Interrogatory responses

Answers to questions 888, 889, 890

Files5

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match
  1. Page 180 of 297

    5. 5.1 6. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 180 of 297 That once the appropriate horizontal and vertical barrier boards are installed, person(s)responsible for performing the “Work” on Network Units as defined in paragraph 5.1 below and those person(s) within the immediate work zone shall at minimum wear the following PPE (Identified in JHA-201303): • Hard Hat • Full body FR clothing where the total FR calorie count must be equal to or greater than 8 calories • Safety Glasses with Side Shields (or Goggles) • Work gloves as needed Work” on Network Units requiring PPE, identified in paragraph 5, includes the following activities: • Lowering or raising equipment and tools. • Maintenance, Testing and Calibration of the breaker (To perform work on the breaker, the breaker has to be racked out to the “Disconnect” position) • Wiring changes outside the energized area Prior to accessing manholes and vaults to investigate, inspect or work on a network unit in a single transformer vault, the maintenance records for that unit will be reviewed for condition of the unit. • If the records indicate that a major maintenance was completed within the maintenance cycle per the Eversource Maintenance Program and the unit has no major deficiencies, work may commence on the network transformer with the unit energized following all applicable company procedures and the protocols. (Applicable only to Connecticut and Western MA) • If the records do not indicate that a major maintenance was completed on the unit within the maintenance cycle per the Eversource Maintenance Program or major deficiencies have not been addressed, then the primary feed to the unit will be deenergized prior to commencement of maintenance work. The maintenance work on the unit will then take place with the unit deenergized, and only the secondary cables will be energized back from the street grid during the work. This will only apply to single transformer vault units. • The deficiencies described below, require the primary circuit to be de-energized in accordance with the operating policy. o Major maintenance not performed within the maintenance cycle required by the Eversource Maintenance Program o Low oil level (below sight glass / gauge level) in primary switch or transformer or dielectric quality of oil below acceptable level o Any other significant defect or abnormal condition that may affect the safe operation of the network protector or transformer, such as, free standing water in the primary switching or transformer oil sample, excessive damage/ corrosion in the network protector or other defect that requires immediate repair to return to service.
  2. Page 181 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 181 of 297 NOTE: The secondaries remain energized to the protector enclosure unless existing deficiencies or conditions require that the secondaries be cut as jointly determined by Management and Field Personnel. 7. That prior to accessing manholes and vaults to investigate, inspect or work on network units where multiple network units exist in a vault, the maintenance records will be reviewed for condition of the units, major deficiencies and/or major maintenance completion within the maintenance cycle per the Eversource Maintenance Program. • If records indicate that major maintenance for all network units within the vault is up-to-date, and that there are no major deficiencies, then work may proceed. • If major deficiencies exist or major maintenance was not completed, management will jointly work with Field Personnel for the appropriate steps to follow. • If any units within the vault have deficiencies, the primaries for the unit being worked on must be de-energized. NOTE: For cases where multiple network units exist in a vault, it will generally not be possible to de-energize multiple units for a variety of reasons. Further actions will be determined jointly by Management and Field Personnel. 8. 9. 10. 11. 12. 13. That with the exception of the commissioning of a new network unit, 480V/277V network units shall have major maintenance completed with the primary de-energized. 216V/125V network units may be worked on with the primary energized as long as no oil work (i.e. oil sampling, topping off and/or retro- filling) is being performed. • Network major maintenance that includes any oil work (i.e. primary equipment oil sampling, topping off or the like) shall only be completed with the primary equipment de-energized That primaries are de-energized and grounded at every network transformer and/or protector whenever installing or replacing a network transformer or protector. That Job Setup is performed. This may include working with local authorities to establish Work zones, determining requirements for various jobs, and switching requirements. All arrangements should be completed and set up prior to beginning the job, which include cones, signage, and police or traffic control. Check holes prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis. Review of the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. That person(s) responsible for performing the “Work” have primer, paint, and any additional material needed for cleaning and preservation of the exterior of the network protector prior to departing the work center That person(s) responsible for performing the “Work”, prepare the vault for entry. • Check for dangerous atmospheric conditions before entering the vault using company-approved atmospheric sampling equipment. • Ventilate the vault, if required, in accordance with the Eversource Employee Safety Manual. • Remove substantial water or debris from the vault in accordance with
  3. Page 182 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 182 of 297 ENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. Network Protector Tools The following fully insulated tools are available and may be useful for Network Protector Service: Tool Description NU Stock Code Wrench, Torque, 1/2” drive 0441650 Wrench, Socket, extension bar, 1/2” drive, 12” long 0441649 Socket size 3/4”, 1/2” drive, 6 pt. 0441652 Wrench, Socket, T Handle, 33” long, ¾” socket 0441647 MPCV Relay Programmer 0445902 Transformer Mating Gasket For CM52 Size: 800A – 2000A 0450826 Transformer Mating Gasket For CM52 Size: 2500A – 3500A 0450825 CM52-H-1 – Horizontal Barrier Board for CM52 Size: 800A-1875A 0461714 CM52-V-1 – Vertical Barrier Board for CM52 Size: 800A-1875A 0461715 CM52-H-2 – Horizontal Barrier Board for CM52 Size: 2000A-3000A 0461716 CM52-V-2 – Vertical Barrier Board for CM52 Size: 2000A-3000A 0461718 CM52-V-3 – Vertical Barrier Board for CM52 Size: 3500A 0461719 The above listed wrenches may be available in other lengths by special order. The insulation from the time of original manufacture has been increased at the request of Eversource and stock code revisions will reflect “FI” for “Fully Insulated”. NOTE: The orange surface insulation on these tools has a yellow undercoat. If yellow is detected on the surface due to cuts or punctures, the surface insulation has been compromised and the tool should be retired. Opening the Network Protector Door NOTE: The CM-52 Network Protector is a dead-front, rack in breaker and does not require the removal of fuses under normal maintenance activities. Testing of the CM-52 network protector should be performed with the breaker racked out to provide a visible break. 1. Vent the protector enclosure as follows: o Loosen the enclosure cover bolts on the side opposite from the operating handle in order to vent the protector. 2. Operate the network protector handle while standing to the side of the enclosure or as far away as possible from the front of the enclosure. Leave the handle in the “OPEN” position. 3. Verify that the network protector mechanism is in the open position as follows: o Inspect the network protector position indicator through the network protector enclosure window. o Use a clamp or rope style current transformer (CT) around the conductors of each phase, verify that the current on each phase is zero. (Zero current may indicate that the breaker position is open or the network protector fuses or cable limiters are blown.) o Measure and record the secondary voltages.
  4. Page 183 of 297

    4. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 183 of 297 Loosen all enclosure cover bolts and pull the bolts back all the way and open the enclosure door. NOTE: Be sure the bolts are away from the hinge when opening the door to prevent them from being damaged. Racking Out and Isolating the Protector Reminder: Although it is not shown in some of the following figures, proper PPE must be worn while performing maintenance and testing on all Network Protectors. 1. Remove the levering crank mounted on the inside of the enclosure door. See Figure 1. Levering Crank Figure 1 – The Levering Crank 2. Lift the levering crank access door and insert the end of the levering crank (3/8” square). See Figure 2. NOTE: 480 volt units may have remote racking requiring a different technique. Figure 2 – The Levering Crank Access Door 3. Turn the levering crank counter-clockwise. • The red window on the breaker will move from the Connect position to the Test position. See Figure 3.
  5. Page 184 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 184 of 297 Figure 3 – The Test Position Indicator • 4. The breaker will drop down slightly as it disconnects from the transformer and the network side bus work. • If the springs are charged, they will discharge as the breaker is racked out. • A full yellow position indicates that the breaker is disconnected from the Network and Transformer side bus. Continue to crank until the crank stops. The green window will indicate that the unit is in Disconnect position. See Figure 4. Figure 4 – The Disconnect Indicator 5. 6. Locate the rail handles on each side of the breaker and pull the breaker evenly until it is completely drawn out. Insert the appropriate “Horizontal” barrier board under the breaker as shown in figure 5. NOTE: This step is applicable to CM52 enclosure sizes: 800A1875A and 2000A-3000A. See Network Protector Tool Table.
  6. Page 185 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 185 of 297 Figure 5 Use appropriate sized board. See Network Protector Tool Table Figure 6 – Installing the Horizontal Barrier Board Ensure board is seated flat on the surface and its cutouts fit over the structures Figure 6 – Horizontal Barrier Board Correctly Installed 7. Install the appropriate “Vertical” barrier board behind the breaker as shown in figure 7. The cutouts near the top of the board should rest on the sides of the
  7. Page 186 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 186 of 297 enclosure frame, just behind the breaker. NOTE: This step applies to all CM52 enclosure sizes. See Network Protector Tool Table. Figure 7 Figure 7 – Installing the Vertical Barrier Board
  8. Page 187 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 187 of 297 Figure 8 – Vertical Barrier Board Correctly Installed 8. Insert the 10mm socket on the crank and remove the front cover bolts. See Figure 9. Figure 9 – Removing the Front Cover Bolts
  9. Page 188 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 188 of 297 Caution: To prevent the protector from tipping forward, place your hand on the center arc chute to steady breaker mechanism. 9. Pull down slightly on the charge handle and remove the cover. Inspection of Arc Chutes and Contacts 10. Remove the arc chutes and inspect them to ensure the vents are free and clear. See Figure 10. Figure 10 – The Arc Chutes Caution: To prevent the protector from tipping forward, place your hand on the center arc chute to steady breaker mechanism. 11. Manually charge the breaker with the charge handle. See Figure 11. Operating the Charge Handle Figure 11 – Charging the Breaker • The flag will indicate “Charged” after the closing spring is compressed. Press here to keep the protector from tipping forward
  10. Page 189 of 297

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 189 of 297 12. Push the button labeled “CLOSE” to close the breaker. See Figure 12. Note: If there is a plastic shield which covers the close button, carefully remove the hinged cover and remove and discard the plastic shield and reinstall the hinged covers. Figure 12 – The “CLOSE” Button 13. Check for contact wear. Side-by-side ledge acts as a contact wear indicator. Check the wear indicator by looking straight down into the arc chamber. See Figure 13. • If the ledge is covered by the back edge of the moving contacts, the contacts are in good condition. • If the ledge is not completely covered by the back edge of the moving contacts, replace the contacts. Ledging acting as wear indicator Back edge of the moving contacts (must extend over the edge) Figure 13 – Checking for Contact Wear NOTE: There are no adjustments needed for contact pressure or lubrication required. Do not wipe away or add any grease or lubricant.
Words on different pages

Text of OCC-890_Final.pdf

Extracted from the file · 1 page · 553 characters

Words on different pagesRead the text of OCC-890_Final.pdf