long Range Investigation to Examine the Adequacy of the Transmission and Distribution Systems of The Connecticut Light and Power Company and The United Illuminating Company, and Docket No. 97-11-10, DPUC Review of Electric Utility Line Maintenance Plans - 1998. In the joint Decision in those dockets, the Department stated that it “expects significant improvements in CL&P’s system reliability . . .” and found that the Company’s new policies for replacement of failure prone equipment, including direct buried cable and overhead equipment, were necessary and should improve system reliability. Decision dated August 21, 1998, pp. 9 and 11. The Department also found that the Company did not have a systematic program for replacing bare wire with covered wire, but that such a program was necessary to improve reliability, given the conclusive data on the effectiveness of covered wire in preventing tree-caused outages. Id., p. 11.Page 37 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 37 of 191 Page 30 The proposed amounts for funding improvements to the distribution system represent a major commitment on the part of the Company to enhance system reliability. Replacement of old or faulty overhead, underground, and substation equipment is necessary to improve the reliability of the distribution system. The Company’s plans for bare wire conversion to covered wire will increase the proportion of covered wire from 34% to 50% by 2003. Louth Testimony, p. 23. The Department believes this is a reasonably aggressive effort to improve the resistance of the system to tree contacts and will therefore improve reliability substantially. The proposed capital expenditures for distribution improvements are therefore reasonable and necessary to serve the public. The Department concludes that the construction program appears reasonable for planning purposes; however, all proposed items are subject to review when the Company seeks their inclusion in rate base. 5. Accumulated Depreciation The Department reduces CL&P’s proposed depreciation expense by $13,280,827 ($7,210,587 + $2,238,000 + $3,084,646 + 747,594) in Sections F.1, below. Since the Department uses the average rate base for the rate year, the accumulated depreciation must be adjusted by one half of the adjustment to depreciation expense. Consequently, the Department reduces accumulated depreciation by $6,640,414, thereby increasing rate base by the same amount. CL&P correctly stated in its written exceptions that the Department did not adjust accumulated depreciation for the removal of Bulls Bridge Hydroelectric station, Middletown 1 and the Four Mile River Road building. CL&P estimated the adjustments to be $140,870. Written Exceptions, Appendix, p. 8. However, the Department also did not remove the rate year depreciation expense for these items. The adjustment to depreciation expense would offset the accumulated depreciation adjustment resulting in no change to revenue requirements. Therefore, the Department does not make either adjustment. 6. Working Capital a. Introduction It is customary regulatory practice to allow an adjustment to rate base in recognition of the timing differences between when revenues are received and when expenses are paid out and to account for the need to have such items as fuel and materials and supplies on hand and available prior to actually being needed. For large utilities, the Department typically requires that timing differences between revenues and expenses be determined by means of a lead/lag study rather than using some rule of thumb approach. In the Decision dated June 16, 1993, in Docket No. 92-11-11, the Department ordered the Company to conduct a lead/lag study and submit it with its next rate application. The Company has complied with that order and filed the results of its study as Schedule H-1.6 along with supporting work papers. In addition to a request for a working capital allowance based on the results of its lead/lag study (cash workingPage 38 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 38 of 191 Page 31 capital), the Company has requested an allowance for Fuel Reserve, Nuclear Fuel Reserve, and Materials and Supplies, Excluding Fuel. The Department has reviewed the Company’s request for a working capital allowance and finds it acceptable except as noted below. b. Fuel Reserve The Company has proposed to include a level of fuel reserve in its working capital based on the average expected fuel inventory for December 31, 1998, and December 31, 1999, and reflecting fuel prices for those two dates as forecasted by CERA. Schedules B-1.0 and B-4.0; Late Filed Exhibit No. 100. As of the date of the Company’s filing, CERA was projecting the cost of oil delivered to CL&P generating sites to range from $18.57 to $31.04 per barrel during this time frame depending on the site and fuel grade used. These forecasted oil costs are significantly higher than current costs to the Company and higher than the Department is expecting for the Company during calendar year 1999. See Section II.G.1, below. Consistent with the oil costs the Department is using in this Decision to determine the base fuel rate for the Company, the Department will recalculate the fuel reserve using oil costs to the Company that range from $12.00 to $24.47. In addition, the Department finds the use of inventory levels as of December 31 st for purposes of setting a fuel reserve for ratemaking purposes highly questionable. The level of inventory for generating sites typically varies during the course of a year as the level of production expected/required from the site changes. Since the Company generally attempts to keep a minimum 10-day, full-load supply of inventory at each site, months of higher expected/required production are characterized by higher inventories and vice versa. Late Filed Exhibit No. 100. The months of December, January and February mark that time of the year when oil generation is expected to be its highest and, thus, inventories taken at that time tend to be significantly higher than at other times of the year. Late Filed Exhibit No. 138. In the Decision dated June 16, 1993, in Docket No. 92-11-11, the Department found “. . . it inappropriate to use a December balance . . . because December levels are usually higher.” Decision, p. 14. That Decision indicated that inventory levels for April 30th were more than 30% less than the December 31st levels. Id. Late Filed Exhibit No. 138 shows that average monthly expected oil generation production during 1999 is more than 32% less than the production in December. Compared to January, the discrepancy is even greater, with average production more than 50% less. Clearly, an inventory level as of December 31st is likely to be at least 30% higher than average inventory levels for the year; therefore, the Department will reduce the fuel reserve by 30%. The net result of the above adjustments is to reduce fuel reserve from $22,888,000 to $10,734,000. c. Nuclear Fuel Reserve The Company’s request for nuclear fuel reserve is predicated on decontamination and decommissioning (D&D) costs that were incurred by the Company for 1996 through 1997 and into 1998 but have not been expensed. Tr. 9/22/98, pp. 2039 and 2040. The Company claims that these costs have also not been recovered from ratepayers and, thus, are owing from ratepayers, including rate base treatmentPage 39 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 39 of 191 Page 32 while the costs are recovered. Id.; Brief, pp. 24-28. However, as discussed in Section II.G.1, below, the Department finds that until the units were removed from rate base, these costs were recovered from ratepayers during the period they were incurred. As such, there is no amount due to the Company and no amount that should be included in rate base. Therefore, the Department has reduced the nuclear fuel reserve included in rate base by $11,150,000 (22,300,000 2). d. Materials and Supplies, Excluding Fuel The Company initially requested an allowance of $70,364,000 for materials and supplies, excluding fuel for the 1999 rate year based on the average of the materials and supplies, excluding fuel balances on December 31, 1998 and December 31, 1999. These balances were calculated using the actual balance as of December 31, 1997, of accounts 154 and 163 escalated at 4% per year plus CL&P’s portion of the average materials and supplies balance per the Northeast Nuclear Energy Company Millstone 3 Nuclear Unit funding statement for January 1998. Schedule B-1; WPB-1; Late Filed Exhibit No. 5 AR-DPUC-08, AR-DPUC-028. In its revised filing, the Company used an escalation rate of 3% on account 154 and 163 balances. The 4% and 3% escalation rates used by the Company in its calculations of the average materials and supplies, excluding fuel balance for rate year 1999 are significantly in excess of the escalation rates, as measured by the Producer Price Index, historically achieved in the first two quarters of 1998, and currently projected for 1998 as a whole and 1999. See Section II.F.6, below. The current projections for 1998 and 1999 are negative 0.4% and positive 0.7%, respectively. Id. The Department finds it reasonable and consistent to use these latest projections to escalate the balances of accounts 154 and 163 to calculate the average materials and supplies, excluding fuel balance, for rate year 1999. Using these escalation rates results in a reduction to the 1999 average materials and supplies excluding fuel balance, from $70,364,000 to $67,190,000, a net reduction of $3,174,000.
As listed on the current system
Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026