  1. Page 106 of 297Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 106 of 297 5.44.2 S/S Reclosers – SCADA Monitored/Controlled See EMP Instruction 6.44 for details on performing the following maintenance activities. 5.44.2.1 Check and Inspection – Energized – Monthly 5.44.3 S/S Reclosers – Non-SCADA ELECTRONIC 5.44.3.1 Check and Inspection – Energized – Monthly HYDRAULIC 5.44.3.2 Check – Energized – Annually 5.44.4 Pole–Top Reclosers – SCADA 5.44.4.1 Check and Inspection – Energized – Annually 5.44.5 Pole-Top Reclosers – Non-SCADA ELECTRONIC 5.44.5.1 Check – Energized – Every Two Months HYDRAULIC 5.44.5.2 Check – Energized – Annually 5.44.6 Recloser – All – Major Maintenance – De-Energized (triggered by fault operations) 5.44.6.1 Vacuum Under Oil Device 5.44.7 Major Maintenance Evaluation (triggered by operations count) 5.44.8 Sectionalizers (SEC3) and Voltage Switches (VS) General Description The importance of following a strict maintenance program on sectionalizers cannot be over-emphasized. The nature of these devices is such that they operate primarily during times of emergency. It is their function to limit service interruptions on permanent faults to a relatively small group of customers. Failure to operate properly increases the cost and time required to restore service following an emergency and reduces the system reliability. Sectionalizers are used with reclosers and reclosing circuit breakers to isolate permanent faults and confine outages to smaller sections of line on electric power distribution systems. They are applied on the load side of the faultinterrupting device, and can be set to trip and lockout during the first, second, or third open interval of the recloser or breaker. They are not rated to interrupt fault current; however, they can safely be closed into a fault, and can interrupt load current. Voltage Switches (VS) are those reclosers that are used as sectionalizers. Their trip settings are so high they will never trip for fault current before upstream protective devices operate. Because of the “lighter duty”
  2. Page 107 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 107 of 297 service they perform, they are maintained to the same schedule as regular sectionalizers. When a recloser is used as a VS, it shall be maintained as a recloser Table 2 – Pole-Top Sectionalizer Maintenance Intervals Sectionalizer Type Pole-Top Sectionalizer & VS Maintenance Schedule Electronic Hydraulic Check – Energized – 3 Phase 4M N/A Check – Energized – Single Phase 1Y 1Y IR Inspection – Energized 1Y 1Y 6Y or A/R 6Y or A/R Interval-Based Maintenance Major Maintenance – De-Energized In Table 2, the type of maintenance is listed in the left column and the interval required for that type of maintenance is listed in the right column. For example, the interval for an IR Inspection for a Sectionalizer is 1Y (or 1 Year). The abbreviations used for the intervals are: Y = Year, i.e. 2Y = 2 Years M = Month, i.e. 1M = 1 Month A/R = As Required 5.44.9 Pole-Top Sectionalizers and Voltage Switches (VS) See EMP Instruction 6.44 for details on performing the following maintenance activities. 5.44.9.1 Sectionalizer and VS – Check – Energized 5.44.9.2 Sectionalizer and Voltage Switch IR Survey Inspection 5.44.9.3 Sectionalizer and VS Major Maintenance – De-Energized 5.44.10 Failure Finding Failures of reclosers and sectionalizers shall be documented in the equipment failure reporting system used by your region (EFRS, UPER, or Cascade, as appropriate). 5.44.11Recloser Maintenance Basis Documentation The maintenance activities and their schedules are based on industry Standards, manufacturer’s recommendations, and Field experience.
  3. Page 108 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 108 of 297 Requirement Basis Check – Energized – Substation & Pole-Top NonSCADA Electronic Reclosers – 2M The Industry Standards recommend more frequent inspections, testing, and maintenance than our Company has followed, but they also state that operating experience should govern the maintenance plan. The sources of information we can draw on include: • SCADA and Hydraulic Pole-Top Reclosers – 1Y Major Maintenance (Oil) – 12Y and (Vacuum) – N/A Condition–Based Maintenance (CBM) IEEE Std 321-1973 “IEEE Standard Guide for the Application, Operation, and Maintenance of Automatic Circuit Reclosers” • ANSI Std C37.61-1973. • Manufacturer’s Literature • Our Operating Experience and Maintenance records All sources indicate that periodic inspections should be performed to look for oil leaks, check for cracked or broken bushings. Currently, Time-Directed maintenance is the standard used at NU. The intervals for Time-Directed maintenance may be affected by weather conditions. CBM for reclosers is based on: The number of operations or duty cycle. (Oil) – 100 Operations A combination of CBM and Time-Directed Maintenance is recommended by the ANSI/IEEE and the Manufacturer as it accounts for both the activity level of the recloser and the time-based requirements of the oil. (Vacuum) 200 Fault Operations Accurate and complete inspection findings, such as op counts and oil level and condition must be maintained in order to develop cost-effective maintenance plans that will keep Eversource’s equipment in reliable condition. Major Maintenance Evaluation Sectionalizers • Check – Energized – 3 Phase – 4M • Check – Energized – Single Phase – All – 1Y • Major Maintenance – 6Y or A/R 5.44.12 This will be performed based on discussion with the EMP Working Group. Sectionalizers are few in number and are scheduled to be phased out over time. The maintenance schedule will remain unchanged. Appendix 1 5.44.12.1 SCADA Recloser Capabilities The following table lists the currently used SCADA-capable Reclosers and the functions they can monitor.
  4. Page 109 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 109 of 297 SCADA Recloser Monitoring Capabilities Siemens Advanced Siemens Centurian Cooper Form 6 Cooper 4c with PoleCAT Battery Status (high/low vtg, off, etc.) C C C C Capacitor Charge Status C C N/A N/A Low Power Mode C C N/A N/A Mechanism Failure C C C C AC Power C C C N/A System Alarm N/A N/A C N/A RAM/ROM/EPROM Failure N/A N/A C C Power Down Time N/A N/A N/A C Abbreviations used in this table are: C = Continuous N/A = Not Applicable 5.44.13 Appendix 2 – Recloser Types & Ratings (Informational only – not intended to be an all-inclusive list of all Reclosers) 5.44.13.1 Single Phase Recloser Classifications Controller Type Single Phase Reclosers Hydraulic Contacts in Vacuum Electronic Contacts in Oil Contacts in Vacuum Contacts in Oil Rating Max Cont. Int Rating Sym Type H X 50 1,250 4H X 100 2,000 200 2,000 280 4,000 280 6,000 400 * 8,000 V4H X X L V4L X X VXE15 D X 500 10,000 E X 100 2,500 4E X 280 4,000 * 560 A. Available with Accessory
  5. Page 110 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 110 of 297 5.44.13.2 Three Phase Recloser Classifications Controller Type Three Phase Reclosers Hydraulic Contacts in Vacuum Electronic Contacts in Oil Contacts in Vacuum Contacts in Oil X Type 6H X V6H X W X WE X VW E X Rating Max Cont. Int Rating Sym 100 2,000 200 2,000 560 10,000 560 * 10,000 560 * 12,000 560 * 8,000 VW VE27 X 560 12,000 NOVA27 X 630 * 12,500 WVE27 X WVE38X 560 8,000 VW VE38X X 560 * 12,000 VSO12 X 560 12,000 NOVA38 X 630 * 12,500 Centurian 27 X 630 12,500 * 800 A. Available with Accessory 6.44 Recloser Maintenance Instructions Before You Begin 1. Ensure that all employees are properly trained and qualified to perform this work; and all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • Eversource Employee Safety & Health Handbook Procedure S/S Reclosers – SCADA Monitored/Controlled Check and Inspection – Energized – Monthly 1. Make a visual inspection of the recloser: • Check the ground integrity • Check for oil leaks, if applicable. • Check the condition of the bushings to ensure they are not blow or badly chipped, when practical. • Check to ensure animal guards are present, correctly installed and in good condition.
  6. Page 111 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 111 of 297 2. 3. • Check the control cable for damage from animals, vandalism, etc. Record the operations counter reading. Inspect the control cables and connectors for damage and for water intrusion into the connectors to the extent possible. CAUTION: Some recloser controls must be removed from service before you can replace their batteries. See Appendix 1 for instructions on replacing batteries for the different types of reclosers. 4. Check the date on the battery sticker and replace the batteries (as a set) based on their age as follows: • • • • • • • • 5. 6. 7. 8. 9. Form 2, 3, 3A controls – replace every 5 years Form 4C controls – replace every 3 years Siemens controls – replace every 3 years Form 6 controls – replace every 4 years Nu-Lec/Schneider Electric Recloser – replace every 3 years VXE controls – replace every 6 years G&W Viper Reclosers with SEL 351R/651R (SCADA) – replace every 10 years G&W Viper Reclosers with SEL 351R/651R (NON-SCADA) – replace every 6 years Check the battery terminal voltage. Test the battery with a dummy load. This can be done with an internal test program, if the recloser is so equipped, or by using an external load device. •A 3 – 4 volt drop is normal. A larger drop in voltage indicates the batteries are worn and due for replacement. For VIPER Reclosers, check the Enable Supply Light: •GREEN = OK •OFF – Notify Supervisor For VIPER Reclosers, check the Battery Problem Light: •OFF = OK •RED – Notify Supervisor Check the heaters and the AC supply to the battery charger. S/S Reclosers – Non-SCADA ELECTRONIC Check and Inspection – Energized 1. 2. 3. 4. Record the operations counter reading. Check all metering and indicating devices and inspect all control switches for normal position or electronic indication. Inspect the control cables and connectors for damage and for water intrusion into the connectors to the extent possible. Make a visual inspection of the recloser: •Check the ground integrity.
  7. Page 112 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 112 of 297 •Check for oil leaks, if applicable. •Check the condition of the bushings to ensure they are not blown or badly chipped, when practical. •Check the control cable for damage from animals, vandalism, etc. •Check to ensure animal guards are present, correctly installed and in good condition. CAUTION: Some recloser controls must be removed from service before you can replace its batteries. See Appendix 1 for instructions on replacing batteries for the different types of recloser 5. 6. 7. 8. 9. 10. Check the date on the battery sticker and replace the batteries (as a set) based on their age as follows: • Form 3A controls – replace every 5 years • Form 4C controls – replace every 3 years • Siemens controls – replace every 3 years • Form 6 Controls – replace every 4 years • Nu-Lec/Schneider Electric Recloser – replace every 3 years VXE controls – replace every years • G&W Viper Reclosers with SEL 351R/651R (SCADA) – replace every 10 years • G&W Viper Reclosers with SEL 351/651R (NON-SCADA) – replace every 6 years Check the battery terminal voltage. For VIPER Reclosers, check the Enable Supply Light: •GREEN = OK •OFF – Notify Supervisor For VIPER Reclosers, check the Battery Problem Light: •OFF = OK •RED – Notify Supervisor Test the battery with a dummy load. This can be done with an internal test program, if the recloser is so equipped, or by using an external load device. •A 3 – 4 volt drop is normal. A larger drop in voltage indicates the batteries are worn and due for replacement. Check the heaters and the AC supply to the battery charger. S/S Reclosers – Non-SCADA HYDRAULIC Check – Energized
  8. Page 113 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 113 of 297 1. 2. 3. Make a visual inspection of the recloser. Record the operations counter reading. Check for the following: •Ensure there are no oil leaks. •Check to ensure animal guards are present, correctly installed and in good condition. •Ensure that lightning arresters are present and in good condition. •Ensure the Trip / Close lever is in its normal position. Pole–Top Reclosers – SCADA Check and Inspection – Energized 1. 2. 3. 4. Make a visual inspection of the recloser: •Check the ground integrity. •Check to ensure lightning arresters are present and in good condition. •Check for oil leaks, if applicable. •Check the condition of the bushings to ensure they are not blown or badly chipped, when practical. •Check the control cable for damage from animals, vandalism, etc. •Check to ensure animal guards are present, correctly installed and in good condition. Perform touch potential testing on all controls or components that may be accessible to the public. Record the counter reading. Inspect the control cables and connectors for damage and for water intrusion into the connectors to the extent possible. CAUTION: Some recloser controls must be removed from service before you can replace its batteries. See Appendix 1 for instructions on replacing batteries for the different types of reclosers. 5. Check the date on the battery sticker and replace the batteries (as a set) based on their age as follows: (Instructions for changing batteries are at the end of this section.) • Form 3A controls - replace every 5 years • Form 4C controls - replace every 3 years • Siemens controls - replace every 3 years • Form 6 controls - replace every 4 years • Nu-Lec/Schneider Electric Recloser – replace every 3 years VXE controls – replace every 6 years. • G&W Viper Reclosers with SEL 351R/651R (SCADA) – replace every 10 years.
  9. Page 114 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 114 of 297 • 6. 7. 8. 9. 10. G&W Viper Reclosers with SEL 351R/651R (NON-SCADA) – replace every 6 years. Check the battery terminal voltage. Test the battery with a dummy load. This can be done with an internal test program, if the recloser is so equipped, or by using an external load device. For VIPER Reclosers, check the Enable Supply Light: •GREEN = OK •OFF – Notify Supervisor For VIPER Reclosers, check the Battery Problem Light: •OFF = OK •RED – Notify Supervisor Check the heaters and the AC supply to battery charger. Pole-Top Reclosers – Non-SCADA ELECTRONIC Check - Energized 1. 2. 3. 4. Record the operations counter reading. Check all metering and indicating devices and inspect all control switches for normal position or electronic indication. Inspect the control cables and connectors for damage and for water intrusion into the connectors to the extent possible. Make a visual inspection of the recloser: • Check the ground integrity. • Check to ensure lightning arresters are present and in good condition. • Check for oil leaks, if applicable. • Check the condition of the bushings to ensure they are not blown or badly chipped, when practical. • Check the control cable for damage from animals, vandalism, etc. • Check to ensure animal guards are present, correctly installed and in good condition. CAUTION: Some recloser controls must be removed from service before you can replace its batteries. See Appendix 1 for instructions on replacing batteries for the different types of reclosers. 5. 6. Perform touch potential testing on all controls or components that may be accessible to the public. Check the date on the battery sticker and replace the batteries (as a set) based on their age as follows:
  10. Page 115 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 115 of 297 • • • • • • 7. 8. 9. 10. 11. Form 3A controls – replace every 5 years Form 4C controls – replace every 3 years Siemens controls – replace every 3 years Form 6 controls – replace every 4 years Scweitzer SEL-651R controls replace every 3 years. Nu-Lec/Schneider Electric recloser – replace every 3 years. VXE controls – replace every 6 years. • G&W viper Reclosers with SEL 351R/651R (SCADA) – replace every 10 years. • G&W Viper Reclosers with SEL 351R/651R (NON-SCADA) – replace every 6 years. Check the battery terminal voltage. For VIPER Reclosers, check the Enable Supply Light: • GREEN = OK • OFF – Notify Supervisor For VIPER Reclosers, check the Battery Problem Light: • OFF = OK • RED – Notify Supervisor Test the battery with a dummy load. This can be done with an internal test program, if the recloser is so equipped, or by using an external load device. Check the heaters and the AC supply to battery charger. Pole-Top Reclosers – Non-SCADA HYDRAULIC Check – Energized – Annually 1. 2. 3. 4. Make a visual inspection of the recloser. Record the operations counter reading. Perform touch potential testing on all controls or components that may be accessible to the public. Ensure that all metering and indicating devices are in their normal positions. Recloser – All – Major Maintenance – De-Energized While most Major Maintenance for reclosers is performed at a maintenance shop, some is performed on-site. Perform the following steps: 1. Remove the unit from service. 2. Measure contact resistance to provide an indication of contact condition as well as loose current carrying parts. Use of a micro-ohmmeter is the recommended method. 3. Perform an insulation test (utilizing an insulation tester), phase-to-
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)