  1. Page 156 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 156 of 297 • 2. 3. 4. 5. TD 952, “Protection of Personnel Entering Enclosed Spaces” (CL&P, WMECO, and NUSCO only) • TD 955, “Confined Space Requirements” • Eversource Employee Safety Manual • TD -877 Managing Arch Flash Hazards on CL&P Distribution Facilities (CL&P ONLY) Ensure those performing the work are aware that of the following PPE requirements whenever working in Underground Vaults & Manholes: • Safety Glasses with side shields • EH (Electrical Hazard) rated boots • High Voltage gloves • FR (flame resistant) clothing, as specified in TD 211 Whenever “Work” is performed on a network unit as defined in paragraph 5 of this procedure, the following PPE is required : • Protective Arc Flash Hood (Beehive), (Stock Code 442151) or company approved equivalent. • Safety glasses with side shields • Minimum of low voltage (Class 0) rubber gloves (use of High Voltage Rubber Gloves is preferred) • Double layer of full body FR Clothing (i.e., FR shirt and pants plus full body FR coverall) All persons performing “Work” on Network Units as defined below and those persons within the immediate work zone while “Work” is being performed shall wear at minimum double layer full body FR clothing, minimum 25 cal. FR rated hood (beehive type with built-in arc rated face shield), safety glasses and, minimum of low voltage (Class 0) rubber gloves (high voltage rubber gloves preferred). As defined in this document, “Work” includes the following tasks: • Installing or removing transformer links and network fuses • Rolling or racking out the protector • Phasing the unit • Connecting test leads to an energized bus • Obtaining transformer and network voltages • Test probe usage prior to installing links and network fuses • Or any other work performed inside the network protector enclosure with the transformer and/or network bus energized Prior to accessing manholes and vaults to investigate, inspect or work on a network unit in a single transformer vault, the maintenance records for that unit will be reviewed for condition of the unit. • If the records indicate that a major maintenance was completed within the maintenance cycle per the Eversource Maintenance Program and the unit has no major deficiencies, work may commence on the network transformer with the unit energized following all applicable company procedures and the protocols.
  2. Page 157 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 157 of 297 (Applicable only to Connecticut and Western Mass) If the records do not indicate that a major maintenance was completed on the unit within the maintenance cycle per the Eversource Maintenance Program or major deficiencies have not been addressed, then the primary feed to the unit will be deenergized prior to commencement of maintenance work. The maintenance work on the unit will then take place with the unit deenergized, and only the secondary cables will be energized back from the street grid during the work. This will only apply to single transformer vault units. • The deficiencies described below, require the primary circuit to be de-energize in accordance with the operating policy. o Major maintenance not performed within the maintenance cycle required by the Eversource maintenance manual o Low oil level (below sight glass / gauge level) in primary switch or transformer or dielectric quality of oil below acceptable level o Any other significant defect or abnormal condition that may affect the safe operation of the network protector or transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage / corrosion in the network protector or other defect that requires immediate repair to return to service. For cases where multiple network transformers exist in a vault, it will generally not be possible to de-energize all of those units for a variety of reasons. Therefore, prior to working on a network transformer, where multiple network transformers exist in a vault, maintenance records shall be reviewed for major deficiencies and/or major maintenance completion within the maintenance cycle per the Eversource Maintenance Program prior to working in the vault. • If records indicate that major maintenance for all transformers within the vault is up-to-date, and that there are no major deficiencies, then work may proceed. • If major deficiencies or major maintenance was not completed, management will jointly work with employees for the appropriate steps to follow. With the exception of the commissioning of a new network unit, 480V/277V network units shall have major maintenance completed with the primary de-energized. 216V/125V network units may be worked on with the primary energized as long as no oil work (i.e. oil sampling, topping off and/or retro-filling) is being performed. • Network major maintenance that includes any oil work (i.e. primary equipment oil sampling, topping off or the like) shall only be completed with the primary equipment de-energized Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior • 6. 7. 8.
  3. Page 158 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 158 of 297 9. 10. to beginning the job. These include cones, signage, and police or traffic control. Check holes prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis. Review the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. Prepare the vault for entry. a) Check for dangerous atmospheric conditions before entering the vault using company-approved atmospheric sampling equipment b) Ventilate the vault, if required, in accordance with the NU System Employee Safety & Health Handbook. c) Remove any standing water or debris from the vault in accordance with ENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. Routine Inspection – Energized 1. 2. Check for stray voltage in accordance with EMP 6.62 - Touch Potential Record the fluid level in the transformer using the liquid level gauge. The level should be between mid-scale and below top of scale (i.e. high but visible) If there is no oil indication, immediately stop the job and notify Supervision. CAUTION Continued operation of a Network Transformer with an abnormal main tank oil level requires Manager level approval. NOTE: Some transformers are equipped with magnetic mount oil gauges. These should be removed, cleaned and remounted to ensure their 3. 4. 5. 6. Look for any other defect or abnormal condition that may affect the operation of the network transformer. Verify the transformer nomenclature, if applicable. Clean or replace as necessary. • Ensure the work order matches the transformer ID tag and that all identification and location numbers are correct. • Ensure the PCB tag is in place. Replace as necessary. Ensure that the high voltage switch position nameplates and nomenclature are visible and secure. Clean or replace as necessary. Verify the high voltage switch is closed.
  4. Page 159 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 159 of 297 7. Check the primary cables for leaking or damaged splices, indications of tracking, and adequate cable support. 8. Check for transformer leaks. • Cooling Radiator (if present) • Leaking Termination (stuffing) box (if applicable) • Leaking Potheads (if applicable) Fix those that you can by tightening connections, etc. Report those leaks that can’t be fixed at the time of this maintenance call. 9. Check the high voltage switch, including the termination compartment, when applicable, for leaks. Report those leaks that can’t be fixed at the time of this maintenance call. 10. Check the transformer and the high voltage switch for any abnormalities such as: • Severe rust – or corrosion from road salt • Physical damage from falling concrete, vandalism, failed mounting rails, etc. • Indications of overheating 11. Record the fluid level in the high voltage switch using the gauge. The level should be between mid-scale and below top of scale (i.e. high but visible) NOTE: A new high voltage switch has one compartment and the fluid level is obtainable. For an older high voltage switch with two compartments, the fluid level in the termination compartment MAY NOT be verified with the transformer energized. 12. 13. 14. 15. 16. 17. Record the peak temperature, if the gauge has a drag hand, and present temperature of the fluid in the transformer from the gauge. Reset the drag hand (if installed) to the present reading. Observe the primary connections on the high voltage switch for any unusual conditions such as cracked lead wipe, discolored high voltage connection, signs of heat, etc. Check the condition of the valve handles to ensure they are in good condition. Ensure the valves are closed and that there are no leaks. Ensure the transformer and protector have separate grounds to the ground grid or vault ground rod. Do not rely on the mount support to act as a ground for the protector. Check for the presence of anodes and the condition of their connections (if anodes are installed). Replace if needed. Major Maintenance – De-Energized Note: It is acknowledged that switching protocols vary among locations. It is the responsibility of the technician performing the maintenance work to either perform the following steps or to ensure that they have been performed. 1. De-energize the primary network cable.
  5. Page 160 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 160 of 297 2. 3. 4. Ensure the cable is de-energized. • For those installations in which the primary network cables have a rack in ground and test device, rack in the ground and test device and then perform a live – dead– live test with a noisy tester. • For those installations in which the primary network cables do not have a rack in ground test device, perform a live – dead – live test with an approved tester, and then install grounds on the cable just above the pothead. • When the network transformer is de-energized, there will be no audible hum or vibration. Ensure the network protector is in the Open position, in manual mode, and locked in order to prevent unintentional operation. Verify the high side switch is closed. Warning: You must obtain permission from Dispatch before operating the high side switch on a network transformer. (CL&P and WMECO ONLY) Warning: There have been instances in which the roll pin that connects the high side switch handle to the operating shaft has failed on Carte transformers. This has allowed the handle to move without actually rotating the operating shaft, thereby causing a false reading of the switch’s position. 5. On Carte transformers, inspect the pin that connects the high side switch handle to the operating shaft. Replace it with a new, solid pin if it shows any signs of corrosion or damage. 6. Obtain a fluid sample from the transformer and the high voltage switch and replenish the fluids. • Record the date and quantity of oil added to the main tank to replenish level in the Network Transformer • Refer to TD202 to ensure compliance with ChemLab requirements. • Submit the fluid samples for testing 7. Pressure-test the transformer main tank and the high voltage switch. Slowly pressurize each with nitrogen to 3.0 PSI (or Manufacturer’s recommendations). Once stabilized, pressure should remain greater than 2.8 PSI for 30 minutes. • When the test passes, reduce the pressure to 0.5 PSI. • If the test fails, further investigation is required. Notify Supervision
  6. Page 161 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 161 of 297 Network Transformer Form Routine - Energized EMP 6.30-1 Guideline INSPECT INSPECTION ATTRIBUTES 1 2 Stray Voltage Check for stray voltage in accordance with EMP 6.62 - Touch Potential Check The Transformer Fluid Level 3 Significant Defect Or Abnormal Condition 4 Verify The Transformer Nomenclature 5 6 PCB Tag The level should be between mid-scale and below top of scale (i.e. high but visible) If there is no oil indication, stop the job and notify Supervision Look for any other significant defect or abnormal condition that may affect the safe operation of the network transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage / corrosion in the network protector or other defect Ensure the work order matches the transformer ID tag and that all identification and location numbers are correct. Clean or replace as necessary. Ensure it is in place. Replace as necessary 7 High Voltage Switch Position Nameplates High Voltage Switch 8 Primary Cables & Connections 9 Leaks 10 11 High Voltage Switch Fluid Level Temperature 12 Valves 13 Grounds 14 Corrosion Protection Ensure that the nameplate and nomenclature are visible and secure. Clean or replace as necessary 1. Verify it is closed 2. When applicable, Check the high voltage switch for leaks (including the termination compartment) Check for any unusual conditions including: • indications of tracking, • adequate cable support • leaking or damaged splices, • cracked lead wipe • discolored high voltage connection, • signs of overheating 1. Check for transformer leaks. 2. Check for Leaking Termination (stuffing) box. 3. Check for Leaking Potheads 4. high voltage switch, including the termination compartment Record the fluid level in the high voltage switch. The level should be between mid-scale and below top of scale (i.e. high but visible) Record the peak temperature, if the gauge has a drag hand, and present temperature of the fluid in the transformer from the gauge. Reset the drag hand (if installed) to the present reading 1. Check the condition of the valve handles to ensure they are in good condition. 2. Ensure the valves are closed and that there are no leaks Ensure the transformer and protector have separate grounds to the ground grid or vault ground rod. Do not rely on the mount support to act as a ground for the protector Check for the presence of anodes and the condition of their connections (if anodes are installed). Replace if needed
  7. Page 162 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 162 of 297 Network Transformer Form Routine – De-Energized EMP 6.30-1 Guideline INSPECT INSPECTION ATTRIBUTES Primary Cable De-energize the primary network cable and ensure it is de-energized 1 Ensure the network protector is in the Open position, in manual Network 2 3 Protector High Side Switch 4 Fluid Sample 5 Pressure Test mode, and locked in order to prevent unintentional operation Verify the high side switch is closed. On Carte transformers, inspect the pin that connects the high side switch handle to the operating shaft. Replace it with a new, solid pin if it shows any signs of corrosion or damage Obtain a fluid sample from the transformer and the high voltage switch and replenish the fluids. • Refer to TD202 to ensure compliance with ChemLab requirements. • Record the date and quantity of oil added to the main tank to replenish level in the Network Transformer • Submit the fluid samples for testing Pressure-test the transformer main tank and the high voltage switch. Slowly pressurize each with nitrogen to 3.0 PSI (or Manufacturer’s recommendations). Once stabilized, pressure should remain greater than 2.8 PSI for 30 minutes. • When the test passes, reduce the pressure to 0.5 PSI. • If the test fails, further investigation is required. Notify Supervision
  8. Page 163 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 163 of 297 APPENDIX 13 UNDERGROUND NETWORK PROTECTORS
  9. Page 164 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 164 of 297 5.29 - Network Protectors (NPs) General Description A network protector is an air circuit breaker and relay scheme (network protector mechanism) connected between the secondary side of a network transformer and the secondary network grid. The network protector is designed to perform the following three basic functions: •Open on reverse power (flow of energy from the network into the transformer) •Close on system conditions that allow for power flow into the secondary networks •Close on a de-energized secondary network. Incorporated in the design of the network protector are network protector fuses. These fuses provide backup protection should the network protector fail to open during faults on the primary feeder. Network protectors fall under two categories – Live Front and Dead Front designs. •Live front network protectors have exposed energized parts. The live front network protectors require the removal of the network protector fuses and transformer links to rack the breaker mechanism out of the enclosure to perform maintenance activities, (CM22 and MG8/9 styles). This type of network protector utilizes a motor close mechanism to close the network protector contacts. •Dead front network protectors have all energized parts insulated or isolated. This type of protector uses a spring charge, to close the network protector contacts (CMD and CM52 styles). The spring is charged by a motor, which then releases the stored energy to close the protector contacts. The maintenance requirements for the following network protectors are provided in separate sections for each model. • CMD • CM-22 • CM-52 • MG 8/9 Network Maintenance shall be performed in accordance with TD871. NOTE: All specific maintenance requirements that are followed by a triangle symbol “▲” are explained in the Network Protectors Maintenance Basis Documentation section of this chapter.
  10. Page 165 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 165 of 297 Facilities/Equipment Street and spot networks 5.29.1 Inspection and Maintenance Activity Schedules 5.29.1.1 Table 1 - Network Protectors Maintenance Intervals Network Protector Type NETWORK PROTECTOR Maintenance Schedule CMD – DTA or CTD Actuation Section 5.1.2 CM-22 CM-52 MG 8/9 Section 5.1.4 Section 5.1.5 DTA CTD Section 5.1.3 A/R A/R A/R A/R A/R 1Y 1Y 1Y 1Y 1Y 2Y (Note 1) 2Y 2Y 4Y (2Y) (Note 2) 2Y PM Task Condition Monitoring Any defects found during Routine Inspection, such as worn contacts, rust, failed pressure test, excessive operation count, etc. Time-Directed Routine Inspection – Energized ▲ Major Maintenance – De-Energized ▲ Condition-Based Major Maintenance – All models Counter over 500 Ops since last Annual Inspection Failure Finding Equipment Failure Reporting System used by your region (EFRS, UPER, Cascade etc.) R R R R R Failure Investigation A/R A/R A/R A/R A/R Scheduling Requirements Perform together with Network Transformer Maintenance In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for a Major Maintenance on the CM-22 is 2Y (or 2 years). The abbreviations used for the intervals are: A/R = As Required CTD = Capacitive Trip Device DTA = Direct Trip Actuator R = Required M = Month, i.e. 1M = 1 Month Y = Year, i.e. 2Y = 2 Years Note 1 = Convert all DTA actuators to CTD at the NP’s next Major Maintenance (unless the NP is being taken out of service). ▲ Conversion kits with instructions are available: Stock Code0000446777 for 480 volt CMDs and 0000446778 for 216 volt CMDs. Note 2 = For the CM-52 Network Protectors, a Major Maintenance shall be considered based upon the number of operations, 2Y after the initial installation date and subsequently every 4Y.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026