Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 888, 889, 890

Files5

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match
  1. Page 176 of 297

    6. 7. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 176 of 297 o ETI relays have a scrolling alphanumeric LED display. An ETI relay with no scrolling display indicates a failed relay. o MPCV relays have three lights: Fail, Float, and Trip and Close. A failed relay will have the Fail light lit. Record the current value on the operations counter. If the number of operations is greater than 500 since the last inspection, notify Supervision. For CM-52 network protectors only, verify that all IDM (Indicating Diagnostic Module) LEDs are illuminated. See Figure 1. Figure 1 – The IDM Module Yellow “Power On” Indicates the presence of normal power input to the IDM. Yellow “Motor OK” Indicates a healthy motor and close circuit. Red “Motor Enabled” Indicates that the supply voltage is at or above 73% of nominal and the motor has sufficient power to charge the breaker. Yellow “IDM Trip Enabled” Indicates that the IDM trip portion of the circuit is healthy and is ready to implement a trip, if such conditions should exist. • If the LED is illuminated, the component is in working order. • If the LED is not illuminated, the component or the wiring to the component is damaged. CAUTION For 480 volt network protectors, If the network protector is closed, and there is an exposed, energized copper bus or conductors, do not check for blown limiters or phase currents as required by steps 8 & 9. 8. Inspect for blown limiters, if applicable, as follows (all protectors): a) Determine if the network protector is open or closed. o If the network protector is open, record this on the inspection form and continue to Step 9.
  2. Page 177 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 177 of 297 • • o If the network protector is closed, inspect for blown limiters by using a clamp on current transformer (CT) around each individual secondary cable. If the ammeter reads current, the limiter is good. If the limiter is open, record this condition and alert supervision of the need for corrective action. NOTE A blown limiter on the network protector secondary terminals may indicate a damaged or defective secondary cable that needs to be replaced. 9. Check and record the phase currents on each phase as follows: a) Determine if the network protector is open or closed. o If the network protector is open go to step 10. o If the network protector is closed, check and record current readings using one of the following methods: • Measure current on each phase using a rope style current transformer around all conductors of each phase. or • If an ETI relay is installed, read phase currents from the scrolling display on the relay. 10. Verify the protector enclosure is holding pressure using a pressure gauge/fill device. • If there is positive pressure, it indicates the protector is air-tight. Go on to the next step. • If it is not, perform a leak check on those network protectors with submersible enclosures as follows: a) Pressurize the enclosure with 5 PSI of dry nitrogen. b) Apply a soap solution to the door gaskets, enclosure penetrations, throat gaskets, operating handle gaskets, welds, etc. c) Let this sit for 10 minutes. d) Check for leaks by looking for soap bubbles. Fix any leaks if possible. e) Record any leaks on the inspection form and alert supervision. f) Reduce the pressure within the enclosure to 1.5 PSI. Network Protector Routine – Energized EMP 6.29-1 Guideline INSPECT 1 Clean the exterior of the network protector 2 Check Ground Connections 3 Inspect the network protector enclosure 4 Inspect the interior of the network protector INSPECTION ATTRIBUTES • Removing debris from the top of the enclosure. • Clean all outside surfaces of the enclosure to facilitate corrosion inspection and internal inspections through the network protector enclosure windows. • Check High and Low side grounds. • Check the ground connection between the network protector ground pad and the transformer ground pad. Inspect the network protector enclosure for chipped, cracked or missing paint, corrosion, etc. Remove any loose paint and/or rust with a wire brush and repaint those areas to prevent further corrosion Through the enclosure door windows check for abnormal conditions, including but not limited to the following:
  3. Page 178 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 178 of 297 • • • Signs of moisture Blown fuses Signs of arcing or soot • 5 Network Protector Relay 6 Operations Counter 7 Indicating Diagnostic Module Noisy operation of any electro-mechanical relays Check the condition of electro-mechanical relays, when possible. • ETI relays have a scrolling alphanumeric LED display. An ETI relay with no scrolling display indicates a failed relay. • MPCV relays have three lights: Fail, Float, and Trip and Close. A failed relay will have the Fail light lit Record the current value on the operations counter. If the number of operations is greater than 500 since the last inspection, notify Supervision For CM-52 network protectors only, verify that all IDM (Indicating Diagnostic Module) LEDs are illuminated • If the LED is illuminated, the component is in working order. • 8 Inspect Limiters 9 Phase Currents If the LED is not illuminated, the component or the wiring to the component is damaged Inspect for blown limiters, if applicable, as follows (all protectors): Determine if the network protector is open or closed. • If the network protector is open, record this on the inspection form and go to step 10. • If the network protector is closed, inspect for blown limiters by using a clamp on current transformer (CT) around each individual secondary cable. O If the ammeter reads current, the limiter is good. O If the limiter is open; record this condition and alert supervision of the need for corrective action. Check and record the phase currents on each phase as follows: If the network protector is closed, check and record current readings using one of the following methods: • Measure current on each phase using a rope style current transformers around all conductors of each phase. • 10 Leaks If an ETI relay is installed, read phase currents from the scrolling display on the relay. Verify the protector enclosure is holding pressure using a pressure gauge/fill device. • If there is positive pressure, it indicates the protector is air-tight. . • If it is not, perform a leak check on those network protectors with submersible enclosures per NUMM 6.29 6.29A - CM-52 Network Protectors – Major Maintenance 1. 2. CAUTION No modifications to network protectors shall be made, either temporary or permanent, without prior approval of the Distribution Engineering Department. Stop the job, place equipment in a safe condition, and contact Supervision if the process does not proceed as expected, if unusual situations occur during the performance of the process, or any significant problems occur during maintenance activities. Before You Begin Prior to assigning work on network protectors, Supervision shall:
  4. Page 179 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 179 of 297 1. 2. 3. 4. 4.1 That person(s) responsible for performing the “Work” are properly trained and fully qualified in accordance with operating company requirements.. That all PPE and safety requirements are met, including but not limited to those defined within the following documents: • TD 211, “When to Wear FR Clothing” • TD 952, “Protection of Personnel Entering Enclosed Spaces” (Connecticut, and Western MA only) • TD 955, “Confined Space Requirements” • Eversource Employee Safety Manual • TD -877 Managing Arch Flash Hazards on CL&P Distribution Facilities (Connecticut ONLY) That person(s) responsible for performing the “Work” are aware of the following PPE requirements whenever working in Underground Vaults & Manholes: • Hard Hats • Safety Glasses with side shields (or Goggles) • EH (Electrical Hazard) rated boots • Low and High Voltage gloves • FR (flame resistant) clothing, as specified in TD 211 That person(s) responsible for performing the “Work” on Network Units as defined in paragraph 4.1 below and those person(s) within the immediate work zone, shall at minimum wear the following PPE (Identified in JHA2013-03):: • Protective Arc Flash Hood (Beehive), (Stock Code 442151) or 45 Calorie Rated Knit Hood with Goggles (Stock Code 0457052) or, company-approved equivalent. • Safety glasses with side shields (or Goggles) • Minimum of low voltage (Class 0) rubber gloves (use of High Voltage Rubber Gloves is preferred) • Double layer of full body FR Clothing (i.e., FR shirt and pants plus full body FR coverall). Total FR calorie count must be equal to or greater than 16 calories. Work” on Network Units requiring PPE, identified in paragraph 4, includes the following activities: • Installing or removing network fuses • Rolling or racking out/in the breaker (operating mechanism cassette protector)(Except when using remote racking mechanism with control pendant) • Phasing the unit at the network secondary buses (network fuses removed and breaker closed) • Connecting test leads to an energized bus (Note: Always re-install compartment access shield after test leads are connected) • Obtaining transformer and network voltages on secondary buses • Installing or removing horizontal or vertical barrier boards, after the breaker is racked out to the “Disconnect” position, and fully drawn out. • Any other work performed inside the network protector enclosure with the transformer and/or network bus energized prior to installation of the horizontal and vertical barrier boards. Note: No breaker work is to be performed while the breaker is in “Test” or “Connect” positions.
  5. Page 180 of 297

    5. 5.1 6. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 180 of 297 That once the appropriate horizontal and vertical barrier boards are installed, person(s)responsible for performing the “Work” on Network Units as defined in paragraph 5.1 below and those person(s) within the immediate work zone shall at minimum wear the following PPE (Identified in JHA-201303): • Hard Hat • Full body FR clothing where the total FR calorie count must be equal to or greater than 8 calories • Safety Glasses with Side Shields (or Goggles) • Work gloves as needed Work” on Network Units requiring PPE, identified in paragraph 5, includes the following activities: • Lowering or raising equipment and tools. • Maintenance, Testing and Calibration of the breaker (To perform work on the breaker, the breaker has to be racked out to the “Disconnect” position) • Wiring changes outside the energized area Prior to accessing manholes and vaults to investigate, inspect or work on a network unit in a single transformer vault, the maintenance records for that unit will be reviewed for condition of the unit. • If the records indicate that a major maintenance was completed within the maintenance cycle per the Eversource Maintenance Program and the unit has no major deficiencies, work may commence on the network transformer with the unit energized following all applicable company procedures and the protocols. (Applicable only to Connecticut and Western MA) • If the records do not indicate that a major maintenance was completed on the unit within the maintenance cycle per the Eversource Maintenance Program or major deficiencies have not been addressed, then the primary feed to the unit will be deenergized prior to commencement of maintenance work. The maintenance work on the unit will then take place with the unit deenergized, and only the secondary cables will be energized back from the street grid during the work. This will only apply to single transformer vault units. • The deficiencies described below, require the primary circuit to be de-energized in accordance with the operating policy. o Major maintenance not performed within the maintenance cycle required by the Eversource Maintenance Program o Low oil level (below sight glass / gauge level) in primary switch or transformer or dielectric quality of oil below acceptable level o Any other significant defect or abnormal condition that may affect the safe operation of the network protector or transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage/ corrosion in the network protector or other defect that requires immediate repair to return to service.
  6. Page 181 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 181 of 297 NOTE: The secondaries remain energized to the protector enclosure unless existing deficiencies or conditions require that the secondaries be cut as jointly determined by Management and Field Personnel. 7. That prior to accessing manholes and vaults to investigate, inspect or work on network units where multiple network units exist in a vault, the maintenance records will be reviewed for condition of the units, major deficiencies and/or major maintenance completion within the maintenance cycle per the Eversource Maintenance Program. • If records indicate that major maintenance for all network units within the vault is up-to-date, and that there are no major deficiencies, then work may proceed. • If major deficiencies exist or major maintenance was not completed, management will jointly work with Field Personnel for the appropriate steps to follow. • If any units within the vault have deficiencies, the primaries for the unit being worked on must be de-energized. NOTE: For cases where multiple network units exist in a vault, it will generally not be possible to de-energize multiple units for a variety of reasons. Further actions will be determined jointly by Management and Field Personnel. 8. 9. 10. 11. 12. 13. That with the exception of the commissioning of a new network unit, 480V/277V network units shall have major maintenance completed with the primary de-energized. 216V/125V network units may be worked on with the primary energized as long as no oil work (i.e. oil sampling, topping off and/or retro- filling) is being performed. • Network major maintenance that includes any oil work (i.e. primary equipment oil sampling, topping off or the like) shall only be completed with the primary equipment de-energized That primaries are de-energized and grounded at every network transformer and/or protector whenever installing or replacing a network transformer or protector. That Job Setup is performed. This may include working with local authorities to establish Work zones, determining requirements for various jobs, and switching requirements. All arrangements should be completed and set up prior to beginning the job, which include cones, signage, and police or traffic control. Check holes prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis. Review of the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. That person(s) responsible for performing the “Work” have primer, paint, and any additional material needed for cleaning and preservation of the exterior of the network protector prior to departing the work center That person(s) responsible for performing the “Work”, prepare the vault for entry. • Check for dangerous atmospheric conditions before entering the vault using company-approved atmospheric sampling equipment. • Ventilate the vault, if required, in accordance with the Eversource Employee Safety Manual. • Remove substantial water or debris from the vault in accordance with
  7. Page 182 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 182 of 297 ENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. Network Protector Tools The following fully insulated tools are available and may be useful for Network Protector Service: Tool Description NU Stock Code Wrench, Torque, 1/2” drive 0441650 Wrench, Socket, extension bar, 1/2” drive, 12” long 0441649 Socket size 3/4”, 1/2” drive, 6 pt. 0441652 Wrench, Socket, T Handle, 33” long, ¾” socket 0441647 MPCV Relay Programmer 0445902 Transformer Mating Gasket For CM52 Size: 800A – 2000A 0450826 Transformer Mating Gasket For CM52 Size: 2500A – 3500A 0450825 CM52-H-1 – Horizontal Barrier Board for CM52 Size: 800A-1875A 0461714 CM52-V-1 – Vertical Barrier Board for CM52 Size: 800A-1875A 0461715 CM52-H-2 – Horizontal Barrier Board for CM52 Size: 2000A-3000A 0461716 CM52-V-2 – Vertical Barrier Board for CM52 Size: 2000A-3000A 0461718 CM52-V-3 – Vertical Barrier Board for CM52 Size: 3500A 0461719 The above listed wrenches may be available in other lengths by special order. The insulation from the time of original manufacture has been increased at the request of Eversource and stock code revisions will reflect “FI” for “Fully Insulated”. NOTE: The orange surface insulation on these tools has a yellow undercoat. If yellow is detected on the surface due to cuts or punctures, the surface insulation has been compromised and the tool should be retired. Opening the Network Protector Door NOTE: The CM-52 Network Protector is a dead-front, rack in breaker and does not require the removal of fuses under normal maintenance activities. Testing of the CM-52 network protector should be performed with the breaker racked out to provide a visible break. 1. Vent the protector enclosure as follows: o Loosen the enclosure cover bolts on the side opposite from the operating handle in order to vent the protector. 2. Operate the network protector handle while standing to the side of the enclosure or as far away as possible from the front of the enclosure. Leave the handle in the “OPEN” position. 3. Verify that the network protector mechanism is in the open position as follows: o Inspect the network protector position indicator through the network protector enclosure window. o Use a clamp or rope style current transformer (CT) around the conductors of each phase, verify that the current on each phase is zero. (Zero current may indicate that the breaker position is open or the network protector fuses or cable limiters are blown.) o Measure and record the secondary voltages.
  8. Page 183 of 297

    4. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 183 of 297 Loosen all enclosure cover bolts and pull the bolts back all the way and open the enclosure door. NOTE: Be sure the bolts are away from the hinge when opening the door to prevent them from being damaged. Racking Out and Isolating the Protector Reminder: Although it is not shown in some of the following figures, proper PPE must be worn while performing maintenance and testing on all Network Protectors. 1. Remove the levering crank mounted on the inside of the enclosure door. See Figure 1. Levering Crank Figure 1 – The Levering Crank 2. Lift the levering crank access door and insert the end of the levering crank (3/8” square). See Figure 2. NOTE: 480 volt units may have remote racking requiring a different technique. Figure 2 – The Levering Crank Access Door 3. Turn the levering crank counter-clockwise. • The red window on the breaker will move from the Connect position to the Test position. See Figure 3.
  9. Page 184 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 184 of 297 Figure 3 – The Test Position Indicator • 4. The breaker will drop down slightly as it disconnects from the transformer and the network side bus work. • If the springs are charged, they will discharge as the breaker is racked out. • A full yellow position indicates that the breaker is disconnected from the Network and Transformer side bus. Continue to crank until the crank stops. The green window will indicate that the unit is in Disconnect position. See Figure 4. Figure 4 – The Disconnect Indicator 5. 6. Locate the rail handles on each side of the breaker and pull the breaker evenly until it is completely drawn out. Insert the appropriate “Horizontal” barrier board under the breaker as shown in figure 5. NOTE: This step is applicable to CM52 enclosure sizes: 800A1875A and 2000A-3000A. See Network Protector Tool Table.
  10. Page 185 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 185 of 297 Figure 5 Use appropriate sized board. See Network Protector Tool Table Figure 6 – Installing the Horizontal Barrier Board Ensure board is seated flat on the surface and its cutouts fit over the structures Figure 6 – Horizontal Barrier Board Correctly Installed 7. Install the appropriate “Vertical” barrier board behind the breaker as shown in figure 7. The cutouts near the top of the board should rest on the sides of the
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf

As listed on the current system

Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)