  1. Page 148 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 148 of 297 In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for a Routine Inspection is 5Y (or 5 Years). The abbreviations used for the intervals are: Y = Year, i.e. 2Y = 2 Years A/R = As Required N/A = Not Applicable Note 1 Equipment or conditions may exist that require monitoring on a basis more frequent than the 5Y Routine Inspection. 5.51.2 Maintenance Categories Refer to EMP Instruction 6.51 for details on performing the following maintenance tasks TIME-DIRECTED 5.51.2.1 Routine Inspection – Energized Refer to EMP Instruction 6.51 for details on performing the routine inspection for underground switches. CONDITION-BASED Correct any conditions found during Routine Inspection or record the conditions and schedule them for future replacement. 5.51.3 Failure Finding A failure report shall be completed for any subway switch failure and placed in the appropriate failure tracking system (EFRS, UPER, Cascade, etc.) for review by Distribution Standards. Analysis of of subway switch failures should be performed when deemed necessary by Distribution Standards. 5.51.4 Related Documents • Product Review 132, Dated 10-30-02 – Describes Load Break Elbow Pulling Tools as used for Removing elbow connectors from transformers and other UG/DB apparatus. • Product Review 133, Dated 11-07-02 – Provides alternative tools to loosen and remove “stuck” elbows and/or for performing DB./UG switching. • CO-1004 – New Hampshire Loadbreak Elbow Procedure. Establishes guidelines for safe operation of loadbreak elbows during load break, load make switching and phasing of the underground systems at PSNH. • TD 921 – Identifying molded rubber components with probable manufacturing defects 5.51.5 Maintenance Basis Documentation The maintenance activities and their schedules are based on company past practices and the subject matter expert who is a Senior Engineer in the Distribution Engineering and Design Group.
  2. Page 149 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 149 of 297 Requirement Basis Routine Inspection – Energized at 5Y interval The five year inspection of subway switches has been changed from the previous three year cycle to better coincide with other underground equipment maintenance. The SME from Distribution Engineering and Design along with Maintenance personnel agree this should be the new interval. 5.51.6 Condition Monitoring/Maintenance N/A 6.51 Underground Switch Maintenance Instructions Before You Begin Prior to assigning work on underground switches, Supervision shall: 1. Ensure that all employees are properly trained and qualified to perform this work, and that all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • • • TD 952, “Protection of Personnel Entering Enclosed Spaces” (Connecticut and Western Massachusetts only) TD 955, “Confined Space Requirements” Eversource Employee Safety Manual 2. Ensure those performing the work are aware of the following PPE Requirements whenever working in Underground manholes or vaults: • • • • Safety Glasses with side shields EH (Electrical Hazard) rated boots High Voltage gloves FR (flame resistant) clothing, as specified in TD 211 3. Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior to beginning the job. These include cones, signage, and police or traffic control. Check manholes and vaults prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis. 4. Review the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. 5. Prepare the manhole or vault for entry. a) Check for dangerous atmospheric conditions before entering the manhole using company-approved atmospheric sampling equipment. b) Ventilate the manhole or vault, if required, in accordance with the Eversource Employee Safety Manual c) Remove any standing water or debris from the manhole or vault in accordance with ENVIROWI-0105 or company-specific
  3. Page 150 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 150 of 297 requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. 6. Place the circuit in “non-recloser” mode; this disables the automatic closing of a protective device following automatic tripping, thus preventing the reenergizing of the distribution line. 7. Apply “Hotline” tags to the circuit, where available. A Hotline Tag is an alternative setting used on some reclosers and substation breakers that place the device on a fast-trip curve and blocks reclosing. Routine Inspection – Preparation Supervisor, planner or working foreman (as appropriate) 1. Check for open work orders (such as leaking splices) for this location that may indicate unsafe conditions or that may present the opportunity for combining maintenance at this or adjacent vaults. Ensure Copies are provided to the crew performing the inspection. 2. Provide equipment prints / schematics / circuit maps for this location so that the actual field conditions, i.e. transformer size, etc. can be verified by the crew performing the inspection. Routine Inspection – Performance Inspection Crew 1. Check for stray voltage in accordance with EMP 6.62 - Touch Potential. 2. Ensure equipment nomenclature and status indicators are present and in good condition. Clean or replace as required. • Ensure the work order matches the ID tag and that all identification and Location numbers are correct. 3. Observe the exterior of the switch for any other significant defect or abnormal condition that may affect the safe operation of the switch, such as excessive damage / corrosion to the unit or other defect that requires immediate repair. 4. Check the switch for any discoloration. 5. Check that switch is physically secured in place. 6. Ensure the switch is properly grounded to the manhole, vault, or concrete pad ground grid, if possible. 7. Visually check the switch for leaks. If a gauge is available, record the pressure / level. 8. Perform an infrared inspection to check for heat anomalies on primary connections, secondary connections and accessories, as applicable. Refer to EMP 5.22 for additional guidance. NOTE: Perform the Infrared (IR) inspection using an infrared camera. If an infrared camera is not available, a temperature reading tool, such as the Fluke 63 (SC 0435572) may be used to take spot temperature readings of the equipment in place of the IR inspection. 9. Refer to manufacturer’s manuals for specific requirements for the switch being serviced.
  4. Page 151 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 151 of 297 Underground Switches Form Routine - Energized EMP 6.51-1 Guideline Inspect 1 Stray Voltage 2 Nomenclature and Status Indicators 3 Significant Defect or Abnormal Condition 4 5 Discoloration Mounting 6 Grounding 7 Check for leaks 8 Infrared Inspection Inspection Attributes Check for stray voltage in accordance with EMP 6.62 - Touch Potential Ensure equipment nomenclature and status indicators are present and in good condition. Clean or replace as required. Ensure the work order matches the ID tag and that all identification and location numbers are correct. Observe the exterior of the switch for any other significant defect or abnormal condition that may affect the safe operation of the switch, such as excessive damage / corrosion to the unit or other defect that requires immediate repair. Check the switch for any discoloration Check that switch is physically secured in place Ensure the switch is properly grounded to the manhole, vault, or concrete pad ground grid, if possible Visually check the switch for leaks. If a gauge is available, record the pressure / level Perform an infrared inspection to check for heat anomalies on primary connections, secondary connections and accessories, as applicable. Refer to EMP 5.22 for additional guidance
  5. Page 152 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 152 of 297 APPENDIX 12 UNDERGROUND SYSTEM - NETWORK TRANSFORMERS
  6. Page 153 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 153 of 297 5.30 Network Transformers General Description A network transformer transforms a primary voltage down to the voltage of a secondary network grid. A network transformer is designed and constructed to operate in harsh environments such as street vaults, sidewalk vaults and customer building vaults. A network transformer consists of two main sections. The first section is the main tank in which the core and coils are located and the second section is the high voltage switch. The standard network transformer has a onecompartment high voltage switch, but there are also network transformers with a two-compartment high voltage switch in service. One compartment of this high voltage switch contains the switch mechanism and the other compartment is the high voltage termination compartment. The insulating fluid that is in the main tank of a standard network transformer is transformer oil and the insulating fluid that is in the high voltage switch of a standard network transformer is a less flammable insulating fluid. There are other network transformers in service with other insulating fluids in the main tank and high voltage switch. Also, the termination compartment of a high voltage switch may contain insulating fluids or compounds which may be PCB contaminated. For these reasons, it is essential to check the nameplates for each network transformer to identify all of the insulating fluids. NOTE: All specific maintenance requirements that are followed by a triangle symbol “▲” are explained in the Maintenance Basis Documentation section of this chapter. 5.30.1 Inspection and Maintenance Activity Schedules 5.30.1.1 Table 1 – Network Transformer Maintenance Intervals NETWORK TRANSFORMER Maintenance Schedule All Models PM Task Time Based Routine Inspection – Energized ▲ 1Y Routine Inspection – De-Energized ▲ 4Y Condition Based Any defects found during Routine Inspection, such as oil leaks, failed pressure test, unexplained temperature changes, etc. A/R
  7. Page 154 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 154 of 297 Failure Finding Equipment Failure Reporting System used by your region (EFRS, UPER, etc.) A/R Failure Investigation A/R Scheduling Requirements Perform together with Network Protector Maintenance Perform together with Vault Inspections In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for a Routine Inspection - Energized for all models of Network Transformers is 1Y (or one year). The abbreviations used for the intervals are: Y = Year, i.e. 1Y = 1 year A/R = As Required 5.30.2 Maintenance Activities TIME-DIRECTED 5.30.2.1 Routine Inspection – Energized ▲ Refer to EMP Instruction 6.30A for details 5.30.2.2 Routine Inspection – De-Energized ▲ Refer to EMP Instruction 6.30A for details 5.30.2.3 Network Transformer References: • Electric Utility Line Maintenance Plan • EMP • Industry Experience • TD202 Oil Sampling and Analysis • Eversource Employee Safety Manual 5.30.3 Failure Finding A failure report shall be completed for any network transformer failure, submitted to the equipment failure reporting system used by your region (EFRS, UPER, Cascade, etc.), and placed in “To Eng” status for review by Distribution Standards. Analysis of network transformer failures should be performed when deemed necessary by Distribution Standards.
  8. Page 155 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 155 of 297 5.30.4 Network Transformer Maintenance Basis Documentation The maintenance activities and their schedules are based on industry experience, manufacturer’s recommendations, feedback from service technicians, and subject matter expert who is a Senior Engineer for Distribution Engineering and Design. Requirement Basis Routine Maintenance – Energized at 1Y interval. The annual inspection of the network transformer and switch, performed energized, has historically been the accepted frequency cycle for this equipment. No information, either internal or external to Eversource, has been found to suggest a change to this frequency cycle is warranted and will continue to be required annually. In general, in their product literature, network transformer manufacturers suggest periodic sampling and testing of the fluid in high voltage switches and network transformers. However, there is no mention of the length of time between taking the samples. Major Maintenance - De-energized at 4Y Interval. (To be performed with Network Protector Major Maintenance.) A survey of an approximate dozen other utilities indicated that a small percentage do sample the fluid in high voltage switches and network transformers, but there was no common time period given. It was determined that the consequences of a network transformer failure would not significantly affect system reliability. In addition, the Working Group consensus identified that the failure history for network transformers is very low. As a result, a two year interval for performing de-energized inspections was selected. As data is collected and examined, this interval may be changed. 6.30 Network Transformer Maintenance Instructions Before You Begin Prior to assigning work in Underground Vaults & Manholes, Supervision shall: 1. Ensure that all employees are properly trained and qualified to perform this work, and that all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing”
  9. Page 156 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 156 of 297 • 2. 3. 4. 5. TD 952, “Protection of Personnel Entering Enclosed Spaces” (CL&P, WMECO, and NUSCO only) • TD 955, “Confined Space Requirements” • Eversource Employee Safety Manual • TD -877 Managing Arch Flash Hazards on CL&P Distribution Facilities (CL&P ONLY) Ensure those performing the work are aware that of the following PPE requirements whenever working in Underground Vaults & Manholes: • Safety Glasses with side shields • EH (Electrical Hazard) rated boots • High Voltage gloves • FR (flame resistant) clothing, as specified in TD 211 Whenever “Work” is performed on a network unit as defined in paragraph 5 of this procedure, the following PPE is required : • Protective Arc Flash Hood (Beehive), (Stock Code 442151) or company approved equivalent. • Safety glasses with side shields • Minimum of low voltage (Class 0) rubber gloves (use of High Voltage Rubber Gloves is preferred) • Double layer of full body FR Clothing (i.e., FR shirt and pants plus full body FR coverall) All persons performing “Work” on Network Units as defined below and those persons within the immediate work zone while “Work” is being performed shall wear at minimum double layer full body FR clothing, minimum 25 cal. FR rated hood (beehive type with built-in arc rated face shield), safety glasses and, minimum of low voltage (Class 0) rubber gloves (high voltage rubber gloves preferred). As defined in this document, “Work” includes the following tasks: • Installing or removing transformer links and network fuses • Rolling or racking out the protector • Phasing the unit • Connecting test leads to an energized bus • Obtaining transformer and network voltages • Test probe usage prior to installing links and network fuses • Or any other work performed inside the network protector enclosure with the transformer and/or network bus energized Prior to accessing manholes and vaults to investigate, inspect or work on a network unit in a single transformer vault, the maintenance records for that unit will be reviewed for condition of the unit. • If the records indicate that a major maintenance was completed within the maintenance cycle per the Eversource Maintenance Program and the unit has no major deficiencies, work may commence on the network transformer with the unit energized following all applicable company procedures and the protocols.
  10. Page 157 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 157 of 297 (Applicable only to Connecticut and Western Mass) If the records do not indicate that a major maintenance was completed on the unit within the maintenance cycle per the Eversource Maintenance Program or major deficiencies have not been addressed, then the primary feed to the unit will be deenergized prior to commencement of maintenance work. The maintenance work on the unit will then take place with the unit deenergized, and only the secondary cables will be energized back from the street grid during the work. This will only apply to single transformer vault units. • The deficiencies described below, require the primary circuit to be de-energize in accordance with the operating policy. o Major maintenance not performed within the maintenance cycle required by the Eversource maintenance manual o Low oil level (below sight glass / gauge level) in primary switch or transformer or dielectric quality of oil below acceptable level o Any other significant defect or abnormal condition that may affect the safe operation of the network protector or transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage / corrosion in the network protector or other defect that requires immediate repair to return to service. For cases where multiple network transformers exist in a vault, it will generally not be possible to de-energize all of those units for a variety of reasons. Therefore, prior to working on a network transformer, where multiple network transformers exist in a vault, maintenance records shall be reviewed for major deficiencies and/or major maintenance completion within the maintenance cycle per the Eversource Maintenance Program prior to working in the vault. • If records indicate that major maintenance for all transformers within the vault is up-to-date, and that there are no major deficiencies, then work may proceed. • If major deficiencies or major maintenance was not completed, management will jointly work with employees for the appropriate steps to follow. With the exception of the commissioning of a new network unit, 480V/277V network units shall have major maintenance completed with the primary de-energized. 216V/125V network units may be worked on with the primary energized as long as no oil work (i.e. oil sampling, topping off and/or retro-filling) is being performed. • Network major maintenance that includes any oil work (i.e. primary equipment oil sampling, topping off or the like) shall only be completed with the primary equipment de-energized Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior • 6. 7. 8.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf