Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 874, 885, 886

Files5

Search terms highlighted
Eversource rate increase is on 67 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of OCC-886_Final.pdf

Extracted from the file · 1 page · 1,819 characters

Words on different pagesRead the text of OCC-886_Final.pdf
67 pages match
  1. Page 61 of 191Match

    Docket No. 98-01-02 f. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 61 of 191 Page 54 Non-capital Plant Modifications Non-capital modifications (NCMs) are low-cost changes to plant that are treated as expense items. The Company’s initial filing included $11,800,000 for NCMs at MP2 and $930,000 at MP3, on a whole-unit basis. Dente Testimony, Exhibit TJD-1. The CL&P portions of these amounts are $9,558,000 and $493,000, respectively. The Company stated that these amounts were based on historical experience adjusted for known commitments to the NRC. Response to Interrogatory EL-1. The Company subsequently revised its expectations for 1999 NCMs when the projects were identified and submitted a list of the projects on October 29, 1998. The NCM amounts on a total unit basis are $2,720,000 for MP2 and $8,850,000 for MP3. Response to Interrogatory EL-1, Supplement 1. The CL&P portions of these amounts are $2,203,000 and $4,691,000, respectively. NCM expenses for the three years prior to the Millstone outages, 1993-1995, averaged $3,200,000 for MP2 and $9,700,000 for MP3. Response to Interrogatory EL-354. The proposed NCM amounts are consistent with historical expenses. The expense items are typical of small modifications that occur throughout the life of a nuclear plant. Therefore, the Department accepts the revised amounts and decreases the original MP2 amount by $7,355,000 and increases the original MP3 amount by $4,198,000, for a net reduction of $3,157,000. g. Calculation Tracking System The Company’s filing includes expenses for a new system for tracking calculations, which eases the retrieval of the calculations when a future need arises to access them. Previously, calculations were not comprehensively tracked on a centralized computer system. Response to Interrogatory OCC-177, Supplement 1, Bulk p. 5. OCC states that the costs associated with this program should not be allowed, since the program is not related to industry standards and is a result of the NRC 10CFR50.54(f) order that resulted in the Millstone outages. Schlissel Testimony, pp. 55 and 56. However, OCC did not cite any evidence supporting this position. The system is intended to be used on a going-forward basis to ensure future calculations are properly tracked. This should result in improved efficiencies by reducing the administrative burden of retrieving calculations from diverse locations. Tr. 9/25/98, pp. 2623-2625. Again, the Department will not disallow expenses for the sole reason that they are not necessary to meet industry standards. Therefore, the Department will allow these expenses to be included in rates. h. Material Equipment Parts List The Material Equipment Parts List (MEPL) is a database of plant components that contains information important to the maintenance of that equipment. Response to Interrogatory OCC-177, Supplement 1, p. 7. The Company’s filing includes incremental expenses for completing the MEPL. The changes to the MEPL include adding components and increasing efficiencies in the procurement and storage of replacement parts. Response to Interrogatory OCC-182, Supplement 2, Maintenance of Material Equipment Parts List. OCC states that expenses associated with this program should
  2. Page 62 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 62 of 191 Page 55 not be allowed, since the Company has not identified new or heightened industry standards associated with this program; rather, it is necessary to remedy “deficiencies.” Schlissel Testimony, p. 58. There is no evidence that the MEPL improvements are related to the Millstone outages. They are enhancements to an existing program. Since safety grade components cost considerably more than non-safety grade ones, the enhancements should result in long-run savings by elimination of the practice of procuring non-safety grade components that were previously classified as safety grade. Again, the Department will not disallow expenses for the sole reason that they are not necessary to meet industry standards. Therefore, the Department will allow these expenses to be included in rates. i. Implementation of Condition Based Maintenance The Company’s filing includes expenses for the addition of an Integrated Preventive Maintenance Program (IPMP) and an Equipment Effectiveness Training Program (EETP). These programs were implemented to develop methods for trending and monitoring performance for common component failures. The Company states that these programs will improve equipment reliability over time. Response to Interrogatory OCC-177, Supplement 1, p. 8. OCC states that the costs associated with the IPMP and EETP should not be allowed, since the Company has not identified new or heightened industry standards associated with them. Schlissel Testimony, p. 59. Documentation provided by the Company states that these programs were designed by consultation with other nuclear industry participants to identify characteristics of successful programs in this area. Response to Interrogatory OCC-178, Supplement 2, Equipment Effectiveness Trending - Best Practices Initiative, p. 3. Therefore, evidence supports the claim that these programs were implemented to meet industry standards. There is no evidence that the IPMP and EETP are related to the Millstone outages. They are improvements of an existing program. Therefore, the Department will allow these expenses to be included in rates. 8. Devon Station Gas Turbines The Devon Station O&M costs are $11.823 million, including lease payments of $9.6 million, for the rate year. June 30, 1998, Supplemental Filing, Devon Station O&M; Tr. 9/15/98, pp. 1055 and 1056; Late Filed Exhibit No. 92. As concluded in Section II.E.1.c, above, the gas turbines were added solely due to the Millstone outages. Therefore, the Department reduces expenses by $11.823 million.
  3. Page 63 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 63 of 191 Docket No. 98-01-02 9. Page 56 Decommissioning The Company filed the latest decommissioning studies for MP1, 2, and 3. The proposed method of decommissioning is immediate dismantlement (single unit DECON) for each unit. The estimated cost of decommissioning in 1997 dollars is $481,800,000 for MP1; $430,900,000 for MP2; and $519,400,000 for MP3. By comparison, the DECON cost estimates the Company submitted in Docket No. 92-11-11 were $350,864,000 for MP1; $281,798,000 for MP2; and $383,175,000 for MP3. The NRC requires each nuclear plant owner to calculate a minimum decommissioning cost per Title 10 of the federal Code of Regulations,10CFR50.75(c). The NRC also requires the owner to fund decommissioning for at least this amount, regardless of the amount determined by the site specific study. The amount is determined by a prescribed formula in 10CFR50.75(c) and adjusted by escalation factors for labor, energy, and radioactive waste burial charges. The labor and escalation factors are required to be derived from U.S. Department of Labor Statistics data, and the radioactive waste burial factor must be derived from NUREG-1307, “Report on Waste Burial Charges.” 10CFR50.65(c)(2). These amounts in 1997 dollars are calculated as $512,000,000 for MP1; $460,000,000 for MP2; and $488,000,000 for MP3. Levy Testimony, p. 21. The following chart shows the decommissioning amounts for each unit. Decommissioning Amounts (in $thousands) MP1 MP2 MP3 92-11-11 DECON 350,864 281,798 383,175 98-01-02 DECON 481,800 430,900 519,400 NRC Minimum 512,000 460,000 488,000 Proposed 512,000 460,000 519,400 The DECON cost estimates were developed by TLG Engineering, Inc. using the latest cost estimating methodologies and are based on site-specific studies for each unit. Each estimate reflects the present cost of decommissioning under current requirements using available technology. Levy Testimony, pp. 11 and 12. The DECON estimates also include a contingency factor to reflect possible schedule delays due to unforeseeable events such as equipment breakdowns. The contingency factors are assigned to individual activities based on the uncertainty associated with that activity. The overall contingency factors for each unit are 19.7% for MP1, 18.6% for MP2, and 19.0% for MP3. By comparison, in Docket No. 92-11-11 the DECON estimates included contingency factors of 15.95% for MP1, 16.18% for MP2, and 16.00% for MP3. The Company states that the changes in contingency factors are based on industry experience with decommissioning and related issues such as radioactive waste disposal costs. Tr. 9/25/98, p. 2670. The Company proposes to base the decommissioning collections on the NRC minimum amounts for MP1 and 2, and the site-specific amount for MP3. For each unit, the amount requested is the greater of the NRC minimum or the site amount. In the
  4. Page 64 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 64 of 191 Page 57 case of MP1 and 2, the amount requested is based on regulatory requirements and is not subject to potential inaccuracies in assumptions such as contingency or future radioactive waste disposal costs. Therefore, the Department concludes that the proposed amounts for MP1 and 2 are reasonable and approves them as filed. The Company proposes to base its decommissioning collection for MP3 on the site-specific DECON study amount of $519,400,000, which is $31,400,000 more than the NRC minimum amount. The Company states that the site-specific cost estimate is greater than the NRC minimum due to features peculiar to MP3 that differ from the unit on which the minimum calculation is based. Levy Testimony, p. 21. The cited differences include design, siting, and access to radioactive waste disposal sites. Response to Interrogatory EL-27. In its decommissioning estimates, the Company includes the cost of removing non-radioactive structures and components. However, the NRC does not require the costs of removing this material to be included in decommissioning cost estimates, and, in fact, specifically excludes them from its regulations regarding decommissioning. Response to Interrogatory EL-16. The Company states these costs should be included in the cost estimates, since they are legitimate business costs that will be incurred in the future. Tr. 9/25/98, pp. 2655 and 2656. The total estimated cost of non-radioactive material removal at MP3 is $71,189,000. Response to Interrogatory EL-18. This amount includes removal of a technical building, and the training/simulator building. Tr. 9/25/98, p. 2673. Both these buildings could have value after the units are decommissioned, since they do not contain any radioactive contamination and could be used for another purpose. This is particularly true of the technical building, which was constructed in 1994. Decision dated May 5, 1994, in Docket No. 93-09-04, Application of Northeast Nuclear Energy Company, The Connecticut Light and Power Company and Western Massachusetts Electric Company for Approval to Finance the Construction of a Technical Building at the Millstone Nuclear Generating Units, p. 9. Including the cost of removing non-radioactive material in decommissioning cost estimates involves issues of equity between nuclear and non-nuclear generating facilities, since non-nuclear facilities do not benefit from prefunding of dismantling costs. This is not equitable to those facilities since, given pending deregulation of electric generation, those facilities will not have a mechanism to recover these costs, but nuclear facilities would. The Department therefore believes the decommissioning cost estimates should only reflect those costs that the NRC requires to be prefunded. Since the NRC only requires radioactive material removal costs to be prefunded, the Department will not consider the cost of removing non-radioactive material in the decommissioning cost estimates. In the case of radioactive materials, there are clear regulatory and public safety issues that mandate funding of these costs. Subtracting the non-radioactive material removal cost from the total MP3 decommissioning cost yields a total radioactive material remediation cost of $448,211,000. This is below the NRC minimum decommissioning amount of $488,000,000. Since the NRC requires this amount to be prefunded, the Department will allow decommissioning collections to be based on this amount. The Department will therefore order the Company to reduce MP3 decommissioning collections to reflect the
  5. Page 65 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 65 of 191 Docket No. 98-01-02 Page 58 NRC minimum, reducing revenue requirements from $9.35 million to $8.42 million, a reduction of $930,000. a. Nuclear Decommissioning Financing The calculation of nuclear decommissioning funding requirements for 1999 and over the life of the nuclear decommissioning trusts requires assumptions about the earnings, schedule of contribution levels, tax rates, cost escalation rates, as well as estimates of the current cost of decommissioning. Each Millstone plant has two decommissioning trust funds, a “qualified” (tax-deductible) and a “non-qualified” (non-tax deductible), to finance its nuclear decommissioning. CL&P contributes its pro rata share of funds, which are deposited into each trust fund on a monthly basis. MP2 and 3 trust funds have investment allocations of 40% equity and 60% fixed income securities, while the MP1 trust fund, with a shorter decommissioning time horizon, has asset allocations of 30% equity and 70% fixed income securities. At the end of the time horizon for each of the trusts, the time period when the majority of the funds will be spent, the percentage of assets invested in equity will be reduced by 5% per year until all of the equity investments have been phased out. Response to Interrogatory EL-395. The assumed rates of return for the trusts’ assets are as follows: Equity: Fixed income: Taxable Tax exempt ` 9.5% 6.0% 4.5% Source: Response to Interrogatory EL-395 The expected return of 9.5% on equity was developed using information on current returns and expected long-term returns on stocks. The 6.0% expected return on bonds is the average yield on the bond market as a whole, as measured by the Lehman Aggregate Index. The tax exempt rate of 4.5% was obtained by taking 75% of the average yield on taxable bonds, which reflects the ratio of the returns of tax-exempt compared to taxable fixed securities. Response to Interrogatory EL-399. These rates of return would result in a weighted average before-tax assumed return on assets of approximately 6.53% for the MP1 trust and 6.95% for the MP2 and 3 trusts. Response to Interrogatory EL-395; Tr. 9/25/98, pp. 2689-2691. Recent returns on assets of the trusts for MP1, 2 and 3, 1992 through 1997, have averaged a before tax return of approximately 10.2%.4 The Company also submitted escalation rates for materials, labor and energy, which have average long-term growth rates of 2.1%, 4.1%, and 3.6%, respectively. Response to Interrogatory EL-393, p. 2. The Department finds these escalation rates to be reasonable. The Company has used assumed rates of return on equity and fixed assets that are less than the actual earned rates for the years 1992 through 1997; however, the Department finds the assumed rates to be reasonable for the long term. Although the 4 Averages for the Millstone Units trusts are unweighted.
  6. Page 66 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 66 of 191 Page 59 Department reduces the 1999 decommissioning collections for MP3 by $930,000, as described in Section II.F.9, above, the magnitude of this change in 1999 costs does not warrant a revision in the assumed earnings and future collections in the MP3 trust to reflect this cost reduction. 10. Nuclear Final Materials and Supplies Expense The Company requests that the Department approve $1.428 million for amortization of final M&S. Response to Interrogatory OCC-232, p. 2. The final M&S value is based on the M&S on hand on 12/31/97. Tr. 9/15/98, p. 1111. This is the first time the Company has sought inclusion of this item in rates. Pursuant to the Act, nuclear units will not be subject to rate regulation after January 1, 2004. The Company’s operational nuclear units are expected to continue running until at least the year 2015, the license expiration date for MP2. Response to Interrogatory OCC-86, p. 4. Therefore, at the time the M&S expenses are incurred, the units will not be subject to rate regulation. The Company is requesting that the Department allow an expense in regulated rates that will be incurred in a deregulated market. It is not appropriate to recover these costs through rates, absent a significant public policy determination to do so. Also, there is no reason to speculate as to the value of the final core and M&S since this amount will be reflected in the price paid for the units when they are sold, and ultimately included in the calculation of stranded cost. Therefore, the Department will disallow this expense, reducing expense by $1.428 million. 11. MP Unit 1 Administrative and General Expenses Due to the early retirement of MP1, CL&P forecasts O&M expense savings of $111.4 million in 1999. Late Filed Exhibit No. 6, AR-OCC-34. The Company did not include $5.6 million of administrative and general (A&G) expense savings associated with the MP1 retirement in the O&M expense savings. Tr. 9/17/98, pp. 1427-1429; Late Filed Exhibit No. 168, Read-In W. PRO and OCC believe that the Department should remove $5.6 million from the rate year. PRO Brief, p. 9; OCC Brief, p. IV-30. The Department does not agree with PRO and OCC that it is appropriate to remove the A&G expense savings from the rate year. The Company cleansed the rate year of MP1 expenses in Schedule C-2. Therefore, any savings the Company may realize from the retirement do not affect the rate year. 12. Maine Yankee The Company has included expenses in the rate year for its contractual payments to Maine Yankee (MY) based on its ownership percentage. The components of the payments are O&M, Department of Energy Decontamination and Decommissioning (DOE D&D) costs, amortization of nuclear fuel final core and M&S, depreciation, taxes, decommissioning, and a return on the unrecovered investment balance. Response to Interrogatory EL-211. MY currently has a proceeding before the Federal Energy Regulatory Commission (FERC) to determine the rates it may charge its
  7. Page 67 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 67 of 191 Page 60 owners, including CL&P. Response to Interrogatory OCC-189. FERC precedent is to establish rates subject to refund. Tr. 9/14/98, p. 950. In the event FERC decides the rates charged by MY are too high or if any components of the rates are denied because of imprudence, CL&P would receive credits or refunds, which it would apply to the account where the costs were initially recorded. Because the Application does not contain any credits, they will flow directly to the financial statements and the bottom line, not to ratepayers. However, the Company could defer the refunds for future disposition to ratepayers. Response to Interrogatory OCC-335; Tr. 9/14/98, pp. 951, 952 and 957. Because FERC has jurisdiction to set the rates CL&P must pay MY, the Department will allow the MY costs to be passed on to ratepayers. However, the Department leaves open the possibility of refunding MY costs to ratepayers that are disallowed by FERC. The Department will order CL&P to create an account to record refunds or credits it receives from MY. The Department will consider the disposition of refunds or credits by reopening this docket or in a future rate proceeding. 13. C&LM Bonus Incentive As discussed in Section II.E.7, above, the Department eliminates the CAM for 1999. Traditionally, CL&P is awarded a bonus incentive of up to 3% of average rate base, based on the cost effectiveness of its C&LM programs, as a means of promoting C&LM. A target incentive is calculated each year and then trued up in following years based upon the actual cost effectiveness of the C&LM programs. The Company is concerned that there could be some true-ups from prior years that might not have been taken care of without the CAM. Tr. 9/14/98, p. 922. However, the Company is never guaranteed it will receive a bonus because the cost effectiveness of the C&LM programs could fall below expectations. The Department allows a 2% bonus incentive for 1999 applied to 1999 C&LM expenditures instead of rate base, because the 1999 rate base will be extremely small. This equals $575,000 ($28.752 million x .02). This gives the Company a reasonable incentive to pursue C&LM for 1999 and should allay the Company’s concerns about prior years true-ups as well as the true-up for 1999. 14. Electric Power Research Institute The Electric Power Research Institute (EPRI) provides extensive research and development (R&D) services to the electric utility industry. In recent years it has expanded membership eligibility to all organizations in the evolving energy field, including the generation, delivery and sale of electricity, related services and other energy suppliers. EPRI also has taxable subsidiaries, EPRICSG, Inc. and EPRIGEN, Inc., which were created to meet new and emerging needs of an increasingly competitive energy industry, while maintaining EPRI’s historical, tax-exempt mission to perform R&D in the public interest. Late Filed Exhibit No. 6, AR-OCC 55. At the present time, many technological changes are being introduced in the electric industry and many more are in the developmental stages. EPRI’s R&D results
  8. Page 68 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 68 of 191 Page 61 take the form of products, services, and information that can be applied for the benefit of the members, their customers, and the energy community at large. Any entity eligible to join EPRI may fund projects in the taxable subsidiaries, and, in so doing, will be considered a member of EPRI. This means that contributors to the taxable subsidiary will have rights of EPRI membership even if they only fund taxable subsidiary projects and do not fund any EPRI projects in the non-profit parent. Id. The Company’s proposed EPRI dues for the 1999 rate year are approximately $1.5 million: direct CL&P allocation of $853,965; CL&P’s share of NNECO dues (approximately 72%) of $644,799; and CL&P’s share of Seabrook dues (approximately 4%) of $12,180. In 1997 and 1998, the total amounts allocated to CL&P were $810,000 and $897,513 respectively. Response to Interrogatory OCC-51. This equates to an increase of 86% over 1997 and 68% over 1998 with 95% of the increase in the direct CL&P allocation. CL&P states that the substantial increase in the 1999 rate year is due to its budget constraints in 1998. Late Filed Exhibit No. 7, AR-PRO 7. These budget constraints were primarily in the non-nuclear areas. The level of project funding was reduced to five environmental programs in 1998. For the 1999 rate year, the Company has increased the project funding to all of the 22 environmental programs offered by EPRI. The Company believes with all of its nuclear units running in 1999, and the benefits it will be deriving from the current EPRI projects, its involvement in the 22 projects from EPRI will be beneficial in the long run. Tr. 10/16/98, p. 3753. OCC believes that the 1999 rate proceeding does not give CL&P the right to abandon cost containment efforts. OCC states that the Company found that it did not need to fund the extra EPRI programs in 1997 and 1998; therefore, it should not be the responsibility of ratepayers to fund all of the 22 EPRI projects in 1999. OCC suggests an adjustment of approximately $543,000 to reflect the 1997 EPRI dues cost level of $311,000 (direct CL&P allocation), which is higher than the projected 1998 level of $270,000. OCC Brief, p. IV-41. The Department believes that ratepayers should bear their appropriate share of research expenses, where the cost of such research is reasonable and the benefits equitable. The Department is unconvinced, however, that CL&P has provided evidence in this case to warrant cost recovery associated with the substantial increase in dues to fund all 22 of the EPRI environmental projects. Further, the Department concurs with OCC that CL&P should not abandon its cost containment efforts. The Department is concerned that the Company is reverting to a “business as usual” approach now that MP3 is running and MP2 should be in the near future. The Company will need to incorporate the cost containment approaches used in the last few years to succeed in the upcoming restructured environment. The Department is also concerned that EPRI appears to be expanding its membership to the point that regulated entities may be directly or indirectly subsidizing unregulated entities. Although the Company has assured the Department that its own unregulated subsidiary (Select Energy) does not use EPRI, there are other nonregulated entities that do. Late Filed Exhibit No. 27.
  9. Page 69 of 191Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 69 of 191 Docket No. 98-01-02 Page 62 The following chart shows the increase or decrease in the EPRI funding levels for the years 1997 to 1999. 1997 1998 EPRI Percentage Inc./(Dec) CL&P 310,801 270,102 (15%) 270,102 853,965 216% NNECO 490,121 615,783 20% 615,783 644,799 5% Seabrook 9,127 11,628 22% 11,628 12,180 5% Total 810,049 897,513 897,513 742,374 1998 1999 Percentage Inc./(Dec) The Northeast Nuclear Energy Company (NNECO) and Seabrook levels appear to be within reason. CL&P’s do not. Although the Company explained the benefits, it did not submit a cost/benefit analysis to substantiate the increased funding. Late Filed Exhibit No. 6 AR-OCC-13, p. 2. The Department believes that the increase of funding in the CL&P level is inappropriate. The Department will cap the CL&P level to 25% over the 1997 level. This brings the CL&P expense to $388,501, which is a reduction of $465,464. 15. Consulting Fees In 1997, CL&P entered into a Transition and Retirement Agreement with its then Chief Executive Officer (CEO) to reflect his election to retire. Under the Transition Agreement, CL&P was required to engage him as a consultant for two years, with annual fees of $500,000 and $300,000 for the first and second years. Late Filed Exhibit No. 5, ADR-DPUC No. 22, Proxy Statement. CL&P’s portion of the consulting costs that will be applicable in the 1999 rate year is approximately $84,000. Tr. 10/16/98, p. 832. OCC states that this is a non-reoccurring consultant fee and should be removed from the rate year. OCC Brief, p. 35. According to the Company, the former CEO is carrying out work as a consultant in support of litigation that pertains to outage related issues, such as joint owner litigation. Tr. 9/14/98, p. 831. Because these are clearly outage-related costs that are a result of mismanagement of the plants, the Department reduces the 1999 rate year consultant expense by $84,000. 16. Telephone Expense The 1999 telephone expense proposed by the Company is $5.3 million, which includes approximately $3.3 million billed from Northeast Utilities Service Company (NUSCO). The telephone expense budgeted in 1998 was $5.2 million, which includes approximately $3.2 million billed from NUSCO. The actual 1998 telephone expense through August is $2.9 million, of which approximately $2.1 million is billed from
  10. Page 70 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 70 of 191 Page 63 NUSCO. This compares to the budgeted $3.5 million telephone expense through the same period for CL&P, which includes $2.1 million billed from NUSCO. Response to Interrogatory EL-316. Within the last few years, the Company has been reviewing the rates paid for telephone services. By negotiating with AT&T, CL&P was able to cut long distance rates in half, resulting in savings of approximately $80,000 per month (NU level). Consultants were utilized to validate the rates of the Company’s local service carrier, SNET. The existing SNET contract was restructured, resulting in total savings of approximately $300,000 (CL&P level) over the next two years (1999 and 2000). Late Filed Exhibit No. 149. OCC recommends an adjustment of $900,000 to the projected 1999 telephone expense, which is equal to the annualized amount CL&P was under budget as of August 1998. OCC believes that after making this adjustment, the projected telephone expense will be more in line with 1997 actual. OCC Brief, p. IV-36. The Department recognizes the Company’s efforts to reduce the cost of its telephone rates. However, there is no evidence to indicate that the AT&T or the SNET savings were in the 1998 budget or reflected in the 1999 projections. When comparing actual to budget through August 1998, there is a difference of approximately $600,000 in the total telephone expense. This equates to a reduction of approximately $75,000 per month. An adjustment of this magnitude is appropriate given the savings that resulted from the renegotiation of the AT&T and SNET contracts that approximate $76,5005 on a CL&P level. The Company did not offer any explanation as to why there was this large discrepancy between actual and budget. Therefore, the Department concludes that the savings discussed in Late Filed Exhibit No. 149 were not reflected in 1998 or 1999. The Department therefore will reduce the 1999 telephone expense by $900,000 ($75,000 x 12). 17. Payroll Adjustments a. Labor Escalation The Company reflects a 1999 labor escalation rate of 3.6%, derived from the DRI review of the U. S. Economy, May 1997. Schedule F, CL&P Summary of Assumptions, p.1. The Company made the assumption that all areas, union/non-union, exempt/nonexempt, would be escalated at 3.6% due to the ongoing union contract negotiations. Response to Interrogatory OCC-105; Tr. 10/14/98, p. 810. The contract negotiations had ceased with the contract rates, effective June 1, 1997, but were extended until September 25, 1998. Late Filed Exhibit No. 29. The negotiation process had not been completed as of the end of hearings in this docket. 5 The savings associated with the AT&T renegotiations are approximately $80,000 a month at a NU level. The Department approximates CL&P’s portion to be 80%. That results in savings to CL&P of $64,000 per month. The savings associated with the SNET negotiations was $150,000 per year. That is about $12,500 per month. Thus, the total CL&P savings are approximately $76,500.

As listed on the current system

Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)