Interrogatory responses
Answers to questions 874, 885, 886
Files5
OCC-874_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download OCC-874_Final.pdfRead the text of OCC-874_Final.pdf
OCC-874 Attachment 1 REDACTED.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download OCC-874 Attachment 1 REDACTED.pdfRead the text of OCC-874 Attachment 1 REDACTED.pdf
OCC-885_Final.pdf
PDF · 77 KB · 1 pageText searchable
Download OCC-885_Final.pdfRead the text of OCC-885_Final.pdf
OCC-886_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download OCC-886_Final.pdfRead the text of OCC-886_Final.pdf
OCC-886 Attachment 1.pdf
PDF · 10 MB · 191 pagesText searchable
Download OCC-886 Attachment 1.pdfRead the text of OCC-886 Attachment 1.pdf
Text of OCC-886_Final.pdf
Extracted from the file · 1 page · 1,819 characters
Page 7 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 7 of 191 Financial adjustments include an approved capital structure consisting of 2.82% in short-term debt; 54.71% in long-term debt; 7.54% in preferred stock, and common equity of 34.93%. The Department allows the Company a rate of return on equity of 10.3% with a weighted cost of capital of 8.12%. Other regulatory adjustments include: reducing payroll expenses by $18.9 million; reduction of proposed depreciation expenses by $12.9 million; reducing the Company’s forecasted price of fossil fuels for purposes of setting its base fuel rate, which was the primary factor in reducing the Company’s base fuel rate expenses by $78.8 million; reducing the claimed allowance for materials and supplies other than fuel for the 1999 rate year by $3.8 million to $67.2 million; and disallowing industry restructuring advertising costs of $1.4 million. The Department also reduced the rate base for fossil/hydro units by $3.6 million and associated depreciation by $7.2 million. On the revenue side, the Department found that the Company’s sales and revenues forecast was approximately $27 million lower than appropriate and assigned that amount to forecasted Company revenues. The Department also allowed CL&P to transfer its wholesale market-based contracts to an affiliate of its parent, Northeast Utilities, but requires that the future value of these contracts (forecasted to be up to $50 million) be used to offset stranded costs. The assessment of the value of these agreements will be reviewed in a later proceeding, when the Department determines the Company’s stranded costs. Further, the Department is requiring the Company to continue to offer Flex Riders and to continue to honor the terms of all special contracts entered into before April 29, 1998.Page 8 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 8 of 191 DECISION I. INTRODUCTION A. BACKGROUND OF THE PROCEEDING By letter dated January 5, 1998, to CL&P and on its own motion and pursuant to §§ 16-11, 16-19 and 16-19(g) Conn. Gen. Stat., the Department opened the instant docket to address the overearnings of CL&P identified in the Decision dated December 31, 1997, in Docket No. 97-05-12, DPUC Financial and Operations Review of The Connecticut Light and Power Company. The Department advised the Company that it would be conducting this proceeding in two phases: phase one being a Conn. Gen. Stat. § 16-19(g) review to determine if the Company's revenue requirements should be reduced on an interim basis and phase two being a complete rate review pursuant to Conn. Gen. Stat. § 16-19. The Department ordered the Company to submit the Standard Filing Requirements for a rate case (SFRs) no later than April 1, 1998. By letter dated January 27, 1998, CL&P requested a delay until June 1, 1998, to file the SFRs so that the rate case could be based on a calendar year 1997 test year. By letter dated February 2, 1998, the Department granted CL&P's request with the caveat that the Company stipulate that any rate decrease be effective no later than September 28, 1998, which would be the 180 day deadline for a Conn. Gen. Stat. § 16-9 Decision to be rendered. By letter dated February 5, 1998, the Company so stipulated. The Department issued an Interim Decision in phase one on February 25, 1998, adjusting rates on an interim basis to remove the Millstone Unit 1 nuclear generating unit (MP1) from rate base and to address certain specific non-rate base dollars totaling $110,479,000. The Company filed its phase two application on June 1, 1998, (Application) seeking Department approval of new and amended rate schedules. By Notice of Technical Meeting dated June 9, 1998, a technical meeting was held in the Department's offices, Ten Franklin Square, New Britain, Connecticut on June 17, 1998, to discuss the Application. At the meeting the Department indicated that the Application did not contain sufficient detail for the Department to conduct a proper review of the Company's revenue requirements. The Company agreed to amend its filing. By letter dated June 18, 1998, the Department formalized the additional data required and ordered the Company to submit it no later than June 30, 1998. The Company made its supplemental filing on June 30, 1998, (Supplemental Filing) and the Department accepted it by letter dated July 2, 1998. B. CONDUCT OF PROCEEDING By Notice of Technical Meeting dated June 23, 1998, and Notice of Change of Scope of Technical Meeting dated July 2, 1998, a technical meeting to discuss thePage 9 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 9 of 191 Page 2 termination of the Northeast Utilities' (NU) Generation and Transmission Agreement (NUG&T Agreement) and the Public Service Company of New Hampshire (PSNH) Sharing Agreement (Sharing Agreement) and its impact on CL&P’s base rate fuel revenue factor, as proposed in the Application, was held at the offices of the Department on July 7, 1998. By Notice of Audit dated July 21, 1998, the Department conducted an audit of the books and records of the Company, at CL&P's offices, 107 Selden Street, Berlin, Connecticut, beginning July 27, 1998. By Notice of Hearing dated July 23, 1998; Notice of Additional Hearing Session dated September 2, 1998; and Notice of Continued Hearing dated October 2, 1998, a public hearing was held at the offices of the Department on September 10, 11, 14, 15, 16, 17, 18, 22, 23, 24, 25, and 28; and October 8, 13, 15, 16, and 20, 1998. In addition, the following evening sessions were held to receive comments on the Company’s proposals from members of the public: September 3, 1998, Legislative Office Building, Hartford September 15, 1998, New London City Hall, New London September 17, 1998, South Windsor Town Hall, South Windsor September 22, 1998, Windham Town Hall, Willimantic September 24, 1998, Torrington Town Hall, Torrington September 28, 1998, Greenwich Town Hall, Greenwich The October 20, 1998 hearing was continued without date to accommodate questions regarding Late Filed Exhibits. No questions were raised; therefore, the Department issued a Notice of Close of Hearing on November 9, 1998. By letter dated December 1, 1998, the Company extended the 180 day deadline for rendering a final Decision by 30 business days. The Department issued a draft Decision in this matter on January 19, 1999. All Parties and Intervenors were provided an opportunity to file written exceptions to and present oral arguments on the draft Decision. C. PARTIES AND INTERVENORS The following were recognized as Parties to this proceeding: The Connecticut Light and Power Company, P.O. Box 270, Hartford, CT 06141-0270; Office of Consumer Counsel (OCC), Ten Franklin Square, New Britain, CT 06051; Prosecutorial Division of the Department (PRO), Ten Franklin Square, New Britain, CT 06051; and Connecticut Siting Council, Ten Franklin Square, New Britain, CT 06051. The Connecticut Conference of Municipalities (CCM), Connecticut Industrial Energy Consumers (CIEC), and the State of Connecticut Office of the Attorney General (AG) requested and were granted intervenor status.Page 10 of 191
Docket No. 98-01-02 II. DEPARTMENT ANALYSIS A. CONTINUED UNIT OPERATIONS 1. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 10 of 191 Page 3 General By Order No. 4 in the Decision dated December 31, 1996, in Docket No. 96-04-01, DPUC Eleventh Annual Review of The Connecticut Light and Power Company and The United Illuminating Company Integrated Resource Planning, the Department ordered the Company to conduct a revised Continued Unit Operation (CUO) study of MP1 and the Connecticut Yankee (CY) and Millstone Unit 2 (MP2) nuclear generating plants. The Company filed the study on July 1, 1997, in Docket No. 96-10-06, DPUC Investigation into Whether The Connecticut Light and Power Company has Fulfilled Its Public Service Responsibilities with Respect to Its Nuclear Units (1997 Study). The Department then deferred its review of this study to Docket No. 98-03-04, Thirteenth Annual Review of The Connecticut Light and Power Company and The United Illuminating Company Integrated Resource Planning. The Department subsequently deferred its review of this matter to the instant proceeding. On June 1, 1998, the Company re-filed the 1997 Study in the instant proceeding. At that time, the Company notified the Department that it was updating the study and would re-file it when the new analysis was completed. The Company filed the revised study on July 17, 1998 (1998 Study). This Decision addresses the 1998 Study. The analyses performed by the Company compare the revenue requirements of continued operation between the projected July 1, 1999 restart and the expiration of its operating license in 2010 to the revenue requirements of replacement energy, capacity, and applicable costs in retirement, should these units be prematurely retired from service. Issues such as transmission modifications, environmental impacts, fuel diversity, employment and taxes were not considered in the economic analyses. Tr. 9/25/98, p. 2707. Decommissioning costs have been included in the studies because, even though they would eventually be incurred whether the plant continues to operate or is prematurely shutdown, the costs are different for the two cases. To assess the economics of these two nuclear units under varying assumptions, each analysis was performed under a reference case that assumed base line Operations and Maintenance (O&M) costs and average annual capacity factors of 79.7% and 79.5% for MP1 and 2, respectively. Further, as the Department requested, +10% and +20% non-fuel O&M cases were analyzed. 2. Millstone Unit 1 The 1998 Study indicates that MP 1 has a positive economic value of $19 million and MP2 has a positive economic value of $433 million on a present value basis. 1998 Study, p. 2. The Company concludes that continued operation of MP2 is economic for NU’s customers, but states there is not sufficient value to continue to operate MP1 and therefore it will be retired.Page 11 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 11 of 191 Page 4 Although positive, the study results are in no way compelling. While this analysis could conceivably be used to support continued operation of Units 1 and 2, the changing utility structure and electric marketplace lead NU to the harsh reality that there is insufficient value in Unit 1 for NU customers and, therefore, we plan to evaluate alternatives and not bring Unit 1 back on line as an operating nuclear plant. NU will now cease restart activities at Unit 1 in preparation for final decommissioning. 1998 Study, Cover Letter. The 1997 Study indicated that MP1 had a positive economic value of approximately $68 million on a present value basis. The Company testified that the single biggest variable between the 1998 and 1997 studies is the cost of replacement power. The 1998 Study shows the costs for replacement power as $80 million lower than the previous study. Tr. 9/25/98, p. 2698. In its Supplemental Testimony the Company discusses several reasons that compelled it to retire MP1. First, the marginally positive economic benefit of $19 million indicated in the 1998 Study was neither substantial nor assured. Minor changes in the variables used could reverse these benefits. Second, new or heightened industry standards create relatively greater challenges for plants of MP1’s vintage. Although these standards are faced by all nuclear plants in the United States, the costs of implementing unanticipated changes in standards at MP1 could erode the modest economic benefits shown in the CUO study. Third, competition is imminent. MP1 would have had to operate in a competitive generation market after January 2000, in accordance with Public Act 98-28, An Act Concerning Electric Restructuring (Act). It will likely be more costly to continue to operate and more difficult to maintain sufficient cash flows to assure safe operation for a unit with a thin margin between costs and revenues. Fourth, the Act requires CL&P to auction its nuclear plants by 2004 if it intends to seek stranded cost recovery, and CL&P believes that the sale of an operating MP1 would have produced little added mitigation value as opposed to selling the site. Any attempt to restart the unit to enhance its sale price would only add costs without increasing sale net proceeds. Finally, while the foregoing reasons are a sufficient basis for retiring the unit, bringing the unit back to service would continue to burden CL&P’s financial and other resources. Morris Supp. PFT, p. 4. The projected $19 million of economic value was an estimate derived from the information available and assumptions used when the 1998 Study was performed. Based on events since that time, management concluded that the economic value of MP1 was likely lower than shown in the CUO study. For example, based on the level of new generation that is planned in New England, the new pipelines that are being built and the availability of gas into New England, the Company expects replacement power costs to decline to levels lower than reflected in the CUO studies. Tr. 9/25/98, pp. 2711 and 2712. Replacement power costs have the largest influence on the declining economics of MP1, and the developments after CUO assumptions were set strongly suggest that such costs will be lower than assumed in that study. Id., pp. 2728-30. Other changes in the variables used in the CUO study (such as fuel prices, capacity factor and O&M expenses) could make the restoration of MP1 an even more uneconomic investment. Morris Supp. PFT, p. 5.Page 12 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 12 of 191 Page 5 The Company requests that the Department find that MP1 was retired for economic reasons. Roman Additional Testimony, p. 5; Tr. 10/16/98, pp. 3877-3880. The Company requests the Department’s authority to reflect a regulatory asset representing full recovery of the costs associated with its unrecovered investment in MP1, which will be submitted to the Department as part of the ongoing restructuring proceedings. CL&P is also seeking the Department’s authority to defer, in the interim between the shutdown and January 1, 2000, all costs related to post-retirement safe shutdown and site protection, and costs incurred for work being done in preparation for the decommissioning of the unit. The amortization of this deferral would be reflected in the Company’s proposed Systems Benefits Charge (SBC) calculation to be filed April 1, 1999. Roman Supp. PFT, pp. 9 and 10. No parties or intervenors in this proceeding support CL&P’s proposal. AG, OCC and PRO all recommend that the recovery of remaining costs associated with MP1 be denied. In its Brief, the AG states that the Department should flatly refuse to adopt CL&P’s requested treatment of MP1. MP1 was shut down as a result of the Company’s imprudence and is not allowed to restart without specific permission of the NRC. There has been no finding in this or any previous docket that MP1 was shut down for economic reasons and CL&P has failed to present any credible evidence to support such a finding in this case. The DPUC should not permit the Company to establish a regulatory asset for MP1 when the Company has shown absolutely no assurance that it will be allowed any recovery under P.A. 98-28. In fact, since the Company has failed to show that the recovery of MP1 is assured, the DPUC should force CL&P to write this asset off its books pursuant to the mitigation provisions of P.A. 98-28. AG Brief, p. 23. OCC states the Department should reject this CL&P proposal with respect to MP1 at this time. Acceptance of this proposal would amount to a DPUC allowance for CL&P to write itself a blank check with respect to this asset, which would eventually be payable by the Company’s ratepayers. This resolution of MP1’s regulatory status is singularly inappropriate, particularly in light of this unit’s current out-of-rate-base. . . status. OCC Brief, p. VI-3. PRO also recommends that the Department make a finding that MP1 was not retired for economic reasons and not allow recovery of carrying charges. “It would be wholly improper for the Department to make the requested finding that MP1 was retired for economic, not prudence-related reasons.” PRO Brief, p. 5. The Department must evaluate recovery of MP1 costs based on current law and regulatory case history. Section 8(j)(1) of the Act denies recovery of stranded costs for nuclear generation assets or for any generation related regulatory asset that is not operating as a result of an order by the Nuclear Regulatory Commission (NRC). Section 8(j)(2) however contains an exception for a plant meeting the description ofPage 13 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 13 of 191 Page 6 MP1. The Act allows the owner of such a plant to apply to the Department for approval of early retirement for economic reasons under the general ratemaking statutes. The Company states it is also significant that the Act reflects a policy that MP1 costs should be recovered by the Company in the event of early retirement of the unit for economic reasons. In effect, the Legislature has expressed the policy that, if MP1 should be retired for economic reasons, the Company should go ahead and do so with the knowledge that its right to recover its costs will be protected. Morris Supp. PFT, pp. 9 and 10. The Department strongly disagrees with CL&P’s interpretation of the Act, which clearly allows the Company to apply for recovery of costs if the plant is retired for economic reasons, but does not guarantee that recovery will be granted. The Company has conducted what it refers to as a “first level” economic analysis that compares the revenue requirements of continued operation to the revenue requirements of replacement energy, capacity, and applicable costs in retirement, should these units be prematurely retired from service. Issues such as transmission modifications, environmental impacts, fuel diversity, employment and taxes were not considered. Based on its analysis, the Company concludes that there is insufficient value to justify the continued operation of MP1. The Company implies that the economics of the continued operation of MP1 is marginal. However, it is not just a break-even proposition as the Company suggests. The economics of MP1 are not overwhelming as is the case for MP2; however, they are positive. The Company’s own analysis indicates that the continued operation of MP1 would produce $19 million in benefits over the 12 remaining years of its license period, on a present value basis. Since present value analysis is positive, it provides the Company a return slightly higher than 9.2%, the discount rate used by the Company in its analysis. 1998 Study, Exhibit II. The positive value of $19 million on a present value basis is in addition to a return of 9.2%, which is higher than the return of 8.05% being allowed in this rate case. Perhaps even more important than the overall economic benefits is the distribution of annual economic benefits or penalties of operating MP1. Exhibit 1 of the 1998 Study indicates that the unit provides $64.3 million (nominal dollars) of positive benefits in 1999 and another $45.1 million in 2000 or $109.4 million over the first two years. Over the next 6 years from 2001-2006, the plant is estimated to break even with alternating years of positive and negative benefits. At the end of 2006 the economic benefits total $110.7 million. The remaining four years of the license period are projected to be the worst economically. In those years, the plant’s annual economics are negative, $198 million. These penalties outweigh the positive benefits of the first eight years, resulting in a penalty of $87.1 million in nominal dollars over the remaining license period. This equates to a positive $19 of benefits on a present value basis because the benefits in the early years are discounted less than the penalties in the later years. On a present value basis, the economics would increase to approximately $105 million if the plant were retired for purposes of the analysis in 2007 rather than 2010. 1998 Study, Exhibit 1.Page 14 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 14 of 191 Page 7 The economic assumptions chosen for the 1998 Study are key to understanding its results. On one side of the equation is the cost to operate the plant. Developing the estimated cost to operate MP1 over its remaining life involves a number of assumptions such as O&M costs, capital additions, nuclear fuel and the capacity factor. The cost to operate the plant is compared to the cost of providing power under alternative options. In this case, CL&P has used purchased power. Changes to these assumptions can have a significant impact on the final results and therefore the decision to operate or retire MP1. A recurring theme in the Company’s testimony is that costs other than purchased power, may be higher than expected, which would reduce any benefits from the continued operation of MP1. Tr. 9/25/98, pp. 2711 and 2712. Morris Supp. PFT, p. 5. In general, the Department does not believe the assumptions used by the Company are overly optimistic. While actual costs may be higher than expected, they could also be lower than presented in the base case scenario. The 1998 Study includes projections of O&M and capital expenditures through the end of each unit’s licensed life. The O&M amounts for the years 1998 - 2003 are consistent with amounts the Company has represented elsewhere in this proceeding, (see Dente Testimony, Exhibit TJD-2; Responses to Interrogatories OCC-99 and OCC-172, and the June 30, 1998, Supplemental Filing, Nuclear Business Group). The basis for these projections is discussed in Section II.F.7. For the years 2000 through 2002, the Company’s forecast presumes the Millstone units are in the third quartile in comparison to their sister units. Beyond 2002, the forecast presumes that the units improve to the second quartile, due to the impact of the Company’s nuclear performance improvement program. Response to Interrogatory EL-389. Historically, the units have generally been in the third quartile prior to the NRC Watch List outages. Response to Interrogatories EL-6 and EL-161; Tr. 9/17/98, pp. 1614-1616. Since these amounts are consistent throughout the proceeding, and with recent expenditures1 their inclusion in the 1998 Study is appropriate. Beyond 2003, the Company escalated O&M at 3% annually for the continued operation case. This appears to be a moderate and reasonable expectation. However, it is contrary to assumptions used in the 1997 Study in which the Company ramped down O&M over the final two years of operation, to about 60% of its maximum amount. The Company’s justification for ramping down O&M at that time was “[a]s the unit approached the end of its license life, various staffing and or other resource requirements were adjusted accordingly during the final 18-24 months of service.” The Company states that it did not ramp down O&M because it now believes that the NRC will require a nuclear unit to be maintained at the same level throughout its life. Tr. 9/25/98, p. 2715. The Department believes this is reasonable, since the unit must still be operated and maintained in accordance with its license requirements. There may be some areas where O&M will be curtailed toward the end of life, particularly in non-safety related areas of the plant where preventive maintenance activities and engineering support functions can be reduced. However, since a high proportion of non-fuel nuclear O&M expense is driven by regulatory requirements, the impact of such 1 See Section II.F.7.Page 15 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 15 of 191 Page 8 reduction in non-safety related O&M is probably minimal. Additionally, there are no case histories where a nuclear plant has operated to the end of its licensed life, therefore the magnitude of any such ramp down effect is a matter of conjecture. Since the Company’s overall O&M escalation appears moderate, the Department will accept the absence of a ramp down in O&M at end of life, and approve the projected O&M expense as filed. The 1997 Study included a ramp down of capital expenditures over the final five years of operation of MP1, from $19,400,000 in 2005 to $0 in 2010, the final year of operation. 1997 Study, p. 20. Similar to O&M, the 1998 Study escalated capital expenditures annually through 2010. The Company’s justification was the same as with O&M; the NRC will require the unit to be maintained in good condition throughout its license life. Tr. 9/25/98, p. 2715. However, in the case of capital expenditures, the Department does not believe this argument holds merit. Many capital expenditures are made for the purpose of significantly extending the life of equipment, and may be unnecessary when the equipment only needs to operate for the next few years. This is particularly true of equipment in the secondary side of the plant, where no extensive NRC license requirements apply. Other capital expenditures are desirable only to improve efficiencies and would likely be unnecessary as the unit approaches its license expiration date. Therefore, the Department finds that the assumptions regarding capital expenditures in the 1997 Study were more reasonable. By applying the 1997 rampdown schedule to the 1998 Study, the Department estimates that capital expenditures are reduced by a total of $72,200,000 over the last five years of MP1’s original license life. The Company has included $8.4 million associated with Nuclear Regulatory Commission (NRC) Watch List items as a cost of continued operation in its CUO analysis. Response to Interrogatory OCC-322. Since the Department has ruled that it is not appropriate to recover these costs, they should be removed. This improves the economics of continuing to operate MP1. The Company uses a capacity factor of 79.7% for MP1 in its economic analysis and assumes that the unit will operate at an 86% capacity factor between refueling outages. Refueling outages are planned to last 49 days and generally occur every 24 months. 1998 Study, p. 14. The Company’s assumption is aggressive but not unrealistic. MP1 operated at a capacity factor of 69.6% from 1970 to 1995. The NRC, Information Digest, 1997 Edition indicates that the average capacity factor for the industry over the five year period from 1992-1996 is 75%. Digest, p. 24. The capacity factor usually increases several percentage points when a unit returns to service after being on the Watch List. Response to Interrogatory EL-5. The Company has included the cost of decommissioning in its analysis, estimating $642 million in its shutdown scenario and $482 million if the plant continues to operate. 1998 Study, Appendix A, pp. 4 and 5. These estimates are preliminary and have not been accepted by the Department for ratemaking purposes; however, there is no basis for any adjustment at this time and therefore they are acceptable for the CUO analysis.Page 16 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 16 of 191 Page 9 The single most important assumption in the CUO analysis is the cost of replacement power. CL&P states that “ . . . replacement power costs are clearly the most important driver in the economics.” Tr. 9/25/98, p. 2732. CL&P’s assumption in its CUO analysis is that replacement power (energy and capacity) is purchased in the New England market. 1998 Study, p. 6. The Company has forecasted replacement power costs to be $38.10/MWh in 1998 which increases to $44.80/MWh in 2007, a compound annual increase of approximately 1.8%. Response to Interrogatory OCC-323. The Company’s response to Interrogatory EL-391 indicates that a 10% increase in the cost of replacement power would increase the present value benefits associated with continued operation of MP1 from $19 million to $122 million. Benefits would jump to $225 million, on a present value basis, if replacement power costs were 20% higher than CL&P’s estimates. On the other hand, a decline in purchase power costs would reduce the economic value of continuing to operate MP1 by a similar magnitude. The Company’s forecast of replacement power was developed in-house. Tr. 9/25/98, p. 2700. These purchased power estimates were first used by the Company in its stranded cost testimony for PSNH before the Public Utilities Commission of New Hampshire in November 1997. Response to Interrogatory OCC-323. The Company’s study did not provide any alternative supply options, purchased power forecasts, or scenario analyses to evaluate the sensitivity of the study results to changes in replacement power costs. Although the Department asked several interrogatories and questioned the Company’s CUO witness at the hearing to examine this issue further, the Company provided very little evidence to verify and support its purchased power cost estimates. The Company could not provide any recent replacement power price forecasts from independent organizations or other utilities in New England. The only replacement power costs the Company could submit were done in 1996 by the joint owners of Connecticut Yankee. These estimates were lower than those forecasted by the Company. The Company states that these projections were developed with what is an obsolete methodology today. Late Filed Exhibit No. 120. In addition, the Company’s Response to Interrogatory OCC-323 included a replacement power forecast that was also used in PSNH’s 1997 stranded cost proceeding. Overall, that projection was about 10 percent higher in the 1998-2000 time period and approximately 20 percent higher beginning in 2002. Response to Interrogatory, OCC-323. Replacement power costs are very difficult to predict with a strong degree of accuracy. Replacement power is made up of the forecasted cost of capacity and energy. The capacity value is estimated based on the balance between the supply of generation resources and the demand for electricity in the region. Changes to supply or demand can change the value of capacity in the market. Energy costs are based on fuels forecasts for oil and gas, which are extremely difficult to predict. For example, over the past two years the price of oil at the Company’s Norwalk Harbor Station increased from $15.97/bbl in March 1997 to a high of $21.75/bbl in October 1997 then dropped to approximately $12.00/bbl in October 1998. The Company and most others who have attempted to forecast fuel prices have done a poor job over the past 20 years. One of the primary reasons Connecticut has high cost nuclear power plants (Seabrook and Millstone Unit III (MP3) and purchased
As listed on the current system
Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026