Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 128 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 128 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply ReplacementPage 129 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 129 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply ReplacementPage 130 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 130 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply ReplacementPage 131 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 131 of 297 Appendix 1 – Battery Replacement Cooper Form 4C Power Supply ReplacementPage 132 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 132 of 297 Appendix 1 – Battery Replacement Replacing the Cooper Form 6 Battery 1. 2. 3. 4. Remove the control from service as follows: Enable GND TRIP BLOCKED to allow for ground trip to be disabled when reenergized. a) Press the CHANGE button on the Operator Panel to enter the CHANGE mode. b) Press the GND TRIP BLOCKED button within ten seconds after entering the CHANGE mode. Note: If the GND TRIP BLOCK button is not pressed within ten seconds, the function is not activated. Disconnect the battery. Remove the control AC sensing and power connections from the control using a separate disconnect switch. WARNING: Hazardous voltage. If the recloser is energized while the control cable is disconnected, the CT secondaries can generate high voltages. Contact with high voltage can cause severe personal injury or death. CAUTION: Equipment misoperation. Disconnect all control power sources prior to disconnecting the control cable from the control. Failure to comply can result in recloser misoperation at the time of disconnection or reconnection of the control cable to the control. 5. Disconnect the control cable from the control. Note: Do not disconnect any of the three recloser cables from the Reclosers or junction box unless all of the above steps have been completed. CAUTION: Hazardous voltage. Cable conductors attached to NOVA Reclosers will remain at 53VDC potential after disconnection of source power to the recloser. Contact with any pins at the end of cables directly or indirectly connected to a NOVA recloser can result in personal injury or equipment damage. 6. 7. 8. 9. 10. Remove any control input and status output wiring from TB1, TB3, and TB4. Disconnect any serial communications ports and IRIG-B timing connections. Disconnect the ground from the control. Disconnect and remove the battery. Install the replacement battery. CAUTION: Equipment misoperation. Do not connect this control to an energized recloser until all control settings have been properly programmed and verified. 11. 12. Reconnect the ground cable to the control. Ensure the cable is properly connected and supported. 13. Plug in the control battery.Page 133 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 133 of 297 Note: The Form 6-TS recloser control will not power up until AC power is applied. CAUTION: Equipment misoperation. Verify that the 120/240 VAC selector switch is correctly set for incoming voltage. Failure to comply may cause misoperation (unintentional operation) of the control and/or equipment damage resulting in personal injury. 14. 15. 16. Verify the selector switch on the Power Supply / Battery Charger Board is set to the correct position based on the incoming power supply: • For 120 VAC incoming power, the selector switch must be set to the 115V position. • For 240 VAC incoming power, the selector switch must be set to the 230V position. Apply AC power to the control. Disable GND TRIP BLOCKED. a) Press the CHANGE button on the Operator Panel to enter the CHANGE mode. b) Press the GND TRIP BLOCKED button within ten seconds after entering the CHANGE mode. Note: Once selected (or after ten seconds), the control returns to normal operation. 17. Verify the control clock is set to the current time after AC power has been reapplied. Note: The control clock may require resetting if the operating power has been disconnected for more than 30 days. Refer to the manufacturer’s technical manual for details.Page 134 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 134 of 297 APPENDIX 10 INSPECTION, TREATMENT, RESTORATION AND REPLACEMENT GUIDELINES DISTRIBUTION SYSTEM WOOD POLESPage 135 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 135 of 297 5.61 Wood Poles General Description This procedure establishes a uniform approach for distribution wood pole inspection, treatment, restoration and replacement. It defines the schedule, inspection, and reporting requirements for these facilities. This applies to all wood distribution poles within the custodianship or the maintenance responsibility of Eversource Energy. It shall include push braces and guying stub poles as well as line poles scheduled for the given year. Facilities/Equipment • Wood Poles 5.61.1 Inspection and Maintenance Activity Schedules 5.61.1.1 Table 1 – Wood Poles Maintenance Intervals Wood Poles All Maintenance Schedule PM Task Condition Monitoring N/A Time-Directed Routine Inspection 15Y (Notes 1 & 2) Condition-Based Priority Reject Schedule repairs or replacement. (Note 3) A/R (Note 4) Failure Finding Corrective Maintenance A/R In Table 1, the intersection of the row and column indicate the age-based inspection or maintenance interval for wood poles based on the preservation treatment listed in the column heading. For example, the age requirement for a Routine Inspection is 15Y (or 15 Years). The abbreviations used for the intervals are: Y = Year, i.e. 2Y = 2 Years A/R = As Required N/A = Not Applicable Note 1 = 15 years is the minimum requirement for pole inspection. This interval may be changed due to contractual requirements with joint owners. Note 2 = The type of inspection performed shall be determined by the age of the pole and its type of treatment, as shown in the following table:Page 136 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 136 of 297 Inspection Type Visual Sound & Bore Ground Line Evacuate Creosote, Penta, all others 0 to 9 years old 10 to 14 years old 15 years old and older CC 0 to 19 years old 20 years old and older If decay is indicated by Sound & Bore Note 3 = Check the pole within 48 hours and make the pole safe within 5 working days. Note 4 = Complete the repair or replacement within one year of determination of need following inspection 5.61.2 Maintenance Categories 5.61.2.1 Routine Inspection – Time Directed 1. Routine inspection activities are detailed in EMP Instruction 6.61. 5.61.2.2 Priority Reject Poles 1. Priority reject pole activities are detailed in EMP Instruction 6.61. 5.61.2.3 Normal Reject Poles 1. Normal reject pole activities are detailed in EMP Instruction 6.61. 5.61.3 Evaluation of Restorable Poles 1. The evaluation activities for restorable poles are detailed in EMP Instruction 6.61A. 5.61.4 Failure Finding 1. Failure finding activities are detailed in EMP Instructions 6.61 and 6.61A. 5.61.5 Research/Background Publications and other reference materials from these organizations were used in the development of this program. • National Electric Safety Code, as directed by section DER 0701 “Wood Poles – Aging Infrastructure” • TD 953 – “Inspection, Treatment, Restoration and Replacement Guidelines for Dist Sys Wood Poles” 5.61.6 Wood Poles - Maintenance Basis Documentation The maintenance activities and their schedules are based on industry experience, manufacturer’s recommendations, feedback from the service technicians, and the subject matter expert, who in this case, is a Senior Engineering Technologist for Distribution Engineering Design.Page 137 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 137 of 297 Basis Requirement Routine Inspection at 15Y Interval Inspection required by the NESC - The National Electrical Safety Code requires that poles are inspected as often as experience shows it necessary to maintain the strength required for the pole to remain in service. According to charts developed by Osmose on National averages, the percentage of reject poles starts to rise between ten and fifteen years. However, because Eversource is mostly in a "Moderate Deterioration" zone (National Wood Preservers Association Book of Standards) we could expect better than average results from an inspection program. Eversource's experience finds that a fifteen year inspection and treating program keeps the reject rate reasonable. NOTE: Eversource's line mechanics are taught to visually inspect and sound any pole before climbing it. The 15 year inspection is required, but it is acknowledged that PSNH has an existing contract to perform their inspections at a 10 year interval. EMP 6.61 - Routine Inspection Visual A visual (only) inspection is to be performed on: •CCA Treated Poles -----------------------------------0 – 19 years old •Creosote, Penta, and all other poles--------------0 – 9 years old This shall be the first step for inspecting each pole, and shall include a thorough observation of the above-ground portion of each pole and all attachments. Record any findings into the system appropriate for the activities being performed. 1. Visually inspect the pole for the following defects: • Pole top split or deteriorated • Crossarm damaged or decayed • Broken or damaged insulator • Broken or damaged spacer • Buried anchor guy • Broken guy wire • Leaning pole 2. Check to see if the pole is set shallow. The following table indicates the correct distance from the ground-line to the bottom of the pole brand: Length of Pole (in feet) 25 Groundline Distance To Butt To Brand 5 5 30 5.5 4.5 35 40 6 6 4 4 45 6.5 3.5 50 7 3 55 7.5 6.5
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026