Interrogatory responses
Answers to questions 874, 885, 886
Files5
OCC-874_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download OCC-874_Final.pdfRead the text of OCC-874_Final.pdf
OCC-874 Attachment 1 REDACTED.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download OCC-874 Attachment 1 REDACTED.pdfRead the text of OCC-874 Attachment 1 REDACTED.pdf
OCC-885_Final.pdf
PDF · 77 KB · 1 pageText searchable
Download OCC-885_Final.pdfRead the text of OCC-885_Final.pdf
OCC-886_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download OCC-886_Final.pdfRead the text of OCC-886_Final.pdf
OCC-886 Attachment 1.pdf
PDF · 10 MB · 191 pagesText searchable
Download OCC-886 Attachment 1.pdfRead the text of OCC-886 Attachment 1.pdf
Text of OCC-886_Final.pdf
Extracted from the file · 1 page · 1,819 characters
Page 37 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 37 of 191 Page 30 The proposed amounts for funding improvements to the distribution system represent a major commitment on the part of the Company to enhance system reliability. Replacement of old or faulty overhead, underground, and substation equipment is necessary to improve the reliability of the distribution system. The Company’s plans for bare wire conversion to covered wire will increase the proportion of covered wire from 34% to 50% by 2003. Louth Testimony, p. 23. The Department believes this is a reasonably aggressive effort to improve the resistance of the system to tree contacts and will therefore improve reliability substantially. The proposed capital expenditures for distribution improvements are therefore reasonable and necessary to serve the public. The Department concludes that the construction program appears reasonable for planning purposes; however, all proposed items are subject to review when the Company seeks their inclusion in rate base. 5. Accumulated Depreciation The Department reduces CL&P’s proposed depreciation expense by $13,280,827 ($7,210,587 + $2,238,000 + $3,084,646 + 747,594) in Sections F.1, below. Since the Department uses the average rate base for the rate year, the accumulated depreciation must be adjusted by one half of the adjustment to depreciation expense. Consequently, the Department reduces accumulated depreciation by $6,640,414, thereby increasing rate base by the same amount. CL&P correctly stated in its written exceptions that the Department did not adjust accumulated depreciation for the removal of Bulls Bridge Hydroelectric station, Middletown 1 and the Four Mile River Road building. CL&P estimated the adjustments to be $140,870. Written Exceptions, Appendix, p. 8. However, the Department also did not remove the rate year depreciation expense for these items. The adjustment to depreciation expense would offset the accumulated depreciation adjustment resulting in no change to revenue requirements. Therefore, the Department does not make either adjustment. 6. Working Capital a. Introduction It is customary regulatory practice to allow an adjustment to rate base in recognition of the timing differences between when revenues are received and when expenses are paid out and to account for the need to have such items as fuel and materials and supplies on hand and available prior to actually being needed. For large utilities, the Department typically requires that timing differences between revenues and expenses be determined by means of a lead/lag study rather than using some rule of thumb approach. In the Decision dated June 16, 1993, in Docket No. 92-11-11, the Department ordered the Company to conduct a lead/lag study and submit it with its next rate application. The Company has complied with that order and filed the results of its study as Schedule H-1.6 along with supporting work papers. In addition to a request for a working capital allowance based on the results of its lead/lag study (cash workingPage 38 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 38 of 191 Page 31 capital), the Company has requested an allowance for Fuel Reserve, Nuclear Fuel Reserve, and Materials and Supplies, Excluding Fuel. The Department has reviewed the Company’s request for a working capital allowance and finds it acceptable except as noted below. b. Fuel Reserve The Company has proposed to include a level of fuel reserve in its working capital based on the average expected fuel inventory for December 31, 1998, and December 31, 1999, and reflecting fuel prices for those two dates as forecasted by CERA. Schedules B-1.0 and B-4.0; Late Filed Exhibit No. 100. As of the date of the Company’s filing, CERA was projecting the cost of oil delivered to CL&P generating sites to range from $18.57 to $31.04 per barrel during this time frame depending on the site and fuel grade used. These forecasted oil costs are significantly higher than current costs to the Company and higher than the Department is expecting for the Company during calendar year 1999. See Section II.G.1, below. Consistent with the oil costs the Department is using in this Decision to determine the base fuel rate for the Company, the Department will recalculate the fuel reserve using oil costs to the Company that range from $12.00 to $24.47. In addition, the Department finds the use of inventory levels as of December 31 st for purposes of setting a fuel reserve for ratemaking purposes highly questionable. The level of inventory for generating sites typically varies during the course of a year as the level of production expected/required from the site changes. Since the Company generally attempts to keep a minimum 10-day, full-load supply of inventory at each site, months of higher expected/required production are characterized by higher inventories and vice versa. Late Filed Exhibit No. 100. The months of December, January and February mark that time of the year when oil generation is expected to be its highest and, thus, inventories taken at that time tend to be significantly higher than at other times of the year. Late Filed Exhibit No. 138. In the Decision dated June 16, 1993, in Docket No. 92-11-11, the Department found “. . . it inappropriate to use a December balance . . . because December levels are usually higher.” Decision, p. 14. That Decision indicated that inventory levels for April 30th were more than 30% less than the December 31st levels. Id. Late Filed Exhibit No. 138 shows that average monthly expected oil generation production during 1999 is more than 32% less than the production in December. Compared to January, the discrepancy is even greater, with average production more than 50% less. Clearly, an inventory level as of December 31st is likely to be at least 30% higher than average inventory levels for the year; therefore, the Department will reduce the fuel reserve by 30%. The net result of the above adjustments is to reduce fuel reserve from $22,888,000 to $10,734,000. c. Nuclear Fuel Reserve The Company’s request for nuclear fuel reserve is predicated on decontamination and decommissioning (D&D) costs that were incurred by the Company for 1996 through 1997 and into 1998 but have not been expensed. Tr. 9/22/98, pp. 2039 and 2040. The Company claims that these costs have also not been recovered from ratepayers and, thus, are owing from ratepayers, including rate base treatmentPage 39 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 39 of 191 Page 32 while the costs are recovered. Id.; Brief, pp. 24-28. However, as discussed in Section II.G.1, below, the Department finds that until the units were removed from rate base, these costs were recovered from ratepayers during the period they were incurred. As such, there is no amount due to the Company and no amount that should be included in rate base. Therefore, the Department has reduced the nuclear fuel reserve included in rate base by $11,150,000 (22,300,000 2). d. Materials and Supplies, Excluding Fuel The Company initially requested an allowance of $70,364,000 for materials and supplies, excluding fuel for the 1999 rate year based on the average of the materials and supplies, excluding fuel balances on December 31, 1998 and December 31, 1999. These balances were calculated using the actual balance as of December 31, 1997, of accounts 154 and 163 escalated at 4% per year plus CL&P’s portion of the average materials and supplies balance per the Northeast Nuclear Energy Company Millstone 3 Nuclear Unit funding statement for January 1998. Schedule B-1; WPB-1; Late Filed Exhibit No. 5 AR-DPUC-08, AR-DPUC-028. In its revised filing, the Company used an escalation rate of 3% on account 154 and 163 balances. The 4% and 3% escalation rates used by the Company in its calculations of the average materials and supplies, excluding fuel balance for rate year 1999 are significantly in excess of the escalation rates, as measured by the Producer Price Index, historically achieved in the first two quarters of 1998, and currently projected for 1998 as a whole and 1999. See Section II.F.6, below. The current projections for 1998 and 1999 are negative 0.4% and positive 0.7%, respectively. Id. The Department finds it reasonable and consistent to use these latest projections to escalate the balances of accounts 154 and 163 to calculate the average materials and supplies, excluding fuel balance, for rate year 1999. Using these escalation rates results in a reduction to the 1999 average materials and supplies excluding fuel balance, from $70,364,000 to $67,190,000, a net reduction of $3,174,000.Page 40 of 191
Docket No. 98-01-02 e. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 40 of 191 Page 33 Cash Working Capital The Company’s request for an allowance for cash working capital is based on the average timing difference between when the Company receives its revenues and when it pays out its expenses as measured and weighted by the Company for the 1997 test year. Relative to the Company’s prior lead/lag study, the study submitted in this case indicates a number of significant decreases to the leads of several expense categories, including pension costs, nuclear fuel, and local property, federal unemployment, Connecticut unemployment, sales/use, and corporate business taxes. The Company testified that these changes were related to changes in its accounting practice, better tracking of certain transactions, changes in the make up or definition of certain accounts and/or the particulars of the 1997 test year relative to the test year used in the prior study. Response to Interrogatory EL-341; Tr. 9/22/98, pp. 2067 and 2068. Given the Company’s testimony regarding the reasons for various expense lead decreases, the Department will accept the leads and lags indicated in the study for purposes of determining a cash working capital allowance in this proceeding. The study did not look at the lead associated with short-term debt and this item has not been historically considered for purposes of determining the Company's cash working capital allowance. However, in this proceeding, the Department finds it appropriate to include short-term debt in the Company's capital structure as discussed in Section II.M, below. To maintain consistency between the capital structure and the cash working capital allowance, the Department finds it appropriate to include shortterm debt in the calculation of the allowance. The Department has done so assuming a short-term interest expense lead of 30 days reflective of monthly interest payments. In addition to the various leads and lags assigned to expense and revenue categories, a cash working capital allowance is also predicated on the weight accorded each category and the level of total expense that the allowance must accommodate. The Company’s proposed allowance is based on a hybrid approach using an average of expected annual total expense for 1998 and 1999, and categories that are weighted based on the percent of total each category achieved during the test year 1997. Tr. 9/22/98, pp. 2045 and 2046. During cross-examination, the Company agreed that the total expense should be based solely on the level for 1999 and not averaged with 1998 as done by the Company. Id. Also, and relative to this proceeding, the Department finds it more appropriate to weight the categories based on revenues and expenses found reasonable for ratemaking purposes, (i.e., based on calendar year 1999 and as adjusted by the Department), as this better matches the allowance with the period for which rates are being set and is consistent with the total expense level that is being accommodated. The Company concedes that such an adjustment is not inappropriate. Id. Making this adjustment and using the total expense level allowed by this Decision reduces the calculated net lag for the Company from 12.71 days to 10.36 days and the requested cash working capital allowance from $79,974,000 to $65,397,000. 7. Conservation and Load Management The Company forecasts $28.752 million in 1999 conservation and load management (C&LM) expenditures as approved in the Decision dated March 25, 1998, in Docket No. 97-10-23, DPUC Review of The Connecticut Light and Power Company’sPage 41 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 41 of 191 Page 34 1998 and 1999 Conservation and Load Management Program, Budgets and Conservation Adjustment Mechanism. The Company indicated that it deferred the entire amount to the balance sheet and proposes to amortize 1999 deferred expenditures ratably over 1999. The Company expects to amortize and fully recover all current and prior unamortized C&LM costs through 1999. The Company later indicated that the amount deferred was $26.7 million, while $2.1 million related to payroll was expensed. Responses to Interrogatories EL-88 and OCC-255; Tr. 9/14/98, pp. 793-796, 913; Late Filed Exhibit No. 6, AR-OCC-56 and 168, Read-In I. The Company offsets unamortized C&LM balances by the after tax proceeds received from sales of SO2 Allowances and NOX Emission Reduction Credits in accordance with the Decision in Docket No. 93-04-07, DPUC Review of Electric Utilities’ Plans Pursuant to Public Act 92-106 Regarding Permit Allowance Revenues from the Federal Clean Air Act Amendments of 1990. The Company confirmed that the revenues from sales of SO2 Allowances from Environmental Protection Agency (EPA) auction sales reduce unamortized C&LM balances. Tr. 9/14/98, p. 917. The revenues from these sales fluctuate from $30,000 to $60,000 each year. Response to Interrogatory EL-89. The EPA auction sales will continue into 1999; however, the Company did not reflect any offsets to C&LM balances. This is because there are likely to be credits held back and the Company did not model the forecast down to the level of precision that would incorporate the small amount of SO2 Allowance sales revenues. Tr. 9/14/98, pp. 917-920. The Company set an objective in Docket No. 96-10-09, DPUC Review of the Conservation and Load Management Programs and Budgets and Conservation Adjustment Mechanism of The Connecticut Light and Power Company for 1997, to reduce the unamortized C&LM balance to zero by 2000. The Department agreed that was an appropriate objective. Decision dated April 16, 1997, p. 6. If the Company’s expectation for fully amortizing C&LM balances in 1999 is not met, any small remaining unamortized balance at the end of 1999 would be offset by the revenue the Company will receive from the sales of SO2 Allowances. Because the amount at issue is likely to be immaterial, the Department will not revise the Company’s 1999 unamortized C&LM balance or impute revenues from sales of SO2 Allowances. The 1999 detailed forecast used to project the operating expenses in the Application shows 1999 amortization of deferred C&LM expenditures to be $41.779 million. Response to Interrogatory OCC-6, p. 3. The unamortized balance at December 31, 1998, is $13.026 million. Response to Interrogatory OCC-255, p. 5. A simple calculation leads to the conclusion that CL&P amortized $28.753 million ($41.779 million - $13.026 million) of 1999 deferred expenditures in 1999. The Department believes the actual financial data are more persuasive than the Company’s later assertion to the contrary. Therefore, the Department finds that CL&P has deferred 100% of 1999 C&LM expenditures. The Company’s methodology of deferring 100% of 1999 C&LM expenditures and fully amortizing them over 1999 leads to a similar ratemaking result as expensing all 1999 expenditures. Therefore, no adjustment to the Company’s rate base is necessary.Page 42 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 42 of 191 Page 35 The Department has reviewed all the issues surrounding recovery of past and current C&LM expenditures and concludes that it is appropriate to expense all 1999 C&LM expenditures. However, amortizations of prior C&LM balances remain unchanged from the Company’s filing. The Company’s sales and revenue forecast reflects lost sales and consequently lost fixed costs as a result of C&LM initiatives. The Company recovers the costs of C&LM, including amortization of capitalized expenditures, a return on the unamortized balance of capitalized expenditures, lost fixed costs, and a bonus incentive to encourage C&LM initiatives through base rates and the Conservation Adjustment Mechanism (CAM). The Department now finds that by year end 1999 all past deferred C&LM expenditures, all 1999 C&LM expenditures and lost fixed costs will be recovered. Therefore, the Department eliminates the CAM for 1999. The Department allows the Company to continue to earn a bonus return on its C&LM expenditures for 1999. See discussion in Section II.F.13, below. 8. Gains on Disposition of Property Schedule G-2.17 lists completed and projected land sales for 1997 - 1999. However, CL&P believes the level of uncertainty that surrounds land sales makes it impossible to predict when each sale will ultimately occur. Therefore, CL&P did not reflect land sales in the rate year forecast. Response to Interrogatory OCC-134; Tr. 9/14/98, p. 935. The Company espoused this same belief in Docket No. 92-11-11. According to the Company, a major land sale at the time was speculative and other properties registered with the Department of Economic Development would take three to five years to sell. The Department acknowledged that the land sale market was stagnant, but indicated there was extensive potential for sales and recommended that the Company be innovative in marketing its properties. Therefore, the Department increased gains on disposition of property for the rate period. Docket No. 92-11-11 Decision, pp. 27 and 28. Ultimately, the major land sale transaction did not close. However, the Company has closed an average of 12 real estate transactions per year and achieved annual gains on disposition of property of $157,000; $3,197,638; $1,030,206; $104,000; $243,000; and $695,000 during the years 1992 - 1997, respectively. Late Filed Exhibit Nos. 40 and 168, Read-Ins UU and ZZ. This evidence of actual gains on land sales validated the Decision in Docket No. 92-11-11. CL&P did not present new evidence in this proceeding that would lead the Department to reverse course from the Decision in Docket No. 92-11-11. Historically, the Department has imputed gains on disposition of property as revenue in a rate year, reducing revenue requirements in setting retail rates. Section 8(h)(3) and (4) of the Act mandates that stranded costs for nuclear generation assets be reduced by the net proceeds that are above book value (i.e., gains) received by an electric company for the sale or lease of any real property after July 1, 1998. The Department has ordered the Company to create a contra asset account to record the gains and offset rate base by such gains. Decisions in Docket No. 98-06-09, dated August 21, 1998, Application ofPage 43 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 43 of 191 Page 36 The Connecticut Light and Power Company for Approval of Land Sale and Grant of Easement, p. 2; and Docket No. 98-05-11, dated August 21, 1998, Application of The Connecticut Light and Power Company for Release of an Easement in Meriden, Connecticut, p. 3. This method of recording gains allows ratepayers to receive the benefit of the carrying costs on the gains until they are used to reduce nuclear stranded costs. CL&P provided a list of land sale transactions not completed by July 1, 1998, that have been approved by the Department or that CL&P is negotiating with or has contracted with buyers. This list contains CL&P’s estimated completion date for each transaction. Response to Interrogatory EL-210; Late Filed Exhibit No. 40. From this evidence, the Department concludes that the Company will have some amount of closed land sales in 1998 and 1999 resulting in gains on disposition of property. CL&P agreed that it is likely some land sales will take place in 1999. Tr. 9/14/98, p. 934. Consistent with the Act, CL&P will reflect the gain on sale of relevant property as an offset to stranded costs of nuclear generation assets. Response to Interrogatory EL-142. CL&P calculated the impact to rate base and income for 1997 - 1999 from gains for all the land sales listed in Schedule G-2.17 by taking the sales price less expenses associated with the sale less the book value of the property less income taxes. The Company identified one sale in which $2.08 million of the gain related to land that was never included in rate base. The Company did not reflect the gain in the revenue impacts because the gain would historically have been recorded below-theline. Response to Interrogatory EL-143. The Company revised the exhibit and calculated the impact to rate base and income that results from treating the gains in accordance with the Act. Late Filed Exhibit No. 38. Once again, the Company did not include the gain from the sale of land that was never in rate base in the calculation. Also, the Company added the average gains in 1998 and 1999 in the calculation of the impact to 1999 rate base. OCC believes the projected gains should be recorded as income in the rate year. Larkin PFT, p. 21 and Exhibit L&A-1. OCC believes this adjustment is appropriate because the Department has referred to this proceeding as a traditional rate case. In this proceeding OCC believes the Department should ignore the requirements of the Act, because those issues will be dealt with in the stranded costs proceeding. OCC does not perceive using the gains to reduce revenue requirements in this proceeding and mitigating stranded costs in a later proceeding as a double hit to the Company. Response to Interrogatory CL&P-8; Tr. 10/13/98, pp. 3389 and 3390. The Department believes it is appropriate to reflect gains on all land sales expected to occur by December 31, 1999, in setting rates for 1999. However, the Department strongly disagrees with OCC’s argument to impute gains in rate year revenues. OCC’s argument is contradictory to the Act. Based on the data contained in Late Filed Exhibit No. 40, the Department forecasts gains on disposition of property from July 1, to December 31, 1998, and all of 1999 of $1.157 million and $7.12 million, respectively. The Department did not include the gains for two sales, one in Lebanon and the other in Cromwell. The buyer of the Lebanon property rescinded his offer to purchase the property and the Company doesPage 44 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 44 of 191 Page 37 not have a new buyer for it at this time. The Company has yet to calculate the book value and consequently the estimated gain on the Cromwell property. Late Filed Exhibit No. 168, Read-In VV; Tr. 10/20/98, pp. 3944 and 3945. By not including the gain on the sale of the Lebanon and Cromwell properties, the Department is allowing the Company some flexibility in achieving the forecasted gains. The Company is actively marketing its surplus property. However, the Act has not compelled the Company to market surplus properties or seek to identify other properties more aggressively that it might be able to sell and increase the gains available to reduce stranded costs. Tr. 10/15/98, p. 3573. The Department is interested in exploring all land sale opportunities to reduce stranded costs of nuclear generation assets. The Department will order the Company to request a technical meeting to discuss in greater detail the Company’s policies and procedures for identifying and marketing all properties that are not needed in the delivery of electric service. In summary, the Department reduces rate base by $2.558 million, which is the sum of after tax gains from post July 1, 1998, and the average after tax gains for 1999. The Department also reduces rate base by $.248 million, which is the sum of the book value of property expected to be sold in 1998 plus the average book value of property to be sold in 1999. This methodology is consistent with the average rate base methodology for including plant additions. The total decrease to rate base for 1998 and 1999 land sales is $2.806 million ($2.558 million + $.248 million). 9. Nuclear Fuel Final Core and Materials and Supplies As discussed in Section II.F.10 and II.G.1, below, the Department disallows CL&P’s request for amortization of nuclear fuel final core and materials and supplies. The Company reduced rate base by $1.638 million for the reserve amount included in its forecast for the rate year for MP 2 and 3. The reserve for MP1 was removed when the Company removed effects of MP1 from the Application. Schedules B-1 and WPB-1.0; Tr. 9/15/98, p. 1103. The Department increases rate base by $1.638 million. 10. Enhanced Tree Trimming The Company’s view is that the enhanced tree trimming, as described in Section II.J, below, is a one-time improvement to the physical facilities that exist whether or not wire is actually replaced. Therefore, it is appropriate to treat these costs similarly to the costs of tree trimming associated with new line installations or reconductoring. The Company began this program in 1998 and if the Department accepts the Company’s proposal, CL&P will capitalize the costs incurred in that year. The Company included these costs as part of the rate base in the Application and is looking for Department concurrence to capitalize them so that it can properly record costs incurred in 1998 when it closes its books. Tr. 9/11/98, pp. 542 - 545. These costs represent a minor item of property that did not previously exist but is now added to plant because a substantial dollar addition to plant results. CL&P believes its view is consistent with FERC’s instructions for additions and retirements of electric plant contained in FERC 18 CFR, Item 10. Late Filed Exhibit No. 12; Tr. 10/16/98, p. 3808. The Company identified one other electric company that has a similar program and will be capitalizing the costs.Page 45 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 45 of 191 Page 38 Tr. 10/16/98, pp. 3809 and 3810. When the initial cycle of enhanced tree trimming is completed, the Company will expense costs to maintain the additional clearance in subsequent years. Tr. 9/11/98, p. 547. AG believes that enhanced tree trimming is different than tree trimming done in connection with reconductoring or other capital improvements and does not deserve to be capitalized. AG also contends that, overall, CL&P has failed to show that these costs should be capitalized instead of expensed. AG Brief, pp. 15 and 16. If the Department agrees with the AG’s preferred method of accounting for these costs, and requires the Company to record them as expenses, rate year expenses would be higher by $11 million, the amount of enhanced tree trimming expenditures projected for 1999. Response to Interrogatory OCC-154. This would actually increase rates to customers without providing additional benefits. The Department has reviewed the FERC requirements for accounting for tree trimming costs and concurs with CL&P’s view with respect to capitalizing the enhanced tree trimming costs. Therefore, the Department does not make an adjustment to rate base or expenses. 11. Deferred Nuclear Refueling Outage Costs The Company reduced average rate base by $33,500,000 for deferred nuclear refueling outage costs, net of deferred taxes. Schedule B-1. The Company has collected $32,016,000 ($16,464,000 + $15,552,000) from ratepayers for O&M Accruals for MP2 and MP3 through December 31, 1998. During 1999, the O&M Accruals of $4,822,000 for MP2 and $3,423,000 for MP3 will be added to the balance and MP3 outage costs of $15,900,000 will be subtracted. See discussion in Section II.F.23, below. Therefore, at the end of 1999, the accrued balance will be $24,361,000. Using these data, the Department revises the average deferred refueling outage costs, net of deferred taxes, to $17,262,000. Therefore, the Department increases 1999 average rate base by $16,238,000 ($33,500,000 - $17,262,000). 12. Payroll Adjustment The Department reduces rate base by $1.8 million as a result of the reduction to the employee compensation levels as discussed in Section 11.F.17.c. 13. Niantic Bay Fuel Trust The Department reduces rate base by $1.3 million as a result of the reduction to the Niantic Bay Fuel Trust levels as discussed in Section 11.F.5. 14. Rate Base Summary The Company requested a 1999 average rate base of $3,040,778,000. Schedule B-1. As a result of the rate base adjustments discussed above, the Department sets the 1999 average rate base at $2,876,802. F. EXPENSESPage 46 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 46 of 191 Docket No. 98-01-02 1. Page 39 Depreciation Expense The Company’s last depreciation study was reviewed and approved, with modifications, in the Decision dated August 1, 1991, in Docket No. 90-12-03, Application of The Connecticut Light and Power Company to Amend Rate Schedules. The Company presented a new depreciation study in this case (Study). As in previous cases, the Company used the straight line method, remaining life technique and vintage/broad group method, or average life group, for compiling depreciation of each type of plant. The Study results indicate a very small change in the depreciation expense compared to the results based on the study approved in Docket No. 90-12-03 (Schedule A-1.7, p. I-7). However, this is not the proper comparison. In the Decision dated July 1, 1996, in Docket No. 92-11-11, Application of The Connecticut Light and Power Company to Amend Its Rate Schedules, the Department approved a settlement agreement (Settlement Agreement) that allowed the Company to increase the depreciable lives of T&D assets by 10 years. This resulted in a reduction to the Company’s depreciation expense of approximately $25 million. Subsequent crossexamination and interrogatory responses indicate that the Company’s proposal would increase depreciation expenses by $20,521,565 when compared to current rates approved in the Settlement Agreement. Of the total increase, $347,988 is primarily due to modifications to generation facilities. The remaining $20,173,577 increase is due to modifications to the average service lives for transmission, distribution and general plant. Late File Exhibit No. 68. a. Fossil/Hydroelectric Generating Facilities The Company’s Study, as prior ones, includes a negative net salvage amount for the projected dismantling cost of the fossil and hydroelectric units. In this case, the Company submitted site specific demolition studies for the Devon Station Power Plant, the Norwalk Harbor Station Power Plant, the Montville Station Power Plant, and the Middletown Station Power Plant. The following table shows the proposed negative net salvage amounts and the amounts proposed in Docket No. 90-12-03. Fossil/Hydro Negative Net Salvage (in $million) Unit(s) Proposed Prior Increase Montville Norwalk Harbor Devon Middletown Hydro (all) $14.1 $12.2 $28.5 $15.3 $19.2 $12.6 $10.9 $24.8 $13.6 $16.7 $1.5 $1.3 $3.7 $1.7 $2.5 1995 Depreciation Study, Schedule II, pp. 1-11. The total annual amount of depreciation expense associated with negative net salvage is $7,210,587. Response to Interrogatory EL-13. PRO states that the Department should not allow negative net salvage, since any remediation costs
As listed on the current system
Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026