Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 888, 889, 890

Files5

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match
  1. Page 116 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 116 of 297 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. phase, and phase-to-ground. Inspect and dress the main and control contacts, if necessary. Perform visual inspections on the interrupting chambers. Check clearance and adjust them to manufacturer’s specifications for that recloser model. Check all electrical and mechanical connections for correct tightness. Thoroughly clean all internal mechanisms and tanks, and remove all carbon. Check for traces of tracking on all insulating parts and moisture absorption of the bottom of the tank liner. Check all gaskets. •Replace the main tank gasket, as necessary. •Replace the tank liners, as necessary. •Replace bushing gaskets, as necessary. Check and adjust the component parts of the operating mechanism, if required. Use an electronic control unit to operate the recloser before it goes back into service. Thoroughly clean the exterior of the recloser. Inspect the exterior of the recloser for • • 14. 15. 16. 17. 18. 19. Cracked, chipped, or broken bushings. Replace as necessary. Paint scratches or other mechanical damage. Repaint as necessary to prevent corrosion. Refer to the Manufacturer’s manual for maintenance requirements specific to the recloser model you are servicing. Perform a dielectric test of the oil. Filter the oil and perform a second dielectric test to act as the as-left reading. Change lightning arresters, as required. Verify the recloser and its lightning arrester are the correct voltage for the planned installation. For hydraulically controlled reclosers, operate the recloser manually to lockout, verifying minimum pickup and time current characteristics. Vacuum Under Oil Device (Perform these steps and appropriate work activities outlined under Major Maintenance.) 1. 2. Perform an AC high potential test on each interrupter in accordance with manufacturer’s instructions or NU specifications. Perform this test carefully as it provides the best means for verifying the condition of the interrupter. If the manufacturer has provided a scribe mark for monitoring contact erosion, check the reference dimension to measure wear. Solid Dielectric Vacuum Recloser (Siemens and Cooper NOVA Reclosers and G&W Viper)
  2. Page 117 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 117 of 297 No user maintenance of the recloser mechanism is required. The recloser should be considered for refurbishment or retired if the mechanical duty or breaking duty on any phase is less than (5%). This can be determined this by checking the Operator Control Panel. Further details on maintenance on the recloser and control cubicle are located in the Siemens or Cooper instruction book. POLE-TOP SECTIONALIZERS AND VOLTAGE SWITCHES (VS) Sectionalizer and VS – Check – Energized 1. Perform a visual inspection and record the operations counter. 2. Perform touch potential testing on all controls or components that may be accessible to the public. Sectionalizer and Voltage Switch IR Survey Inspection 1. Perform an Infrared test during a Distribution IR Survey or as required. Sectionalizer and VS Major Maintenance – De-Energized Note: Sectionalizers that have problems may be replaced and taken back to the shop for inspection/maintenance. 1. Perform a power factor test to measure contact resistance to provide an indication of contact condition as well as loose carrying parts. 2. Perform an insulation resistance test (utilizing a micro-ohm meter), phase-to phase, and phase-to-ground. 3. Test for proper operation on the Sectionalizer. 4. Inspect and dress the main and control contacts, if necessary. 5. Inspect interrupting chambers for both mechanical and electrical conditions. 6. Check all electrical and mechanical connections for tightness. 7. Thoroughly clean and remove carbon from the internal mechanism and tanks. 8. Check for traces of tracking on all insulating parts and moisture absorption of the bottom of the tank liner. 9. Check and adjust the component parts of the operating mechanism, if required. 10. Check all gaskets. 11. Ensure the tap wires are properly tightened. 12. Paint, where necessary. 13. Test Oil (Color and dielectric strength); filter and/or replace as necessary.
  3. Page 118 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 118 of 297 Appendix 1 – Recloser Battery Replacement Cooper Form 6 Controls IMPORTANT: Disconnect switches for AC sensing and power connections are necessary to isolate the Form 6 control for testing and servicing. 1. Enable GND TRIP BLOCKED to allow for ground trip to be disabled when reenergized. a) Press the CHANGE button on the Operator Panel to enter the CHANGE mode. b) Press the GND TRIP BLOCKED button within ten seconds after entering the CHANGE mode. NOTE: If the GND TRIP BLOCKED button is not pressed within ten seconds, the function is not activated. 2. Disconnect the old battery and replace it with a new one. Siemens CAUTION The batteries supplied with the Recloser can deliver high discharge currents. This may result in personal injury or damage to equipment. Do not reverse polarity when making battery connections. Immediately replace any frayed leads or damaged connectors. 1. Turn off the battery circuit breaker. 2. Unplug the batteries and replace them with new ones. 3. Confirm the battery polarity is correct. 4. Turn on the battery circuit breaker. 5. Verify that “Battery Normal Status” displays.
  4. Page 119 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 119 of 297 Appendix 1 – Battery Replacement Cooper Form 2, Form 3 and Form 3A Controls
  5. Page 120 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 120 of 297 Appendix 1 – Battery Replacement Cooper Form 2, Form 3 and Form 3A Controls
  6. Page 121 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 121 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply Replacement
  7. Page 122 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 122 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply Replacement Appendix 1 – Battery Replacement
  8. Page 123 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 123 of 297 Cooper Form 4C Power Supply Replacement
  9. Page 124 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 124 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply Replacement
  10. Page 125 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 125 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply Replacement
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)