  1. Page 161 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 161 of 297 Network Transformer Form Routine - Energized EMP 6.30-1 Guideline INSPECT INSPECTION ATTRIBUTES 1 2 Stray Voltage Check for stray voltage in accordance with EMP 6.62 - Touch Potential Check The Transformer Fluid Level 3 Significant Defect Or Abnormal Condition 4 Verify The Transformer Nomenclature 5 6 PCB Tag The level should be between mid-scale and below top of scale (i.e. high but visible) If there is no oil indication, stop the job and notify Supervision Look for any other significant defect or abnormal condition that may affect the safe operation of the network transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage / corrosion in the network protector or other defect Ensure the work order matches the transformer ID tag and that all identification and location numbers are correct. Clean or replace as necessary. Ensure it is in place. Replace as necessary 7 High Voltage Switch Position Nameplates High Voltage Switch 8 Primary Cables & Connections 9 Leaks 10 11 High Voltage Switch Fluid Level Temperature 12 Valves 13 Grounds 14 Corrosion Protection Ensure that the nameplate and nomenclature are visible and secure. Clean or replace as necessary 1. Verify it is closed 2. When applicable, Check the high voltage switch for leaks (including the termination compartment) Check for any unusual conditions including: • indications of tracking, • adequate cable support • leaking or damaged splices, • cracked lead wipe • discolored high voltage connection, • signs of overheating 1. Check for transformer leaks. 2. Check for Leaking Termination (stuffing) box. 3. Check for Leaking Potheads 4. high voltage switch, including the termination compartment Record the fluid level in the high voltage switch. The level should be between mid-scale and below top of scale (i.e. high but visible) Record the peak temperature, if the gauge has a drag hand, and present temperature of the fluid in the transformer from the gauge. Reset the drag hand (if installed) to the present reading 1. Check the condition of the valve handles to ensure they are in good condition. 2. Ensure the valves are closed and that there are no leaks Ensure the transformer and protector have separate grounds to the ground grid or vault ground rod. Do not rely on the mount support to act as a ground for the protector Check for the presence of anodes and the condition of their connections (if anodes are installed). Replace if needed
  2. Page 162 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 162 of 297 Network Transformer Form Routine – De-Energized EMP 6.30-1 Guideline INSPECT INSPECTION ATTRIBUTES Primary Cable De-energize the primary network cable and ensure it is de-energized 1 Ensure the network protector is in the Open position, in manual Network 2 3 Protector High Side Switch 4 Fluid Sample 5 Pressure Test mode, and locked in order to prevent unintentional operation Verify the high side switch is closed. On Carte transformers, inspect the pin that connects the high side switch handle to the operating shaft. Replace it with a new, solid pin if it shows any signs of corrosion or damage Obtain a fluid sample from the transformer and the high voltage switch and replenish the fluids. • Refer to TD202 to ensure compliance with ChemLab requirements. • Record the date and quantity of oil added to the main tank to replenish level in the Network Transformer • Submit the fluid samples for testing Pressure-test the transformer main tank and the high voltage switch. Slowly pressurize each with nitrogen to 3.0 PSI (or Manufacturer’s recommendations). Once stabilized, pressure should remain greater than 2.8 PSI for 30 minutes. • When the test passes, reduce the pressure to 0.5 PSI. • If the test fails, further investigation is required. Notify Supervision
  3. Page 163 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 163 of 297 APPENDIX 13 UNDERGROUND NETWORK PROTECTORS
  4. Page 164 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 164 of 297 5.29 - Network Protectors (NPs) General Description A network protector is an air circuit breaker and relay scheme (network protector mechanism) connected between the secondary side of a network transformer and the secondary network grid. The network protector is designed to perform the following three basic functions: •Open on reverse power (flow of energy from the network into the transformer) •Close on system conditions that allow for power flow into the secondary networks •Close on a de-energized secondary network. Incorporated in the design of the network protector are network protector fuses. These fuses provide backup protection should the network protector fail to open during faults on the primary feeder. Network protectors fall under two categories – Live Front and Dead Front designs. •Live front network protectors have exposed energized parts. The live front network protectors require the removal of the network protector fuses and transformer links to rack the breaker mechanism out of the enclosure to perform maintenance activities, (CM22 and MG8/9 styles). This type of network protector utilizes a motor close mechanism to close the network protector contacts. •Dead front network protectors have all energized parts insulated or isolated. This type of protector uses a spring charge, to close the network protector contacts (CMD and CM52 styles). The spring is charged by a motor, which then releases the stored energy to close the protector contacts. The maintenance requirements for the following network protectors are provided in separate sections for each model. • CMD • CM-22 • CM-52 • MG 8/9 Network Maintenance shall be performed in accordance with TD871. NOTE: All specific maintenance requirements that are followed by a triangle symbol “▲” are explained in the Network Protectors Maintenance Basis Documentation section of this chapter.
  5. Page 165 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 165 of 297 Facilities/Equipment Street and spot networks 5.29.1 Inspection and Maintenance Activity Schedules 5.29.1.1 Table 1 - Network Protectors Maintenance Intervals Network Protector Type NETWORK PROTECTOR Maintenance Schedule CMD – DTA or CTD Actuation Section 5.1.2 CM-22 CM-52 MG 8/9 Section 5.1.4 Section 5.1.5 DTA CTD Section 5.1.3 A/R A/R A/R A/R A/R 1Y 1Y 1Y 1Y 1Y 2Y (Note 1) 2Y 2Y 4Y (2Y) (Note 2) 2Y PM Task Condition Monitoring Any defects found during Routine Inspection, such as worn contacts, rust, failed pressure test, excessive operation count, etc. Time-Directed Routine Inspection – Energized ▲ Major Maintenance – De-Energized ▲ Condition-Based Major Maintenance – All models Counter over 500 Ops since last Annual Inspection Failure Finding Equipment Failure Reporting System used by your region (EFRS, UPER, Cascade etc.) R R R R R Failure Investigation A/R A/R A/R A/R A/R Scheduling Requirements Perform together with Network Transformer Maintenance In Table 1, the intersection of the row and column indicate the inspection or maintenance interval for the equipment in the column heading. For example, the interval for a Major Maintenance on the CM-22 is 2Y (or 2 years). The abbreviations used for the intervals are: A/R = As Required CTD = Capacitive Trip Device DTA = Direct Trip Actuator R = Required M = Month, i.e. 1M = 1 Month Y = Year, i.e. 2Y = 2 Years Note 1 = Convert all DTA actuators to CTD at the NP’s next Major Maintenance (unless the NP is being taken out of service). ▲ Conversion kits with instructions are available: Stock Code0000446777 for 480 volt CMDs and 0000446778 for 216 volt CMDs. Note 2 = For the CM-52 Network Protectors, a Major Maintenance shall be considered based upon the number of operations, 2Y after the initial installation date and subsequently every 4Y.
  6. Page 166 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 166 of 297 Note 3 = For units which are remotely monitored and alarmed on a continuous basis, utilizing SCADA or equivalent, for Pressure, Temperature, Voltage, Current and Oil Level the major maintenance may be extended to a four (4) year frequency. 5.29.2 CMD Maintenance Categories CONDITION MONITORING See Section 5.29.7. TIME DIRECTED 5.29.2.1 CMD Routine Inspection - Energized ▲ Refer to EMP Instruction 6.29A&B for details 5.29.2.2 CMD Major Maintenance ▲ Refer to EMP Instruction 6.29A&B for details 5.29.2.3 Failure Finding A failure report shall be completed for any network protector failure in the specific equipment failure reporting system used by each operating company (EFRS, UPER, Cascade, etc.). Analysis of network protector failures should be performed when deemed necessary by Distribution Standards. 5.29.2.4 CM-22 References: • Eaton, Cutler Hammer, Type CMD Network Protectors 1875 to 3000A, Instruction Bulletin I.B. 35-552-G. • Eaton Network Protector Training Seminar, Handout • IEEE Standard Requirements for Secondary Network Protectors, IEEE std. C57.12.44-2006 5.29.3 CM-52 Maintenance Categories CONDITION MONITORING See Section 5.29.7. TIME DIRECTED 5.29.3.1 CM-52 Routine Inspection - Energized ▲ Refer to EMP Instruction 6.29 for details 5.29.3.2 CM-52 Major Maintenance ▲ Refer to EMP Instruction 6.29A&D for details 5.29.3.3 Failure Finding A failure report shall be completed for any network protector failure in the specific equipment failure reporting system used by each operating company (EFRS, UPER, Cascade, etc.). Analysis of network protector failures should be performed when deemed necessary by Distribution Standards.
  7. Page 167 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 167 of 297 5.29.3.4 CM-52 References: • Richards NP Instruction Manual, Type 313NP, 800 to 3500 Amperes, IM 1223-001B. • Eaton Network Protector Training Seminar, Handout • IEEE Standard Requirements for Secondary Network Protectors, IEEE std. C57.12.44-2006. • Richards Manufacturing Network Protector Training Book • Eversource Employee Safety Manual 5.29.4 CM-52 Maintenance Categories CONDITION MONITORING See Section 5.1.7. TIME DIRECTED 5.29.4.1 CM-52 Routine Inspection - Energized ▲ Refer to either EMP Instruction 6.29A or EMP Instruction 5.29.4.2 CM-52 Major Maintenance ▲ Refer to either EMP Instruction 6.29A 5.29.4.3 Failure Finding A failure report shall be completed for any network protector failure in the specific equipment failure reporting system used by each operating company (EFRS, UPER, Cascade, etc.). Analysis of network protector failures should be performed when deemed necessary by Distribution Standards. 5.29.4.4 CM-52 References: • Eaton, Cutler Hammer, Type CM52 Network Protectors 1875 to 3000A, Instruction Bulletin I.B. 35-552-G • Eaton Network Protector Training Seminar, Handout • IEEE Standard Requirements for Secondary Network Protectors, IEEE std. C57.12.44-2006. 5.29.5 MG 8/9 Maintenance Categories CONDITION MONITORING See Section 5.29.7. TIME DIRECTED 5.29.5.1 MG 8/9 Routine Inspection - Energized ▲ Refer to EMP Instruction 6.29A&C for details 5.29.5.2 MG 8/9 Major Maintenance ▲ Refer to EMP Instruction 6.29A&C for details
  8. Page 168 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 168 of 297 5.29.5.3 Failure Finding A failure report shall be completed for any network protector failure in the specific equipment failure reporting system used by each operating company (EFRS, UPER, Cascade, etc.). Analysis of network protector failures should be performed when deemed necessary by Distribution Standards. 5.29.5.4 MG 8/9 References: • Richards NP Instruction Manual, Type 137NP, 800 to 3500 Amperes, IM 1224-001B. • GE Network Protector Maintenance Manual, MG8 Network Protector • Eaton Network Protector Training Seminar, Handout • IEEE Standard Requirements for Secondary Network Protectors, IEEE std. C57.12.44-2006 5.29.6 Network Protectors Maintenance Basis Documentation The maintenance activities and their schedules are based on industry experience, manufacturer’s recommendations, and recommendations from the Maintenance Standardization Working Group (representing all three operating companies), and the subject matter expert. Specific determinations are provided for each of the four NP types. 5.29.6.1 CMD Maintenance Activity Basis Requirement Perform a 1-Year Routine Inspection - Energized. Perform a 2-Year Major Maintenance. Perform Insulation Resistance Test of the NP mechanism only. Adjust contact pressure 1 month after initial installation. Check the operations counter 1 month after initial installation at time of the contact pressure check. Basis The manufacturer recommends Major Maintenance at this interval, but an annual Routine Inspection has been proven to find minor defects before they affect protector performance. The Mfr recommends a 1-Year Major Maintenance interval, but many years of historical data have proven that a 2-Year Major Maintenance interval provides acceptable equipment performance. The manufacturer recommends performing dielectric tests as described in Bulletin I.B. 35-500-1E on the enclosure and the NP mechanism. Performing dielectric tests on the transformer bus and network bus within a network protector enclosure is impractical in the field due to the fact that the enclosure bus (network and transformer) would have be isolated from the network secondaries and transformer secondary terminals. The Eaton Network Protector Training Seminar indicated that an insulation resistance test should be performed on the network protector mechanism to indicate the condition of the insulating material in the protector. Insulation resistance tests have recently been implemented at Eversource and have identified a number of easily correctable conditions helping to improve reliability of the protectors. The mechanism GPO-3 structure will relax and may result in a change of contact pressure, causing the protector not to open completely. This is recommended by the manufacturer. No new installations of the CMD NP are planned at this time. The manufacturer recommends a check of the operations counter 30-90 days following initial installation. The operations counter can indicate if the protector is operating excessively. The 1 month
  9. Page 169 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 169 of 297 Replace all CMD DTA actuators with Capacitor Trip Device (CTD) at 1st Major Maintenance following their identification. Perform a Major Maintenance if the protector has operated over 500 times in an year. interval is satisfactory and saves the second postinstallation inspection. No new installations of the CMD NP are planned at this time. The manufacturer recommends this retrofit to improve reliability of the Network Protector. DTA actuators have a failure history with Eversource and at least one other utility. CTD actuators are proven to be more reliable. A high number of network protector operations may indicate a problem with the network protector, requiring maintenance, relay adjustment, etc. The majority of network protectors relays installed at Eversoruce are electromechanical relays. Electromechanical relay setpoints are known to change overtime and may require adjustment to ensure proper operation of the network protector. This requirement ensures that the relays are operating correctly and are properly adjusted for system conditions. 5.29.6.2 CM-22 Maintenance Activity Basis Requirement Perform a 1-Year Routine Inspection - Energized Perform a 2-Year Major Maintenance. Perform Insulation Resistance Test of the NP mechanism only. Perform a Major Maintenance if the protector has operated over 500 times in an year. Basis The manufacturer recommends Major Maintenance at this interval, but based on Eversource’s operating experience, an annual Routine Inspection has been proven to find minor defects before they affect protector performance. The Mfr recommends a 1-Year Major Maintenance interval, but many years of historical data have proven that a 2-Year Major Maintenance interval provides acceptable equipment performance. The manufacturer recommends performing dielectric tests as described in Bulletin I.B. 35500-1E on the enclosure and the NP mechanism. Performing dielectric tests on the transformer bus and network bus within a network protector enclosure is impractical in the field due to the fact that the enclosure bus (network and transformer) would have to be isolated from the network secondary and transformer secondary terminals. The Eaton Network Protector Training Seminar indicated that an insulation resistance test should be performed on the network protector mechanism to indicate the condition of the insulating material in the protector. Insulation resistance tests have recently been implemented at Eversource and have identified a number of easily correctable conditions helping to improve reliability of the protectors. A high number of network protector operations may indicate a problem with the network protector, requiring maintenance, relay adjustment, etc. The majority of network protectors relays installed at Eversource are electromechanical relays. Electromechanical relay set points are known to change over time and may require adjustment to ensure proper operation of the network protector. This requirement ensures that the relays are
  10. Page 170 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 170 of 297 operating correctly and are properly adjusted for system conditions. 5.29.6.3 CM-52 Maintenance Activity Basis Requirement Basis Perform a 1-Year Routine Inspection - Energized. Perform Major Maintenance on a 4-Year interval. This is based on the manufacturer’s recommendation and company experience. The manufacturer recommends a 5-Year interval for Major Maintenance. The first Major Maintenance is performed 2Y after installation to ensure it was properly installed. After that, the 4Yr cycle allows us to better coordinate maintenance scheduling with other system maintenance. Perform Insulation Resistance Test of the NP mechanism only. The manufacturer recommends performing dielectric tests as described in Bulletin I.B. 35-5001E on the enclosure and the NP mechanism. Performing dielectric tests on the transformer bus and network bus within a network protector enclosure is impractical in the field due to the fact that the enclosure bus (network and transformer) would have to be isolated from the network secondary and transformer secondary terminals. The Eaton Network Protector Training Seminar indicated that an insulation resistance test should be performed on the network protector mechanism to indicate the condition of the insulating material in the protector. Insulation resistance tests have recently been implemented at Eversource and have identified a number of easily correctable conditions helping to improve reliability of the protectors. Perform a Major Maintenance if the protector has operated over 500 times in an year. A high number of network protector operations may indicate a problem with the network protector, requiring maintenance, relay adjustment, etc. The majority of network protectors relays installed at Eversource are electromechanical relays. Electromechanical relay set points are known to change over time and may require adjustment to ensure proper operation of the network protector. This requirement ensures that the relays are operating correctly and are properly adjusted for system conditions. 5.29.6.4 MG 8/9 Maintenance Activity Basis Requirement Perform a 1-Year Routine Inspection - Energized Perform a 2-Year Major Maintenance. Perform insulation resistance tests Basis Richards Mfg recommends cycle count checks at 24 hours, 48 hours, 1 week, 1 month, 6 months and yearly following initial installation. Based on experience, it has been determined that annual inspections are adequate for detecting excessive cycling. The Mfr recommends a 1-Year Major Maintenance interval, but many years of historical data have proven that a 2-Year Major Maintenance interval provides acceptable equipment performance. Richards Mfg NP instruction Manual, Type 137,
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)