Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 888, 889, 890

Files5

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match
  1. Page 118 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 118 of 297 Appendix 1 – Recloser Battery Replacement Cooper Form 6 Controls IMPORTANT: Disconnect switches for AC sensing and power connections are necessary to isolate the Form 6 control for testing and servicing. 1. Enable GND TRIP BLOCKED to allow for ground trip to be disabled when reenergized. a) Press the CHANGE button on the Operator Panel to enter the CHANGE mode. b) Press the GND TRIP BLOCKED button within ten seconds after entering the CHANGE mode. NOTE: If the GND TRIP BLOCKED button is not pressed within ten seconds, the function is not activated. 2. Disconnect the old battery and replace it with a new one. Siemens CAUTION The batteries supplied with the Recloser can deliver high discharge currents. This may result in personal injury or damage to equipment. Do not reverse polarity when making battery connections. Immediately replace any frayed leads or damaged connectors. 1. Turn off the battery circuit breaker. 2. Unplug the batteries and replace them with new ones. 3. Confirm the battery polarity is correct. 4. Turn on the battery circuit breaker. 5. Verify that “Battery Normal Status” displays.
  2. Page 119 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 119 of 297 Appendix 1 – Battery Replacement Cooper Form 2, Form 3 and Form 3A Controls
  3. Page 120 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 120 of 297 Appendix 1 – Battery Replacement Cooper Form 2, Form 3 and Form 3A Controls
  4. Page 121 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 121 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply Replacement
  5. Page 122 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 122 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply Replacement Appendix 1 – Battery Replacement
  6. Page 123 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 123 of 297 Cooper Form 4C Power Supply Replacement
  7. Page 124 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 124 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply Replacement
  8. Page 125 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 125 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply Replacement
  9. Page 126 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 126 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply Replacement
  10. Page 127 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 127 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply Replacement
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)