  1. Page 138 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 138 of 297 •Measure the distance from the ground line to the bottom of the pole brand. If the distance is more than 6 inches greater than the value in the 3rd column of the above table: a. Attach an aluminum pole tag letter “S” just below the bottom of the pole brand. b. Record the information into Cascade or into the appropriate inspection record. •Do not record this pole as set shallow if there is an “R” tag attached to the pole just below its brand, as this indicates the presence of enough rock to support the pole. 3. Install a reflector on all wood poles located within six feet (6 FT) of any roadway if no guard rail is present. The reflector shall be installed on the wood pole in accordance with DTR 05.091 and in the direction of travel. If unable to install, no follow-up action is required. Sound & Bore Inspection Pole in Ground A Sound & Bore Inspection is performed on: •CCA treated poles---------------------------20 years old and older •Creosote, Penta, and all other poles----10 – 14 years old. 1. Sound the pole all around, listening for hollow sounds that may indicate decay or insect damage. • Strike the pole firmly (not hard) with a hammer from the ground line upward to as high as you can reach, approximately 8 feet above the ground line. • Striking intervals shall be 2” to 3” apart at ground line and where ever decay or insect damage is suspected. • Above the ground line, use 12” intervals. 2. Pull back the soil at ground line on two sides of the pole, giving pullback priority to any suspicious sounding areas or visually suspect areas. •Each pullback should be approximately shovel’s depth and 6” wide. 3. Bore a 3/8” hole into the pole at a 45 degree angle from the ground line to the center of the pole, and wherever there were any suspicious areas detected by sounding, in order to detect insect damage or damage due to decay. • If no insect damage or decay is detected, do not treat the pole. 4. Evacuate any voids found within the pole • If the pole passes inspection, fill the void and coat the outside with the appropriate treatments. 5. Plug all bored holes with 7/16” treated dowels (2” to 3” long), and tamp the pulled-back soil neatly into place. Sound & Bore Inspection – Poles In Pavement This includes those poles that are surrounded by pavement, or that have riser pipes or other obstructions that prevent excavation.
  2. Page 139 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 139 of 297 A Sound & Bore inspection is performed on: • CCA treated poles ------------------------------20 years old and older • Creosote, Penta, and all other poles--------10 - 14 years old Bore each pole with the 3/8 inch x 18 inch or 24 inch inspection bit at a 45 degree angle from above ground line to below ground line to look for decay or insect damage. 2. Evaluate decay as specified in the Circumference Measurement section on page 5. 3. Treat the pole. If the pole exhibits some decay, but still passes inspection, internally treat the pole with: • “WOODFUME” if there are no internal voids • “Hollow Heart” if there are internal voids. • MITC-FUME/MP400-EXT/OSMOSHIELD as appropriate Ground Line Inspection A ground line inspection is performed on: • Creosote, Penta and all other poles---------15 years old and older 1. NOTE: Do not excavate a pole set shallow until Division Operations advises that the situation has been corrected. 1. 2. 3. 4. 5. 6. 7. 8. 9. Excavate each pole all around to a depth of 18 inches, leaving at least 4 inches of radial clearance at the bottom of the excavation. Use a wire brush to clean the below-ground portion of the pole and use a check scraper to locate any exterior decay. Sound the pole all around. Bore a 3/8” hole into each pole at a 45 degree angle from the ground line to the center of the pole and wherever decay or insect damage is suspected. Plug all bored holes with a 7/16” preservative treated wood dowel (2” – 3” long). Use a shell thickness indicator to measure voids and the thickness of the outer shell. Remove by chipping, all loose weathered wood and wood overhanging deteriorated wood to at least 6 inches above ground line. See the following section on Circumference Measurements. Remove all exterior wood from the pole surface to be treated using care not to remove any sound wood unless that is essential to inspection/treatment. Remove all chipped wood debris from the hole and properly dispose of it away from the site. Circumference Measurement Evaluate a pole if its effective ground line circumference has been reduced by decay or insect pockets, hollow heart, mechanical damage or has had exterior decayed wood removed by chipping prior to ground line treatment. Calculate the percentage of the remaining pole strength based on the effective ground line circumference and the existing conductor and attachment load. Remove from service, any corner (angle) poles,
  3. Page 140 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 140 of 297 dead end poles, guy stubs and push braces with less than 80% of their original ground line circumference. Circumference measurements for new poles are listed below in the following table. Length of Pole or Feet From Top Minimum Dimension (in Inches) 0’ Class H-2 H-1 1 2 3 4 5 Diameter Circumference 9.9 31.0 9.2 29.0 8.6 27.0 8.0 25.0 7.3 23.0 6.7 21.0 6.0 19.0 2’ Diameter Circumference 10.2 31.9 9.5 29.8 8.8 27.8 8.2 25.8 7.5 23.7 6.9 21.7 6.3 19.7 5’ Diameter Circumference 10.6 33.2 9.9 31.1 9.3 29.1 8.6 27.0 7.9 24.9 7.3 22.8 6.6 19.7 10’ Diameter Circumference 11.3 35.4 10.6 33.2 9.6 30.0 8.9 28.0 8.3 26.0 7.7 24.0 7.0 22.0 15’ Diameter Circumference 12.0 37.6 11.2 35.3 9.9 31.0 9.2 29.0 8.6 27.0 8.0 25.0 7.3 23.0 20’ Diameter Circumference 12.7 39.8 11.9 37.4 10.7 33.5 10.0 31.5 9.4 29.5 8.8 27.5 8.1 25.5 25’ Diameter Circumference 13.4 42.0 12.6 39.5 11.6 36.5 10.9 34.0 10.2 32.0 9.5 29.5 8.7 27.5 30’ Diameter Circumference 13.8 43.5 13.2 41.5 12.4 39.0 11.6 36.5 10.9 34.0 10.0 31.5 9.2 29.0 35’ Diameter Circumference 14.6 46.0 13.8 43.5 13.1 43.5 12.3 38.5 11.5 36.0 10.7 33.5 9.9 31.0 40’ Diameter Circumference 15.4 48.5 14.5 45.5 13.7 43.0 12.8 40.5 11.9 37.5 11.1 35.0 10.3 32.5 45’ Diameter Circumference 16.1 50.5 15.1 47.5 14.3 45.0 13.3 42.0 12.0 39.0 11.7 36.5 50’ Diameter Circumference 16.6 52.0 15.8 49.5 14.7 46.5 13.8 43.5 12.9 40.5 Ground line (diameter or circumference) dimensions for a pole are measured at 5 feet from the bottom of the pole. Reject Poles Priority Poles Reject all priority poles. A priority pole is one which is in imminent danger of falling because it is completely decayed across the grain, or it has a hollow heart with sound wood in the outer shell of one inch thickness or less. • Use the C-aluminum pole tag which measures 2 inches high and 21/2 inches wide. It has a clear aluminum arrow with an “X” inscribed in a circle imposed on the shaft of the arrow on a red background.
  4. Page 141 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 141 of 297 • • • • Paint a yellow “X”, approximately 1 foot square in size, on the roadside of the pole, centered approximately 6 feet above the ground line. Then, attach one C tag centered on the “X” and attach another C tag at approximately the same height on the field side of the pole. If the pole is defective in the ground line section, place the tags so the arrow points downward. If the pole is defective in the upper portion, place the tags so the arrow points upward. If, however, the pole is defective in both the ground line section and in the upper portion place a double set of tags, one set with the arrow pointing downward and the other set with the arrow pointing upward. Attach the tags with 1-1/4 inch galvanized roofing nails. Report the pole immediately by telephone, radio, or email (whichever is appropriate for your company requirements) to the appropriate district. Record the information in the computer database and include the name of the person the reject information was reported to in the comments section. NOTE: Field Supervision shall check the pole within 48 hours from identification as “priority reject” to assess the conditions and verify there is no immediate danger to the public. The pole must be made safe within 10 calendar days or less from its identification as “priority reject” wood pole. Normal Reject Poles Normal reject poles are those poles which have effective circumferences equal to or less than the minimum ground line circumference at replacement (normally 67% of original circumference) but which are not deteriorated enough to be classified as “priority poles”. Circumference measurements for new poles will be provided in the Instructions chapter. •Reject decayed poles having a minimum shell thickness of less than 2 inches. ○ If the hollow heart is the result of severe ant or termite infestation, then reject those poles having a minimum shell thickness of less than 3 inches. •Normal reject poles shall be identified as follows: ○ Use the B-aluminum pole tag which measures 2 inches high and 2-1/2 inches wide. It has a clear aluminum arrow on a red background. ○ Attachment instructions for the B tag are the same as for the C tag used to identify priority poles in the preceding section. Refer to Instruction EMP 6.61A for details on evaluating “Normal” reject poles and performing their restoration Research/Background Publications and other reference materials from these organizations were used in the development of this program. • National Electric Safety Code, as directed by section DER 07-01 “Wood Poles – Aging Infrastructure” • TD 953 Rev. 2 – Inspection, Treatment, Restoration and Replacement
  5. Page 142 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 142 of 297 Guidelines for Distribution System Wood Poles • PSNH Procedure CO-1009 – Climbing Inspections • Over-Under OH05-090 – Tagging Defective Poles • Over-Under OH05-245 – Woodpecker Damage • TD-067 – Pole Numbering • TD-234 – Re-Use of Treated Wood • Transmission Vegetation Management Wood Pole Inspection • Wood Poles Restoration Guidelines (from Jeff Smith) • EMP Section 6.61A – Wood Pole Restoration (instructions) • DTR 05.101 6.61A Wood Pole Restoration This section of the Eversource Maintenance Manual provides instruction for determining which Reject Poles (as defined in section 6.61 of the manual) are suitable for repair or restoration as a means to extend their useful life by at least: • 15 years* (the inspection interval for wood poles not planned for replacement) or • 5 years (for poles scheduled for replacement within that period) It also provides guidelines for determining which poles may not be restored. Guidelines for Reject Pole Restoration All of the following requirements must be met in order to qualify a pole for restoration: 1. 2. 3. 4. No circuit rebuild requiring taller or larger class poles is planned within the present planning period. Search the Work Management System by pole number to determine if other work has been planned for that pole and proceed accordingly. No equipment additions (capacitors, reclosers, regulators, switches or transformers) that would require a taller or larger class pole are expected in the near future. Telephone Company concurs with pole restoration for those poles jointly owned. (Refer to guidelines for jointly owned poles below). If applicable, State Highway Department concurs with pole restoration for poles along state highways. For the State of Connecticut, written approval must first be obtained from the appointing authority of the local municipality of the state route where pole restoration is planned. A permit by the State of Connecticut Department of Transportation will not be issued unless approval from the municipality is included with the request.
  6. Page 143 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 143 of 297 Restoration Guidelines for poles jointly owned with Frontier (Connecticut only): Frontier encourages pole restoration for the following cases: •Pole with Frontier aerial or ground level interface boxes attached. •Poles with large communication cable risers attached. •Poles in Right of Ways. •Poles 45 feet and above. Guidelines for Reject Pole Replacement Reject poles are categorized as either a Normal Reject or a Priority Reject pole, as follows: • • A Priority Reject pole is one which is in imminent danger of falling because it is completely decayed across the grain, or is a pole having a hollow heart with sound wood in the outer shell of one inch thickness or less. A Normal Reject pole is one that has an effective circumference equal to or less than the Minimum Ground line Circumference at Replacement (normally 67% of original circumference) but which is not deteriorated enough to be classified as a “Priority Reject” pole. 1. Replace all poles found to be Priority Reject poles. 2. Evaluate the condition of the entire pole. If there are cracks, splits, or rot at the top, extensive woodpecker holes, or other damage that would make it impractical to extend the life of the pole by restoring the pole at the ground line, then the pole should be replaced rather than restored. • Exception to this rule: If you know that the pole will be relocated or replaced for other reasons within the next five years, and restoration will extend its life at least for that period, then restore the pole instead of replacing it. 3. Assess the need to climb the pole in the future. If the pole cannot be easily reached with a bucket truck and the condition of the pole above the ground line is not sufficient to allow climbing, then replace the pole. 4. Determine if the pole is the correct class and height to support the facilities that are on it. The Eversource Distribution Standards provide the required clearances and guidance to calculate the strength requirements to support the electric and communications equipment. If it is determined that the existing pole is not sufficient due to strength or clearance issues, then replace it with the correct class and height pole. 5. Return to Distribution Maintenance and Construction a list of those poles which you have confirmed can be restored. For those which you have determined cannot be restored, state the reason(s) in writing why they cannot be restored. 6. Replace poles on scenic highways or in historical areas of towns (Connecticut only).
  7. Page 144 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 144 of 297 Guidelines to replace defective poles jointly owned with Frontier (Connecticut only): Frontier encourages replacing defective poles under the following conditions: 1. Replace 35’ poles with power primary, secondary/neutral and communications cables that cross a road. Poles with 3 phase primary, secondary and communications equipment should be replaced with a tall pole to provide access to the field side of the pole if the 35’ pole is found to be defective. See DTR 04.047. 2. Replace 35’ poles with power primary, secondary/neutral and more than 3 attachments in the communications gains. 3. Replace 40’ poles with power primary, secondary/neutral and more than 5 attachments in the communications gain. Evaluate the pole height to ensure that proper clearance requirements are met. 4. Replace any pole that is inadequate for planned Frontier construction. 5. Replace any pole that does not meet Frontier or State of Connecticut DOT criteria for pole restoration. NOTES: • Attachments in the communication gain refer to all attachments, roadside and field side, including bare strand. (Frontier, Municipal, State, CATV, other communication companies). • Questionable poles will be reviewed by Frontier Line construction/Frontier engineering upon request. • It is requested that pole maps of the projected pole inspection be supplied to Frontier for review. Frontier will identify areas of planned construction and reply back to Eversource. Pole Restoration Poles evaluated as normal reject poles by the inspector shall be noted in the computer database as “Restorable” if there is sufficient shell thickness to transfer the strength of the steel reinforcing member to the wood pole. A normal reject pole is restorable with one of the following options if it meets the following minimum criteria. C-Truss System 1. Sound the pole thoroughly above the ground line again. Concentrate at the zone 15 inches to 4-1/2 feet above the ground line. 2. Drill at 4-1/2 feet above the ground line against the line of lead. • If this boring indicates less than a 4 inch shell thickness a second boring is made opposite (180 degrees from) the first boring whenever possible. Other borings should be taken as necessary. O If the average shell thickness is 4 inches or more at the 41/2 foot height, the pole can be restored using a C-Truss. O If the average shell thickness is less than 4 inches at the 4-1/2 foot height, the pole should be bored at 5-1/2 feet. If the average shell thickness is 4 inches at this height, Then the pole can be restored using a larger C-Truss. O If the average shell thickness is less than 4 inches at both 4-1/2 and – 5-1/2 foot heights, then use a Fiberwrap System to restore the pole.
  8. Page 145 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 145 of 297 3. Drill at 15 inches above the ground line against the line of lead. • If this boring indicates less than a 2 inches shell thickness, a second boring is made opposite (180 degrees from) the first boring whenever possible. Other borings should be taken as necessary. o o o If the average shell thickness at 15 inches is 2 inches, the pole can be restored using a C-Truss. If the average shell thickness at 15 inches is less than 2 inches, bore the pole at a 26 inch height. If there is a 2 inch average at the 26 inch height, the pole can be restored using the larger C-Truss. If the average shell thickness at both 15 inch and 26 inch heights is less than 2 inches, then use a Fiberwrap System to restore the pole. Fiberwrap System 1. Drill at 6 feet above the ground line against the line of lead. • If this boring indicates less than a 4 inch shell thickness, a second boring is made opposite (180o from) the first boring whenever possible. Other borings should be taken as necessary. O If the average shell thickness is 4 inches or more the pole can be restored using a Fiberwrap. O If the average shell thickness is less than 4 inches, continue boring at 6 inch intervals up the pole until a 4 inch average shell thickness is obtained or the height of 10 feet is reached. O If 4 inches of shell thickness if found at a height of 10 feet or less, the pole can be restored using a Fiberwrap. O If an average of a 4 inch shell does not exist from 6 to10 feet, the pole cannot be restored.
  9. Page 146 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 146 of 297 APPENDIX 11 UNDERGROUND SWITCHES
  10. Page 147 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 147 of 297 5.51 Underground Switches General Description Underground systems contain many types of switches. There are oil switches, oil-vacuum switches, fusible switches, SF6 vacuum switches, etc. The switches generally are constructed for submersible application and are located in manholes, vaults or on concrete pads in subway system areas. The purpose of these switches is to isolate sections of circuits in order to minimize the number of customers interrupted due to faults on the circuits or to transfer loads from one circuit to another. Many of the older types of switches have been replaced over the years as 5 kV and below systems have been converted to systems ranging from 15 kV to 35 kV. There are projects to convert more of the 5 kV and below systems to the 15 kV to 35 kV range. Completion of these projects will result in the removal of more of the older types of switches. Switches installed in these conversion areas and in new underground areas are the standard SF6 vacuum switches. Industry-standard rubber molded products are used to connect the switches to Tree Retardant XLink or ethylene propylene rubber insulated primary cables. 5.51.1 Inspection and Maintenance Activity Schedules Table 1 – Underground Switch Maintenance Intervals Underground Switches Maintenance Schedule Interval PM Task Condition Monitoring N/A Time-Directed Routine Inspection – Energized 15Y Condition-Based Correct any defects found during Routine Inspection Inspect suspect equipment or conditions previously reported A/R 1Y (Note 1) Failure Finding Appropriate Failure Reporting System (EFRS, UPER, Cascade, etc) Failure Investigation A/R A/R Scheduling Requirements Perform together with subway system (radial) - cable A/R
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)