  1. Page 101 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 101 of 297 When inspecting contact wear, inspect both stationary and movable contacts. • Refer to manufacturer’s instruction manual for contact wear guidance. • Be especially watchful for inadequate contact pressure, unequal pressure on both sides of contacts, contact alignment and carbon formation on any portion of all contact structures. Check for signs of oil leaking from any seal or gasket. Check all chain and gear parts carefully for chipped or broken teeth or excess backlash in its operation. Check all connections for tightness and overheating. Operate the mechanism through its entire range to ensure there is no mechanical interference and that contact alignment is proper on all steps. Adjust the tap changer to ensure it goes through the neutral position. Operate the regulation equipment to the fully raised and the fully lowered positions to check the upper and lower limit switch operation. Ensure the drive mechanism stops properly on position. Check the counter for proper operation. Use cleaning insulating oil with the proper dielectric strength to refill the regulator. Perform a power factor test (Doble) to determine the insulation integrity of the regulator. Perform an insulation resistance test (megohmmeter). Perform a Transformer Turns Ration Test. Check internal and external motor capacitors. Return the regulator to CMS/DERF Shop for a more thorough repair or disposal if it cannot be made to function within specification. • 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. When the inspection is complete, the unit is ready for service. Return to Service The return to service procedure is essentially the reverse of the procedure used to remove the regulator from service. Energize the regulator only with regulator on neutral tap position. See the appended procedure, co-1040 for details. Siemens MJ-X└ Controls Use the following procedure when placing and MJ-X└ equipped regulator into or out of service. Note that these steps are only for placing the regulator into or out of service. You must still perform the inspection steps, such as the power factor test, TTR, insulation test, etc. that are in the previous section.
  2. Page 102 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 102 of 297 Placing the regulator into service: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Place the Auto/Manual switch in the Bypass position. Place the Raise/Lower switch in “off”. Make certain the regulator is in the Neutral (N) position. Turn the voltage Power Source switch to “off”. Remove the control power fuse. Close, sequentially, the source and the load switches. Open the bypass switch. Visually observe that the bypass circuit has opened. Replace the control power fuse. Place the voltage power source switch to “Normal”. Removing the regulator from service: 1. Place the Auto/Manual switch in the Bypass position. 2. Place the Raise/Lower switch in “Off”. 3. Make certain the regulator is in the Neutral (N) position. If independent checks of the position indicator and the neutral light indicator do not confirm the neutral position, bypassing must not be attempted. In such an event, de-energize the system to remove the regulator from service. 4. Turn the voltage power source switch to “off”. 5. Remove the control power fuse. 6. After ensuring the regulator is in Neutral (N), close the bypass switch. 7. Open sequentially, the load and source switches. 8. Perform the applicable action: • For single phase or grounded wye connection, make sure the high voltage disconnect switches are opened. • For closed delta connection, ensure all regulators in the bank are bypassed and isolated. 9. Exercise appropriate care in the removal of the regulator. High voltage will still be present at the bypass switch and the source and load switch terminals. Remove the ground connection last.
  3. Page 103 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 103 of 297 APPENDIX 9 RECLOSERS AND SECTIONALIZERS
  4. Page 104 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 104 of 297 5.44 Automatic Circuit Reclosers (ACR) & Sectionalizers General Description Reclosers sense and interrupt fault currents and automatically restore service after momentary outages. The automatic circuit recloser is essentially a self- contained device with the necessary intelligence to sense over currents, to time and interrupt fault currents, and to re-energize the line by reclosing automatically. If a fault is permanent, the recloser locks open after a preset number of operations, isolating the faulted section from the main part of the system. Automatic circuit reclosers installed at Northeast Utilities: • Can be either Single-phase or Three-phase • Can have either Oil or Vacuum Interrupters • Can have either Hydraulic or Electronic Controls • Can be either Oil or Epoxy Insulated Single-phase reclosers are used to protect single-phase lines such as branches or taps of a three-phase feeder. They can also be used on three-phase circuits where the load is predominantly single phase. Single phase reclosers installed at Northeast Utilities include (not a complete list) Type H, 4H, V4H, L, V4L, VXE15, D, E, 4E, V4E, and DV. (See Appendix 2.) Three phase reclosers are used in multiple applications: As main feeder breakers at the substation source, as sectionalizing and tie devices with over current protection within auto loops; and for over current protection on major three phase laterals. Reclosers within auto loops operate based on local current and voltage sensing to resectionalize circuits to limit the number of customers interrupted by a fault on a circuit backbone. The majority of three phase reclosers are monitored as part of the DSCADA System, providing remote control and data acquisition capability. Three phase reclosers installed at Northeast Utilities include (not a complete list) Type 6H, V6H, W, WE, VWE, WVE27, VWVE27, NOVA27, WVE38X, VWVE38X, VSO12, and NOVA38. (See Appendix 2.) Recloser Controls provide the intelligence that enables a recloser to sense overcurrents, select timing operation, time the tripping and reclosing functions, and finally lockout the circuit when required. There are two basic types of controls used: an integral hydraulic control or an electronic control located in a separate cabinet. • Hydraulic recloser controls are used in most single-phase reclosers and in threephase recloser types 6H, V6H, and W. The controls are an integral part of the recloser. With this type of control, an over-current is sensed by a trip coil that is connected in series with the line. • Electronic recloser controls are used in most three-phase reclosers and in the single-phase Cooper recloser types VXE and NOVA.
  5. Page 105 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 105 of 297 5.44.1 Inspection and Maintenance Schedules Table 1 –Recloser Maintenance Intervals Recloser Contacts in Vacuum Contacts in Oil Check – Energized S/S 1M 1M Check – Energized (SCADA) – Pole Top (Note 1) 1Y 1Y Check – Energized (Non-SCADA) Pole-Top Electronic 2M 2M Check – Energized Pole-Top Hydraulic 1Y 1Y Inspection – Energized (Infrared) 1Y 1Y Major Maintenance – De-Energized N/A 12Y Major Maintenance – Triggered by Contact Life or Duty Cycle. (Note 2) <95% < 95% Major Maintenance – Triggered by Fault Operations 200 N/A Major Maintenance Evaluation– Triggered by Operations Count. (Note 3) N/A 100 Maintenance Schedule Time-Directed Maintenance Condition-Based Maintenance Scheduling Requirements Schedule maintenance of the attached Potential Transformer at the same time as the recloser, if applicable. In Table 1, the type of maintenance is listed in the left column and the interval required for that type of maintenance is listed in the right column. For example, the interval for an Energized Check for Substations is 1M (or 1 month). The abbreviations used for the intervals are: A/R = As Required M = Month, i.e. 1M = 1 Month Y = Year, i.e. 2Y = 2 Years Note 1 – SCADA Pole Top reclosers are monitored continuously and do not require the monthly checks. They will be inspected for physical damage on an annual basis. Note 2: Duty cycle is calculated based on the number and magnitude of fault interruptions. The duty cycle is calculated and monitored by all electronic controllers (except Form 3A). This is equivalent to remaining contact life. Note 3: Use the operations count for Hydraulic controls and Form 3A controls. Note 4: Scheduled Major Maintenance for oil filled Reclosers may be deferred if a capital replacement project has been formally established and is being implemented on a 12 year replacement plan
  6. Page 106 of 297Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 106 of 297 5.44.2 S/S Reclosers – SCADA Monitored/Controlled See EMP Instruction 6.44 for details on performing the following maintenance activities. 5.44.2.1 Check and Inspection – Energized – Monthly 5.44.3 S/S Reclosers – Non-SCADA ELECTRONIC 5.44.3.1 Check and Inspection – Energized – Monthly HYDRAULIC 5.44.3.2 Check – Energized – Annually 5.44.4 Pole–Top Reclosers – SCADA 5.44.4.1 Check and Inspection – Energized – Annually 5.44.5 Pole-Top Reclosers – Non-SCADA ELECTRONIC 5.44.5.1 Check – Energized – Every Two Months HYDRAULIC 5.44.5.2 Check – Energized – Annually 5.44.6 Recloser – All – Major Maintenance – De-Energized (triggered by fault operations) 5.44.6.1 Vacuum Under Oil Device 5.44.7 Major Maintenance Evaluation (triggered by operations count) 5.44.8 Sectionalizers (SEC3) and Voltage Switches (VS) General Description The importance of following a strict maintenance program on sectionalizers cannot be over-emphasized. The nature of these devices is such that they operate primarily during times of emergency. It is their function to limit service interruptions on permanent faults to a relatively small group of customers. Failure to operate properly increases the cost and time required to restore service following an emergency and reduces the system reliability. Sectionalizers are used with reclosers and reclosing circuit breakers to isolate permanent faults and confine outages to smaller sections of line on electric power distribution systems. They are applied on the load side of the faultinterrupting device, and can be set to trip and lockout during the first, second, or third open interval of the recloser or breaker. They are not rated to interrupt fault current; however, they can safely be closed into a fault, and can interrupt load current. Voltage Switches (VS) are those reclosers that are used as sectionalizers. Their trip settings are so high they will never trip for fault current before upstream protective devices operate. Because of the “lighter duty”
  7. Page 107 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 107 of 297 service they perform, they are maintained to the same schedule as regular sectionalizers. When a recloser is used as a VS, it shall be maintained as a recloser Table 2 – Pole-Top Sectionalizer Maintenance Intervals Sectionalizer Type Pole-Top Sectionalizer & VS Maintenance Schedule Electronic Hydraulic Check – Energized – 3 Phase 4M N/A Check – Energized – Single Phase 1Y 1Y IR Inspection – Energized 1Y 1Y 6Y or A/R 6Y or A/R Interval-Based Maintenance Major Maintenance – De-Energized In Table 2, the type of maintenance is listed in the left column and the interval required for that type of maintenance is listed in the right column. For example, the interval for an IR Inspection for a Sectionalizer is 1Y (or 1 Year). The abbreviations used for the intervals are: Y = Year, i.e. 2Y = 2 Years M = Month, i.e. 1M = 1 Month A/R = As Required 5.44.9 Pole-Top Sectionalizers and Voltage Switches (VS) See EMP Instruction 6.44 for details on performing the following maintenance activities. 5.44.9.1 Sectionalizer and VS – Check – Energized 5.44.9.2 Sectionalizer and Voltage Switch IR Survey Inspection 5.44.9.3 Sectionalizer and VS Major Maintenance – De-Energized 5.44.10 Failure Finding Failures of reclosers and sectionalizers shall be documented in the equipment failure reporting system used by your region (EFRS, UPER, or Cascade, as appropriate). 5.44.11Recloser Maintenance Basis Documentation The maintenance activities and their schedules are based on industry Standards, manufacturer’s recommendations, and Field experience.
  8. Page 108 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 108 of 297 Requirement Basis Check – Energized – Substation & Pole-Top NonSCADA Electronic Reclosers – 2M The Industry Standards recommend more frequent inspections, testing, and maintenance than our Company has followed, but they also state that operating experience should govern the maintenance plan. The sources of information we can draw on include: • SCADA and Hydraulic Pole-Top Reclosers – 1Y Major Maintenance (Oil) – 12Y and (Vacuum) – N/A Condition–Based Maintenance (CBM) IEEE Std 321-1973 “IEEE Standard Guide for the Application, Operation, and Maintenance of Automatic Circuit Reclosers” • ANSI Std C37.61-1973. • Manufacturer’s Literature • Our Operating Experience and Maintenance records All sources indicate that periodic inspections should be performed to look for oil leaks, check for cracked or broken bushings. Currently, Time-Directed maintenance is the standard used at NU. The intervals for Time-Directed maintenance may be affected by weather conditions. CBM for reclosers is based on: The number of operations or duty cycle. (Oil) – 100 Operations A combination of CBM and Time-Directed Maintenance is recommended by the ANSI/IEEE and the Manufacturer as it accounts for both the activity level of the recloser and the time-based requirements of the oil. (Vacuum) 200 Fault Operations Accurate and complete inspection findings, such as op counts and oil level and condition must be maintained in order to develop cost-effective maintenance plans that will keep Eversource’s equipment in reliable condition. Major Maintenance Evaluation Sectionalizers • Check – Energized – 3 Phase – 4M • Check – Energized – Single Phase – All – 1Y • Major Maintenance – 6Y or A/R 5.44.12 This will be performed based on discussion with the EMP Working Group. Sectionalizers are few in number and are scheduled to be phased out over time. The maintenance schedule will remain unchanged. Appendix 1 5.44.12.1 SCADA Recloser Capabilities The following table lists the currently used SCADA-capable Reclosers and the functions they can monitor.
  9. Page 109 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 109 of 297 SCADA Recloser Monitoring Capabilities Siemens Advanced Siemens Centurian Cooper Form 6 Cooper 4c with PoleCAT Battery Status (high/low vtg, off, etc.) C C C C Capacitor Charge Status C C N/A N/A Low Power Mode C C N/A N/A Mechanism Failure C C C C AC Power C C C N/A System Alarm N/A N/A C N/A RAM/ROM/EPROM Failure N/A N/A C C Power Down Time N/A N/A N/A C Abbreviations used in this table are: C = Continuous N/A = Not Applicable 5.44.13 Appendix 2 – Recloser Types & Ratings (Informational only – not intended to be an all-inclusive list of all Reclosers) 5.44.13.1 Single Phase Recloser Classifications Controller Type Single Phase Reclosers Hydraulic Contacts in Vacuum Electronic Contacts in Oil Contacts in Vacuum Contacts in Oil Rating Max Cont. Int Rating Sym Type H X 50 1,250 4H X 100 2,000 200 2,000 280 4,000 280 6,000 400 * 8,000 V4H X X L V4L X X VXE15 D X 500 10,000 E X 100 2,500 4E X 280 4,000 * 560 A. Available with Accessory
  10. Page 110 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 110 of 297 5.44.13.2 Three Phase Recloser Classifications Controller Type Three Phase Reclosers Hydraulic Contacts in Vacuum Electronic Contacts in Oil Contacts in Vacuum Contacts in Oil X Type 6H X V6H X W X WE X VW E X Rating Max Cont. Int Rating Sym 100 2,000 200 2,000 560 10,000 560 * 10,000 560 * 12,000 560 * 8,000 VW VE27 X 560 12,000 NOVA27 X 630 * 12,500 WVE27 X WVE38X 560 8,000 VW VE38X X 560 * 12,000 VSO12 X 560 12,000 NOVA38 X 630 * 12,500 Centurian 27 X 630 12,500 * 800 A. Available with Accessory 6.44 Recloser Maintenance Instructions Before You Begin 1. Ensure that all employees are properly trained and qualified to perform this work; and all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • Eversource Employee Safety & Health Handbook Procedure S/S Reclosers – SCADA Monitored/Controlled Check and Inspection – Energized – Monthly 1. Make a visual inspection of the recloser: • Check the ground integrity • Check for oil leaks, if applicable. • Check the condition of the bushings to ensure they are not blow or badly chipped, when practical. • Check to ensure animal guards are present, correctly installed and in good condition.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)