  1. Page 1 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC-883 Attachment 2 Page 1 of 20 STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY APPLICATION OF THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY TO AMEND ITS RATE SCHEDULES : : : : : : DOCKET NO. 17-10-46 JANUARY 11, 2018 SETTLEMENT AGREEMENT
  2. Page 2 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC-883 Attachment 2 Page 2 of 20 Table of Contents 1) Effective Date and Term...........................................................................................2 2) Revenue Requirements. ............................................................................................2 3) Rate Base. .................................................................................................................3 4) O&M Expense. .........................................................................................................5 5) Annual Step Adjustment for Full-Time Equivalents and Outside Contractors. .......5 6) Depreciation..............................................................................................................8 7) Non-Hardship Uncollectibles. ..................................................................................8 8) Environmental Remediation.....................................................................................8 9) Cost of Capital. .........................................................................................................8 10) Earnings Sharing Mechanism...................................................................................9 11) Enhanced Tree Trimming. .......................................................................................9 12) Revenue Decoupling.................................................................................................9 13) Rate Design. ...........................................................................................................10 14) Credit/Debit Card Fees. ..........................................................................................10 15) Additional Terms and Conditions...........................................................................11 16) Regulatory Process. ................................................................................................11 17) Settlement Conditions. ...........................................................................................12 18) Material Tax Law Change. .....................................................................................13
  3. Page 3 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC-883 Attachment 2 Page 3 of 20 Attachments Attachment 1 Revenue Requirements, Average Bill Impacts and Summary of Tax Changes Attachment 2 Rate Base and Adjustments to Rate Base Attachment 3 Total Operating Expense Attachment 4 Depreciation Rates Attachment 5 Other Amortization Expense Attachment 6 Cost of Capital Attachment 7 Decoupling Targets Attachment 8 Sample Calculation of FTE Funding Methodology Attachment 9 Orders 1 & 2, Docket No. 16-03-01, PURA Annual Review of the Rate Adjustment Mechanisms of The Connecticut Light and Power Company
  4. Page 4 of 20Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC-883 Attachment 2 Page 4 of 20 STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY APPLICATION OF THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY TO AMEND ITS RATE SCHEDULES : : : : : : DOCKET NO. 17-10-46 JANUARY 11, 2018 SETTLEMENT AGREEMENT The Connecticut Light and Power Company d/b/a Eversource Energy (“CL&P” or the “Company”), the Office of Consumer Counsel (“OCC”) and the Prosecutorial Staff of the Public Utilities Regulatory Authority (“PRO”) (collectively, the “Settling Parties”) enter into this Settlement Agreement regarding the Company’s November 22, 2017 application (“Application”) filed with the Public Utilities Regulatory Authority (“PURA” or the “Authority”) pursuant to Conn. Gen. Stat. §§ 16-19 and 16-19e. WHEREAS, the Company requests in its Application approval of a three-year rate plan commencing May 26, 2018; WHEREAS, the requested three-year rate plan in the Application proposes an increase in revenues of $255.8 million for the first rate year, or approximately 6.57% over currently authorized overall revenues;1 an incremental increase of $45 million for the second rate year, or approximately 1.27% over the prior year proposed overall revenues; and an incremental increase of $36 million, or approximately 0.98% over the prior year proposed overall revenues, for a total proposed increase of $336.8 million over the three-year rate plan; WHEREAS, the Application included schedules consistent with the Authority’s standard filing requirements (“SFRs”) along with testimony, attachments and exhibits from 16 witnesses; WHEREAS, the Authority docketed the Application as Docket No. 17-10-46 and subsequently issued a Notice of Proceeding in which it designated the OCC as a party to the proceeding;2 WHEREAS, as of this date, more than 786 interrogatories have been issued to the Company in Docket No. 17-10-46; and 1 This amount reflects an adjustment for the transfer of an estimated $8 million in rate base-eligible capital investment from the non-bypassable federally mandated congestion charge (“NBFMCC”) rate to the distribution rate, which is included in the requested revenue increases (see Docket No. 17-10-46, November 22, 2017 Rates Pre-filed Testimony, Exhibit TRP-4, page 1). 2 The Notice of Proceeding also designated the Commissioner of the Department of Energy and Environmental Protection as a party to this docket. 1
  5. Page 5 of 20Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC-883 Attachment 2 Page 5 of 20 WHEREAS, the Company filed a motion on October 31, 2017 requesting the Authority to appoint prosecutorial staff in order to facilitate settlement discussions among the parties; and the Authority granted the motion on November 6, 2017, and subsequently designated PRO on November 7 and 17, 2017; WHEREAS, the Settling Parties seek to resolve the matters raised in the Application and specified in this Settlement Agreement on mutually agreeable terms, and without establishing any new precedent or principles applicable to any other proceedings; and WHEREAS, the Authority’s policy, consistent with Conn. Gen. Stat. § 16-19jj, is to encourage the use of settlements to resolve contested cases. NOW THEREFORE, in consideration of the exchange of promises and covenants contained herein, the legal sufficiency of which is hereby acknowledged, the Settling Parties agree, subject to the Authority’s approval, to the following terms: 1) Effective Date and Term. a) The effective date of the Company’s new rates pursuant to this Settlement Agreement shall be May 1, 2018. b) The term of the Company’s rate plan shall be three years, for the rate years May 1, 2018 to April 30, 2019 (“Rate Year 1”); May 1, 2019 to April 30, 2020 (“Rate Year 2”); and May 1, 2020 to April 30, 2021 (“Rate Year 3”). 2) Revenue Requirements. a) On May 1, 2018, the Company shall increase the distribution component of its rates to recover an increase in its allowed revenue requirement of $97.114 million over currently effective rates. This represents an average increase of 2.47% over currently authorized overall revenues. b) On May 1, 2019, the Company shall increase the distribution component of its rates to recover an incremental increase in its allowed revenue requirement of $32.714 million over then-currently effective rates plus any adjustment authorized in Section 5 hereof. This represents an average incremental increase of 0.81% over the prior year overall revenues. c) On May 1, 2020, the Company shall increase the distribution component of its rates to recover an incremental increase in its allowed revenue requirement of $24.690 million over then-currently effective rates plus any adjustment authorized in Section 5 hereof. This represents an average incremental increase of 0.61% over the prior year overall revenues. d) Attachment 1 provides a summary of the Revenue Requirements and Average 2
  6. Page 6 of 20Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC-883 Attachment 2 Page 6 of 20 Rates per kWh Current vs. Proposed Per Settlement.3 3) Rate Base. a) Core Capital, System Resiliency and Grid Modernization. i) 2017. (1) Core Capital and System Resiliency. Gross plant additions (“Plant Additions”) of $400 million for calendar year 2017 shall be recovered in base distribution rates. If actual Plant Additions, for both core capital and system resiliency, are greater or less than $400 million, then the actual result for calendar year 2017 shall be reflected (in the form of a credit to the Company or a credit to customers, as appropriate) in a new rate tracking mechanism for capital Plant Additions and the associated O&M expense (“New Capital Tracker”).4 ii) 2018, 2019, 2020 and thereafter. (1) Core Capital. The Company’s proposed capital expenditures for “core”5 capital projects for calendar years 2018, 2019 and 2020, as filed in the Application, are approved. (a) Plant Additions for core capital projects of $270 million for calendar years 2018-2020 shall be recovered in base distribution rates. If Plant Additions for core capital projects are greater than $270 million per year for calendar years 2018-2020, then the Company shall recover “reliability”6 Plant Additions (which are a subset of core capital projects) for that time period through the New Capital Tracker up to the amount in excess of $270 million. (b) Plant Additions up to $300 million annually for core capital projects for the period commencing after the expiration of calendar year 2020 shall be recovered in the New Capital Tracker until the Company’s distribution rates are adjusted in its next distribution rate case. Plant Additions for core capital projects in excess of $300 million during this period shall be deferred for recovery to the Company’s next rate 3 Final bill impacts will vary as a result of the approved rate-design implementation. 4 PURA has concluded it possesses the authority to establish a capital tracking rate for electric distribution companies. See Docket No. 16-06-04, Application of The United Illuminating Company to Increase its Rates and Charges, December 14, 2016 Decision at page 23. 5 In Docket No. 17-10-46, Section IV of the Nov. 22, 2017 Pre-Filed Testimony of Kenneth B. Bowes identifies “core” capital programs. 6 See Docket No. 17-10-46, Nov. 22, 2017 Kenneth B. Bowes Pre-filed Testimony at Table KBB-3, Page 17, which describes the core capital projects in the system “Reliability” category of CL&P’s core capital program. 3
  7. Page 7 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC-883 Attachment 2 Page 7 of 20 case. (2) New System Resiliency. The Company’s proposed new system resiliency projects for calendar years 2018, 2019 and 2020, as filed in the Application, are approved. System resiliency Plant Additions for calendar year 2018 and thereafter, as filed in the Application, shall be recovered through the New Capital Tracker that shall be adjusted on a semi-annual basis commencing July 1, 2018.7 (a) Annual plans of proposed system resiliency work and actual after-the fact results shall be filed with PURA each November 30th and May 31st, respectively, consistent with the current approach established in the most recent system resiliency decision in Docket No. 12-0706RE01.8 (b) If the Company seeks approval and funding for any new system resiliency projects which are not currently in the evidentiary record in Docket No. 17-10-46, it must obtain prior approval for such new system resiliency projects from PURA. (3) The Company’s actual costs and collections under the New Capital Tracker will be reconciled in the Company’s annual rate adjustment mechanism (“RAM”) tracker reconciliation proceeding, which reconciles all of the Company’s tracking rates at the same time for administrative convenience (see, e.g., Docket Nos. 18-03-01, 17-03-01, 16-03-01, PURA Annual Review of the Rate Adjustment Mechanisms of The Connecticut Light and Power Company). (4) Grid Modernization. Any grid modernization Plant Additions and associated O&M approved by PURA in a separate, future docket shall also be recovered in the New Capital Tracker. iii) Miscellaneous Provisions. (1) This Settlement Agreement will not limit the Company’s management’s prerogative on necessary capital expenditures to maintain a safe and reliable system and will not be used as a basis to reduce test year capital 7 The New Capital Tracker shall also recover Plant Additions and the associated O&M for system resiliency projects that (i) were previously approved by PURA in Docket Nos. 12-07-06 and/or 12-0706RE01, Application of The Connecticut Light and Power Company for the Approval of Its System Resiliency Plan- Expanded, and (ii) will not be recovered in the NBFMCC rate. This includes, but is not limited to, recovery (as defined in Section 3(a)(iii)(3) hereof) in the New Capital Tracker of the Plant Additions and associated O&M for such previously-approved system resiliency projects during the period January 1, 2018 until new distribution rates are established hereunder, because there will not be recovery thereof in the NBFMCC rate during this time period. 8 See Orders 1 and 2 in Docket No. 12-07-06RE01, Application of The Connecticut Light and Power Company for the Approval of Its System Resiliency Plan- Expanded, June 3, 2015 Decision. 4
  8. Page 8 of 20Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC-883 Attachment 2 Page 8 of 20 expenditures in a future rate case. (2) Although the Settlement Agreement does not address rate design – and each Settling Party will be able to litigate its respective position on rate design in this Docket No. 17-10-46 – the allocation of revenue responsibility and form of distribution rate design among rate classes approved by PURA in this rate case shall be applied to rate design of the above-described New Capital Tracker. (3) All capital recovery under this Settlement Agreement – in both base distribution rates and in the New Capital Tracker – for core capital projects and system resiliency projects will include recovery of the effect of plant, accumulated deferred income taxes (“ADIT”), and accumulated depreciation for the cumulative additional Plant Additions. Revenue requirements will include pre-tax return on investment, return of investment (depreciation), property taxes, gross earnings tax and uncollectible expense. b) Attachment 2 provides a summary of Rate Base to be reflected in tariffs. c) The Company’s requested increase to Rate Base has been adjusted in Rate Years 1, 2 and 3 by the amounts in Attachment 2. The Rate Base amounts reflect certain Settlement Adjustments (defined below) associated with changes in depreciation as further described in Section 6 of this Settlement Agreement. 4) 5) O&M Expense. a) Attachment 3 provides a detailed summary of O&M to be reflected in the Company’s tariffs pursuant to this Settlement Agreement. b) The Company’s requested increase to O&M will be reduced in Rate Years 1, 2 and 3 by the amounts shown in Attachment 3. The O&M expense reflects adjustments agreed to by the Settling Parties in the settlement process (collectively, the “Settlement Adjustments”). Annual Step Adjustment for Full-Time Equivalents and Outside Contractors. a) Full-Time Equivalents (“FTEs”). i) The Company withdraws its request to recover the cost of any incremental FTEs for 2017. The Company further reduces its request for FTEs from 157 from 2017-2020 to a revised proposal of 100 FTEs in 2018-2020, subject to the restrictions listed below in this Section 5. ii) For FTE hires in 2018-2020, the Company will receive annual step increases to base distribution rates if, and only if, the Company first demonstrates in future compliance filings that it actually hired incremental FTEs of up to 33 in 2018; up to 33 in 2019; and up to 34 in 2020. Each such compliance 5
  9. Page 9 of 20Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC-883 Attachment 2 Page 9 of 20 filing will be made on January 31st, which shall reflect any incremental FTEs hired during the immediately preceding calendar year ending December 31st. The first such compliance filing is due January 31, 2019 (reflecting any incremental CL&P FTEs hired during calendar year 2018.) iii) The Company will be eligible for a step increase of a specified amount of expense per-incremental FTE up to an annual cap of 33 FTEs in 2018, 33 FTEs in 2019, and 34 FTEs in 2020. For example, if the Company hires only 10 incremental FTEs in 2018, then it receives a step increase only for 10 FTEs; but the Company will be allowed to add 23 FTEs spots to the next year’s quota, thereby allowing for a potential step adjustment associated with up to 56 hires in 2019. Conversely, if the Company hires 40 FTEs in 2018, then the step increase for 2018 remains capped at 33 incremental FTEs, but the Company can apply the difference of 7 FTEs (40-33=7) to the cap in the following year of 2019. The total number of incremental hires eligible for the step adjustment is capped at 100 over a 3-year period of 2018-2020. iv) The FTE baseline will be the number of CL&P FTEs as of November 30, 2017, which was 1,166. The Settlement Adjustments in Attachment 3 hereto have been further adjusted to reflect the (A) CL&P FTE headcounts as of November 30, 2017 and (B) Eversource Energy Service Company (“EESCO”) FTE headcounts, which are allocable to CL&P, as of November 30, 2017. v) Eligibility for an annual step increase applies only to proven incremental FTEs. "Incremental FTEs" shall be the number of FTEs net of attrition occurring during the calendar year, as determined by the CL&P headcount over and above the November 30, 2017 benchmark of 1,166 as of December 31st of each year. The Company will prove incremental FTEs through the production of CL&P Human Resources Information System (HRIS) payroll records for two consecutive payroll periods prior to December 31st. vi) The expense per incremental FTE allowed for recovery in rates (once the conditions described in subsections (i) through (v) above are satisfied) will be $84,000 per-FTE for 2018, $82,000 per-FTE for 2019 and $87,000 perFTE for 2020.9 vii) Attachment 8 hereto provides a sample calculation of the methodology for determining that the Company is eligible for an annual step increase and for quantifying that increase, so as to delineate clearly the Settling Parties’ intent and expectations for eligibility for the step adjustment. 9 Cost per FTE reflects payroll, payroll tax, and employee benefits. Source: Cost per-FTE derived from, inter alia, information provided in Docket No. 17-10-46, SFR C-Schedule 3.26, Page 3 of 3 (payroll expense for incremental FTEs). 6
  10. Page 10 of 20Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC-883 Attachment 2 Page 10 of 20 viii) Any step increase in distribution rates the Company is authorized to obtain hereunder due to the hiring of incremental FTEs: (1) is in addition to the incremental distribution requirements in Section 2 hereof; (2) for incremental FTEs hired during calendar year 2018, calendar year 2019 and calendar year 2020, the associated step increase in distribution rates shall occur on May 1, 2019, May 1, 2020 and May 1, 2021, respectively; and (3) shall be reflected in distribution rates and in corresponding annual decoupling revenue targets. b) Outside Contractors. The Company agrees to utilize the following methodology to reduce outside line contractor expense in the event that the Company qualifies for an annual step adjustment for incremental FTEs: i) The current baseline for outside overhead line contractor costs for 2018, 2019 and 2020 appears in SFR C Schedule 3.10(A), (B) and (C), respectively. ii) Table 1, below, shows the reduction in contractor expense that will occur if the Company qualifies for an annual step adjustment for proven incremental FTEs. As shown in the table, if the Company hires 100 proven incremental FTEs, then the reduction to outside contractor expense collected in distribution rates shall be $1.53 million. If the Company hires fewer than 100 incremental CL&P FTEs, the corresponding reduction to outside contractor expense will be pro-rata, as shown in Table 1, below.10 Table 1 FTE INCREASE AND CONTRACTOR EXPENSE REDUCTION OFFSET PROPOSED OPTION FTEs allowed for recovery Avg Expense Cost per FTE TOTAL EXPENSE COST PER FTE CUMULATIVE EXPENSE A FTE Giveback (Lower # of contractors) TOTAL OH CONTRACTOR EXPENSE REDUCTION CUMULATIVE OH CONTRACTOR EXPENSE REDUCTION B A*B 2018 2019 2020 TOTAL $ $ $ 33 84,000 $ 2,772,000 $ 2,772,000 $ 33 82,000 $ 2,706,000 $ 5,478,000 $ 34 87,000 $ 2,958,000 $ 8,436,000 100 87,000 8,436,000 $ $ (2) (168,000) $ (168,000) $ (6) (492,000) $ (660,000) $ (10) (870,000) $ (1,530,000) (18) (1,530,000) Note: Contractors are fully qualified and are needed to cover work until internal craft become trained and rated (4-5 year cycle). Contractor costs will reduce over time only as new craft becomes qualified. Therefore, contractor offset is small at the beginning, growing over time with full impact occurring in years 4-5. Credit to contractor cost is calculated at the applicable union rate for contractor crews (which is the same rate for company crews), and assumes same benefit cost as the Company. iii) Any reduction to contractor expense the Company is required to implement hereunder due to the hiring of incremental CL&P FTEs shall be offset against 10 Table 1 shows the reduction to outside contractor expense if the Company successfully meets its targeted annual hiring goals for incremental CL&P FTEs in 2018, 2019 and 2020. If the Company hires incremental FTEs in an amount that is less than the full amount of the annual targeted hiring goals, then the annual reduction to outside contract expense shall be made mathematically proportionate to the expense reduction shown in Table 1. 7
4 pages match

Text of OCC-883 Attachment 4.pdf

Extracted from the file · 3 pages · 9,001 characters

As listed on the current system

Question(s) Answered 883 (The Connecticut Light and Power Company) Date Filed: 10/13/2026

This filing on the current system (opens in a new tab)