Interrogatory responses
Answers to questions 888, 889, 890
Files5
OCC-888_Final.pdf
PDF · 101 KB · 1 pageText searchable
Download OCC-888_Final.pdfRead the text of OCC-888_Final.pdf
OCC-888 Attachment 1.pdf
PDF · 1.0 MB · 1 pageText searchable
Download OCC-888 Attachment 1.pdfRead the text of OCC-888 Attachment 1.pdf
OCC-888 Attachment 2.pdf
PDF · 8.4 MB · 297 pagesText searchable
Download OCC-888 Attachment 2.pdfRead the text of OCC-888 Attachment 2.pdf
OCC-889_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-889_Final.pdfRead the text of OCC-889_Final.pdf
OCC-890_Final.pdf
PDF · 74 KB · 1 pageText searchable
Download OCC-890_Final.pdfRead the text of OCC-890_Final.pdf
Page 181 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 181 of 297 NOTE: The secondaries remain energized to the protector enclosure unless existing deficiencies or conditions require that the secondaries be cut as jointly determined by Management and Field Personnel. 7. That prior to accessing manholes and vaults to investigate, inspect or work on network units where multiple network units exist in a vault, the maintenance records will be reviewed for condition of the units, major deficiencies and/or major maintenance completion within the maintenance cycle per the Eversource Maintenance Program. • If records indicate that major maintenance for all network units within the vault is up-to-date, and that there are no major deficiencies, then work may proceed. • If major deficiencies exist or major maintenance was not completed, management will jointly work with Field Personnel for the appropriate steps to follow. • If any units within the vault have deficiencies, the primaries for the unit being worked on must be de-energized. NOTE: For cases where multiple network units exist in a vault, it will generally not be possible to de-energize multiple units for a variety of reasons. Further actions will be determined jointly by Management and Field Personnel. 8. 9. 10. 11. 12. 13. That with the exception of the commissioning of a new network unit, 480V/277V network units shall have major maintenance completed with the primary de-energized. 216V/125V network units may be worked on with the primary energized as long as no oil work (i.e. oil sampling, topping off and/or retro- filling) is being performed. • Network major maintenance that includes any oil work (i.e. primary equipment oil sampling, topping off or the like) shall only be completed with the primary equipment de-energized That primaries are de-energized and grounded at every network transformer and/or protector whenever installing or replacing a network transformer or protector. That Job Setup is performed. This may include working with local authorities to establish Work zones, determining requirements for various jobs, and switching requirements. All arrangements should be completed and set up prior to beginning the job, which include cones, signage, and police or traffic control. Check holes prior to entry for cleaning needs, i.e. pumping water, debris, contaminates, visible oil, and providing samples for lab analysis. Review of the manufacturer’s manuals for all safety notations (Danger, Warnings, and Cautions), as needed. These may be in sections of the manual other than with the instructions. That person(s) responsible for performing the “Work” have primer, paint, and any additional material needed for cleaning and preservation of the exterior of the network protector prior to departing the work center That person(s) responsible for performing the “Work”, prepare the vault for entry. • Check for dangerous atmospheric conditions before entering the vault using company-approved atmospheric sampling equipment. • Ventilate the vault, if required, in accordance with the Eversource Employee Safety Manual. • Remove substantial water or debris from the vault in accordance withPage 182 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 182 of 297 ENVIROWI-0105 or company-specific requirements, as required. This is located in the Environmental and Facility Procedures section of the Distribution Engineering Standards Bookshelf. Network Protector Tools The following fully insulated tools are available and may be useful for Network Protector Service: Tool Description NU Stock Code Wrench, Torque, 1/2” drive 0441650 Wrench, Socket, extension bar, 1/2” drive, 12” long 0441649 Socket size 3/4”, 1/2” drive, 6 pt. 0441652 Wrench, Socket, T Handle, 33” long, ¾” socket 0441647 MPCV Relay Programmer 0445902 Transformer Mating Gasket For CM52 Size: 800A – 2000A 0450826 Transformer Mating Gasket For CM52 Size: 2500A – 3500A 0450825 CM52-H-1 – Horizontal Barrier Board for CM52 Size: 800A-1875A 0461714 CM52-V-1 – Vertical Barrier Board for CM52 Size: 800A-1875A 0461715 CM52-H-2 – Horizontal Barrier Board for CM52 Size: 2000A-3000A 0461716 CM52-V-2 – Vertical Barrier Board for CM52 Size: 2000A-3000A 0461718 CM52-V-3 – Vertical Barrier Board for CM52 Size: 3500A 0461719 The above listed wrenches may be available in other lengths by special order. The insulation from the time of original manufacture has been increased at the request of Eversource and stock code revisions will reflect “FI” for “Fully Insulated”. NOTE: The orange surface insulation on these tools has a yellow undercoat. If yellow is detected on the surface due to cuts or punctures, the surface insulation has been compromised and the tool should be retired. Opening the Network Protector Door NOTE: The CM-52 Network Protector is a dead-front, rack in breaker and does not require the removal of fuses under normal maintenance activities. Testing of the CM-52 network protector should be performed with the breaker racked out to provide a visible break. 1. Vent the protector enclosure as follows: o Loosen the enclosure cover bolts on the side opposite from the operating handle in order to vent the protector. 2. Operate the network protector handle while standing to the side of the enclosure or as far away as possible from the front of the enclosure. Leave the handle in the “OPEN” position. 3. Verify that the network protector mechanism is in the open position as follows: o Inspect the network protector position indicator through the network protector enclosure window. o Use a clamp or rope style current transformer (CT) around the conductors of each phase, verify that the current on each phase is zero. (Zero current may indicate that the breaker position is open or the network protector fuses or cable limiters are blown.) o Measure and record the secondary voltages.Page 183 of 297
4. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 183 of 297 Loosen all enclosure cover bolts and pull the bolts back all the way and open the enclosure door. NOTE: Be sure the bolts are away from the hinge when opening the door to prevent them from being damaged. Racking Out and Isolating the Protector Reminder: Although it is not shown in some of the following figures, proper PPE must be worn while performing maintenance and testing on all Network Protectors. 1. Remove the levering crank mounted on the inside of the enclosure door. See Figure 1. Levering Crank Figure 1 – The Levering Crank 2. Lift the levering crank access door and insert the end of the levering crank (3/8” square). See Figure 2. NOTE: 480 volt units may have remote racking requiring a different technique. Figure 2 – The Levering Crank Access Door 3. Turn the levering crank counter-clockwise. • The red window on the breaker will move from the Connect position to the Test position. See Figure 3.Page 184 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 184 of 297 Figure 3 – The Test Position Indicator • 4. The breaker will drop down slightly as it disconnects from the transformer and the network side bus work. • If the springs are charged, they will discharge as the breaker is racked out. • A full yellow position indicates that the breaker is disconnected from the Network and Transformer side bus. Continue to crank until the crank stops. The green window will indicate that the unit is in Disconnect position. See Figure 4. Figure 4 – The Disconnect Indicator 5. 6. Locate the rail handles on each side of the breaker and pull the breaker evenly until it is completely drawn out. Insert the appropriate “Horizontal” barrier board under the breaker as shown in figure 5. NOTE: This step is applicable to CM52 enclosure sizes: 800A1875A and 2000A-3000A. See Network Protector Tool Table.Page 185 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 185 of 297 Figure 5 Use appropriate sized board. See Network Protector Tool Table Figure 6 – Installing the Horizontal Barrier Board Ensure board is seated flat on the surface and its cutouts fit over the structures Figure 6 – Horizontal Barrier Board Correctly Installed 7. Install the appropriate “Vertical” barrier board behind the breaker as shown in figure 7. The cutouts near the top of the board should rest on the sides of thePage 186 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 186 of 297 enclosure frame, just behind the breaker. NOTE: This step applies to all CM52 enclosure sizes. See Network Protector Tool Table. Figure 7 Figure 7 – Installing the Vertical Barrier BoardPage 187 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 187 of 297 Figure 8 – Vertical Barrier Board Correctly Installed 8. Insert the 10mm socket on the crank and remove the front cover bolts. See Figure 9. Figure 9 – Removing the Front Cover BoltsPage 188 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 188 of 297 Caution: To prevent the protector from tipping forward, place your hand on the center arc chute to steady breaker mechanism. 9. Pull down slightly on the charge handle and remove the cover. Inspection of Arc Chutes and Contacts 10. Remove the arc chutes and inspect them to ensure the vents are free and clear. See Figure 10. Figure 10 – The Arc Chutes Caution: To prevent the protector from tipping forward, place your hand on the center arc chute to steady breaker mechanism. 11. Manually charge the breaker with the charge handle. See Figure 11. Operating the Charge Handle Figure 11 – Charging the Breaker • The flag will indicate “Charged” after the closing spring is compressed. Press here to keep the protector from tipping forwardPage 189 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 189 of 297 12. Push the button labeled “CLOSE” to close the breaker. See Figure 12. Note: If there is a plastic shield which covers the close button, carefully remove the hinged cover and remove and discard the plastic shield and reinstall the hinged covers. Figure 12 – The “CLOSE” Button 13. Check for contact wear. Side-by-side ledge acts as a contact wear indicator. Check the wear indicator by looking straight down into the arc chamber. See Figure 13. • If the ledge is covered by the back edge of the moving contacts, the contacts are in good condition. • If the ledge is not completely covered by the back edge of the moving contacts, replace the contacts. Ledging acting as wear indicator Back edge of the moving contacts (must extend over the edge) Figure 13 – Checking for Contact Wear NOTE: There are no adjustments needed for contact pressure or lubrication required. Do not wipe away or add any grease or lubricant.Page 190 of 297
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 28, 2026 OCC- 888 Attachment 2 Page 190 of 297 14. 15. Push the button labeled “OPEN” to open the breaker. Dress the arc contacts if there is black carbon residue from arcing, using only Scotch Brite. Do not use a file on the contacts. Internal Visual Inspection: 1. 2. 3. 4. Record the counter reading. Check for any signs of liquid entry into enclosure, transformer throat, etc. Check for indication of overheating. Inspect the condition of the wiring. Look for frayed or damaged wires. Test Sequence: The next section is a series of tests defined to ensure proper operation at normal condition and at fault duty. It is important to perform the following tests in this order: 1. Manual Breaker Operation Test 2. Relay Testing 3. Ground Fault Test (480V Unit Only) (Account Executive to coordinate with Customer contact) Test 1 – Manual Breaker Operation Test Caution: To prevent the protector from tipping forward, place your hand on the center arc chute to steady breaker mechanism. 1. 2. 3. Operate the breaker manually while it is on rails by charging the breaker using the charging handle. Once charged, press the CLOSE button. rip the breaker by pressing the TRIP button. Repeat these steps 5 times. Relay Testing - Please see the following Relay Test Section for testing procedure. Preparation for Tests 2 through 4 Caution: Test for zero voltage on the potential studs on the test switch as follows: 1. Use a Multi-meter to check for voltage on the stud positions labeled: See Figure 11. • N1, N2, N3 (See Figure 11.) • T1, T2, T3 (See Figure 11.)
Text of OCC-890_Final.pdf
Extracted from the file · 1 page · 553 characters
As listed on the current system
Question(s) Answered 888, 889, 890 (The Connecticut Light and Power Company) Date Filed: 10/09/2026