Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 1 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 1 of 297 Docket No. 19-12-XX ELECTRIC UTILITY LINE MAINTENANCE PLAN FILED PURSUANT TO SECTION 16-32g OF THE GENERAL STATUTES OF CONNECTICUT AND SECTION 16-32g-1 OF THE REGULATIONS OF CONNECTICUT STATE AGENCIES 2020 FILING EVERSOURCE ENERGY JANUARY 6, 2020Page 2 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 2 of 297 THE EVERSOURCE ENERGY ELECTRIC UTILITY LINE MAINTENANCE PLAN – 2020 This is the 2020 submission of The Eversource Energy updated Electric Utility Line Maintenance Plan (“Plan”). The Plan has been prepared in accordance with section 1632g of the General Statutes of Connecticut, section 16-32g-1 of the Regulations of Connecticut State Agencies, and the minimum requirements established by the Public Utilities Regulatory Authority (“Authority”), formerly known as the Department of Public Utility Control (“Department”), by letter dated July 13, 1989. A) Electric System Description The Authority’s requirements call for a description of the transmission and distribution system, including the miles of plant for both underground and overhead lines, miles of plant by voltage level and miles of plant by type of construction. In accordance with that requirement, Eversource has prepared a table that contains this information, which is attached as Appendix 1. In addition, the following definitions were used in preparing Appendix 1 and other pertinent parts of this Plan: Covered - Wire - A conductor with an abrasion-resistant outer covering, usually nonmetallic, and intended for use on overhead lines passing near trees. Non - Covered Wire - Bare wire or any other wire not intended to withstand abrasion to tree contract. Aerial Cable - A conductor system in which each conductor is covered with a fully insulated covering. Spacer Cable - A type of electric supply line construction consisting of an assembly of one or more covered conductors, separated from each other and supported from a messenger by insulating spacers. Underground Cable - Insulated conductors installed in duct or conduit systems. Direct Buried Cable - Insulated conductors installed in direct contact with earth or in conduit. Primarily used in residential developments and industrial or commercial parks. • As directed by the Authority the Plan includes a map of the Eversource service territory, which indicates the location of major electric utility facilities including transmission lines and substations. The map, entitled Transmission System Key Map, is included as part of Appendix 2. (This map has not yet been updated to include the Company's recently-energized new transmission facilities.) Also included is a list of the names associated with the alpha-numeric substation designation.Page 3 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 3 of 297 • Also, as directed, the number of electric distribution customers served by Eversource by customer class as of September 30, 2019 is as follows: Response: The number of customers served by customer class as of September 30, 2019 is: Residential: Commercial: Industrial: Public Street Lighting: Railroad: Sales for Resale: 1,142,498 106,515 2,966 5,002 2 30 TOTAL 1,257,013 * This number is lower than that used in interruption reporting statistics due to the fact that financial accounting counts each account as a customer. Interruption analysis requires that each metered location be considered a customer. Some accounts are a summation of several meter locations.Page 4 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 4 of 297 B) Tree Trimming • Recent Changes in Vegetation Management Practices Implemented in the Past Two Years No recent changes. • Description of Line Clearance Organization and Work Force In 2019, the Eversource Vegetation Management Program was managed by a Manager, a Supervisor, eight Arborists and one billing clerk. Additionally, there were eight Vendor-Arborists added to assist with tree contractor oversight in the field, and two vendor clerks to assist with processing the tree contractor and municipal police invoices and property owner notification. A diagram of the organization is attached in Appendix 3. The Line Clearance organization structure is to continue in 2020. All maintenance, capital, emergency and storm restoration line clearance work will be performed by line clearance contractors. • Standards and Specifications for Conductor Clearances and Trimming Frequency A copy of the Eversource Specification for Local Distribution Line Clearance Tree Work and Brush Control is attached in Appendix 3. The specification is an updated version that captures minor edits to spacing, indentations and punctuation. • Service Areas not trimmed within the Normal Trimming Cycle or to the Current Specifications. In 2019 all tree work including; standard maintenance trimming (“SMT”), backbone maintenance enhanced trimming (“METT-BB”), lateral maintenance enhanced trimming (“METT-LAT”) and lateral enhanced trimming (“ETT”), will be completed in conformance with the specifications shown in Appendix 3, except for locations where denials or modifications to the specifications were made by property owners, per C.G.S 16-234 Section c.(6). Through October of 2019, 3,129 miles of roadside maintenance and 249 roadside miles of Enhanced Tree Trimming have been completed. In 2020, a total of 3,989 miles roadside maintenance miles for the year are scheduled to be completed. Enhanced Tree Trimming will be performed on 331 of those miles, which includes removing all branches above and below the conductors that are within eight feet and inspecting and removing risk trees in the fall zone. Additionally, an Enhanced Tree Removal (ETR) program is targeting risk trees in the fall zone along the backbones that will have scheduled maintenance trimming performed and high customer circuit laterals.Page 5 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 5 of 297 • Information on Tree Trimming Refusals and impact on reliability Eversource will submit all objections (refusals) by 01/31/2020 in accord with the requirements of PURA Docket No. 14-07-18. In general, tree work refusals do not represent a major obstacle to Eversource achieving its Vegetation Management goals. Objections represent a relatively small number of miles when compared to the total number of miles trimmed and the risk from trees far outside the clearance zone. Through October 2019, Eversource has received 762 refusals. • Required information in annual vegetation management plan In attached Appendix 3, the following information is provided: 1. 2. 3. 4. 5. Work scope and budget details Tree and brush work specification Line clearance organization Property owner notification and consent procedures The planned maintenance within each town within the EDC’s service territory. Since the PURA has noted that data “should be filed for a full calendar year”, the company intends to file the following additional information no later than January 31, 2020 to meet the requirements of the final decision in PURA Docket No. 14-07-18: 6. Number of property owner/customer objections by town in prior year. 7. Number of property owner/customer objections by town in prior year accepted by the Tree Warden. 8. Number of property owner/customer requests for modifications and decisions reached. 9. Number of trees per town assessed to be hazardous or non-hazardous. 10. Number of property owners/customers who give affirmative consent versus nonresponses. 11. Number of mediations conducted and outcome of mediation. 12. Number of objections appealed to PURA by either the EDC or landowner and outcome. 13. Number of removals of non-hazardous trees. 14. Number of RTRP trees planted by the EDC, reasons for planting, costs. 15. Did property owner maintain the newly planted tree? 16. Number of stumps ground by EDC, reasons for stump grinding, cost. • Transmission Vegetation Management Program The transmission vegetation management program manages trees and other vegetation that may potentially interfere with the operation of the transmission facilities, including substations, structures and conductors. The Company’s intends that transmission corridors are maintained as sustainable, diverse habitat, with grass, shrubs and low-growing trees that can safely coexist with transmission lines. The Routine Maintenance program consists of four activities: Scheduled Line Inspections – In compliance with NERC VM Standard, FAC-003, inspections are performed to identify any problematic vegetation conditions that requirePage 6 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 6 of 297 corrective action in the upcoming year. All transmission lines are inspected at least once annually. All lines that are subject to FAC-003 requirements are inspected at least twice annually. Cyclical Vegetation Control – This consists of the control of undesirable vegetation (tallgrowing species) within the cleared and maintained areas of the ROW and is performed on a 4-year cycle. The Company employs Integrated Vegetation Management (“IVM”) methods, including manual, mechanical and the targeted application of herbicides to control the tall-growing tree species and state-listed invasive woody shrub species within the ROW. Proper notification of abutters for herbicide application is performed in accordance with C.G.S Chapter 441, section 22a-64k. Side Trimming – This consists of the trimming and removal of tree branches that encroach into the ROW from the outside edges of the cleared ROW for the purpose of ensuring adequate clearance between energized conductors and vegetation located outside the maintained corridors. The Company will be completing side trimming to coincide with the four-year maintenance program. Hazard Tree Removals – Trees along the transmission corridor, both outside and within the easement limits of the ROW are visually inspected to identify those trees that pose a higher risk of falling and making contact with the transmission facilities. Those trees are scheduled for corrective action (topping, trimming, removal), with appropriate notification and/or consent of property owners as required. The inspections are performed in conjunction with the scheduled side trimming. Storm Hardening and System Resiliency Special Program Following the recommendations within the FERC “Report on Transmission Facility Outages during the Northeast Snowstorm of October 29-30, 2011,” the Company has initiated a special program to remove all non-compatible trees within the easemented or fee-owned Rights-Of-Way. In 2016, the Company began its first ROW clearing projects, expanding cleared boundaries by approximately 500 acres. This initiative is expected to continue through 2035 to complete the system in CT. In 2020, the Company is planning to clear approximately 650 acres, subject to permitting requirements. C) Maintenance Practices In accordance with the Authority’s requirements, this section of the Plan includes a detailed description of the Company's inspection, testing, and maintenance practices for transmission and distribution lines and equipment, and any significant changes thereto over the past two years.Page 7 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 7 of 297 • Description of Distribution Maintenance Organization and Work Force Electric System Operations The Electric System Operations organization has the mission to operate the Electric Transmission and Distribution system. This includes overseeing the scheduling and switching required to both restore power when outages occur, and to safely remove assets from service for maintenance and other construction activities. Electric Systems Operations encompasses first response for outages and trouble events, systemrestoration activities and control-room management, and electric system configuration control with the objective of limiting the frequency and duration of customer outages. Electric Field Operations The Electric Field Operations organization is responsible for the construction, maintenance and Operations of the CL&P overhead and underground distribution system. The Electric Field Operations organization at CL&P is composed of a System Projects group and three Division Operations groups, each with responsibility for a specific geographic area. A limited amount of some system maintenance is performed within the Electric Field Operations organization. Engineering The Engineering organization works as a centralized team with responsibility for all design, engineering and technology functions necessary to perform distribution operations. The Engineering organization includes substation engineering, protection and controls engineering, telecommunications engineering, distribution standards and system resiliency. This alignment of engineering functions is designed to promote a stream-lined decision-making focus and standard distribution-system design. Station Operations The Station Operations organization is responsible for a major portion of distribution maintenance in Connecticut. This organization is made up of seven groups in Connecticut. These are Station Operations Central, Station Operations Eastern, Station Operations Western, Technical Services, Station Services, and Maintenance Engineering. The Station Operations Central, Station Operations Eastern, and Station Operations Western groups, each headed by a Manager – CL&P Station Operations, have jurisdiction over all distribution substation electrical equipment maintenance and selected overhead electrical equipment maintenance in their respective geographic regions. Each region is divided into multiple districts, each with a supervisor who has responsibility for completing the maintenance work in the district. District Station Operations Supervision oversees crew complements, makes assignments for crew assignments, arranges for staffing, materials and equipment with local Operations and Technical personnel, and monitors work in progress to determine adherence to safety rules, performance, and construction standards. The Technical Services group is headed by a Manager – CL&P Technical Services, who is responsible for all Connecticut test department activity. The test department is made up of three groups with a Supervisor – CL&P Test for each of three regionalPage 8 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 8 of 297 groups. Test Department Supervision oversees crew staffing, makes assignments for crew assignments, arranges for staffing, materials and equipment with local Operations and Station Operations personnel, and monitors work in progress to determine adherence to safety rules, performance, and construction standards. The Station Services group provides centralized support of maintenance activities, hazardous waste management, distribution transformer repair, and other specialized maintenance services. The Maintenance Engineering group is responsible for utilizing the work management and maintenance management systems, developing new maintenance methods and programs, investigating equipment problems and failures, the Supervisory Control and Data Acquisition (SCADA) equipment and other maintenance related studies. This group is also responsible for the chemistry laboratory and infrared inspection program. Frequency of Inspection and/or Maintenance As an ongoing activity, Company employees routinely observe the condition of distribution plant. This is done as they travel about the Company’s service area to perform field assignments as well as going to and from work. In addition, inspection of the plant goes on as field work is being engineered and as it is physically performed. Eversource also has a comprehensive inspection, testing, and maintenance program for its distribution facilities. A table of the inspection and maintenance procedures, their frequency, and any frequency changes in the past two years is included as Appendix 4. Appendices 5-20 provide complete procedures and brief outlines of policies pertinent to line inspection and maintenance. This program has the following among its primary objectives: • The prevention or mitigation of service interruptions • Extending the useful life of equipment • Avoiding future, more costly maintenance and repairs • Assuring compliance with: safety rules and regulations Legal requirements contractual agreements The Eversource Maintenance Program (“EMP”) identifies maintenance areas to be addressed by the Distribution Maintenance organization in order to reduce outages, add to the useful life of equipment, and reduce system operating costs. The following is a brief description of the highlights for major topics regarding the inspection, testing, and maintenance practices for distribution lines and equipment: 1. The following Direct Buried equipment is inspected at as required with a max of 15-year intervals:Page 9 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 9 of 297 Company Owned direct buried facilities including: • • • • • • • • • Pad Mounted Transformers Submersible Transformers Switch Enclosures Switchgear Transclosures Handholes (HH) Risers Fault Indicators Primary and secondary cable Refer to EMP 5.11 & 6.11 in Appendix 5 for further details. 2. Capacitor Banks All pole top and substation capacitor banks are visually inspected once every year. Substation capacitor banks are routinely inspected monthly. This inspection is intended to determine the condition of the tanks, bushings, terminals, connections, etc. The reactive characteristic of air conditioning load requires a high availability of capacitor banks during summer load periods. The inspection is scheduled for March and repairs are scheduled as problems are identified to ensure repairs are completed by June 1st to prepare for summer loads. An annual infrared survey of capacitor banks is also performed. Refer to EMP 5.05 & 6.05 in Appendix 6 for further details. 3. Inspection and Maintenance of pole top Automatic Voltage Regulating Equipment Pole top regulators are inspected annually and receive major maintenance as required. All three-phase voltage regulating equipment on circuit backbones receive an annual infrared inspection (Appendix 19). Refer to EMP 5.01 & 6.01 in Appendix 8 for further details. 4. Inspection and Maintenance of Reclosers Presently, SCADA controlled pole top distribution line reclosers are inspected annually and Non-SCADA controlled pole top distribution line reclosers are inspected bi-monthly. The vast majority of line reclosers now have microprocessor-based monitoring and are alarmed via the SCADA System. In 2020 Eversource Connecticut will pilot a yearly based inspection on all reclosers as part of the distribution line inspection and perform condition based inspections bas on alarms received via the SCADA System. Substation distribution line reclosers are inspected monthly. Refer to EMP 5.44 & 6.44 in Appendix 9 for further details.Page 10 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 10 of 297 5. Inspection and Maintenance – Network Transformers Network vaults containing network transformers are handled as follows: A. B. Maintenance inspection – Energized - Annually Major Maintenance - De-Energized - Every four years Refer to EMP 5.30 & 6.30 in Appendix 12 for further details. 6. Inspection and Maintenance - Underground System - Cable See Underground Vaults & Manholes Refer to EMP 5.59 & 6.59 A&B in Appendix 17 for further details. Infrared Inspections in Underground Vaults and Networks are conducted to identify potential problems in primary and secondary cables, network protectors and other underground equipment. 7. Inspection and Maintenance - Street lighting Street lighting supplied from the underground system is inspected at five-year intervals. Refer to EMP 5.48, 5.52 and EMP 6.52 in Appendix 16 for further details. 8. Infrared Inspection The three-phase backbone portions of all circuits are surveyed annually with infrared. Refer to EMP 5.22 Appendix 19 for further details. 9. Distribution Wood Pole Inspection and Treatment The Company will continue to evaluate the effectiveness of a pole inspection and treatment program along with a capital pole replacement program. Refer to EMP 5.61 & 6.61 and 6.61A in Appendix 10 for further details. 10. Three-Phase Group Operated Switches Inspection and Maintenance All three-phase group operated switches are visually inspected once per year. As required, these switches are operated to check for blade alignment, contact condition, interrupting devices, insulators, arresters, etc. An annual infrared survey of three-phase switches is also performed. Refer to EMP 5.15, 6.15a and 6.15b in Appendix 7 for further details. 11. Inspection and Maintenance of Underground Transformers.
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026