Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 141 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 141 of 297 • • • • Paint a yellow “X”, approximately 1 foot square in size, on the roadside of the pole, centered approximately 6 feet above the ground line. Then, attach one C tag centered on the “X” and attach another C tag at approximately the same height on the field side of the pole. If the pole is defective in the ground line section, place the tags so the arrow points downward. If the pole is defective in the upper portion, place the tags so the arrow points upward. If, however, the pole is defective in both the ground line section and in the upper portion place a double set of tags, one set with the arrow pointing downward and the other set with the arrow pointing upward. Attach the tags with 1-1/4 inch galvanized roofing nails. Report the pole immediately by telephone, radio, or email (whichever is appropriate for your company requirements) to the appropriate district. Record the information in the computer database and include the name of the person the reject information was reported to in the comments section. NOTE: Field Supervision shall check the pole within 48 hours from identification as “priority reject” to assess the conditions and verify there is no immediate danger to the public. The pole must be made safe within 10 calendar days or less from its identification as “priority reject” wood pole. Normal Reject Poles Normal reject poles are those poles which have effective circumferences equal to or less than the minimum ground line circumference at replacement (normally 67% of original circumference) but which are not deteriorated enough to be classified as “priority poles”. Circumference measurements for new poles will be provided in the Instructions chapter. •Reject decayed poles having a minimum shell thickness of less than 2 inches. ○ If the hollow heart is the result of severe ant or termite infestation, then reject those poles having a minimum shell thickness of less than 3 inches. •Normal reject poles shall be identified as follows: ○ Use the B-aluminum pole tag which measures 2 inches high and 2-1/2 inches wide. It has a clear aluminum arrow on a red background. ○ Attachment instructions for the B tag are the same as for the C tag used to identify priority poles in the preceding section. Refer to Instruction EMP 6.61A for details on evaluating “Normal” reject poles and performing their restoration Research/Background Publications and other reference materials from these organizations were used in the development of this program. • National Electric Safety Code, as directed by section DER 07-01 “Wood Poles – Aging Infrastructure” • TD 953 Rev. 2 – Inspection, Treatment, Restoration and ReplacementPage 142 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 142 of 297 Guidelines for Distribution System Wood Poles • PSNH Procedure CO-1009 – Climbing Inspections • Over-Under OH05-090 – Tagging Defective Poles • Over-Under OH05-245 – Woodpecker Damage • TD-067 – Pole Numbering • TD-234 – Re-Use of Treated Wood • Transmission Vegetation Management Wood Pole Inspection • Wood Poles Restoration Guidelines (from Jeff Smith) • EMP Section 6.61A – Wood Pole Restoration (instructions) • DTR 05.101 6.61A Wood Pole Restoration This section of the Eversource Maintenance Manual provides instruction for determining which Reject Poles (as defined in section 6.61 of the manual) are suitable for repair or restoration as a means to extend their useful life by at least: • 15 years* (the inspection interval for wood poles not planned for replacement) or • 5 years (for poles scheduled for replacement within that period) It also provides guidelines for determining which poles may not be restored. Guidelines for Reject Pole Restoration All of the following requirements must be met in order to qualify a pole for restoration: 1. 2. 3. 4. No circuit rebuild requiring taller or larger class poles is planned within the present planning period. Search the Work Management System by pole number to determine if other work has been planned for that pole and proceed accordingly. No equipment additions (capacitors, reclosers, regulators, switches or transformers) that would require a taller or larger class pole are expected in the near future. Telephone Company concurs with pole restoration for those poles jointly owned. (Refer to guidelines for jointly owned poles below). If applicable, State Highway Department concurs with pole restoration for poles along state highways. For the State of Connecticut, written approval must first be obtained from the appointing authority of the local municipality of the state route where pole restoration is planned. A permit by the State of Connecticut Department of Transportation will not be issued unless approval from the municipality is included with the request.Page 143 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 143 of 297 Restoration Guidelines for poles jointly owned with Frontier (Connecticut only): Frontier encourages pole restoration for the following cases: •Pole with Frontier aerial or ground level interface boxes attached. •Poles with large communication cable risers attached. •Poles in Right of Ways. •Poles 45 feet and above. Guidelines for Reject Pole Replacement Reject poles are categorized as either a Normal Reject or a Priority Reject pole, as follows: • • A Priority Reject pole is one which is in imminent danger of falling because it is completely decayed across the grain, or is a pole having a hollow heart with sound wood in the outer shell of one inch thickness or less. A Normal Reject pole is one that has an effective circumference equal to or less than the Minimum Ground line Circumference at Replacement (normally 67% of original circumference) but which is not deteriorated enough to be classified as a “Priority Reject” pole. 1. Replace all poles found to be Priority Reject poles. 2. Evaluate the condition of the entire pole. If there are cracks, splits, or rot at the top, extensive woodpecker holes, or other damage that would make it impractical to extend the life of the pole by restoring the pole at the ground line, then the pole should be replaced rather than restored. • Exception to this rule: If you know that the pole will be relocated or replaced for other reasons within the next five years, and restoration will extend its life at least for that period, then restore the pole instead of replacing it. 3. Assess the need to climb the pole in the future. If the pole cannot be easily reached with a bucket truck and the condition of the pole above the ground line is not sufficient to allow climbing, then replace the pole. 4. Determine if the pole is the correct class and height to support the facilities that are on it. The Eversource Distribution Standards provide the required clearances and guidance to calculate the strength requirements to support the electric and communications equipment. If it is determined that the existing pole is not sufficient due to strength or clearance issues, then replace it with the correct class and height pole. 5. Return to Distribution Maintenance and Construction a list of those poles which you have confirmed can be restored. For those which you have determined cannot be restored, state the reason(s) in writing why they cannot be restored. 6. Replace poles on scenic highways or in historical areas of towns (Connecticut only).Page 144 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 144 of 297 Guidelines to replace defective poles jointly owned with Frontier (Connecticut only): Frontier encourages replacing defective poles under the following conditions: 1. Replace 35’ poles with power primary, secondary/neutral and communications cables that cross a road. Poles with 3 phase primary, secondary and communications equipment should be replaced with a tall pole to provide access to the field side of the pole if the 35’ pole is found to be defective. See DTR 04.047. 2. Replace 35’ poles with power primary, secondary/neutral and more than 3 attachments in the communications gains. 3. Replace 40’ poles with power primary, secondary/neutral and more than 5 attachments in the communications gain. Evaluate the pole height to ensure that proper clearance requirements are met. 4. Replace any pole that is inadequate for planned Frontier construction. 5. Replace any pole that does not meet Frontier or State of Connecticut DOT criteria for pole restoration. NOTES: • Attachments in the communication gain refer to all attachments, roadside and field side, including bare strand. (Frontier, Municipal, State, CATV, other communication companies). • Questionable poles will be reviewed by Frontier Line construction/Frontier engineering upon request. • It is requested that pole maps of the projected pole inspection be supplied to Frontier for review. Frontier will identify areas of planned construction and reply back to Eversource. Pole Restoration Poles evaluated as normal reject poles by the inspector shall be noted in the computer database as “Restorable” if there is sufficient shell thickness to transfer the strength of the steel reinforcing member to the wood pole. A normal reject pole is restorable with one of the following options if it meets the following minimum criteria. C-Truss System 1. Sound the pole thoroughly above the ground line again. Concentrate at the zone 15 inches to 4-1/2 feet above the ground line. 2. Drill at 4-1/2 feet above the ground line against the line of lead. • If this boring indicates less than a 4 inch shell thickness a second boring is made opposite (180 degrees from) the first boring whenever possible. Other borings should be taken as necessary. O If the average shell thickness is 4 inches or more at the 41/2 foot height, the pole can be restored using a C-Truss. O If the average shell thickness is less than 4 inches at the 4-1/2 foot height, the pole should be bored at 5-1/2 feet. If the average shell thickness is 4 inches at this height, Then the pole can be restored using a larger C-Truss. O If the average shell thickness is less than 4 inches at both 4-1/2 and – 5-1/2 foot heights, then use a Fiberwrap System to restore the pole.Page 145 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 145 of 297 3. Drill at 15 inches above the ground line against the line of lead. • If this boring indicates less than a 2 inches shell thickness, a second boring is made opposite (180 degrees from) the first boring whenever possible. Other borings should be taken as necessary. o o o If the average shell thickness at 15 inches is 2 inches, the pole can be restored using a C-Truss. If the average shell thickness at 15 inches is less than 2 inches, bore the pole at a 26 inch height. If there is a 2 inch average at the 26 inch height, the pole can be restored using the larger C-Truss. If the average shell thickness at both 15 inch and 26 inch heights is less than 2 inches, then use a Fiberwrap System to restore the pole. Fiberwrap System 1. Drill at 6 feet above the ground line against the line of lead. • If this boring indicates less than a 4 inch shell thickness, a second boring is made opposite (180o from) the first boring whenever possible. Other borings should be taken as necessary. O If the average shell thickness is 4 inches or more the pole can be restored using a Fiberwrap. O If the average shell thickness is less than 4 inches, continue boring at 6 inch intervals up the pole until a 4 inch average shell thickness is obtained or the height of 10 feet is reached. O If 4 inches of shell thickness if found at a height of 10 feet or less, the pole can be restored using a Fiberwrap. O If an average of a 4 inch shell does not exist from 6 to10 feet, the pole cannot be restored.Page 146 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 146 of 297 APPENDIX 11 UNDERGROUND SWITCHESPage 147 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 147 of 297 5.51 Underground Switches General Description Underground systems contain many types of switches. There are oil switches, oil-vacuum switches, fusible switches, SF6 vacuum switches, etc. The switches generally are constructed for submersible application and are located in manholes, vaults or on concrete pads in subway system areas. The purpose of these switches is to isolate sections of circuits in order to minimize the number of customers interrupted due to faults on the circuits or to transfer loads from one circuit to another. Many of the older types of switches have been replaced over the years as 5 kV and below systems have been converted to systems ranging from 15 kV to 35 kV. There are projects to convert more of the 5 kV and below systems to the 15 kV to 35 kV range. Completion of these projects will result in the removal of more of the older types of switches. Switches installed in these conversion areas and in new underground areas are the standard SF6 vacuum switches. Industry-standard rubber molded products are used to connect the switches to Tree Retardant XLink or ethylene propylene rubber insulated primary cables. 5.51.1 Inspection and Maintenance Activity Schedules Table 1 – Underground Switch Maintenance Intervals Underground Switches Maintenance Schedule Interval PM Task Condition Monitoring N/A Time-Directed Routine Inspection – Energized 15Y Condition-Based Correct any defects found during Routine Inspection Inspect suspect equipment or conditions previously reported A/R 1Y (Note 1) Failure Finding Appropriate Failure Reporting System (EFRS, UPER, Cascade, etc) Failure Investigation A/R A/R Scheduling Requirements Perform together with subway system (radial) - cable A/RPage 148 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 148 of 297 In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for a Routine Inspection is 5Y (or 5 Years). The abbreviations used for the intervals are: Y = Year, i.e. 2Y = 2 Years A/R = As Required N/A = Not Applicable Note 1 Equipment or conditions may exist that require monitoring on a basis more frequent than the 5Y Routine Inspection. 5.51.2 Maintenance Categories Refer to EMP Instruction 6.51 for details on performing the following maintenance tasks TIME-DIRECTED 5.51.2.1 Routine Inspection – Energized Refer to EMP Instruction 6.51 for details on performing the routine inspection for underground switches. CONDITION-BASED Correct any conditions found during Routine Inspection or record the conditions and schedule them for future replacement. 5.51.3 Failure Finding A failure report shall be completed for any subway switch failure and placed in the appropriate failure tracking system (EFRS, UPER, Cascade, etc.) for review by Distribution Standards. Analysis of of subway switch failures should be performed when deemed necessary by Distribution Standards. 5.51.4 Related Documents • Product Review 132, Dated 10-30-02 – Describes Load Break Elbow Pulling Tools as used for Removing elbow connectors from transformers and other UG/DB apparatus. • Product Review 133, Dated 11-07-02 – Provides alternative tools to loosen and remove “stuck” elbows and/or for performing DB./UG switching. • CO-1004 – New Hampshire Loadbreak Elbow Procedure. Establishes guidelines for safe operation of loadbreak elbows during load break, load make switching and phasing of the underground systems at PSNH. • TD 921 – Identifying molded rubber components with probable manufacturing defects 5.51.5 Maintenance Basis Documentation The maintenance activities and their schedules are based on company past practices and the subject matter expert who is a Senior Engineer in the Distribution Engineering and Design Group.Page 149 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 149 of 297 Requirement Basis Routine Inspection – Energized at 5Y interval The five year inspection of subway switches has been changed from the previous three year cycle to better coincide with other underground equipment maintenance. The SME from Distribution Engineering and Design along with Maintenance personnel agree this should be the new interval. 5.51.6 Condition Monitoring/Maintenance N/A 6.51 Underground Switch Maintenance Instructions Before You Begin Prior to assigning work on underground switches, Supervision shall: 1. Ensure that all employees are properly trained and qualified to perform this work, and that all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • • • TD 952, “Protection of Personnel Entering Enclosed Spaces” (Connecticut and Western Massachusetts only) TD 955, “Confined Space Requirements” Eversource Employee Safety Manual 2. Ensure those performing the work are aware of the following PPE Requirements whenever working in Underground manholes or vaults: • • • • Safety Glasses with side shields EH (Electrical Hazard) rated boots High Voltage gloves FR (flame resistant) clothing, as specified in TD 211 3. Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior to beginning the job. These include cones, signage, and police or traffic control. Check manholes and vaults prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis. 4. Review the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. 5. Prepare the manhole or vault for entry. a) Check for dangerous atmospheric conditions before entering the manhole using company-approved atmospheric sampling equipment. b) Ventilate the manhole or vault, if required, in accordance with the Eversource Employee Safety Manual c) Remove any standing water or debris from the manhole or vault in accordance with ENVIROWI-0105 or company-specificPage 150 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 150 of 297 requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. 6. Place the circuit in “non-recloser” mode; this disables the automatic closing of a protective device following automatic tripping, thus preventing the reenergizing of the distribution line. 7. Apply “Hotline” tags to the circuit, where available. A Hotline Tag is an alternative setting used on some reclosers and substation breakers that place the device on a fast-trip curve and blocks reclosing. Routine Inspection – Preparation Supervisor, planner or working foreman (as appropriate) 1. Check for open work orders (such as leaking splices) for this location that may indicate unsafe conditions or that may present the opportunity for combining maintenance at this or adjacent vaults. Ensure Copies are provided to the crew performing the inspection. 2. Provide equipment prints / schematics / circuit maps for this location so that the actual field conditions, i.e. transformer size, etc. can be verified by the crew performing the inspection. Routine Inspection – Performance Inspection Crew 1. Check for stray voltage in accordance with EMP 6.62 - Touch Potential. 2. Ensure equipment nomenclature and status indicators are present and in good condition. Clean or replace as required. • Ensure the work order matches the ID tag and that all identification and Location numbers are correct. 3. Observe the exterior of the switch for any other significant defect or abnormal condition that may affect the safe operation of the switch, such as excessive damage / corrosion to the unit or other defect that requires immediate repair. 4. Check the switch for any discoloration. 5. Check that switch is physically secured in place. 6. Ensure the switch is properly grounded to the manhole, vault, or concrete pad ground grid, if possible. 7. Visually check the switch for leaks. If a gauge is available, record the pressure / level. 8. Perform an infrared inspection to check for heat anomalies on primary connections, secondary connections and accessories, as applicable. Refer to EMP 5.22 for additional guidance. NOTE: Perform the Infrared (IR) inspection using an infrared camera. If an infrared camera is not available, a temperature reading tool, such as the Fluke 63 (SC 0435572) may be used to take spot temperature readings of the equipment in place of the IR inspection. 9. Refer to manufacturer’s manuals for specific requirements for the switch being serviced.
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026