Interrogatory responses
Answers to questions 874, 885, 886
Files5
OCC-874_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download OCC-874_Final.pdfRead the text of OCC-874_Final.pdf
OCC-874 Attachment 1 REDACTED.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download OCC-874 Attachment 1 REDACTED.pdfRead the text of OCC-874 Attachment 1 REDACTED.pdf
OCC-885_Final.pdf
PDF · 77 KB · 1 pageText searchable
Download OCC-885_Final.pdfRead the text of OCC-885_Final.pdf
OCC-886_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download OCC-886_Final.pdfRead the text of OCC-886_Final.pdf
OCC-886 Attachment 1.pdf
PDF · 10 MB · 191 pagesText searchable
Download OCC-886 Attachment 1.pdfRead the text of OCC-886 Attachment 1.pdf
Text of OCC-886_Final.pdf
Extracted from the file · 1 page · 1,819 characters
Page 99 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 99 of 191 Docket No. 98-01-02 Page 92 Fue l Sim ula tion Nucle a r Production As Filed Revised Fuel Simulation Final Simulation Schedule WPC-3.1 Revis ed WPC-3.1 Late Filed Exhibit No. 138-SP-1 Capacity Factor 72.8% 70.7% 78.9% 76.6% MP1 MP2 MP3 VY SB Total Production GWh 4,326 3,725 303 315 8,669 Capacity Factor 86.0% 74.5% 78.9% 75.7% Production GWh 5,257 4,053 317 393 10,020 Capacity Factor 79.5% 78.9% 82.3% 86.3% Production GWh 4,857 4,292 329 445 9,923 As the table demonstrates, the Revised Fuel Simulation increased total nuclear production by 1,351 GWhs (10,020 - 8,669) above the level included in the original Fuel Simulation. The majority of the increase is attributed to the revised refueling schedule for MP2 and increased capacity associated with the reduced duration of the refueling at MP3. Revised Schedule WPC-3.8, p. 4. Based on the difference between an approximate average cost of fossil production, $25/MWh, and nuclear production, $5/MWh, CL&P’s Revised Fuel Simulation reduced total fuel cost by approximately $27 million ($20/MWh x 1,351 GWhs). Noteworthy is the fact that the combined production from MP2, and 3, as well as VY and SB, are virtually identical under CL&P’s Revised Fuel Simulation and the Department’s revised capacity factors. Further, total nuclear production under the Revised Fuel Simulation exceeds the total nuclear production under the Department’s simulation, albeit by a relatively small amount. As discussed above, where historical data are available they should be considered when developing rates. The Department considered using historical capacity factors to forecast rate year production for SB and VY. However, since the Company’s forecast results in essentially the same output from these plants as that demonstrated by historical performance, the Department accepts CL&P’s revised forecast. In addition, since there is essentially no difference in the combined nuclear production for MP2 and 3 using fuel cycle averages or the Company’s revised capacity factors, the Department will accept the Company’s assumptions for these plants at this time. The difference between the combined production at these plants under the Revised and Final Fuel Simulations is 97,000 MWhs (10,020 - 9,923). Therefore, nuclear production is increased by 97,000 MWhs. This adjustment reduces production/purchases from non-nuclear sources by an equal amount. The expense adjustment associated with this change equals $1,651,167, calculated as the difference in production times the difference between the Company’s marginal cost as calculated in the Final Fuel Simulation and the average cost of nuclear fuel. This adjustment reduces fuel cost by $1,651,167, [97,000 x ($21.56-$4.54)]. g. Fossil Fuel Costs CL&P’s Fuel Simulation relied on a forecasted price of oil that ranged between $16-$18 per barrel. Tr. 9/11/98, p. 662; Late Filed Exhibit No. 57. Although the Company used forecasted prices, it believes that the use of current fossil fuel prices inPage 100 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 100 of 191 Docket No. 98-01-02 Page 93 the Fuel Simulation is reasonable because the EAC will capture changes in the price of fuel. Tr. 9/16/98, p. 1318. The following demonstrates the price of oil used in the Fuel Simulation and prices during 1998. Price of Oil at CL&P Fossil Fue l Plants Oil Type/Station No. 6 Oil Cost Per Barrel Fuel Simulation Devon Middletown .5% Middletown .3% Montville Norwalk Harbor As of June 1998 As of August 1998 (1) (2) (3) $16.70 $17.90 $18.20 $16.70 $16.70 $14.87 $15.97 $16.82 $14.94 $14.73 $11.92 $13.36 $13.93 $11.94 $11.65 $24.90 $21.38 not provided No. 2 Oil All Stations Sourc e: (1) Late Filed Ex hibit No. 57. (2) Response to Interrogatory OCC-155 (3) Response to Interrogatory EL-428 As the table demonstrates, the price of oil has declined during 1998. As of the conclusion of the hearing, the price was at or slightly above August prices. Tr. 10/20/98, p. 4108. The Department believes that it is reasonable to use current prices in the Fuel Simulation. Therefore, the Department requested the Company to use the current price of oil, adjusted for seasonal changes, in the Final Fuel Simulation. Norwalk Harbor Station demonstrates the lowest price of oil among CL&P’s generating plants and the price at the remaining plants can be estimated based on the Norwalk price. The Norwalk Harbor price was approximately $12 per barrel at the close of hearing. Tr. 10/20/98, pp. 4108-4110. Based on a review of CL&P’s historical fuel prices, $12 per barrel represents the lowest price for oil in over a decade. As a result, the Department adjusted the Norwalk Harbor price for purposes of the Final Fuel Simulation because it appeared unlikely that $12 per barrel would be sustained and because prices generally rise seasonally as demand for oil increases during the winter months. Therefore, the Department directed CL&P to use a Norwalk Harbor ‘base price’ of $13.50 per barrel in the Final Fuel Simulation and to adjust the price of oil for its other fossil plants. Id. The price of natural gas trends with oil. Id.; Late Filed Exhibit No. 88. Therefore, the Department directed CL&P to adjust the price of natural gas used in the Fuel Simulation to trend with the base price of oil used at Norwalk Harbor. The Company included this adjustment in the Final Fuel Simulation.Page 101 of 191
Docket No. 98-01-02 h. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 101 of 191 Page 94 Cogeneration Costs The BRFR reflects the total cost for purchases under CL&P’s cogeneration contracts. A breakdown of the forecasted total cogeneration cost was provided in response to Interrogatory EL-59. Upon review of these data, the Company discovered that the Fuel Simulation incorrectly priced the purchases from the Citizen’s and Self-Generation contracts, overstating total cogeneration costs. Late Filed Exhibit No. 60. The Citizen’s contract was overstated by $5,023,000 while Self-Generation costs were overstated by $106,000. The Company indicated that it was appropriate to reduce its forecast of fuel costs by $5,129,000, the total of these amounts. Id. The Company was directed to include these adjustments in its Final Fuel Simulation. Tr. 10/20/98, pp. 4098, 4121 and 4122. i. Nuclear Decontamination and Decommissioning Assessments The Energy Policy Act of 1992 requires electric utilities to fund the decontamination and decommissioning (D&D) of the Department of Energy’s (DOE) uranium enrichment plants through 15 annual assessments running through October 2006. In Docket No. 92-11-11, the Department approved estimated D&D assessments for the period July 1, 1993, through June 30, 1996. The assessments were added to the cost of the Millstone units’ fuel and amortized as the fuel was burned (Fuel Burn Method). Mahoney PFT, p. 8. CL&P contends that since 1996 it has continued to make payments to the DOE for D&D, but because the Millstone units have not been operating, and therefore not burning nuclear fuel, CL&P has not recovered its DOE payments from ratepayers since that time. Consequently, CL&P is proposing to amortize in 1999 an accumulated $22.3 million unrecovered balance as of December 31, 1998 (Unrecovered D&D) and collect it through the BRFR. Id.; Schedule WPC-3.1, pp. 12-15. In addition, the Company is proposing to change the recovery method for D&D expense to collect the annual assessments on a more current basis consistent with the current FERC method of recovery. The Fuel Burn Method adds D&D to the cost of each fuel load and amortizes the cost as the fuel is burned. Mahoney PFT, p. 8. The FERC method amortizes actual amounts paid to the DOE over the 12 months subsequent to each payment period. This latter change would become effective with the October 1998 assessment. Together, the proposed changes represent an increase of $22.9 million to 1999 forecast fuel costs over levels produced by the current recovery method. Id.; Response to Interrogatory OCC-267. j. Unrecovered D&D In support of its proposal regarding Unrecovered D&D, the Company claims that while the Millstone units were off line and not burning fuel, it did not recover D&D from ratepayers under the Fuel Burn Method. The Company states that fossil generation and its concomitant costs replaced unavailable nuclear production and its concomitant costs; therefore, D&D that is embedded in the cost of nuclear fuel was not recovered from ratepayers. Tr. 10/20/98, pp. 4074-4081; Read-In RR. In addition, the Company states that the 1992 Energy Policy Act deems D&D costs as a reasonable cost of fuel recoverable in rates. Id.; Late Filed Exhibit No. 138 SP1.Page 102 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 102 of 191 Page 95 The U.S. Congress deems D&D cost “. . . a necessary and reasonable current cost of fuel [that] shall be fully recoverable in rates in all jurisdictions in the same manner as the utility’s other fuel cost.” Pub. L. 102-486 § 28 Sec. 1802 (g). In light of Congress’ treatment of D&D costs, the Department concurs with CL&P that they are recoverable in rates. Therefore, the analysis regarding Unrecovered D&D does not address the appropriateness of cost recovery, but whether these costs have been recovered from ratepayers since 1996. The Company’s claim that it has not recovered D&D from ratepayers under the Fuel Burn Method is false. In fact, D&D costs are embedded in CL&P’s current BRFR. Current rates were approved pursuant to the Settlement Agreement in the Decision dated June 13, 1998, in Docket No. 92-11-11, and include recovery of D&D costs under the Fuel Burn Method. Id.; Tr. 9/16/98, p. 1380; Response to Interrogatory OCC-265. Put simply, D&D costs are an integral element of the nuclear base fuel rate established in a rate proceeding. Consequently, these costs were recovered from ratepayers while the nuclear units were in rate base. Schedule H-1.1, CL&P’s FERC Form 1, p. 123.9. The Department concludes that CL&P recovered D&D from ratepayers during the outages at Millstone Station while the units remained in rate base; therefore, CL&P’s proposal to collect $22.3 million of Unrecovered D&D is denied. The Company did not recover D&D costs during periods in which its nuclear units were out of rate base, because virtually all costs related to a nuclear unit (except property taxes and replacement power) were disallowed through base rates once the unit was taken out of rate base. It is appropriate to allow recovery of D&D while the nuclear units were excluded from rate base for two reasons: (1) D&D costs are government-imposed and incurred regardless of a unit’s operational status; and (2) according to the language in the Energy Policy Act of 1992, electric utilities’ D&D costs are fully recoverable. Consequently, the Department authorizes recovery of D&D costs incurred during periods of time in which the Company’s nuclear units were not in rate base. To determine the amount of allowed D&D costs, it is necessary to delineate the status of each of the Millstone units in CL&P’s rate base over the period of time the Company claims that D&D was not recovered (1996 through October 1998). The Decision dated February 25, 1998, in the instant docket, established March 1, 1998, as the effective date for removal of MP1 from CL&P’s rate base. Decision, p. 5. Pursuant to the Decision dated April 29, 1998, in Docket No. 92-11-11, MP2 was removed from CL&P’s rate base effective May 1, 1998. Decision, p. 9. In addition, the Decision in Docket No. 92-11-11 concluded that if MP3 did not return to service by July 1, 1998, it would be considered not used and useful and automatically removed from CL&P’s rate base effective on that date. Decision, p. 7. MP3 did not return to service by July 1, 1998; consequently, it was taken out of CL&P’s rate base effective July 1, 1998. Since the Millstone units’ removal from rate base, only MP3 has returned to service (on July 18, 1998). Upon its return to service, MP3 was immediately reincorporated into rate base. While the Department rejects the Company’s request to collect $22.3 million, it approves collection of D&D costs in an amount that reflects the total number of daysPage 103 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 103 of 191 Page 96 that each Millstone unit was out of rate base. Based on the evidence presented, the Department is unable to determine that amount but will do so in a subsequent EAC proceeding. CL&P was directed to exclude Unrecovered D&D from the Final BRFR and to identify the effect on the BRFR. Tr. 10/20/98, p. 4110. However, the Company did not remove the Unrecovered D&D from its Final Fuel Simulation. Instead, it included four options for recovery of these costs. Late Filed Exhibit No. 138-SP-1, pp. 3 and 4. Based on the above, the Department reduces CL&P’s net forecasted fuel expense by the amount of the Unrecovered D&D, $22.3 million. As discussed below, the Department approves CL&P proposal to modify the recovery method for current D&D costs. Therefore, it is reasonable to remove the full amount of the Unrecovered D&D because the Final BRFR embeds current recovery of D&D under the proposed FERC method effective October 1998. k. D&D Recovery Methodology CL&P also requested a change in the method of recovery for current D&D costs. The requested method would expense each of the remaining D&D annual assessments over a 12-month period in line with FERC guidelines. As noted above, the Fuel Burn Method could result in the build-up of a regulatory deferral should the Company experience an extended outage under normal, prudent operations. The Department believes that the use of the FERC method will levelize recovery of D&D costs and avoid the potential for deferring these costs. Therefore, the Company’s proposal is approved. The FERC method was assumed in the original Fuel Simulation and was carried forward to the Revised Fuel Simulation and Final BRFR. Therefore, no further adjustment to the Final Fuel Simulation is required. l. Delivery Efficiency Delivery efficiency (DE) represents the difference between retail sales and retail requirements (i.e., generation) needed to serve those sales. The value is expressed as a percentage and can be accounted for primarily by line losses, company use and billing lag. Losses are primarily incurred on the transmission and distribution systems as the result of transmitting power from generation sources to the ultimate users. According to CL&P, billing lag can be affected by “drastic temperature changes at year end, and to a smaller degree by estimating customers usage.” Late Filed Exhibit No. 62. DE can also fluctuate due to changes in the mix of sales among major classes of service as well as the gain or loss of large customer loads. Id. The DE percentage approved in Docket No. 92-11-11 is .92225. CL&P proposes to reduce it to .92040 in this proceeding. Schedule WPC-3.1, p. 16; Response to Interrogatory EL-288.Page 104 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 104 of 191 Docket No. 98-01-02 Page 97 Historical Delivery Efficency Percentages Actual 1993 1994 1995 1996 1997 91.63% 93.26% 92.11% 92.77% 92.11% Proposed 92.04% Five-Year Average Four-Year Three-Year Average Average 92.33% 92.56% 92.38% Source: Late Filed Exhibit No. 62 CL&P states that the DE percentage does not ‘drive’ the determination of generation requirements from forecasted sales. Instead, CL&P forecasts its energy requirements and retail sales separately, then determines its DE percentage based on these forecasted values (sales divided by requirements). Therefore, the proposed DE percentage ‘falls out’ of these separate forecasts. Tr. 9/16/98, pp. 1361-1367; Tr. 10/20/98, pp. 1362 and 4091-4098. The Company’s method of deriving DE appears to be reasonable, but the result should be compared to actual. It was not. According to the Company the proposed percentage reflects “an increase in unaccounted for losses,” an undesirable trend. Id. The DE percentage provides a link between sales and generation; the lower the DE percentage, the more electricity that must be generated and the greater the total fuel cost needed to serve the forecasted load. As such, the DE percentage should drive the determination of requirements or at least be used as a check against the reasonableness of forecasted generation and fuel cost. The table above demonstrates that DE has improved in the recent past; therefore, the Department finds CL&P’s proposed DE percentage unsupported. The three, four and five-year averages are higher that the DE proposed by CL&P and the five-year average provides a reasonable, long-term DE. Therefore the Department approves it. CL&P was directed to use 92.38%, the five-year average, in its Final Fuel Simulation. Tr. 10/20/98, p. 4099. m. Sharing Agreement and NUG&T The 1992 merger of NU and PSNH resulted in a sharing agreement designed to allocate the energy cost savings resulting from the economic dispatch of the combined NU and PSNH systems (Sharing Agreement). In addition, the Sharing Agreement includes a mechanism for allocating capacity and related costs between PSNH and NU to share the surplus capacity of the combined systems (Capacity Transfer) when one of the systems is capacity deficient. According to CL&P, the Sharing Agreement “defines the mechanical process” regarding energy cost savings and the transfer of surplus capacity. Tr. 9/16/98, pp. 1194-1286. The Northeast Utilities Generation and Transmission Agreement (NUG&T) came about following the creation of NU, which essentially consolidated the Western Massachusetts Electric Company (WMECO), Holyoke Water and Power (HWP) andPage 105 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 105 of 191 Page 98 CL&P (combined, NU Initial System Companies).10 The NUG&T allows NU Initial System Companies to plan and dispatch for system need based on the operation of the combined companies instead of on a stand-alone basis. The savings that result from this single system approach are shared among the companies. Roman PFT, pp. 2-7; Id. Restructuring activities are underway in New Hampshire and Massachusetts and those activities require PSNH, WMECO and HWP to sell their generation and generation-related assets. Based on the timetable for restructuring in those states, CL&P anticipated that the sale of PSNH, WMECO and HWP generation assets would be completed prior to 1999.11 The sale of those assets would render the Sharing Agreement and NUG&T unworkable because the companies would no longer control generation. The Fuel Simulation submitted with the original filing assumed that the Sharing Agreement and NUG&T were not in effect throughout 1999. Therefore, the Proposed BRFR was based on a Fuel Simulation in which CL&P assumed operation of its generation system on a stand-alone basis for the rate year. Id.; Tr. 9/16/98, pp. 1202 and 1237; Shuckerow PFT, pp. 3-8. Implementation of retail choice in New Hampshire and Massachusetts has been delayed. As a result, CL&P states that the Sharing Agreement and NUG&T will remain in effect through the first half of 1999. The Revised Fuel Simulation assumes operation of the NUG&T through June 1999 and continuation of the Sharing Agreement through April 1999. Id.; Filing dated September 30, 1999, Revised Schedule C-3.8 and WPC-3.8. CL&P states that including the NUG&T in the revised filing for the first half of 1999 increases capacity costs but reduces energy costs. Essentially, “CL&P incurs capacity charges for being a member of the NUG&T and receives energy benefits for being a member.” Tr. 9/16/98, p. 1242. The Company estimates the annual net effect of these two items as an increase to costs of approximately $8 million, or $4 million for the half year assumed in the revised filing. Tr. 9/16/98, p. 1244. The Sharing Agreement provides energy cost benefits to CL&P through the pooled dispatch of PSNH resources. However, the NU Initial System Companies are capacity deficient as a result of the extended outages at Millstone Station and the retirement of MP1, CY and MY. Under the Capacity Transfer provisions of the Sharing Agreement, the NU Initial Companies must take surplus capacity from PSNH at formula-based rates. The cost of capacity under the ‘must take’ provision of the Sharing Agreement is in excess of current market rates and, although there are energy cost benefits included with these transfers, there is a net increase to expenses associated with the transfer. Therefore, the revised filing reflects increased capacity costs and reduced energy costs associated with the Sharing Agreement through April 1999. Id.; Tr. 9/16/98, 1234-1258. 10 The NU Operating Companies are referred to as the NU Initial System, whereas the operation of NU including PSNH, is referred to as the Combined System. 11 For example, Massachusetts legislation provided for implementation of retail choice by March 1998.Page 106 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 106 of 191 Page 99 The Capacity Transfer provision requires CL&P to take PSNH surplus capacity for six-month periods (Capability Period) that run from November through April and May through October. For 1999, CL&P included a forecast of capacity costs reflecting four months of PSNH capacity in its revised filing. The four-month period, January through April, represents the final months of the November 1998 through April 1999 Capability Period. CL&P states that the capacity costs reflect the transfer of 270 MWs of capacity for this Capability Period at a forecasted average monthly cost of $2.5 million. Id.; Tr. 9/16/98, pp. 1204-1215. At the time CL&P prepared its rate filing, it appeared that restructuring activities in Massachusetts and New Hampshire would render the Sharing Agreement and NUG&T unworkable for the rate year. As a result, CL&P submitted its original filing based on the assumption that these agreements would not be in effect throughout 1999. However, restructuring is a complex task and although delays were not expected, it is not unreasonable for them to occur, as they have. The Department believes that the Company acted reasonably in assuming that the Sharing Agreement and NUG&T would terminate prior to the rate year, given the information available to it at the time. Once CL&P became aware that the agreements would go forward into 1999, it was reasonable for the Company to amend its filing and include continued operation of the agreements for the first half of 1999. Therefore, the Department accepts continued operation of these agreements for the first half of 1999. The combined PSNH and NUG&T capacity costs are forecasted to total $46.8 million for January through June 1998. Late Filed Exhibit No. 151; Revised Schedule C-3.8; Late Filed Exhibit No. 138 SP 1. These costs reflect the operation of the NUG&T for the full six-month period and the operation of the Sharing Agreement through April 1999. The four-month recovery of PSNH capacity costs assumes approval of CL&P’s proposal to transfer its wholesale contracts to an unregulated subsidiary. See Section II.G.5. Therefore, the Final Fuel Simulation did not demonstrate PSNH capacity costs for May and June, nor did it include the energy benefits associated with the transfer for these months. CL&P embedded $46.8 million in capacity costs in the non-fuel component of base rates in its revised filing. At the Department’s request, CL&P isolated NUG&T and PSNH capacity costs in the BRFR under the Final Fuel Simulation. Tr. 10/20/98, p. 4103; Late Filed Exhibit No. 138 SP 1. The Company states that reflecting NUG&T and PSNH capacity costs in the calculation of the BRFR will not change the overall revenue requirement but will assure tracking of these costs through the EAC. Id. However, the Company believes that capacity costs are not permitted in the EAC; therefore, it is inappropriate to include these costs in the BRFR. The Department disagrees. At present, the EAC is truing-up the capacity costs associated with the MP2 out-of-rate-base disallowance. Docket No. 98-06-01, EAC filing, p. 79. In addition, CL&P recovers the full cost of PPP contracts through the BRFR and these costs are trued-up in the EAC. Although CL&P books all PPP purchases as energy, it is clear that these costs reflect both energy and capacity. See Section II.I.10.Page 107 of 191
Docket No. 98-01-02 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 107 of 191 Page 100 Traditionally, the BRFR has excluded recovery of non-PPP capacity costs. However, the capacity costs associated with the NUG&T and Sharing Agreement will end at the mid-point of the rate year. If these costs are embedded in non-fuel rates, there is no adjustment mechanism should actual costs deviate from forecasted levels. The Company would continue to recover at the level embedded in rates beyond 1999 unless base rates are reset at that time. If these cost are included in the BRFR, the Department can true them up with a simple adjustment through the EAC. Therefore, the Department will include $46.8 million in the BRFR. These costs will be trued-up to actual through the EAC. The Department notes that embedding these costs in the BRFR increases that rate by approximately 2 mills while reducing non-fuel base rates by an equal amount. CL&P has proposed to transfer its wholesale contracts to an NU subsidiary to avoid PSNH capacity payments for May and June 1999, the first two months of the next Capability Period. Consistent with this proposal, CL&P has excluded a forecast of PSNH capacity costs for May and June 1999, therefore, the Final BRFR does not reflect recovery of these costs. Late Filed Exhibit No. 138 SP 1; Late Filed Exhibit No. 151. As discussed in Section II.G.5., the Department approves CL&P’s proposal to transfer its wholesale contracts to an unregulated subsidiary. Therefore, it appears that CL&P will not incur PSNH capacity costs for May and June 1999. However, the Department notes that if MP2 does not returned to service by April 1999, CL&P will remain capacity deficient and may require PSNH capacity in May and June. If this occurs, the Department will address the matter in the appropriate EAC proceeding. n. Price of No. 6 oil As noted above, the price of oil at CL&P’s oil-fired plants can be estimated based on the price of oil at the Norwalk Harbor Station. Therefore, the system average production cost of oil-fired generation can also be determined based on the price of oil at this facility. The Company’s original Fuel Simulation assumed the price of oil at Norwalk Harbor Station to be $16.70/bbl.12 That Fuel Simulation demonstrated an average production cost of $27.70/MWh from oil-fired generation based on production of 4,208,000 MWhs and total cost of $116,552,000. Late Filed Exhibit No. 57; Schedule WPC-3.1 The Final Fuel Simulation used $13.50/bbl as the price of oil at Norwalk Harbor Station. Tr. 10/20/98, p. 4108; Late Filed Exhibit No. 138 SP 1. The Final Fuel Simulation demonstrated an average production cost of $22.46/MWh from oil-fired generation based on production of 6,582,000 MWhs and total cost of $147,816,000. Based on these costs, the average production cost per dollar price is $1.66/MWh ($27.70 $16.70) and ($22.46 $13.50). See table below. As discussed above, the Department directed the Company to use $13.50/bbl in the Final Fuel Simulation, because it was unlikely that the $12/bbl price would be sustained. However, oil prices have not increased; therefore it is reasonable to adjust the Company’s forecasted total fuel cost to reflect the price as of the last day of the 12 Norwalk Harbor Station demonstrates the lowest price of oil among CL&P’s generating plants, approximately $12/bbl at the close of hearing. Tr. 10/20/98, pp. 4108-4110. The cost of oil at CL&P’s remaining plants was based on the Norwalk Harbor price. Id.Page 108 of 191
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 886 Attachment 1 Page 108 of 191 Docket No. 98-01-02 Page 101 hearing. Therefore, the Department reduces the price of oil at Norwalk Harbor Station to $12/bbl. The Department examined the forecasted production cost and price of oil demonstrated in WPC-3.1 and Late Filed Exhibit No. 138 SP 1. The following table demonstrates these values. Fuel Cost Adjustment Change In Oil Price (1) (2) (3) (4) (5) Price/bbl Production Total Cost Cost per MWh Production Cost* (Mwhs) (Per MWh) (3/2) (4/1) Original Fuel Simulation $16.70 4,208,000 $116,552,000 $27.70 $1.66 Final Fuel Simulation** $13.50 5,964,000 $133,946,000 $22.46 $1.66 (2x4) (1x5) (5) $118,802,880 $15,143,120 $19.92 $1.66 DPUC Adjustment** Difference/Adjustment $12.00 5,964,000 Source: Schedule WP C-3.1; Late Filed Exhibit No. 138 SP 1. * Price is per MWh per dollar a barrel cost. ** January through June production and cost are adjusted to a CL&P basis using .85 as a multiplier. A review of these data finds that a relationship exists between the price of oil and the forecasted cost of production. Each dollar of cost reflects a production cost of approximately $1.66/MWh. See table above, column 5. Therefore, reducing the base price of oil to $12/bbl reduces total fuel cost for oil-fired generation by approximately $15.1 million. This value was determined by subtracting the total fuel cost for oil-fired production at $12/bbl, $19.92/MWh ($1.66 x $12/bbl) times total production of 5,964,000 MWhs, from the total fuel cost for oil-fired production reflected in the Final Fuel Simulation, $133,946,000. Although a change in the price of oil drives changes to production from oil and gas-fired facilities as well as market purchases, the Department has not attempted to capture these changes in this adjustment. The adjustment herein reflects the approximate effect of the change in oil prices and all other changes will be captured through the EAC. The table above demonstrates this adjustment. o. Marginal Cost A change in the price of oil drives a change in the forecasted marginal cost, which in turn drives a change in expense associated with an adjustment to sales. The Department did not request a Fuel Simulation using $12/bbl as the base price. Therefore, the Department has calculated an estimated marginal cost based on a $12/bbl base price of oil. The Department examined the forecasted marginal cost and price of oil demonstrated in WPC-3.1, Late Filed Exhibit No. 138 and Late Filed Exhibit No. 138 SP 1. The following table demonstrates the price of oil and resulting marginal cost.
As listed on the current system
Question(s) Answered 874, 885, 886 (The Connecticut Light and Power Company) Date Filed: 10/09/2026