Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 166 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 166 of 297 Note 3 = For units which are remotely monitored and alarmed on a continuous basis, utilizing SCADA or equivalent, for Pressure, Temperature, Voltage, Current and Oil Level the major maintenance may be extended to a four (4) year frequency. 5.29.2 CMD Maintenance Categories CONDITION MONITORING See Section 5.29.7. TIME DIRECTED 5.29.2.1 CMD Routine Inspection - Energized ▲ Refer to EMP Instruction 6.29A&B for details 5.29.2.2 CMD Major Maintenance ▲ Refer to EMP Instruction 6.29A&B for details 5.29.2.3 Failure Finding A failure report shall be completed for any network protector failure in the specific equipment failure reporting system used by each operating company (EFRS, UPER, Cascade, etc.). Analysis of network protector failures should be performed when deemed necessary by Distribution Standards. 5.29.2.4 CM-22 References: • Eaton, Cutler Hammer, Type CMD Network Protectors 1875 to 3000A, Instruction Bulletin I.B. 35-552-G. • Eaton Network Protector Training Seminar, Handout • IEEE Standard Requirements for Secondary Network Protectors, IEEE std. C57.12.44-2006 5.29.3 CM-52 Maintenance Categories CONDITION MONITORING See Section 5.29.7. TIME DIRECTED 5.29.3.1 CM-52 Routine Inspection - Energized ▲ Refer to EMP Instruction 6.29 for details 5.29.3.2 CM-52 Major Maintenance ▲ Refer to EMP Instruction 6.29A&D for details 5.29.3.3 Failure Finding A failure report shall be completed for any network protector failure in the specific equipment failure reporting system used by each operating company (EFRS, UPER, Cascade, etc.). Analysis of network protector failures should be performed when deemed necessary by Distribution Standards.Page 167 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 167 of 297 5.29.3.4 CM-52 References: • Richards NP Instruction Manual, Type 313NP, 800 to 3500 Amperes, IM 1223-001B. • Eaton Network Protector Training Seminar, Handout • IEEE Standard Requirements for Secondary Network Protectors, IEEE std. C57.12.44-2006. • Richards Manufacturing Network Protector Training Book • Eversource Employee Safety Manual 5.29.4 CM-52 Maintenance Categories CONDITION MONITORING See Section 5.1.7. TIME DIRECTED 5.29.4.1 CM-52 Routine Inspection - Energized ▲ Refer to either EMP Instruction 6.29A or EMP Instruction 5.29.4.2 CM-52 Major Maintenance ▲ Refer to either EMP Instruction 6.29A 5.29.4.3 Failure Finding A failure report shall be completed for any network protector failure in the specific equipment failure reporting system used by each operating company (EFRS, UPER, Cascade, etc.). Analysis of network protector failures should be performed when deemed necessary by Distribution Standards. 5.29.4.4 CM-52 References: • Eaton, Cutler Hammer, Type CM52 Network Protectors 1875 to 3000A, Instruction Bulletin I.B. 35-552-G • Eaton Network Protector Training Seminar, Handout • IEEE Standard Requirements for Secondary Network Protectors, IEEE std. C57.12.44-2006. 5.29.5 MG 8/9 Maintenance Categories CONDITION MONITORING See Section 5.29.7. TIME DIRECTED 5.29.5.1 MG 8/9 Routine Inspection - Energized ▲ Refer to EMP Instruction 6.29A&C for details 5.29.5.2 MG 8/9 Major Maintenance ▲ Refer to EMP Instruction 6.29A&C for detailsPage 168 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 168 of 297 5.29.5.3 Failure Finding A failure report shall be completed for any network protector failure in the specific equipment failure reporting system used by each operating company (EFRS, UPER, Cascade, etc.). Analysis of network protector failures should be performed when deemed necessary by Distribution Standards. 5.29.5.4 MG 8/9 References: • Richards NP Instruction Manual, Type 137NP, 800 to 3500 Amperes, IM 1224-001B. • GE Network Protector Maintenance Manual, MG8 Network Protector • Eaton Network Protector Training Seminar, Handout • IEEE Standard Requirements for Secondary Network Protectors, IEEE std. C57.12.44-2006 5.29.6 Network Protectors Maintenance Basis Documentation The maintenance activities and their schedules are based on industry experience, manufacturer’s recommendations, and recommendations from the Maintenance Standardization Working Group (representing all three operating companies), and the subject matter expert. Specific determinations are provided for each of the four NP types. 5.29.6.1 CMD Maintenance Activity Basis Requirement Perform a 1-Year Routine Inspection - Energized. Perform a 2-Year Major Maintenance. Perform Insulation Resistance Test of the NP mechanism only. Adjust contact pressure 1 month after initial installation. Check the operations counter 1 month after initial installation at time of the contact pressure check. Basis The manufacturer recommends Major Maintenance at this interval, but an annual Routine Inspection has been proven to find minor defects before they affect protector performance. The Mfr recommends a 1-Year Major Maintenance interval, but many years of historical data have proven that a 2-Year Major Maintenance interval provides acceptable equipment performance. The manufacturer recommends performing dielectric tests as described in Bulletin I.B. 35-500-1E on the enclosure and the NP mechanism. Performing dielectric tests on the transformer bus and network bus within a network protector enclosure is impractical in the field due to the fact that the enclosure bus (network and transformer) would have be isolated from the network secondaries and transformer secondary terminals. The Eaton Network Protector Training Seminar indicated that an insulation resistance test should be performed on the network protector mechanism to indicate the condition of the insulating material in the protector. Insulation resistance tests have recently been implemented at Eversource and have identified a number of easily correctable conditions helping to improve reliability of the protectors. The mechanism GPO-3 structure will relax and may result in a change of contact pressure, causing the protector not to open completely. This is recommended by the manufacturer. No new installations of the CMD NP are planned at this time. The manufacturer recommends a check of the operations counter 30-90 days following initial installation. The operations counter can indicate if the protector is operating excessively. The 1 monthPage 169 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 169 of 297 Replace all CMD DTA actuators with Capacitor Trip Device (CTD) at 1st Major Maintenance following their identification. Perform a Major Maintenance if the protector has operated over 500 times in an year. interval is satisfactory and saves the second postinstallation inspection. No new installations of the CMD NP are planned at this time. The manufacturer recommends this retrofit to improve reliability of the Network Protector. DTA actuators have a failure history with Eversource and at least one other utility. CTD actuators are proven to be more reliable. A high number of network protector operations may indicate a problem with the network protector, requiring maintenance, relay adjustment, etc. The majority of network protectors relays installed at Eversoruce are electromechanical relays. Electromechanical relay setpoints are known to change overtime and may require adjustment to ensure proper operation of the network protector. This requirement ensures that the relays are operating correctly and are properly adjusted for system conditions. 5.29.6.2 CM-22 Maintenance Activity Basis Requirement Perform a 1-Year Routine Inspection - Energized Perform a 2-Year Major Maintenance. Perform Insulation Resistance Test of the NP mechanism only. Perform a Major Maintenance if the protector has operated over 500 times in an year. Basis The manufacturer recommends Major Maintenance at this interval, but based on Eversource’s operating experience, an annual Routine Inspection has been proven to find minor defects before they affect protector performance. The Mfr recommends a 1-Year Major Maintenance interval, but many years of historical data have proven that a 2-Year Major Maintenance interval provides acceptable equipment performance. The manufacturer recommends performing dielectric tests as described in Bulletin I.B. 35500-1E on the enclosure and the NP mechanism. Performing dielectric tests on the transformer bus and network bus within a network protector enclosure is impractical in the field due to the fact that the enclosure bus (network and transformer) would have to be isolated from the network secondary and transformer secondary terminals. The Eaton Network Protector Training Seminar indicated that an insulation resistance test should be performed on the network protector mechanism to indicate the condition of the insulating material in the protector. Insulation resistance tests have recently been implemented at Eversource and have identified a number of easily correctable conditions helping to improve reliability of the protectors. A high number of network protector operations may indicate a problem with the network protector, requiring maintenance, relay adjustment, etc. The majority of network protectors relays installed at Eversource are electromechanical relays. Electromechanical relay set points are known to change over time and may require adjustment to ensure proper operation of the network protector. This requirement ensures that the relays arePage 170 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 170 of 297 operating correctly and are properly adjusted for system conditions. 5.29.6.3 CM-52 Maintenance Activity Basis Requirement Basis Perform a 1-Year Routine Inspection - Energized. Perform Major Maintenance on a 4-Year interval. This is based on the manufacturer’s recommendation and company experience. The manufacturer recommends a 5-Year interval for Major Maintenance. The first Major Maintenance is performed 2Y after installation to ensure it was properly installed. After that, the 4Yr cycle allows us to better coordinate maintenance scheduling with other system maintenance. Perform Insulation Resistance Test of the NP mechanism only. The manufacturer recommends performing dielectric tests as described in Bulletin I.B. 35-5001E on the enclosure and the NP mechanism. Performing dielectric tests on the transformer bus and network bus within a network protector enclosure is impractical in the field due to the fact that the enclosure bus (network and transformer) would have to be isolated from the network secondary and transformer secondary terminals. The Eaton Network Protector Training Seminar indicated that an insulation resistance test should be performed on the network protector mechanism to indicate the condition of the insulating material in the protector. Insulation resistance tests have recently been implemented at Eversource and have identified a number of easily correctable conditions helping to improve reliability of the protectors. Perform a Major Maintenance if the protector has operated over 500 times in an year. A high number of network protector operations may indicate a problem with the network protector, requiring maintenance, relay adjustment, etc. The majority of network protectors relays installed at Eversource are electromechanical relays. Electromechanical relay set points are known to change over time and may require adjustment to ensure proper operation of the network protector. This requirement ensures that the relays are operating correctly and are properly adjusted for system conditions. 5.29.6.4 MG 8/9 Maintenance Activity Basis Requirement Perform a 1-Year Routine Inspection - Energized Perform a 2-Year Major Maintenance. Perform insulation resistance tests Basis Richards Mfg recommends cycle count checks at 24 hours, 48 hours, 1 week, 1 month, 6 months and yearly following initial installation. Based on experience, it has been determined that annual inspections are adequate for detecting excessive cycling. The Mfr recommends a 1-Year Major Maintenance interval, but many years of historical data have proven that a 2-Year Major Maintenance interval provides acceptable equipment performance. Richards Mfg NP instruction Manual, Type 137,Page 171 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 171 of 297 Perform a Major Maintenance if the protector has operated over 500 times in an year. IM 1224-001A indicates hi-pot testing is not required on MG8/9 NPs. However, CL&P has been performing insulation resistance testing on MG8/9, CM22 and CMD style protectors and have found that insulation resistance testing (Megger) has identified a number of degraded conditions, including degraded arc chutes, and backboards. Repair of these conditions helps to maintain a safe and reliable system. A high number of network protector operations may indicate a problem with the network protector, requiring maintenance, relay adjustment, etc. The majority of network protectors relays installed at Eversource are electromechanical relays. Electromechanical relay set points are known to change over time and may require adjustment to ensure proper operation of the network protector. This requirement ensures that the relays are operating correctly and are properly adjusted for system conditions. Industry Reference Materials The following book provided some general maintenance and testing on electrical equipment as well as provided some general standards to review: • Electrical Power Equipment Maintenance and Testing, Paul Gill The following Standards and codes have been reviewed for relevancy for NP maintenance. No specific requirements were identified. • • • • • • 29CFR 1910, OSHA General Industry Regulations 29CRR 1926, OSHA Construction Industry Regulations ANSI C37.50-1989, American National Standard, Switchgear Low Voltage AC Power Circuit Breakers Used in Enclosures – Test Procedures C57.12.44-2005, IEEE Standard Requirements for Secondary Network Protectors NEMA AB-4-2003, NEMA Standards Publication, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications National Electric Safety Code (NESC) IEEE C2 2007 Failure Findings Failures of network protectors shall be documented in the equipment failure reporting system used by the individual operating companies (EFRS, UPER, Cascade, etc.). Analysis of a failed network protector may be performed as deemed necessary by Distribution Standards. 5.29.7 Condition-based monitoring: Condition-based maintenance can be developed if additional monitoring of the network protector is implemented. This may help to lengthen current maintenance intervals beyond the current cycles. The Cutler Hammer MPCV network protector relays, which are installed in the CM-52 network protectors, have communication capability built in, that can be adapted to and monitoredPage 172 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 172 of 297 by the SCADA system. The CM-52 network protectors were specified with a pressure switch to indicate a loss of pressure within the submersible enclosure. This can trigger a condition-based maintenance activity and allow the unit to be repaired shortly after the defect occurs, as opposed to letting sit un-repaired for the remainder of its inspection interval. This could protect the unit from further damage and add to the reliability of the network. Many Utilities have dedicated feeders supplying only their secondary networks. In a dedicated network system, the operation of network protectors can be verified by deenergizing a single network feeder to determine if all network protectors open. This can provide an indication that the network protectors are operational, which may, with other improvements, be able to extend the maintenance cycle. Eversource has added radial loads off of the network feeders, thus creating non-dedicated network feeders. Non-dedicated network feeders would require significant switching to be able to de-energize a feeder to check the operation of network protectors. As such feeders supplying networks would need to be reconfigured to create a dedicated network to facilitate this operational check. Many parameters can be monitored to develop condition-based maintenance including the following: • Network protector pressure • Transformer voltages • Phase angle • Pumping/Counter • Sump pump alarm • Network voltages • Protector currents • Protector status (open or closed) • General trouble alarm • Protector temperature 6.29 – Network Protector – Routine Inspection - Energized Purpose The Purpose of this inspection is to identify any potential operational problems with Network Protectors prior to their major maintenance cycle. This inspection is intended to be performed with the network protector door closed. CAUTION 1. No modifications to network protectors shall be made, either temporary or permanent, without prior approval of the Distribution Engineering Department 2. Stop the job, place equipment in a safe condition, and contact Supervision if the process does not proceed as expected, if unusual situations occur during the performance of the process, or any significant problems occur during maintenance activities. Before You Begin Prior to assigning work on network protectors, Supervision shall: 1. Prior to assigning personnel to perform “Work” on a network protector, ENSURE the person(s) responsible for performing the “Work” is fully qualified in accordance with operating company requirementsPage 173 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 173 of 297 2. 3. 4. 5. 6. Ensure that all employees are properly trained and qualified to perform this work, and that all appropriate PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • TD 952, “Protection of Personnel Entering Enclosed Spaces” (Connecticut and Western Mass only) • TD 955, “Confined Space Requirements” • Eversource Employee Safety Manual • TD -877 Managing Arch Flash Hazards on CL&P Distribution Facilities (Connecticut ONLY) Ensure those performing the work are aware that of the following PPE requirements whenever working in Underground Vaults & Manholes: • Safety Glasses with side shields • EH (Electrical Hazard) rated boots • High Voltage gloves • FR (flame resistant) clothing, as specified in TD 211 Whenever “Work” is performed on a network unit as defined in paragraph 5 of this procedure, the following PPE is required : • Protective Arc Flash Hood (Beehive), (Stock Code 442151) or company approved equivalent. • Safety glasses with side shields • Minimum of low voltage (Class 0) rubber gloves (use of High Voltage Rubber Gloves is preferred) • Double layer of full body FR Clothing (i.e., FR shirt and pants plus full body FR coverall) All persons performing “Work” on Network Units as defined below and those persons within the immediate work zone while “Work” is being performed shall wear at minimum double layer full body FR clothing, minimum 25 cal. FR rated hood (beehive type with built-in arc rated face shield), safety glasses and, minimum of low voltage (Class 0) rubber gloves (high voltage rubber gloves preferred). As defined in this document, “Work” includes the following tasks: • Installing or removing transformer links and network fuses • Rolling or racking out the protector • Phasing the unit • Connecting test leads to an energized bus • Obtaining transformer and network voltages • Test probe usage prior to installing links and network fuses • Or any other work performed inside the network protector enclosure with the transformer and/or network bus energized Prior to accessing manholes and vaults to investigate, inspect or work on a network unit in a single transformer vault, the maintenance records for that unit will be reviewed for condition of the unit. • If the records indicate that a major maintenance was completed within the maintenance cycle per the Eversource Maintenance Program and the unit has no major deficiencies, work may commence on the network transformer with the unit energized following all applicable company procedures and the protocols. (Applicable only to Connecticut and Western Mass) • If the records do not indicate that a major maintenance was completed on the unit within the maintenance cycle per thePage 174 of 297
7. 8. 9. 10. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 174 of 297 Eversource Maintenance Program or major deficiencies have not been addressed, then the primary feed to the unit will be deenergized prior to commencement of maintenance work. The maintenance work on the unit will then take place with the unit deenergized, and only the secondary cables will be energized back from the street grid during the work. This will only apply to single transformer vault units. • The deficiencies described below, require the primary circuit to be de-energized in accordance with the operating policy. o Major maintenance not performed within the maintenance cycle required by the Eversource Maintenance Program o Low oil level (below sight glass / gauge level) in primary switch or transformer or dielectric quality of oil below acceptable level o Any other significant defect or abnormal condition that may affect the safe operation of the network protector or transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage / corrosion in the network protector or other defect that requires immediate repair to return to service. For cases where multiple network transformers exist in a vault, it will generally not be possible to de-energize all of those units for a variety of reasons. Therefore, prior to working on a network transformer, where multiple network transformers exist in a vault, maintenance records shall be reviewed for major deficiencies and/or major maintenance completion within the maintenance cycle per the Eversource Maintenance Program prior to working in the vault. • If records indicate that major maintenance for all transformers within the vault is up-to-date, and that there are no major deficiencies, then work may proceed. • If major deficiencies or major maintenance was not completed, management will jointly work with employees for the appropriate steps to follow. With the exception of the commissioning of a new network unit, 480V/277V network units shall have major maintenance completed with the primary deenergized. 216V/125V network units may be worked on with the primary energized as long as no oil work (i.e. oil sampling, topping off and/or retrofilling) is being performed. • Network major maintenance that includes any oil work (i.e. primary equipment oil sampling, topping off or the like) shall only be completed with the primary equipment de-energized Job Setup: Work zones, requirements for various jobs, switching requirements. All arrangements should be completed or setup prior to beginning the job. These include cones, signage, and police or traffic control. Check holes prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis. Review the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions.Page 175 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 175 of 297 11. 12. Supervision shall ensure the assigned workers have primer, paint, and any additional material needed for cleaning and preservation of the exterior of the network protector prior to departing the work center. Prepare the vault for entry. • Check for dangerous atmospheric conditions before entering the vault using company-approved atmospheric sampling equipment • Ventilate the vault, if required, in accordance with the Eversource Employee Safety Manual. • Remove any standing water or debris from the vault in accordance with ENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. Procedure 1. 2. 3. Review the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions). These may be in sections of the manual other than with the instructions. Prepare the vault for entry. a) Check for dangerous atmospheric conditions before entering the vault. b) Ventilate the vault, if required, in accordance with the Accident Prevention Manual. c) Remove any standing water or debris from the vault in accordance with ENVIROWI-0105 or company-specific requirements. Clean the exterior of the network protector to facilitate inspection and maintenance of the network protector. Cleaning shall include: a) Removing debris from the top of the enclosure. b) Cleaning all outside surfaces of the enclosure to facilitate corrosion inspection and internal inspections through the network protector enclosure windows. c) Check High and Low side grounds. d) Check the ground connection between the network protector ground pad and the transformer ground pad. NOTE When painting is required, use proper ventilation and respiratory equipment. 4. 5. Inspect the network protector enclosure for chipped, cracked or missing paint, corrosion, etc. Remove any loose paint and/or rust with a wire brush and repaint those areas to prevent further corrosion. Inspect the interior of the network protector through the enclosure door windows for abnormal conditions including but not limited to the following: • Signs of moisture • Blown fuses • Signs of arcing or soot • Noisy operation of any electro-mechanical relays • Network protector relay failure o Check the condition of electro-mechanical relays, when possible.
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026