Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 874, 885, 886

Files5

Search terms highlighted
Eversource rate increase is on 67 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of OCC-886_Final.pdf

Extracted from the file · 1 page · 1,819 characters

Words on different pagesRead the text of OCC-886_Final.pdf
67 pages match
  1. Page 95 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 95 of 191 Docket No. 98-01-02 b. Page 88 Nuclear Capacity Factors The table below demonstrates the nuclear capacity factors assumed in the Company’s original fuel cost simulation (Fuel Simulation). Proposed Capacity Factors Millstone Unit 1 Millstone Unit 2 Millstone Unit 3 Conn. Yankee Maine Yankee Vermont Yankee Seabrook As Filed 72.8% 70.7% 78.9% 76.6% *Source: Schedule WP C-3.1, p. 6. Traditionally, the Company established the BRFR using the forecasted rate year capacity factor for each nuclear power plant. The forecasted capacity factor established production from each nuclear unit based on the rate year refueling outage schedule and an estimated level of forced outages. For example, for MP2, a two-year refueling cycle with an assumed operating performance of 86% between outages and a refueling outage of 56 days, the resulting capacity factors will be 72.8% for the year in which the refueling outage is scheduled and 86% for the year without the scheduled outage. This results in an average fuel cycle capacity factor of 79.5%. Late Filed Exhibit No. 56; Tr. 9/16/98, pp. 1290-1300. Similar assumptions were used to determine the rate year capacity factors in the Fuel Simulation. Id. The Company states that it does not rely on historical operating performance of nuclear plants when forecasting rate year capacity factors because historical values have proven to be poor indicators in short-term forecasting. Instead, the Company believes it is appropriate to rely on the latest forecasted data for determining nuclear performance. Id. Further, the Company states that it is inappropriate to ignore planned refueling outages when setting the BRFR. To do so would understate fuel cost recovery associated with known and measurable events that occur in the course of operating these units. In addition, the use of the rate year capacity factor provides proper timing of fuel cost recovery. Tr. 9/16/98, pp. 1324-1327. In addition, CL&P states that the use of higher capacity factors would understate base recoveries resulting in a built-in regulatory lag for recovery of fuel costs. Also, if the capacity factor used is unrealistically high, the incentive collar provision of the EAC would react negatively, forcing the Company to write-off the full value of the collar. Response to Interrogatory EL-48.
  2. Page 96 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 96 of 191 Docket No. 98-01-02 Page 89 The following demonstrates the historical performance of the Seabrook (SB) and Vermont Yankee (VY) nuclear power plants. Historical Capacity Factors for Vermont Yankee and Seabrook 1993 1994 1995 1996 1997 1999 Proposed 5-Year Average 4-Year Average 3-Year Average Seabrook 90.0% 61.7% 83.3% 97.6% 79.0% 78.9% 82.3% 80.4% 86.6% Vermont Yankee 74.9% 95.8% 84.8% 82.8% 93.3% 76.6% 86.3% 89.2% 87.0% Source: Resonse to Interrogatory EL-160. As the table demonstrates, since 1995, annual and average performance at these plants has exceeded the proposed capacity factors in four out of the last five years for both plants. These data reflect five years of operation and capture multiple refueling outages. Therefore, these capacity factors reflect fuel cycle averages for these plants. Absent evidence to the contrary, it is reasonable to expect these units to continue to operate at historical levels. The Department concludes that the evidence does not support the Company’s assertion that historical operating performance is a poor indicator of short-term performance. The Department concludes that where relevant historical data are available, they should be considered when establishing rates. The use of either the three, four or five-year average results in a capacity factor that exceeds CL&P’s proposal for these units. However, the use of a five-year average captures multiple refueling outages and therefore better reflects fuel cycle averages than does the use of the other averages. As directed by the Department, CL&P used a capacity factor of 82.3% for VY and 86.3% for SB in the Final Fuel Simulation. 7 Recent historical capacity factors for MP2 and 3 are unavailable because these units have not operated during the past two years; therefore, an alternative forecasting method must be used. In the past, the Department relied on rate year capacity factors to establish the BRFR because refueling outages were known, measurable events, generally occurring when scheduled. However, based on the recent problems experienced at CL&P’s nuclear plants, and nuclear plants in which CL&P has contractual obligations, refueling outages cannot be viewed as known, measurable or predictable. This has affected the BRFR. For example, the current BRFR assumed that MP2 and MP3 would be refueled in 1997. As a result, the rate year capacity factors embedded in base rates for these units were set at 73% and 71%, respectively. Late Filed Exhibit No. 2, Docket No. 92-11-11, Summary of Assumptions, Schedule SE-3, 1997 Fuel Schedules, p. 7. However, neither refueling outage occurred in 1997 and the BRFR has not changed since that time. Because the BRFR can only be adjusted in a rate proceeding, the replacement power costs (RPC) embedded in base rates for MP2 and 3 continue to reflect the capacity factors assumed for the 1997 rate year. 7 The Department notes that it inadvertently directed CL&P to use the wrong five-year average capacity factors for SB and VY in the Final Fuel Simulation. The correct capacity factors should have been 82.3% for SB and 86.3% for VY. As discussed herein, the Department accepts the capacity factors as proposed by CL&P for these units; therefore the capacity factors as directed by the Department in the Final Fuel Simulation have no bearing on the approved BRFR.
  3. Page 97 of 191Match

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 97 of 191 Page 90 As further evidence of the difficulty in predicting refueling outages at the Millstone units, the Proposed BRFR assumed that MP2 would be refueled in 1999, resulting in an forecasted capacity factor of 72.8% for this unit. Schedule WPC-3.1, pp. 6 and 13. However, subsequent to the initial filing, CL&P modified the refueling schedule for MP2, moving the outage to 2000. As a result, CL&P modified its Fuel Simulation and Proposed BRFR to reflect a rate year capacity factor of 86% for MP2. Revised WPC-3.8, dated September 30, 1998, pp. 4-13. As detailed below, this adjustment increased the forecasted production from MP2 by approximately 950 Gigawatt-hours (GWh). Nuclear Production Table below. CL&P states that the use of rate year capacity factors provides for timely recovery of its costs. The Department disagrees. Although this may have been true when refueling outages occurred as planned, as noted above, they have not in the recent past. In addition, as with SB and VY, the use of a fuel cycle average capacity factor and/or recent historical operating performance levelizes base recovery of the Company’s total fuel costs. The change in the MP2 capacity factor noted above provides an example of this. Had the Department relied on CL&P’s initial filing to determine fuel costs, the BRFR would have reflected the lower capacity factor for MP2 and the BRFR would have overstated costs for this unit. Absent historical operating data for MP2 and 3, the use of a fuel cycle average levelizes fuel cost recovery, provides less volatility in relation to the predictability of refueling outages and is consistent with the method used to determine capacity factors for SB and VY. In addition, the use of a fuel cycle average is consistent with the analysis provided in the MP2 CUO Study. Response to Interrogatory EL-8; Tr. 9/16/98, pp. 1286-1290. The use of a fuel cycle average for MP2 would reduce the Company’s revised capacity factor from 86% to 79.5%. The Department directed CL&P to use a capacity factor of 79.5% for MP2 and 78.9% for MP3 reflecting fuel cycle averages of 86% between refuelings in the Final Fuel Simulation. c. Millstone Unit 1 CL&P was directed to embed MP1 RPC in the Final Fuel Simulation. Tr. 10/20/98, p. 4120. CL&P included RPC for this unit in its Final Fuel Simulation. Schedule C-3.1, Fuel Simulation B. d. Maine Yankee The MY nuclear power facility was retired on August 6, 1997. Pursuant to the Decision dated December 31, 1997, in Docket No. 97-06-01, DPUC Periodic Review of The Connecticut Light and Power Company’s Energy Adjustment Clause and The United Illuminating Company’s Fuel Adjustment Clause, CL&P was allowed current recovery of MY RPC through the EAC. However, recovery of these costs was subject to refund pending a final decision by the FERC in Docket No. ER98-570-000, In the matter of Maine Yankee Atomic Power Company. Decision in Docket No. 97-06-01, pp. 5 and 6. The FERC investigation is ongoing and a decision is not anticipated in the near term. Therefore, it is appropriate to maintain the current status for recovery of these
  4. Page 98 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 98 of 191 Docket No. 98-01-02 Page 91 costs and allow CL&P recovery of MY RPC subject to refund. CL&P has embedded MY RPC in the Fuel Simulation. The Department agrees that this is appropriate but directed the Company to identify these costs separately in the Final Fuel Simulation. Tr. 10/20/98, p. 4098. CL&P will be required to track MY RPC and to report these monthly costs in its EAC filings. e. Connecticut Yankee The CY nuclear power facility was retired on December 4, 1996. Pursuant to the Procedural Order dated June 6, 1997, in Docket No. 97-06-01 (CY Procedural Order), the Department suspended current recovery of CY RPC incurred subsequent to the plant’s retirement until a final decision is issued by FERC in Docket No. ER97-913-000, In the matter of Connecticut Yankee Atomic Power Company.8 As a result, CL&P has deferred CY RPC since the plant was retired. FERC issued an Initial Decision on August 31, 1998, but a final decision had not been issued as of the close of the evidentiary portion of this proceeding.9 Pursuant to the Decision dated April 29, 1998, in Docket No. 92-11-11, the Department found that the deferral of CY RPC could total in excess of $80 million by December 1998. Decision, p. 18. To avoid the rate impact of this potentially large deferral, the Department required CL&P to accrue the revenue reduction associated with the removal of MP2 and 3 from rate base (MP Accrual) as an offset to the deferral. Id. As of June 30, 1998, the deferral totaled approximately $67 million, while the MP Accrual totaled approximately $6.3 million. Response to OCC-97 SP 1; Response to Interrogatory EL-1, Docket No. 98-06-01, DPUC Periodic Review of The Connecticut Light and Power Company’s Energy Adjustment Clause and The United Illuminating Company’s Fuel Adjustment Clause. Because a FERC final decision is imminent, the Department believes it is appropriate to rescind the CY Procedural Order at this time and allow CL&P to recover CY RPC incurred after September 28, 1998, on a current basis. However, consistent with the CY Procedural Order and the treatment of MY RPC, recovery of these costs remains subject to refund pending Department review of the final FERC decision in this matter. CL&P was directed to embed CY RPC in the Final Fuel Simulation and to identify these costs separately. Tr. 10/20/98, p. 4098. CY RPC deferred as of September 28, 1998, shall remain on CL&P's books until the final FERC decision. CL&P will be required to track CY RPC and to report the monthly costs in its EAC filing. f. Effect of Modifying Nuclear Capacity Factors CL&P submitted a revised Fuel Simulation (Revised Fuel Simulation) on September 30, 1998. The following demonstrates how the change in capacity factors affects total nuclear production. 8 The Department is an admitted party to this proceeding. 9 The Initial Decision is a draft. A final decision requires the vote of the full Commission at FERC.
  5. Page 99 of 191Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 99 of 191 Docket No. 98-01-02 Page 92 Fue l Sim ula tion Nucle a r Production As Filed Revised Fuel Simulation Final Simulation Schedule WPC-3.1 Revis ed WPC-3.1 Late Filed Exhibit No. 138-SP-1 Capacity Factor 72.8% 70.7% 78.9% 76.6% MP1 MP2 MP3 VY SB Total Production GWh 4,326 3,725 303 315 8,669 Capacity Factor 86.0% 74.5% 78.9% 75.7% Production GWh 5,257 4,053 317 393 10,020 Capacity Factor 79.5% 78.9% 82.3% 86.3% Production GWh 4,857 4,292 329 445 9,923 As the table demonstrates, the Revised Fuel Simulation increased total nuclear production by 1,351 GWhs (10,020 - 8,669) above the level included in the original Fuel Simulation. The majority of the increase is attributed to the revised refueling schedule for MP2 and increased capacity associated with the reduced duration of the refueling at MP3. Revised Schedule WPC-3.8, p. 4. Based on the difference between an approximate average cost of fossil production, $25/MWh, and nuclear production, $5/MWh, CL&P’s Revised Fuel Simulation reduced total fuel cost by approximately $27 million ($20/MWh x 1,351 GWhs). Noteworthy is the fact that the combined production from MP2, and 3, as well as VY and SB, are virtually identical under CL&P’s Revised Fuel Simulation and the Department’s revised capacity factors. Further, total nuclear production under the Revised Fuel Simulation exceeds the total nuclear production under the Department’s simulation, albeit by a relatively small amount. As discussed above, where historical data are available they should be considered when developing rates. The Department considered using historical capacity factors to forecast rate year production for SB and VY. However, since the Company’s forecast results in essentially the same output from these plants as that demonstrated by historical performance, the Department accepts CL&P’s revised forecast. In addition, since there is essentially no difference in the combined nuclear production for MP2 and 3 using fuel cycle averages or the Company’s revised capacity factors, the Department will accept the Company’s assumptions for these plants at this time. The difference between the combined production at these plants under the Revised and Final Fuel Simulations is 97,000 MWhs (10,020 - 9,923). Therefore, nuclear production is increased by 97,000 MWhs. This adjustment reduces production/purchases from non-nuclear sources by an equal amount. The expense adjustment associated with this change equals $1,651,167, calculated as the difference in production times the difference between the Company’s marginal cost as calculated in the Final Fuel Simulation and the average cost of nuclear fuel. This adjustment reduces fuel cost by $1,651,167, [97,000 x ($21.56-$4.54)]. g. Fossil Fuel Costs CL&P’s Fuel Simulation relied on a forecasted price of oil that ranged between $16-$18 per barrel. Tr. 9/11/98, p. 662; Late Filed Exhibit No. 57. Although the Company used forecasted prices, it believes that the use of current fossil fuel prices in
  6. Page 100 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 100 of 191 Docket No. 98-01-02 Page 93 the Fuel Simulation is reasonable because the EAC will capture changes in the price of fuel. Tr. 9/16/98, p. 1318. The following demonstrates the price of oil used in the Fuel Simulation and prices during 1998. Price of Oil at CL&P Fossil Fue l Plants Oil Type/Station No. 6 Oil Cost Per Barrel Fuel Simulation Devon Middletown .5% Middletown .3% Montville Norwalk Harbor As of June 1998 As of August 1998 (1) (2) (3) $16.70 $17.90 $18.20 $16.70 $16.70 $14.87 $15.97 $16.82 $14.94 $14.73 $11.92 $13.36 $13.93 $11.94 $11.65 $24.90 $21.38 not provided No. 2 Oil All Stations Sourc e: (1) Late Filed Ex hibit No. 57. (2) Response to Interrogatory OCC-155 (3) Response to Interrogatory EL-428 As the table demonstrates, the price of oil has declined during 1998. As of the conclusion of the hearing, the price was at or slightly above August prices. Tr. 10/20/98, p. 4108. The Department believes that it is reasonable to use current prices in the Fuel Simulation. Therefore, the Department requested the Company to use the current price of oil, adjusted for seasonal changes, in the Final Fuel Simulation. Norwalk Harbor Station demonstrates the lowest price of oil among CL&P’s generating plants and the price at the remaining plants can be estimated based on the Norwalk price. The Norwalk Harbor price was approximately $12 per barrel at the close of hearing. Tr. 10/20/98, pp. 4108-4110. Based on a review of CL&P’s historical fuel prices, $12 per barrel represents the lowest price for oil in over a decade. As a result, the Department adjusted the Norwalk Harbor price for purposes of the Final Fuel Simulation because it appeared unlikely that $12 per barrel would be sustained and because prices generally rise seasonally as demand for oil increases during the winter months. Therefore, the Department directed CL&P to use a Norwalk Harbor ‘base price’ of $13.50 per barrel in the Final Fuel Simulation and to adjust the price of oil for its other fossil plants. Id. The price of natural gas trends with oil. Id.; Late Filed Exhibit No. 88. Therefore, the Department directed CL&P to adjust the price of natural gas used in the Fuel Simulation to trend with the base price of oil used at Norwalk Harbor. The Company included this adjustment in the Final Fuel Simulation.
  7. Page 101 of 191Match

    Docket No. 98-01-02 h. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 101 of 191 Page 94 Cogeneration Costs The BRFR reflects the total cost for purchases under CL&P’s cogeneration contracts. A breakdown of the forecasted total cogeneration cost was provided in response to Interrogatory EL-59. Upon review of these data, the Company discovered that the Fuel Simulation incorrectly priced the purchases from the Citizen’s and Self-Generation contracts, overstating total cogeneration costs. Late Filed Exhibit No. 60. The Citizen’s contract was overstated by $5,023,000 while Self-Generation costs were overstated by $106,000. The Company indicated that it was appropriate to reduce its forecast of fuel costs by $5,129,000, the total of these amounts. Id. The Company was directed to include these adjustments in its Final Fuel Simulation. Tr. 10/20/98, pp. 4098, 4121 and 4122. i. Nuclear Decontamination and Decommissioning Assessments The Energy Policy Act of 1992 requires electric utilities to fund the decontamination and decommissioning (D&D) of the Department of Energy’s (DOE) uranium enrichment plants through 15 annual assessments running through October 2006. In Docket No. 92-11-11, the Department approved estimated D&D assessments for the period July 1, 1993, through June 30, 1996. The assessments were added to the cost of the Millstone units’ fuel and amortized as the fuel was burned (Fuel Burn Method). Mahoney PFT, p. 8. CL&P contends that since 1996 it has continued to make payments to the DOE for D&D, but because the Millstone units have not been operating, and therefore not burning nuclear fuel, CL&P has not recovered its DOE payments from ratepayers since that time. Consequently, CL&P is proposing to amortize in 1999 an accumulated $22.3 million unrecovered balance as of December 31, 1998 (Unrecovered D&D) and collect it through the BRFR. Id.; Schedule WPC-3.1, pp. 12-15. In addition, the Company is proposing to change the recovery method for D&D expense to collect the annual assessments on a more current basis consistent with the current FERC method of recovery. The Fuel Burn Method adds D&D to the cost of each fuel load and amortizes the cost as the fuel is burned. Mahoney PFT, p. 8. The FERC method amortizes actual amounts paid to the DOE over the 12 months subsequent to each payment period. This latter change would become effective with the October 1998 assessment. Together, the proposed changes represent an increase of $22.9 million to 1999 forecast fuel costs over levels produced by the current recovery method. Id.; Response to Interrogatory OCC-267. j. Unrecovered D&D In support of its proposal regarding Unrecovered D&D, the Company claims that while the Millstone units were off line and not burning fuel, it did not recover D&D from ratepayers under the Fuel Burn Method. The Company states that fossil generation and its concomitant costs replaced unavailable nuclear production and its concomitant costs; therefore, D&D that is embedded in the cost of nuclear fuel was not recovered from ratepayers. Tr. 10/20/98, pp. 4074-4081; Read-In RR. In addition, the Company states that the 1992 Energy Policy Act deems D&D costs as a reasonable cost of fuel recoverable in rates. Id.; Late Filed Exhibit No. 138 SP1.
  8. Page 102 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 102 of 191 Page 95 The U.S. Congress deems D&D cost “. . . a necessary and reasonable current cost of fuel [that] shall be fully recoverable in rates in all jurisdictions in the same manner as the utility’s other fuel cost.” Pub. L. 102-486 § 28 Sec. 1802 (g). In light of Congress’ treatment of D&D costs, the Department concurs with CL&P that they are recoverable in rates. Therefore, the analysis regarding Unrecovered D&D does not address the appropriateness of cost recovery, but whether these costs have been recovered from ratepayers since 1996. The Company’s claim that it has not recovered D&D from ratepayers under the Fuel Burn Method is false. In fact, D&D costs are embedded in CL&P’s current BRFR. Current rates were approved pursuant to the Settlement Agreement in the Decision dated June 13, 1998, in Docket No. 92-11-11, and include recovery of D&D costs under the Fuel Burn Method. Id.; Tr. 9/16/98, p. 1380; Response to Interrogatory OCC-265. Put simply, D&D costs are an integral element of the nuclear base fuel rate established in a rate proceeding. Consequently, these costs were recovered from ratepayers while the nuclear units were in rate base. Schedule H-1.1, CL&P’s FERC Form 1, p. 123.9. The Department concludes that CL&P recovered D&D from ratepayers during the outages at Millstone Station while the units remained in rate base; therefore, CL&P’s proposal to collect $22.3 million of Unrecovered D&D is denied. The Company did not recover D&D costs during periods in which its nuclear units were out of rate base, because virtually all costs related to a nuclear unit (except property taxes and replacement power) were disallowed through base rates once the unit was taken out of rate base. It is appropriate to allow recovery of D&D while the nuclear units were excluded from rate base for two reasons: (1) D&D costs are government-imposed and incurred regardless of a unit’s operational status; and (2) according to the language in the Energy Policy Act of 1992, electric utilities’ D&D costs are fully recoverable. Consequently, the Department authorizes recovery of D&D costs incurred during periods of time in which the Company’s nuclear units were not in rate base. To determine the amount of allowed D&D costs, it is necessary to delineate the status of each of the Millstone units in CL&P’s rate base over the period of time the Company claims that D&D was not recovered (1996 through October 1998). The Decision dated February 25, 1998, in the instant docket, established March 1, 1998, as the effective date for removal of MP1 from CL&P’s rate base. Decision, p. 5. Pursuant to the Decision dated April 29, 1998, in Docket No. 92-11-11, MP2 was removed from CL&P’s rate base effective May 1, 1998. Decision, p. 9. In addition, the Decision in Docket No. 92-11-11 concluded that if MP3 did not return to service by July 1, 1998, it would be considered not used and useful and automatically removed from CL&P’s rate base effective on that date. Decision, p. 7. MP3 did not return to service by July 1, 1998; consequently, it was taken out of CL&P’s rate base effective July 1, 1998. Since the Millstone units’ removal from rate base, only MP3 has returned to service (on July 18, 1998). Upon its return to service, MP3 was immediately reincorporated into rate base. While the Department rejects the Company’s request to collect $22.3 million, it approves collection of D&D costs in an amount that reflects the total number of days
  9. Page 103 of 191

    Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 103 of 191 Page 96 that each Millstone unit was out of rate base. Based on the evidence presented, the Department is unable to determine that amount but will do so in a subsequent EAC proceeding. CL&P was directed to exclude Unrecovered D&D from the Final BRFR and to identify the effect on the BRFR. Tr. 10/20/98, p. 4110. However, the Company did not remove the Unrecovered D&D from its Final Fuel Simulation. Instead, it included four options for recovery of these costs. Late Filed Exhibit No. 138-SP-1, pp. 3 and 4. Based on the above, the Department reduces CL&P’s net forecasted fuel expense by the amount of the Unrecovered D&D, $22.3 million. As discussed below, the Department approves CL&P proposal to modify the recovery method for current D&D costs. Therefore, it is reasonable to remove the full amount of the Unrecovered D&D because the Final BRFR embeds current recovery of D&D under the proposed FERC method effective October 1998. k. D&D Recovery Methodology CL&P also requested a change in the method of recovery for current D&D costs. The requested method would expense each of the remaining D&D annual assessments over a 12-month period in line with FERC guidelines. As noted above, the Fuel Burn Method could result in the build-up of a regulatory deferral should the Company experience an extended outage under normal, prudent operations. The Department believes that the use of the FERC method will levelize recovery of D&D costs and avoid the potential for deferring these costs. Therefore, the Company’s proposal is approved. The FERC method was assumed in the original Fuel Simulation and was carried forward to the Revised Fuel Simulation and Final BRFR. Therefore, no further adjustment to the Final Fuel Simulation is required. l. Delivery Efficiency Delivery efficiency (DE) represents the difference between retail sales and retail requirements (i.e., generation) needed to serve those sales. The value is expressed as a percentage and can be accounted for primarily by line losses, company use and billing lag. Losses are primarily incurred on the transmission and distribution systems as the result of transmitting power from generation sources to the ultimate users. According to CL&P, billing lag can be affected by “drastic temperature changes at year end, and to a smaller degree by estimating customers usage.” Late Filed Exhibit No. 62. DE can also fluctuate due to changes in the mix of sales among major classes of service as well as the gain or loss of large customer loads. Id. The DE percentage approved in Docket No. 92-11-11 is .92225. CL&P proposes to reduce it to .92040 in this proceeding. Schedule WPC-3.1, p. 16; Response to Interrogatory EL-288.
  10. Page 104 of 191

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 104 of 191 Docket No. 98-01-02 Page 97 Historical Delivery Efficency Percentages Actual 1993 1994 1995 1996 1997 91.63% 93.26% 92.11% 92.77% 92.11% Proposed 92.04% Five-Year Average Four-Year Three-Year Average Average 92.33% 92.56% 92.38% Source: Late Filed Exhibit No. 62 CL&P states that the DE percentage does not ‘drive’ the determination of generation requirements from forecasted sales. Instead, CL&P forecasts its energy requirements and retail sales separately, then determines its DE percentage based on these forecasted values (sales divided by requirements). Therefore, the proposed DE percentage ‘falls out’ of these separate forecasts. Tr. 9/16/98, pp. 1361-1367; Tr. 10/20/98, pp. 1362 and 4091-4098. The Company’s method of deriving DE appears to be reasonable, but the result should be compared to actual. It was not. According to the Company the proposed percentage reflects “an increase in unaccounted for losses,” an undesirable trend. Id. The DE percentage provides a link between sales and generation; the lower the DE percentage, the more electricity that must be generated and the greater the total fuel cost needed to serve the forecasted load. As such, the DE percentage should drive the determination of requirements or at least be used as a check against the reasonableness of forecasted generation and fuel cost. The table above demonstrates that DE has improved in the recent past; therefore, the Department finds CL&P’s proposed DE percentage unsupported. The three, four and five-year averages are higher that the DE proposed by CL&P and the five-year average provides a reasonable, long-term DE. Therefore the Department approves it. CL&P was directed to use 92.38%, the five-year average, in its Final Fuel Simulation. Tr. 10/20/98, p. 4099. m. Sharing Agreement and NUG&T The 1992 merger of NU and PSNH resulted in a sharing agreement designed to allocate the energy cost savings resulting from the economic dispatch of the combined NU and PSNH systems (Sharing Agreement). In addition, the Sharing Agreement includes a mechanism for allocating capacity and related costs between PSNH and NU to share the surplus capacity of the combined systems (Capacity Transfer) when one of the systems is capacity deficient. According to CL&P, the Sharing Agreement “defines the mechanical process” regarding energy cost savings and the transfer of surplus capacity. Tr. 9/16/98, pp. 1194-1286. The Northeast Utilities Generation and Transmission Agreement (NUG&T) came about following the creation of NU, which essentially consolidated the Western Massachusetts Electric Company (WMECO), Holyoke Water and Power (HWP) and

As listed on the current system

Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)