Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 874, 885, 886

Files5

Search terms highlighted
Eversource rate increase is on 67 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of OCC-886_Final.pdf

Extracted from the file · 1 page · 1,819 characters

Words on different pagesRead the text of OCC-886_Final.pdf
67 pages match
  1. Page 56 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 56 of 191 Docket No. 98-01-02 Page 49 a relatively small portion of CL&P O&M expenditures. Tr. 10/20/98, pp. 3975 - 3980. The Company pointed out that the DRI Total Utility O&M index is projected to rise 1.9% in 1999, and is “more representative of likely price changes that CL&P will encounter in 1999.” Late Filed Exhibit No. 90. However, the Company’s 1999 Other O&M costs escalation rate is taken directly from the May 1997 DRI forecast of the PPI finished goods, capital equipment index. The Department concludes that it is appropriate to use an escalation rate of 0.7% for Other O&M costs for ratemaking purposes, based on the updated 1999 DRI forecasted PPI finished goods, capital equipment index. This lower rate is also supported by recent minimal to negative rates of change in producer prices. OCC also supports an escalation rate of 0.7% based on the revised DRI forecast. OCC Brief, p. IV-43. The adjustment to a 0.7% escalation factor for O&M costs results in an expense adjustment of $1.9 million. OCC Brief, pp. 56-59. Therefore, the Department reduces expenses by $1.9 million. 7. Nuclear O&M Expense The Company’s filing includes higher than historical O&M expense at MP2 and MP3. The Company analyzed the differential expense based on comparison to the historical average for the years 1990 through 1995. The expense for MP2 is $34.5 million higher than the 1990-1995 average; for MP3 this differential is $11.8 million. Kenyon Testimony, p. 6. The following table shows the 1990-1995 historical amounts and the 1999 budgeted amount for each unit, on a CL&P basis. Projected vs. Historical Nuclear O&M Amount (In $million) MP2 1990-1995 Average 72.6 1999 107.1 Difference 34.5 Response to Interrogatory OCC-172. MP3 Total 53.2 65 11.8 125.8 172.1 46.3 The Company analyzed the O&M differential by identifying those costs that account for the differential and segregated them into costs related to the current outage and costs related to new or heightened industry standards. The following table shows these amounts, on a CL&P basis: MP2 and MP3 Differential O&M vs. Historical (in $million) Costs Related to Current Outage Costs Related to Industry Standards Total Dente Testimony, Exhibit TJD-1. MP2 MP3 Total 15.0 19.5 34.5 5.5 6.3 11.8 20.5 25.8 46.3
  2. Page 57 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 57 of 191 Page 50 The Company is not seeking to recover those costs related to the Millstone outages that began in 1996. AG and OCC state that the Company’s base 1990 - 1995 period should be adjusted downward by the cost of the nuclear Performance Enhancement Program (PEP). According to AG and OCC, this program was intended to address deficiencies in the Company’s nuclear program, and, since the program did not prevent the Millstone outages, it was ineffective and should not be included in the base O&M comparisons. AG Brief, p. 5; Schlissel Testimony, pp. 7-10. The Company states that the base years should not be adjusted for PEP, since the Department previously approved most of the PEP expenses, and that historical nuclear costs are similar to other nuclear units, including PEP. CL&P Brief, pp. 21 and 22. The Department ruled on the recovery of PEP costs in the Decision dated June 16, 1993, in Docket No. 92-11-11. In that proceeding, the Department examined the history of PEP and the objectives of the PEP action plans. The Department concluded the following: When analyzing the background and merit of PEP, the Authority believes that it is inappropriate to view PEP as one program with one goal. The Action Plans which comprise PEP have their own degree of merit. Some Action Plans are associated with regulatory requirements unrelated to the prior performance of NU's nuclear power plants. Some Action Plans have a direct impact on plant operation and maintenance (although they may not be cost-beneficial), while the impact of others is more subtle. Some Action Plans represent programs that were under evaluation by the Company prior to formulation of PEP and some represent initiatives that have already been implemented throughout a large segment of the nuclear industry. Other Action Plans represent programs that directly result from lack of timely management attention to certain issues. These programs have all been placed under the umbrella of PEP. The Authority believes that a reasonable decision on this issue is possible only by analyzing the constituent Action Plans. Decision, p. 52. Based on its review, the Department determined that 65% of the costs of PEP should be allowed, while the remainder was deferred to Docket No. 93-09-28, DPUC Review of The Connecticut Light and Power Company Nuclear Performance Enhancement Program, for further review. The remaining 35% was dispositioned by the July 1, 1996 Settlement Agreement in Docket No. 92-11-11. By requesting exclusion, AG and OCC are requesting the Department to rule that PEP was an imprudently incurred expense. As outlined above, the Department has already ruled on the necessity and propriety of most of PEP, and noted that many of the expenses of PEP were irrelevant to the performance of the Company’s nuclear program. It would be inappropriate to reverse a prior Decision by judging it from the ultimate fate of the Company’s nuclear program. If PEP costs are excluded from the comparison, there would presumably be other expenses that would account for the differential from the historical comparisons. Additionally, the Company has formally requested O&M based on projections for 1999, and the base period was used for
  3. Page 58 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 58 of 191 Page 51 comparison purposes only. The Department views the position of OCC and AG on this matter as supporting retroactive ratemaking and will not reduce nuclear O&M as these parties have requested. The Company identified the costs related to industry standards by function. OCC states that costs associated with a number of these functions should be disallowed. The following sections address each of these functions. a. Work Planning and Control The Company’s improvements to its work planning and control program include establishing a full time outage management staff, and ancillary costs associated with maintaining this staff. Response to OCC-177, Bulk, p. 1. OCC states that costs associated with the Work Planning and Control function should be disallowed since the Company did not identify any new or heightened industry standard requiring it, and these activities are necessary to raise the Company’s standards. Schlissel Testimony, p. 40. The Company states that the costs of this program are driven by the Maintenance Rule, which was an NRC regulation established in 1991 that became effective in 1996. The objective of the Maintenance Rule is to establish a performance-based maintenance system at each nuclear power plant that would result in performance of maintenance based on an assessment of risk. Response to Interrogatory OCC-182, Supplement 1, Bulk, Letter dated March 4, 1997, to NRC Commissioners from Joseph Callan, p. 2. The Company’s documentation on the Work Planning function indicates that implementation of the Maintenance Rule has increased quality requirements, resulting in increased training requirements and more work while the unit is on line. Response to Interrogatory OCC-177. Documentation submitted by the Company to support this function was largely linked to the Maintenance Rule. Response to Interrogatory OCC-182. The justification submitted consists largely of NRC documentation regarding Maintenance Rule inspections at other nuclear units. The documentation contains numerous references to Maintenance Rule requirements regarding safety risk assessments prior to removing equipment from service while the unit is on line. The NRC found this to be a common weakness at several plants. Id., NRC Information Notice 97-18, Problems Identified During Maintenance Rule Baseline Inspections, pp. 2 and 3. The NRC documentation includes references to utility programs that were implemented to comply with the Maintenance Rule, shows how these programs have evolved over time beyond the scope of the initial Maintenance Rule, and contains statements showing that the NRC endorsed these efforts. Id., Letter dated March 4, 1997, from Joseph Callan to NRC Commissioners, p. 5. The Maintenance Rule has been amended twice since it was issued, last in 1996. Id., p. 7. The picture that develops from this documentation is of an industry struggling to comply with a complex regulation, whose implications were not fully foreseen when initially promulgated. However, it is clear that the Maintenance Rule requires daily vigilance on the part of Company personnel who are familiar with the complex requirements of that rule. This is consistent with the Company’s establishment of a full-time outage management staff. Regardless of the existence of any standard for such a group, this function is clearly not related to the outages at Millstone nor does any party make such a claim.
  4. Page 59 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 59 of 191 Page 52 Also, the Department does not believe that the Company should be held to making only those expenditures necessary for minimal compliance with standards. In fact, the Department has found that a culture of minimal compliance was one of the root causes of the decline of Millstone station performance, resulting in the current outages. Tr. 6/27/97 in Docket No. 96-10-06 (Oral Decision), DPUC Investigation into Whether The Connecticut Light and Power Company Fulfilled Its Obligations with Regard to its Nuclear Operations, p. 847. As stated by the Department at that time, “the public and the citizens of Connecticut have a right to expect that the management of a nuclear power plant will always strive for excellence.” Id., p. 856. The Company should certainly not be held to a standard where any expenses beyond those necessary to comply with minimal regulatory standards should be viewed as wasteful, as OCC implies. Also, “industry standards” are sometimes inherently difficult to establish, since they may be set by a common approach to problems that is not codified in any documentation. Often, standards are established and understood by interaction among staff assigned to different nuclear plants. Since the cost associated with Work Planning and Control is not a consequence of the current outage, the Department will allow its inclusion in rates. b. Material Condition Improvement Program The Company is establishing a program that consolidates all painting and coating work into one organization. OCC states that the costs of this program should be disallowed, since they cannot be linked to new or heightened industry standards. Schlissel Testimony, p. 42. Also, the Company had painting and coating programs during the reference 1990-1995 time period, therefore OCC believes the additional cost cannot be justified. Id., p. 43. The Company states that the proposed costs incorporate recent industry experience with coatings at other nuclear power plants and the program achieves greater accountability by consolidating all similar work in one department. Response to Interrogatory OCC-177. The Company provided supporting documentation from the NRC that describes significant deficiencies in the application of coatings at other nuclear power plants. Response to Interrogatory OCC-182. The reported events, from as recently as 1997, highlight the importance of coatings in certain applications, where defects in coatings could have major safety implications. The record shows that industry experience with protective coatings is continually evolving. This is supportive of the Company’s efforts to focus more attention on this area of its nuclear operations. No party claims that the expenses associated with this function are the result of the current outages. As in Section II.F.7.a, above, the Department believes the Company should have the flexibility to operate and maintain its nuclear plants beyond minimal industry standards, and that it is not appropriate to include in rates only those costs required for minimal compliance with industry standards or NRC regulations. Therefore, the Department will allow this program’s costs to be included in rates. c. Commitment Tracking System The Commitment Tracking System function includes expenses for creating a centralized tracking system for all commitments made to the NRC by the Company. Response to Interrogatory OCC-177, p. 3. OCC states that the costs associated with
  5. Page 60 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 60 of 191 Page 53 this function should not be allowed, since the system was developed in response to the NRC 10CFR50.54(f) demand for information. Schlissel Testimony, p. 45. The Company provided documents from the NRC and the Nuclear Energy Institute that describe industry standards and NRC expectations for managing NRC Commitments. Response to Interrogatory OCC-182. The documents describe the importance of establishing processes and procedures for controlling commitments made to the NRC. The changes to the Commitment Tracking System improves the Company’s ability to track and maintain future commitments as well as presently existing ones. However, documentation provided by the Company states “The RCD [Regulatory Commitment Database] was developed as part of the response to the 10CFR50.54(f) letter to (1) ensure compliance with the Licensing Basis and (2) establish programs to ensure continued compliance.” Response to Interrogatory OCC-182, Letter dated 5/28/98 from Mario Robles to Walkesl. Since this program was necessitated by the 10CFR50.54(f) demand for information, the program is related to the Millstone outages and the Department will remove its costs from rates. The CL&P portion of the expense for this program is (0.81 * $500,000) [MP2] + (0.53 * $500,000) [MP3] = $670,000. Dente Testimony, Exhibit TJD-1. d. Personal Computer Leasing Program The Company has instituted a program to lease personal computers for employees, instead of buying them. OCC states that the costs associated with this program should not be allowed, since they are not associated with a new or heightened industry standard. Schlissel Testimony, p. 47. The Company states that it is leasing personal computers because it has found it to be more cost effective than purchasing them. Tr. 9/25/98, pp. 2606 and 2607. There has been no claim by any party that leasing personal computers is a result of the Millstone outages. There is no evidence that suggests leasing personal computers is a wasteful use of ratepayer funds, particularly when the alternative to leasing computers is buying them. Similar to Section II.F.7.a, above, the Department will not disallow expenses for the sole reason that they are not necessary to meet industry standards. Therefore, the Department will allow these expenses to be included in rates. e. Consolidation of Information Technology and Support The Company has instituted a program to consolidate all information technology and support functions in one department, to improve administration of these functions and achieve synergies. OCC states that the costs associated with this program should be disallowed, since it is not related to a new or heightened industry standard. Schlissel Testimony, p. 47. There has been no claim by any party that the consolidation of information technology functions is a result of the Millstone outages. Consolidation of these similar functions should result in long-term cost savings. Again, the Department will not disallow expenses for the sole reason that they are not necessary to meet industry standards. Therefore, the Department will allow these expenses to be included in rates.
  6. Page 61 of 191Match

    Docket No. 98-01-02 f. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 61 of 191 Page 54 Non-capital Plant Modifications Non-capital modifications (NCMs) are low-cost changes to plant that are treated as expense items. The Company’s initial filing included $11,800,000 for NCMs at MP2 and $930,000 at MP3, on a whole-unit basis. Dente Testimony, Exhibit TJD-1. The CL&P portions of these amounts are $9,558,000 and $493,000, respectively. The Company stated that these amounts were based on historical experience adjusted for known commitments to the NRC. Response to Interrogatory EL-1. The Company subsequently revised its expectations for 1999 NCMs when the projects were identified and submitted a list of the projects on October 29, 1998. The NCM amounts on a total unit basis are $2,720,000 for MP2 and $8,850,000 for MP3. Response to Interrogatory EL-1, Supplement 1. The CL&P portions of these amounts are $2,203,000 and $4,691,000, respectively. NCM expenses for the three years prior to the Millstone outages, 1993-1995, averaged $3,200,000 for MP2 and $9,700,000 for MP3. Response to Interrogatory EL-354. The proposed NCM amounts are consistent with historical expenses. The expense items are typical of small modifications that occur throughout the life of a nuclear plant. Therefore, the Department accepts the revised amounts and decreases the original MP2 amount by $7,355,000 and increases the original MP3 amount by $4,198,000, for a net reduction of $3,157,000. g. Calculation Tracking System The Company’s filing includes expenses for a new system for tracking calculations, which eases the retrieval of the calculations when a future need arises to access them. Previously, calculations were not comprehensively tracked on a centralized computer system. Response to Interrogatory OCC-177, Supplement 1, Bulk p. 5. OCC states that the costs associated with this program should not be allowed, since the program is not related to industry standards and is a result of the NRC 10CFR50.54(f) order that resulted in the Millstone outages. Schlissel Testimony, pp. 55 and 56. However, OCC did not cite any evidence supporting this position. The system is intended to be used on a going-forward basis to ensure future calculations are properly tracked. This should result in improved efficiencies by reducing the administrative burden of retrieving calculations from diverse locations. Tr. 9/25/98, pp. 2623-2625. Again, the Department will not disallow expenses for the sole reason that they are not necessary to meet industry standards. Therefore, the Department will allow these expenses to be included in rates. h. Material Equipment Parts List The Material Equipment Parts List (MEPL) is a database of plant components that contains information important to the maintenance of that equipment. Response to Interrogatory OCC-177, Supplement 1, p. 7. The Company’s filing includes incremental expenses for completing the MEPL. The changes to the MEPL include adding components and increasing efficiencies in the procurement and storage of replacement parts. Response to Interrogatory OCC-182, Supplement 2, Maintenance of Material Equipment Parts List. OCC states that expenses associated with this program should
  7. Page 62 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 62 of 191 Page 55 not be allowed, since the Company has not identified new or heightened industry standards associated with this program; rather, it is necessary to remedy “deficiencies.” Schlissel Testimony, p. 58. There is no evidence that the MEPL improvements are related to the Millstone outages. They are enhancements to an existing program. Since safety grade components cost considerably more than non-safety grade ones, the enhancements should result in long-run savings by elimination of the practice of procuring non-safety grade components that were previously classified as safety grade. Again, the Department will not disallow expenses for the sole reason that they are not necessary to meet industry standards. Therefore, the Department will allow these expenses to be included in rates. i. Implementation of Condition Based Maintenance The Company’s filing includes expenses for the addition of an Integrated Preventive Maintenance Program (IPMP) and an Equipment Effectiveness Training Program (EETP). These programs were implemented to develop methods for trending and monitoring performance for common component failures. The Company states that these programs will improve equipment reliability over time. Response to Interrogatory OCC-177, Supplement 1, p. 8. OCC states that the costs associated with the IPMP and EETP should not be allowed, since the Company has not identified new or heightened industry standards associated with them. Schlissel Testimony, p. 59. Documentation provided by the Company states that these programs were designed by consultation with other nuclear industry participants to identify characteristics of successful programs in this area. Response to Interrogatory OCC-178, Supplement 2, Equipment Effectiveness Trending - Best Practices Initiative, p. 3. Therefore, evidence supports the claim that these programs were implemented to meet industry standards. There is no evidence that the IPMP and EETP are related to the Millstone outages. They are improvements of an existing program. Therefore, the Department will allow these expenses to be included in rates. 8. Devon Station Gas Turbines The Devon Station O&M costs are $11.823 million, including lease payments of $9.6 million, for the rate year. June 30, 1998, Supplemental Filing, Devon Station O&M; Tr. 9/15/98, pp. 1055 and 1056; Late Filed Exhibit No. 92. As concluded in Section II.E.1.c, above, the gas turbines were added solely due to the Millstone outages. Therefore, the Department reduces expenses by $11.823 million.
  8. Page 63 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 63 of 191 Docket No. 98-01-02 9. Page 56 Decommissioning The Company filed the latest decommissioning studies for MP1, 2, and 3. The proposed method of decommissioning is immediate dismantlement (single unit DECON) for each unit. The estimated cost of decommissioning in 1997 dollars is $481,800,000 for MP1; $430,900,000 for MP2; and $519,400,000 for MP3. By comparison, the DECON cost estimates the Company submitted in Docket No. 92-11-11 were $350,864,000 for MP1; $281,798,000 for MP2; and $383,175,000 for MP3. The NRC requires each nuclear plant owner to calculate a minimum decommissioning cost per Title 10 of the federal Code of Regulations,10CFR50.75(c). The NRC also requires the owner to fund decommissioning for at least this amount, regardless of the amount determined by the site specific study. The amount is determined by a prescribed formula in 10CFR50.75(c) and adjusted by escalation factors for labor, energy, and radioactive waste burial charges. The labor and escalation factors are required to be derived from U.S. Department of Labor Statistics data, and the radioactive waste burial factor must be derived from NUREG-1307, “Report on Waste Burial Charges.” 10CFR50.65(c)(2). These amounts in 1997 dollars are calculated as $512,000,000 for MP1; $460,000,000 for MP2; and $488,000,000 for MP3. Levy Testimony, p. 21. The following chart shows the decommissioning amounts for each unit. Decommissioning Amounts (in $thousands) MP1 MP2 MP3 92-11-11 DECON 350,864 281,798 383,175 98-01-02 DECON 481,800 430,900 519,400 NRC Minimum 512,000 460,000 488,000 Proposed 512,000 460,000 519,400 The DECON cost estimates were developed by TLG Engineering, Inc. using the latest cost estimating methodologies and are based on site-specific studies for each unit. Each estimate reflects the present cost of decommissioning under current requirements using available technology. Levy Testimony, pp. 11 and 12. The DECON estimates also include a contingency factor to reflect possible schedule delays due to unforeseeable events such as equipment breakdowns. The contingency factors are assigned to individual activities based on the uncertainty associated with that activity. The overall contingency factors for each unit are 19.7% for MP1, 18.6% for MP2, and 19.0% for MP3. By comparison, in Docket No. 92-11-11 the DECON estimates included contingency factors of 15.95% for MP1, 16.18% for MP2, and 16.00% for MP3. The Company states that the changes in contingency factors are based on industry experience with decommissioning and related issues such as radioactive waste disposal costs. Tr. 9/25/98, p. 2670. The Company proposes to base the decommissioning collections on the NRC minimum amounts for MP1 and 2, and the site-specific amount for MP3. For each unit, the amount requested is the greater of the NRC minimum or the site amount. In the
  9. Page 64 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 64 of 191 Page 57 case of MP1 and 2, the amount requested is based on regulatory requirements and is not subject to potential inaccuracies in assumptions such as contingency or future radioactive waste disposal costs. Therefore, the Department concludes that the proposed amounts for MP1 and 2 are reasonable and approves them as filed. The Company proposes to base its decommissioning collection for MP3 on the site-specific DECON study amount of $519,400,000, which is $31,400,000 more than the NRC minimum amount. The Company states that the site-specific cost estimate is greater than the NRC minimum due to features peculiar to MP3 that differ from the unit on which the minimum calculation is based. Levy Testimony, p. 21. The cited differences include design, siting, and access to radioactive waste disposal sites. Response to Interrogatory EL-27. In its decommissioning estimates, the Company includes the cost of removing non-radioactive structures and components. However, the NRC does not require the costs of removing this material to be included in decommissioning cost estimates, and, in fact, specifically excludes them from its regulations regarding decommissioning. Response to Interrogatory EL-16. The Company states these costs should be included in the cost estimates, since they are legitimate business costs that will be incurred in the future. Tr. 9/25/98, pp. 2655 and 2656. The total estimated cost of non-radioactive material removal at MP3 is $71,189,000. Response to Interrogatory EL-18. This amount includes removal of a technical building, and the training/simulator building. Tr. 9/25/98, p. 2673. Both these buildings could have value after the units are decommissioned, since they do not contain any radioactive contamination and could be used for another purpose. This is particularly true of the technical building, which was constructed in 1994. Decision dated May 5, 1994, in Docket No. 93-09-04, Application of Northeast Nuclear Energy Company, The Connecticut Light and Power Company and Western Massachusetts Electric Company for Approval to Finance the Construction of a Technical Building at the Millstone Nuclear Generating Units, p. 9. Including the cost of removing non-radioactive material in decommissioning cost estimates involves issues of equity between nuclear and non-nuclear generating facilities, since non-nuclear facilities do not benefit from prefunding of dismantling costs. This is not equitable to those facilities since, given pending deregulation of electric generation, those facilities will not have a mechanism to recover these costs, but nuclear facilities would. The Department therefore believes the decommissioning cost estimates should only reflect those costs that the NRC requires to be prefunded. Since the NRC only requires radioactive material removal costs to be prefunded, the Department will not consider the cost of removing non-radioactive material in the decommissioning cost estimates. In the case of radioactive materials, there are clear regulatory and public safety issues that mandate funding of these costs. Subtracting the non-radioactive material removal cost from the total MP3 decommissioning cost yields a total radioactive material remediation cost of $448,211,000. This is below the NRC minimum decommissioning amount of $488,000,000. Since the NRC requires this amount to be prefunded, the Department will allow decommissioning collections to be based on this amount. The Department will therefore order the Company to reduce MP3 decommissioning collections to reflect the
  10. Page 65 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 65 of 191 Docket No. 98-01-02 Page 58 NRC minimum, reducing revenue requirements from $9.35 million to $8.42 million, a reduction of $930,000. a. Nuclear Decommissioning Financing The calculation of nuclear decommissioning funding requirements for 1999 and over the life of the nuclear decommissioning trusts requires assumptions about the earnings, schedule of contribution levels, tax rates, cost escalation rates, as well as estimates of the current cost of decommissioning. Each Millstone plant has two decommissioning trust funds, a “qualified” (tax-deductible) and a “non-qualified” (non-tax deductible), to finance its nuclear decommissioning. CL&P contributes its pro rata share of funds, which are deposited into each trust fund on a monthly basis. MP2 and 3 trust funds have investment allocations of 40% equity and 60% fixed income securities, while the MP1 trust fund, with a shorter decommissioning time horizon, has asset allocations of 30% equity and 70% fixed income securities. At the end of the time horizon for each of the trusts, the time period when the majority of the funds will be spent, the percentage of assets invested in equity will be reduced by 5% per year until all of the equity investments have been phased out. Response to Interrogatory EL-395. The assumed rates of return for the trusts’ assets are as follows: Equity: Fixed income: Taxable Tax exempt ` 9.5% 6.0% 4.5% Source: Response to Interrogatory EL-395 The expected return of 9.5% on equity was developed using information on current returns and expected long-term returns on stocks. The 6.0% expected return on bonds is the average yield on the bond market as a whole, as measured by the Lehman Aggregate Index. The tax exempt rate of 4.5% was obtained by taking 75% of the average yield on taxable bonds, which reflects the ratio of the returns of tax-exempt compared to taxable fixed securities. Response to Interrogatory EL-399. These rates of return would result in a weighted average before-tax assumed return on assets of approximately 6.53% for the MP1 trust and 6.95% for the MP2 and 3 trusts. Response to Interrogatory EL-395; Tr. 9/25/98, pp. 2689-2691. Recent returns on assets of the trusts for MP1, 2 and 3, 1992 through 1997, have averaged a before tax return of approximately 10.2%.4 The Company also submitted escalation rates for materials, labor and energy, which have average long-term growth rates of 2.1%, 4.1%, and 3.6%, respectively. Response to Interrogatory EL-393, p. 2. The Department finds these escalation rates to be reasonable. The Company has used assumed rates of return on equity and fixed assets that are less than the actual earned rates for the years 1992 through 1997; however, the Department finds the assumed rates to be reasonable for the long term. Although the 4 Averages for the Millstone Units trusts are unweighted.

As listed on the current system

Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)