Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 150 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 150 of 297 requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. 6. Place the circuit in “non-recloser” mode; this disables the automatic closing of a protective device following automatic tripping, thus preventing the reenergizing of the distribution line. 7. Apply “Hotline” tags to the circuit, where available. A Hotline Tag is an alternative setting used on some reclosers and substation breakers that place the device on a fast-trip curve and blocks reclosing. Routine Inspection – Preparation Supervisor, planner or working foreman (as appropriate) 1. Check for open work orders (such as leaking splices) for this location that may indicate unsafe conditions or that may present the opportunity for combining maintenance at this or adjacent vaults. Ensure Copies are provided to the crew performing the inspection. 2. Provide equipment prints / schematics / circuit maps for this location so that the actual field conditions, i.e. transformer size, etc. can be verified by the crew performing the inspection. Routine Inspection – Performance Inspection Crew 1. Check for stray voltage in accordance with EMP 6.62 - Touch Potential. 2. Ensure equipment nomenclature and status indicators are present and in good condition. Clean or replace as required. • Ensure the work order matches the ID tag and that all identification and Location numbers are correct. 3. Observe the exterior of the switch for any other significant defect or abnormal condition that may affect the safe operation of the switch, such as excessive damage / corrosion to the unit or other defect that requires immediate repair. 4. Check the switch for any discoloration. 5. Check that switch is physically secured in place. 6. Ensure the switch is properly grounded to the manhole, vault, or concrete pad ground grid, if possible. 7. Visually check the switch for leaks. If a gauge is available, record the pressure / level. 8. Perform an infrared inspection to check for heat anomalies on primary connections, secondary connections and accessories, as applicable. Refer to EMP 5.22 for additional guidance. NOTE: Perform the Infrared (IR) inspection using an infrared camera. If an infrared camera is not available, a temperature reading tool, such as the Fluke 63 (SC 0435572) may be used to take spot temperature readings of the equipment in place of the IR inspection. 9. Refer to manufacturer’s manuals for specific requirements for the switch being serviced.Page 151 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 151 of 297 Underground Switches Form Routine - Energized EMP 6.51-1 Guideline Inspect 1 Stray Voltage 2 Nomenclature and Status Indicators 3 Significant Defect or Abnormal Condition 4 5 Discoloration Mounting 6 Grounding 7 Check for leaks 8 Infrared Inspection Inspection Attributes Check for stray voltage in accordance with EMP 6.62 - Touch Potential Ensure equipment nomenclature and status indicators are present and in good condition. Clean or replace as required. Ensure the work order matches the ID tag and that all identification and location numbers are correct. Observe the exterior of the switch for any other significant defect or abnormal condition that may affect the safe operation of the switch, such as excessive damage / corrosion to the unit or other defect that requires immediate repair. Check the switch for any discoloration Check that switch is physically secured in place Ensure the switch is properly grounded to the manhole, vault, or concrete pad ground grid, if possible Visually check the switch for leaks. If a gauge is available, record the pressure / level Perform an infrared inspection to check for heat anomalies on primary connections, secondary connections and accessories, as applicable. Refer to EMP 5.22 for additional guidancePage 152 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 152 of 297 APPENDIX 12 UNDERGROUND SYSTEM - NETWORK TRANSFORMERSPage 153 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 153 of 297 5.30 Network Transformers General Description A network transformer transforms a primary voltage down to the voltage of a secondary network grid. A network transformer is designed and constructed to operate in harsh environments such as street vaults, sidewalk vaults and customer building vaults. A network transformer consists of two main sections. The first section is the main tank in which the core and coils are located and the second section is the high voltage switch. The standard network transformer has a onecompartment high voltage switch, but there are also network transformers with a two-compartment high voltage switch in service. One compartment of this high voltage switch contains the switch mechanism and the other compartment is the high voltage termination compartment. The insulating fluid that is in the main tank of a standard network transformer is transformer oil and the insulating fluid that is in the high voltage switch of a standard network transformer is a less flammable insulating fluid. There are other network transformers in service with other insulating fluids in the main tank and high voltage switch. Also, the termination compartment of a high voltage switch may contain insulating fluids or compounds which may be PCB contaminated. For these reasons, it is essential to check the nameplates for each network transformer to identify all of the insulating fluids. NOTE: All specific maintenance requirements that are followed by a triangle symbol “▲” are explained in the Maintenance Basis Documentation section of this chapter. 5.30.1 Inspection and Maintenance Activity Schedules 5.30.1.1 Table 1 – Network Transformer Maintenance Intervals NETWORK TRANSFORMER Maintenance Schedule All Models PM Task Time Based Routine Inspection – Energized ▲ 1Y Routine Inspection – De-Energized ▲ 4Y Condition Based Any defects found during Routine Inspection, such as oil leaks, failed pressure test, unexplained temperature changes, etc. A/RPage 154 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 154 of 297 Failure Finding Equipment Failure Reporting System used by your region (EFRS, UPER, etc.) A/R Failure Investigation A/R Scheduling Requirements Perform together with Network Protector Maintenance Perform together with Vault Inspections In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for a Routine Inspection - Energized for all models of Network Transformers is 1Y (or one year). The abbreviations used for the intervals are: Y = Year, i.e. 1Y = 1 year A/R = As Required 5.30.2 Maintenance Activities TIME-DIRECTED 5.30.2.1 Routine Inspection – Energized ▲ Refer to EMP Instruction 6.30A for details 5.30.2.2 Routine Inspection – De-Energized ▲ Refer to EMP Instruction 6.30A for details 5.30.2.3 Network Transformer References: • Electric Utility Line Maintenance Plan • EMP • Industry Experience • TD202 Oil Sampling and Analysis • Eversource Employee Safety Manual 5.30.3 Failure Finding A failure report shall be completed for any network transformer failure, submitted to the equipment failure reporting system used by your region (EFRS, UPER, Cascade, etc.), and placed in “To Eng” status for review by Distribution Standards. Analysis of network transformer failures should be performed when deemed necessary by Distribution Standards.Page 155 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 155 of 297 5.30.4 Network Transformer Maintenance Basis Documentation The maintenance activities and their schedules are based on industry experience, manufacturer’s recommendations, feedback from service technicians, and subject matter expert who is a Senior Engineer for Distribution Engineering and Design. Requirement Basis Routine Maintenance – Energized at 1Y interval. The annual inspection of the network transformer and switch, performed energized, has historically been the accepted frequency cycle for this equipment. No information, either internal or external to Eversource, has been found to suggest a change to this frequency cycle is warranted and will continue to be required annually. In general, in their product literature, network transformer manufacturers suggest periodic sampling and testing of the fluid in high voltage switches and network transformers. However, there is no mention of the length of time between taking the samples. Major Maintenance - De-energized at 4Y Interval. (To be performed with Network Protector Major Maintenance.) A survey of an approximate dozen other utilities indicated that a small percentage do sample the fluid in high voltage switches and network transformers, but there was no common time period given. It was determined that the consequences of a network transformer failure would not significantly affect system reliability. In addition, the Working Group consensus identified that the failure history for network transformers is very low. As a result, a two year interval for performing de-energized inspections was selected. As data is collected and examined, this interval may be changed. 6.30 Network Transformer Maintenance Instructions Before You Begin Prior to assigning work in Underground Vaults & Manholes, Supervision shall: 1. Ensure that all employees are properly trained and qualified to perform this work, and that all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing”Page 156 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 156 of 297 • 2. 3. 4. 5. TD 952, “Protection of Personnel Entering Enclosed Spaces” (CL&P, WMECO, and NUSCO only) • TD 955, “Confined Space Requirements” • Eversource Employee Safety Manual • TD -877 Managing Arch Flash Hazards on CL&P Distribution Facilities (CL&P ONLY) Ensure those performing the work are aware that of the following PPE requirements whenever working in Underground Vaults & Manholes: • Safety Glasses with side shields • EH (Electrical Hazard) rated boots • High Voltage gloves • FR (flame resistant) clothing, as specified in TD 211 Whenever “Work” is performed on a network unit as defined in paragraph 5 of this procedure, the following PPE is required : • Protective Arc Flash Hood (Beehive), (Stock Code 442151) or company approved equivalent. • Safety glasses with side shields • Minimum of low voltage (Class 0) rubber gloves (use of High Voltage Rubber Gloves is preferred) • Double layer of full body FR Clothing (i.e., FR shirt and pants plus full body FR coverall) All persons performing “Work” on Network Units as defined below and those persons within the immediate work zone while “Work” is being performed shall wear at minimum double layer full body FR clothing, minimum 25 cal. FR rated hood (beehive type with built-in arc rated face shield), safety glasses and, minimum of low voltage (Class 0) rubber gloves (high voltage rubber gloves preferred). As defined in this document, “Work” includes the following tasks: • Installing or removing transformer links and network fuses • Rolling or racking out the protector • Phasing the unit • Connecting test leads to an energized bus • Obtaining transformer and network voltages • Test probe usage prior to installing links and network fuses • Or any other work performed inside the network protector enclosure with the transformer and/or network bus energized Prior to accessing manholes and vaults to investigate, inspect or work on a network unit in a single transformer vault, the maintenance records for that unit will be reviewed for condition of the unit. • If the records indicate that a major maintenance was completed within the maintenance cycle per the Eversource Maintenance Program and the unit has no major deficiencies, work may commence on the network transformer with the unit energized following all applicable company procedures and the protocols.Page 157 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 157 of 297 (Applicable only to Connecticut and Western Mass) If the records do not indicate that a major maintenance was completed on the unit within the maintenance cycle per the Eversource Maintenance Program or major deficiencies have not been addressed, then the primary feed to the unit will be deenergized prior to commencement of maintenance work. The maintenance work on the unit will then take place with the unit deenergized, and only the secondary cables will be energized back from the street grid during the work. This will only apply to single transformer vault units. • The deficiencies described below, require the primary circuit to be de-energize in accordance with the operating policy. o Major maintenance not performed within the maintenance cycle required by the Eversource maintenance manual o Low oil level (below sight glass / gauge level) in primary switch or transformer or dielectric quality of oil below acceptable level o Any other significant defect or abnormal condition that may affect the safe operation of the network protector or transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage / corrosion in the network protector or other defect that requires immediate repair to return to service. For cases where multiple network transformers exist in a vault, it will generally not be possible to de-energize all of those units for a variety of reasons. Therefore, prior to working on a network transformer, where multiple network transformers exist in a vault, maintenance records shall be reviewed for major deficiencies and/or major maintenance completion within the maintenance cycle per the Eversource Maintenance Program prior to working in the vault. • If records indicate that major maintenance for all transformers within the vault is up-to-date, and that there are no major deficiencies, then work may proceed. • If major deficiencies or major maintenance was not completed, management will jointly work with employees for the appropriate steps to follow. With the exception of the commissioning of a new network unit, 480V/277V network units shall have major maintenance completed with the primary de-energized. 216V/125V network units may be worked on with the primary energized as long as no oil work (i.e. oil sampling, topping off and/or retro-filling) is being performed. • Network major maintenance that includes any oil work (i.e. primary equipment oil sampling, topping off or the like) shall only be completed with the primary equipment de-energized Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior • 6. 7. 8.Page 158 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 158 of 297 9. 10. to beginning the job. These include cones, signage, and police or traffic control. Check holes prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis. Review the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. Prepare the vault for entry. a) Check for dangerous atmospheric conditions before entering the vault using company-approved atmospheric sampling equipment b) Ventilate the vault, if required, in accordance with the NU System Employee Safety & Health Handbook. c) Remove any standing water or debris from the vault in accordance with ENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. Routine Inspection – Energized 1. 2. Check for stray voltage in accordance with EMP 6.62 - Touch Potential Record the fluid level in the transformer using the liquid level gauge. The level should be between mid-scale and below top of scale (i.e. high but visible) If there is no oil indication, immediately stop the job and notify Supervision. CAUTION Continued operation of a Network Transformer with an abnormal main tank oil level requires Manager level approval. NOTE: Some transformers are equipped with magnetic mount oil gauges. These should be removed, cleaned and remounted to ensure their 3. 4. 5. 6. Look for any other defect or abnormal condition that may affect the operation of the network transformer. Verify the transformer nomenclature, if applicable. Clean or replace as necessary. • Ensure the work order matches the transformer ID tag and that all identification and location numbers are correct. • Ensure the PCB tag is in place. Replace as necessary. Ensure that the high voltage switch position nameplates and nomenclature are visible and secure. Clean or replace as necessary. Verify the high voltage switch is closed.Page 159 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 159 of 297 7. Check the primary cables for leaking or damaged splices, indications of tracking, and adequate cable support. 8. Check for transformer leaks. • Cooling Radiator (if present) • Leaking Termination (stuffing) box (if applicable) • Leaking Potheads (if applicable) Fix those that you can by tightening connections, etc. Report those leaks that can’t be fixed at the time of this maintenance call. 9. Check the high voltage switch, including the termination compartment, when applicable, for leaks. Report those leaks that can’t be fixed at the time of this maintenance call. 10. Check the transformer and the high voltage switch for any abnormalities such as: • Severe rust – or corrosion from road salt • Physical damage from falling concrete, vandalism, failed mounting rails, etc. • Indications of overheating 11. Record the fluid level in the high voltage switch using the gauge. The level should be between mid-scale and below top of scale (i.e. high but visible) NOTE: A new high voltage switch has one compartment and the fluid level is obtainable. For an older high voltage switch with two compartments, the fluid level in the termination compartment MAY NOT be verified with the transformer energized. 12. 13. 14. 15. 16. 17. Record the peak temperature, if the gauge has a drag hand, and present temperature of the fluid in the transformer from the gauge. Reset the drag hand (if installed) to the present reading. Observe the primary connections on the high voltage switch for any unusual conditions such as cracked lead wipe, discolored high voltage connection, signs of heat, etc. Check the condition of the valve handles to ensure they are in good condition. Ensure the valves are closed and that there are no leaks. Ensure the transformer and protector have separate grounds to the ground grid or vault ground rod. Do not rely on the mount support to act as a ground for the protector. Check for the presence of anodes and the condition of their connections (if anodes are installed). Replace if needed. Major Maintenance – De-Energized Note: It is acknowledged that switching protocols vary among locations. It is the responsibility of the technician performing the maintenance work to either perform the following steps or to ensure that they have been performed. 1. De-energize the primary network cable.
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026